Show Job Controls
Bid Cobra

OCHILTREE SH 15 (0355-03-034)

Items: 134

County: OCHILTREE
Length: 0.0000 MILES
Highway: SH 15
District: AMARILLO
Control Number: 0355-03-034
DBE Goal: 0.0%
Project: C 355-3-34
Guaranty: $100,000.00
Time: 166 WORKING DAYS
Engineer's Estimate: $30,107,140.00
Date: 09/05/2024 (1 year ago)
Contract Number: 9243006
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00192976
Project Description: COLD IN PLACE RECYCLE; ACP OVERLAY; SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To: N/A
ZACHARY MAYER
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$30,107,140.00
$28,843,111.11
Over/Under Est: -4.2% -$1,264,028.89
$29,190,032.72
Over/Under Est: -3.05% -$917,107.28
Amt Left: 1.2% $346,921.61
$29,910,076.56
Over/Under Est: -0.65% -$197,063.44
Amt Left: 3.7% $1,066,965.45
Delta: -2.47% -$720,043.84
$30,483,867.34
Over/Under Est: 1.25% $376,727.34
Amt Left: 5.69% $1,640,756.23
Delta: -1.92% -$573,790.78
$32,438,431.55
Over/Under Est: 7.74% $2,331,291.55
Amt Left: 12.47% $3,595,320.44
Delta: -6.41% -$1,954,564.21
Subcontractor Percentage Amount
COUGHLIN COMPANY I, INC. 10.79% $3,047,601.18
SAVATREE, LLC 0.36% $101,680.85
HJC FARMS, INC. 0.00% $0.00
PROFESSIONAL TRAFFIC CONTROL LLC 0.00% $0.00
TEXOP CONSTRUCTION 0.00% $0.00
TRP CONSTRUCTION GROUP, LLC 0.00% $0.00
W. S. CONSTRUCTION COMPANY 0.00% $0.00
ALAMO BROTHERS CONCRETE INC 0.00% $0.00
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.00% $0.00
BARRICADES UNLIMITED 0.00% $0.00
Total: 11.15% $3,149,282.03

