|
|
PREPARING ROW
|
STA
|
873.000
|
$175.000
|
$100.000
|
$20.000
|
$48.960
|
$170.000
|
$15.000
|
|
|
PREP ROW (TREE REMOVE) (0"-12" DIA)
|
EA
|
24.000
|
$1,000.000
|
$862.980
|
$790.000
|
$839.500
|
$730.000
|
$625.000
|
|
|
PREP ROW (TREE REMOVE) (12"-24" DIA)
|
EA
|
27.000
|
$1,600.000
|
$1,725.960
|
$1,000.000
|
$1,092.500
|
$950.000
|
$1,325.000
|
|
|
PREP ROW (TREE REMOVE) (24"-36" DIA)
|
EA
|
18.000
|
$2,200.000
|
$2,588.940
|
$1,800.000
|
$1,863.000
|
$1,620.000
|
$2,500.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
15.000
|
$80.000
|
$185.050
|
$86.500
|
$34.500
|
$136.050
|
$205.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
2,172.000
|
$35.000
|
$33.290
|
$23.000
|
$39.240
|
$34.120
|
$54.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
154.000
|
$50.000
|
$81.920
|
$43.000
|
$29.800
|
$25.910
|
$124.000
|
|
|
REMOV CONC (CURB & GUTTER)
|
LF
|
3,552.000
|
$13.000
|
$39.060
|
$14.500
|
$12.910
|
$11.230
|
$16.250
|
|
|
RMV (8") TRT/UNTRT BASE & ASPH PAV
|
SY
|
1,118.000
|
$30.000
|
$29.610
|
$21.500
|
$46.540
|
$16.180
|
$26.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
3,375.000
|
$24.000
|
$15.900
|
$40.500
|
$31.050
|
$55.000
|
$60.000
|
|
|
SUBGR WIDEN (DC)
|
STA
|
36.000
|
$1,900.000
|
$637.470
|
$2,200.000
|
$1,641.660
|
$900.000
|
$550.000
|
|
|
EMBANK (FNL)(OC)(TY B)
|
CY
|
213.000
|
$55.000
|
$45.580
|
$40.500
|
$72.860
|
$52.000
|
$61.500
|
|
|
BACKFILL (TY A)
|
STA
|
873.000
|
$240.000
|
$83.130
|
$425.000
|
$205.700
|
$367.000
|
$615.000
|
|
|
BLADING
|
STA
|
36.000
|
$550.000
|
$293.810
|
$185.000
|
$253.420
|
$255.000
|
$650.000
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
AC
|
40.000
|
$800.000
|
$689.190
|
$590.000
|
$626.750
|
$601.080
|
$610.000
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
AC
|
40.000
|
$650.000
|
$509.400
|
$430.000
|
$460.000
|
$461.080
|
$445.000
|
|
|
HYDRO MULCH SEED (PERM_URBAN_CLAY)
|
AC
|
4.000
|
$2,500.000
|
$2,397.170
|
$2,200.000
|
$2,300.000
|
$3,850.000
|
$2,230.000
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_LONG_ROLL)
|
SY
|
3,191.000
|
$6.000
|
$2.400
|
$2.150
|
$2.300
|
$5.000
|
$2.250
|
|
|
FL BS(CMP IN PLC)(TY A,B OR D GR4)(6")
|
SY
|
8,462.000
|
$25.000
|
$19.100
|
$30.000
|
$30.090
|
$31.000
|
$30.000
|
|
|
REWORK BS MTL (TY B)(16")(DENS CONT)
|
SY
|
3,966.000
|
$30.000
|
$21.990
|
$35.500
|
$31.740
|
$32.000
|
$30.000
|
|
|
LIME (QUICKLIME (DRY))
|
TON
|
93.000
|
$360.000
|
$499.090
|
$590.000
|
$512.140
|
$445.000
|
$610.000
|
|
|
LIME TRT (EXIST MATL)(8")
|
SY
|
8,462.000
|
$6.000
|
$4.870
|
$14.000
|
$8.210
|
$6.500
|
$12.900
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,116.000
|
$7.000
|
$6.150
|
$5.750
|
$5.280
|
$5.000
|
$5.300
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
48,795.000
|
$5.000
|
$2.070
|
$1.850
|
$3.950
|
$5.250
|
$5.050
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
28,797.000
|
$4.250
|
$2.550
|
$4.600
|
$13.510
|
$4.250
|
$4.750
|
|
|
ASPH (CRS-2)
|
GAL
|
119,508.000
|
$4.400
|
$4.820
|
$3.550
|
$5.750
|
$4.000
|
$3.500
|
|
|
AGGR (TY-A, GR-4)(SAC-A)
|
CY
|
2,417.000
|
$265.000
|
$199.220
|
$195.000
|
$178.250
|
$295.000
|
$150.000
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
79,361.000
|
$172.000
|
$156.290
|
$175.200
|
$167.220
|