Bid Items & Bid Tabulations

134 Total 0 of 134
OCHILTREE  |  SH 15  |  AMARILLO  |  0355-03-034  |  09/05/2024  |  $30,107,140.00  |  C 355-3-34  |  SURF/ROADWAY RESTOR  |  166 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KIEWIT INFRASTRUCTURE SOUTH CO.
DUININCK, INC.
RK HALL, LLC
OVERLAND CORPORATION
J. LEE MILLIGAN, INC.
PREPARING ROW
STA 873.000 $175.000 $100.000 $20.000 $48.960 $170.000 $15.000
PREP ROW (TREE REMOVE) (0"-12" DIA)
EA 24.000 $1,000.000 $862.980 $790.000 $839.500 $730.000 $625.000
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 27.000 $1,600.000 $1,725.960 $1,000.000 $1,092.500 $950.000 $1,325.000
PREP ROW (TREE REMOVE) (24"-36" DIA)
EA 18.000 $2,200.000 $2,588.940 $1,800.000 $1,863.000 $1,620.000 $2,500.000
REMOV CONC (RIPRAP)
SY 15.000 $80.000 $185.050 $86.500 $34.500 $136.050 $205.000
REMOV CONC (DRIVEWAYS)
SY 2,172.000 $35.000 $33.290 $23.000 $39.240 $34.120 $54.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 154.000 $50.000 $81.920 $43.000 $29.800 $25.910 $124.000
REMOV CONC (CURB & GUTTER)
LF 3,552.000 $13.000 $39.060 $14.500 $12.910 $11.230 $16.250
RMV (8") TRT/UNTRT BASE & ASPH PAV
SY 1,118.000 $30.000 $29.610 $21.500 $46.540 $16.180 $26.000
EXCAV (ROADWAY)
CY 3,375.000 $24.000 $15.900 $40.500 $31.050 $55.000 $60.000
SUBGR WIDEN (DC)
STA 36.000 $1,900.000 $637.470 $2,200.000 $1,641.660 $900.000 $550.000
EMBANK (FNL)(OC)(TY B)
CY 213.000 $55.000 $45.580 $40.500 $72.860 $52.000 $61.500
BACKFILL (TY A)
STA 873.000 $240.000 $83.130 $425.000 $205.700 $367.000 $615.000
BLADING
STA 36.000 $550.000 $293.810 $185.000 $253.420 $255.000 $650.000
DRILL SEED (PERM_RURAL_CLAY)
AC 40.000 $800.000 $689.190 $590.000 $626.750 $601.080 $610.000
DRILL SEED (TEMP_WARM_COOL)
AC 40.000 $650.000 $509.400 $430.000 $460.000 $461.080 $445.000
HYDRO MULCH SEED (PERM_URBAN_CLAY)
AC 4.000 $2,500.000 $2,397.170 $2,200.000 $2,300.000 $3,850.000 $2,230.000
SOIL RET BLKT(SL_MOD_CLAY_LONG_ROLL)
SY 3,191.000 $6.000 $2.400 $2.150 $2.300 $5.000 $2.250
FL BS(CMP IN PLC)(TY A,B OR D GR4)(6")
SY 8,462.000 $25.000 $19.100 $30.000 $30.090 $31.000 $30.000
REWORK BS MTL (TY B)(16")(DENS CONT)
SY 3,966.000 $30.000 $21.990 $35.500 $31.740 $32.000 $30.000
LIME (QUICKLIME (DRY))
TON 93.000 $360.000 $499.090 $590.000 $512.140 $445.000 $610.000
LIME TRT (EXIST MATL)(8")
SY 8,462.000 $6.000 $4.870 $14.000 $8.210 $6.500 $12.900
PRIME COAT (MC-30)
GAL 2,116.000 $7.000 $6.150 $5.750 $5.280 $5.000 $5.300
EMULS ASPH (EROSN CONT)(MULTI)
GAL 48,795.000 $5.000 $2.070 $1.850 $3.950 $5.250 $5.050
FOG SEAL (CSS-1H)
GAL 28,797.000 $4.250 $2.550 $4.600 $13.510 $4.250 $4.750
ASPH (CRS-2)
GAL 119,508.000 $4.400 $4.820 $3.550 $5.750 $4.000 $3.500
AGGR (TY-A, GR-4)(SAC-A)
CY 2,417.000 $265.000 $199.220 $195.000 $178.250 $295.000 $150.000
SP MIXES SP-D SAC-A PG70-28
TON 79,361.000 $172.000 $156.290 $175.200 $167.220 $193.500 $180.000
TACK COAT
GAL 118,558.000 $6.500 $5.870 $7.500 $6.760 $6.250 $6.350
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 4,237.000 $30.000 $24.000 $50.000 $25.940 $40.000 $46.350
PLANE ASPH CONC PAV(0" TO 1")
SY 11,517.000 $3.000 $2.520 $5.400 $3.110 $3.550 $5.100
PLANE ASPH CONC PAV(0" TO 2")
SY 23,501.000 $3.500 $2.910 $5.750 $3.300 $3.000 $5.750
PLANE ASPH CONC PAV(1")
SY 159.000 $15.000 $16.800 $59.500 $39.720 $15.000 $61.700
PLANE ASPH CONC PAV(2")
SY 3,532.000 $15.000 $4.410 $11.500 $5.420 $5.000 $9.500
CUT & RESTORE ASPH PAVING
SY 881.000 $300.000 $316.380 $215.000 $217.520 $125.000 $123.250
FLOWABLE BACKFILL
CY 15.000 $400.000 $419.500 $380.000 $402.500 $350.000 $730.000
CL B CONC (FLUME)
CY 8.000 $850.000 $1,078.730 $1,100.000 $1,035.000 $842.230 $1,040.000
CL C CONC (COLLAR)
EA 112.000 $1,050.000 $359.580 $250.000 $345.000 $300.000 $2,025.000
RIPRAP (CONC)(4 IN)
CY 94.000 $825.000 $1,070.000 $735.000 $891.250 $842.230 $725.000
RIPRAP (CONC)(5 IN)
CY 28.000 $800.000 $1,070.000 $670.000 $891.250 $842.230 $660.000
RIPRAP (MOW STRIP)(4 IN)
CY 128.000 $800.000 $1,029.090 $710.000 $891.250 $842.230 $895.000
RAIL (HANDRAIL)(TY F)
LF 65.000 $350.000 $479.430 $380.000 $402.500 $290.110 $385.000
CMP (GAL STL 18 IN)
LF 32.000 $100.000 $107.870 $97.000 $103.500 $90.000 $145.000
CMP (GAL STL 24 IN)
LF 184.000 $100.000 $131.840 $120.000 $126.500 $110.000 $205.000
CONC BOX CULV (3 FT X 2 FT)
LF 73.000 $650.000 $419.500 $380.000 $402.500 $350.000 $735.000