$193.500
|
$180.000
|
|
|
TACK COAT
|
GAL
|
118,558.000
|
$6.500
|
$5.870
|
$7.500
|
$6.760
|
$6.250
|
$6.350
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
|
SY
|
4,237.000
|
$30.000
|
$24.000
|
$50.000
|
$25.940
|
$40.000
|
$46.350
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
11,517.000
|
$3.000
|
$2.520
|
$5.400
|
$3.110
|
$3.550
|
$5.100
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
23,501.000
|
$3.500
|
$2.910
|
$5.750
|
$3.300
|
$3.000
|
$5.750
|
|
|
PLANE ASPH CONC PAV(1")
|
SY
|
159.000
|
$15.000
|
$16.800
|
$59.500
|
$39.720
|
$15.000
|
$61.700
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
3,532.000
|
$15.000
|
$4.410
|
$11.500
|
$5.420
|
$5.000
|
$9.500
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
881.000
|
$300.000
|
$316.380
|
$215.000
|
$217.520
|
$125.000
|
$123.250
|
|
|
FLOWABLE BACKFILL
|
CY
|
15.000
|
$400.000
|
$419.500
|
$380.000
|
$402.500
|
$350.000
|
$730.000
|
|
|
CL B CONC (FLUME)
|
CY
|
8.000
|
$850.000
|
$1,078.730
|
$1,100.000
|
$1,035.000
|
$842.230
|
$1,040.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
112.000
|
$1,050.000
|
$359.580
|
$250.000
|
$345.000
|
$300.000
|
$2,025.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
94.000
|
$825.000
|
$1,070.000
|
$735.000
|
$891.250
|
$842.230
|
$725.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
28.000
|
$800.000
|
$1,070.000
|
$670.000
|
$891.250
|
$842.230
|
$660.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
128.000
|
$800.000
|
$1,029.090
|
$710.000
|
$891.250
|
$842.230
|
$895.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
65.000
|
$350.000
|
$479.430
|
$380.000
|
$402.500
|
$290.110
|
$385.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
32.000
|
$100.000
|
$107.870
|
$97.000
|
$103.500
|
$90.000
|
$145.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
184.000
|
$100.000
|
$131.840
|
$120.000
|
$126.500
|
$110.000
|
$205.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
73.000
|
$650.000
|
$419.500
|
$380.000
|
$402.500
|
$350.000
|
$735.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
24.000
|
$850.000
|
$839.010
|
$755.000
|
$805.000
|
$700.000
|
$1,000.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
459.000
|
$575.000
|
$419.500
|
$380.000
|
$402.500
|
$350.000
|
$325.000
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
276.000
|
$800.000
|
$623.260
|
$560.000
|
$598.000
|
$520.000
|
$470.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
4.000
|
$125.000
|
$107.870
|
$97.000
|
$103.500
|
$90.000
|
$385.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
336.000
|
$160.000
|
$119.860
|
$110.000
|
$115.000
|
$100.000
|
$240.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
96.000
|
$525.000
|
$317.620
|
$285.000
|
$304.750
|
$265.000
|
$275.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 3)
|
LF
|
240.000
|
$585.000
|
$359.580
|
$325.000
|
$345.000
|
$300.000
|
$325.000
|
|
|
SET (TY I)(S= 3 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
8.000
|
$7,700.000
|
$8,390.090
|
$7,600.000
|
$8,050.000
|
$7,000.000
|
$14,500.000
|
|
|
SET (TY I)(S= 3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
2.000
|
$8,500.000
|
$16,780.190
|
$15,000.000
|
$16,100.000
|
$14,000.000
|
$16,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
16.000
|
$10,000.000
|
$9,888.320
|
$8,900.000
|
$9,487.500
|
$8,250.000
|
$16,300.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
1.000
|
$10,800.000
|
$17,379.480
|
$15,500.000
|
$16,675.000
|
$14,500.000
|
$15,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1)(C)
|
EA
|
1.000
|
$15,000.000
|
$21,095.090
|
$19,000.000
|
$20,240.000
|
$17,600.000
|
$16,600.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1)(C)
|
EA
|
2.000
|
$15,000.000
|
$10,187.970
|
$9,200.000
|
$9,775.000
|
$8,500.000
|
$15,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
2.000
|
$16,000.000
|
$13,783.730
|
$12,500.000
|
$13,225.000
|
$11,500.000
|
$16,600.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
4.000
|
$16,000.000
|
$13,783.730
|
$12,500.000
|
$13,225.000
|
$11,500.000
|
$16,700.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
8.000
|
$2,100.000
|
$1,558.160
|
$1,400.000
|
$1,495.000
|
$1,300.000
|
$4,100.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$2,100.000
|
$1,737.950
|
$1,600.000
|
$1,667.500
|
$1,450.000
|
$4,100.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (C)
|
EA
|
1.000
|
$2,600.000
|
$1,678.020
|
$1,500.000
|
$1,610.000
|
$1,400.000
|
$4,100.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
88.000
|
$2,600.000
|
$1,797.880
|
$1,600.000
|
$1,725.000
|
$1,500.000
|
$4,450.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$2,000.000
|
$1,977.660
|
$1,800.000
|
$1,897.500
|
$1,650.000
|
$4,400.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$3,600.000
|
$3,595.750
|
$3,200.000
|
$3,450.000
|
$3,000.000
|
$4,200.000
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (C)
|
EA
|
8.000
|
$5,000.000
|
$4,195.050
|
$3,800.000
|
$4,025.000
|
$3,500.000
|
$4,350.000
|
|
|
GRATE & FRAME
|
EA
|
14.000
|
$3,600.000
|
$2,996.460
|
$4,300.000
|
$3,044.050
|
$2,647.010
|
$5,000.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
19.000
|
$5,000.000
|
$4,340.140
|
$2,800.000
|
$966.000
|
$840.000
|
$6,000.000
|
|
|
ADJUSTING MANHOLES (UTILITY BOX)
|
EA
|
13.000
|
$5,000.000
|
$4,210.740
|
$2,800.000
|
$705.930
|
$613.850
|
$2,000.000
|
|
|
REMOV STR (SET)
|
EA
|
9.000
|
$1,500.000
|
$1,368.920
|
$810.000
|
$862.500
|
$750.000
|
$1,450.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
20.000
|
$1,700.000
|
$1,238.110
|
$810.000
|
$862.500
|
$750.000
|
$2,150.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,812.000
|
$45.000
|
$24.970
|
$21.500
|
$23.000
|
$20.000
|
$75.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
58.000
|
$225.000
|
$134.520
|
$110.000
|
$115.000
|
$100.000
|
$250.000
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
6.000
|
$1,500.000
|
$1,227.040
|
$430.000
|
$158.130
|
$100.000
|
$565.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,600,000.000
|
$2,766,004.710
|
$2,800,000.000
|
$2,392,806.120
|
$3,034,000.000
|
$3,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$38,000.000
|
$80,000.000
|
$60,000.000
|
$35,040.460
|
$25,000.000
|
$100,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$23,794.970
|
$20,000.000
|
$20,244.680
|
$20,000.000
|
$60,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
240.000
|
$330.000
|
$563.810
|
$270.000
|
$497.810
|
$300.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
440.000
|
$105.000
|
$107.410
|
$110.000
|
$113.400
|
$85.000
|
$115.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
3,930.000
|
$6.000
|
$3.540
|
$3.200
|
$3.390
|
$5.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,930.000
|
$2.000
|
$1.200
|
$1.100
|
$1.150
|
$1.000
|
$4.500
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
1,664.000
|
$135.000
|
$209.110
|
$180.000
|
$402.500
|
$159.000
|
$175.000
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
2,223.000
|
$180.000
|
$124.740
|
$99.500
|
$184.870
|
$160.760
|
$100.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
24.000
|
$70.000
|
$122.270
|
$115.000
|
$76.620
|
$66.630
|
$110.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
25.000
|
$75.000
|
$54.360
|
$45.500
|
$76.620
|
$66.630
|
$45.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,370.000
|
$50.000
|
$60.000
|
$50.500
|
$67.050
|
$58.300
|
$50.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
4,008.000
|
$130.000
|
$164.290
|
$135.000
|
$157.010
|
$136.530
|
$145.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
350.000
|
$82.000
|
$114.640
|
$135.000
|
$176.170
|
$90.920
|
$85.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
5,580.000
|
$104.000
|
$109.980
|
$86.000
|
$117.690
|
$102.340
|
$93.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
11.000
|
$150.000
|
$226.280
|
$195.000
|
$167.570
|
$145.710
|
$195.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
14.000
|
$150.000
|
$211.030
|
$180.000
|
$167.570
|
$145.710
|
$180.000
|
|
|
CURB RAMPS (TY 5)
|
SY
|
35.000
|
$150.000
|
$285.610
|
$250.000
|
$167.570
|
$145.710
|
$250.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
581.000
|
$150.000
|
$202.640
|
$175.000
|
$167.570
|
$145.710
|
$170.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
60.000
|
$150.000
|
$226.280
|
$195.000
|
$167.570
|
$145.710
|
$200.000
|
|
|
CONCRETE SIDEWALK (RETAINING WALL)
|
CY
|
142.000
|
$1,400.000
|
$749.320
|
$690.000
|
$1,169.440
|
$1,016.900
|
$845.000
|
|
|
FIXED BOLLARD
|
EA
|
2.000
|
$1,000.000
|
$1,648.050
|
$1,700.000
|
$1,581.250
|
$1,375.000
|
$2,500.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
151,791.000
|
$0.400
|
$0.070
|
$0.080
|
$0.070
|
$0.060
|
$0.350
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
75,895.000
|
$0.600
|
$0.060
|
$0.070
|
$0.060
|
$0.050
|
$0.350
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
400.000
|
$36.000
|
$39.550
|
$35.500
|
$37.950
|
$34.000
|
$37.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
16.000
|
$1,800.000
|
$3,356.040
|
$3,000.000
|
$3,220.000
|
$2,500.000
|
$3,125.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,200.000
|
$7.000
|
$2.400
|
$2.150
|
$2.300
|
$4.000
|
$2.250
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$3,400.000
|
$4,135.120
|
$3,500.000
|
$3,737.500
|
$3,400.000
|
$3,625.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
16.000
|
$900.000
|
$239.720
|
$215.000
|
$230.000
|
$500.000
|
$55.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$800.000
|
$425.500
|
$460.000
|
$408.250
|
$426.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
65.000
|
$980.000
|
$989.790
|
$760.000
|
$949.670
|
$702.000
|
$925.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
81.000
|
$1,100.000
|
$1,165.020
|
$935.000
|
$1,117.800
|
$865.000
|
$1,085.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,200.000
|
$1,470.240
|
$1,200.000
|
$1,410.650
|
$1,110.000
|
$1,370.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
148.000
|
$200.000
|
$119.860
|
$160.000
|
$115.000
|
$100.000
|
$115.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
110.000
|
$155.000
|
$176.790
|
$130.000
|
$169.630
|
$122.000
|
$165.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
24.000
|
$26.000
|
$53.940
|
$48.500
|
$51.750
|
$46.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
48.000
|
$45.000
|
$53.940
|
$48.500
|
$51.750
|
$46.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
203.000
|
$155.000
|
$182.780
|
$130.000
|
$175.380
|
$122.000
|
$170.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
115.000
|
$35.000
|
$17.980
|
$43.000
|
$17.250
|
$25.000
|
$17.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
172,893.000
|
$0.450
|
$0.260
|
$0.240
|
$0.860
|
$0.230
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
1,003.000
|
$0.700
|
$0.600
|
$0.540
|
$0.580
|
$0.530
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
902.000
|
$10.000
|
$7.190
|
$6.500
|
$6.900
|
$6.350
|
$6.700
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
24,116.000
|
$0.500
|
$0.300
|
$0.270
|
$1.150
|
$0.260
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
32,641.000
|
$0.450
|
$0.300
|
$0.270
|
$1.150
|
$0.260
|
$0.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
986.000
|
$2.000
|
$2.400
|
$1.650
|
$2.810
|
$0.530
|
$1.700
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
18,263.000
|
$2.000
|
$2.400
|
$1.650
|
$2.980
|
$0.530
|
$1.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,103.000
|
$1.400
|
$1.200
|
$1.100
|
$1.150
|
$1.060
|
$1.150
|
|
TY I HIGH PERF PM (W)6"(SLD)(090MIL)
|
LF
|
172,893.000
|
$0.800
|
$0.820
|
$0.730
|
$0.780
|
$0.720
|
$0.750
|
|
TY I HIGH PERF PM (Y)6"(BRK)(090MIL)
|
LF
|
24,116.000
|
$0.850
|
$0.840
|
$0.760
|
$0.810
|
$0.740
|
$0.800
|
|
TY I HIGH PERF PM (Y)6"(SLD)(090MIL)
|
LF
|
32,641.000
|
$0.800
|
$0.840
|
$0.760
|
$0.810
|
$0.740
|
$0.800
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
1,430.000
|
$25.000
|
$17.380
|
$15.500
|
$16.680
|
$15.350
|
$16.200
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
6.000
|
$350.000
|
$299.650
|
$270.000
|
$287.500
|
$264.650
|
$280.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
6.000
|
$350.000
|
$449.470
|
$405.000
|
$431.250
|
$396.970
|
$420.000
|
|
|
COLD-IN-PLACE RECYCLE (4")
|
SY
|
239,971.000
|
$9.000
|
$8.570
|
$6.450
|
$9.200
|
$6.500
|
$8.350
|
|
|
EMUL ASPH (CSS-1H)
|
GAL
|
251,969.000
|
$4.250
|
$5.090
|
$4.600
|
$4.030
|
$4.250
|
$4.750
|
|
|
LIME (COMMERCIAL OR QUICKLINE)(SLURRY)
|
TON
|
529.000
|
$400.000
|
$628.640
|
$530.000
|
$920.000
|
$489.000
|
$550.000
|
|
|
RECYCLED MATERIAL PATCHING
|
TON
|
360.000
|
$300.000
|
$441.700
|
$325.000
|
$143.750
|
$282.000
|
$225.000
|
|
|
REC REFL PAV MRKR TY II-A-A
|
EA
|
3,074.000
|
$30.000
|
$47.940
|
$43.000
|
$46.000
|
$42.340
|
$44.650
|
|
|
REC REFL PAV MRKR TY II-C-C
|
EA
|
25.000
|
$30.000
|
$89.890
|
$81.000
|
$86.250
|
$79.390
|
$83.700
|
|
Totals: |
$30,107,140.000
|
$28,843,111.110
|
$29,190,032.720
|
$29,910,076.560
|
$30,483,867.340
|
$32,438,431.550
|