CONC BOX CULV (3 FT X 3 FT)
LF 24.000 $850.000 $839.010 $755.000 $805.000 $700.000 $1,000.000
CONC BOX CULV (4 FT X 2 FT)
LF 459.000 $575.000 $419.500 $380.000 $402.500 $350.000 $325.000
CONC BOX CULV (6 FT X 2 FT)
LF 276.000 $800.000 $623.260 $560.000 $598.000 $520.000 $470.000
RC PIPE (CL III)(18 IN)
LF 4.000 $125.000 $107.870 $97.000 $103.500 $90.000 $385.000
RC PIPE (CL III)(24 IN)
LF 336.000 $160.000 $119.860 $110.000 $115.000 $100.000 $240.000
RC PIPE (ARCH)(CL III)(DES 1)
LF 96.000 $525.000 $317.620 $285.000 $304.750 $265.000 $275.000
RC PIPE (ARCH)(CL III)(DES 3)
LF 240.000 $585.000 $359.580 $325.000 $345.000 $300.000 $325.000
SET (TY I)(S= 3 FT)(HW= 4 FT)(3:1)(C)
EA 8.000 $7,700.000 $8,390.090 $7,600.000 $8,050.000 $7,000.000 $14,500.000
SET (TY I)(S= 3 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $8,500.000 $16,780.190 $15,000.000 $16,100.000 $14,000.000 $16,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1)(P)
EA 16.000 $10,000.000 $9,888.320 $8,900.000 $9,487.500 $8,250.000 $16,300.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1)(C)
EA 1.000 $10,800.000 $17,379.480 $15,500.000 $16,675.000 $14,500.000 $15,500.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1)(C)
EA 1.000 $15,000.000 $21,095.090 $19,000.000 $20,240.000 $17,600.000 $16,600.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1)(C)
EA 2.000 $15,000.000 $10,187.970 $9,200.000 $9,775.000 $8,500.000 $15,000.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1)(C)
EA 2.000 $16,000.000 $13,783.730 $12,500.000 $13,225.000 $11,500.000 $16,600.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1)(P)
EA 4.000 $16,000.000 $13,783.730 $12,500.000 $13,225.000 $11,500.000 $16,700.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 8.000 $2,100.000 $1,558.160 $1,400.000 $1,495.000 $1,300.000 $4,100.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $2,100.000 $1,737.950 $1,600.000 $1,667.500 $1,450.000 $4,100.000
SET (TY II) (24 IN) (CMP) (6: 1) (C)
EA 1.000 $2,600.000 $1,678.020 $1,500.000 $1,610.000 $1,400.000 $4,100.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 88.000 $2,600.000 $1,797.880 $1,600.000 $1,725.000 $1,500.000 $4,450.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 32.000 $2,000.000 $1,977.660 $1,800.000 $1,897.500 $1,650.000 $4,400.000
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 4.000 $3,600.000 $3,595.750 $3,200.000 $3,450.000 $3,000.000 $4,200.000
SET (TY II) (DES 3) (RCP) (6: 1) (C)
EA 8.000 $5,000.000 $4,195.050 $3,800.000 $4,025.000 $3,500.000 $4,350.000
GRATE & FRAME
EA 14.000 $3,600.000 $2,996.460 $4,300.000 $3,044.050 $2,647.010 $5,000.000
ADJUSTING MANHOLES
EA 19.000 $5,000.000 $4,340.140 $2,800.000 $966.000 $840.000 $6,000.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 13.000 $5,000.000 $4,210.740 $2,800.000 $705.930 $613.850 $2,000.000
REMOV STR (SET)
EA 9.000 $1,500.000 $1,368.920 $810.000 $862.500 $750.000 $1,450.000
REMOV STR (HEADWALL)
EA 20.000 $1,700.000 $1,238.110 $810.000 $862.500 $750.000 $2,150.000
REMOV STR (PIPE)
LF 1,812.000 $45.000 $24.970 $21.500 $23.000 $20.000 $75.000
REMOV STR (BOX CULVERT)
LF 58.000 $225.000 $134.520 $110.000 $115.000 $100.000 $250.000
REMOVE STR (BOLLARD)
EA 6.000 $1,500.000 $1,227.040 $430.000 $158.130 $100.000 $565.000
MOBILIZATION
LS 1.000 $2,600,000.000 $2,766,004.710 $2,800,000.000 $2,392,806.120 $3,034,000.000 $3,200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $38,000.000 $80,000.000 $60,000.000 $35,040.460 $25,000.000 $100,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $23,794.970 $20,000.000 $20,244.680 $20,000.000 $60,000.000
TMA (STATIONARY)
DAY 240.000 $330.000 $563.810 $270.000 $497.810 $300.000 $500.000
TMA (MOBILE OPERATION)
HR 440.000 $105.000 $107.410 $110.000 $113.400 $85.000 $115.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 3,930.000 $6.000 $3.540 $3.200 $3.390 $5.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,930.000 $2.000 $1.200 $1.100 $1.150 $1.000 $4.500
PERM CTB (SGL SLOPE) (TY 1) (54 )
LF 1,664.000 $135.000 $209.110 $180.000 $402.500 $159.000 $175.000
COLORED TEXTURED CONC (4")
SY 2,223.000 $180.000 $124.740 $99.500 $184.870 $160.760 $100.000
CONC CURB (MONO) (TY II)
LF 24.000 $70.000 $122.270 $115.000 $76.620 $66.630 $110.000
CONC CURB & GUTTER (TY I)
LF 25.000 $75.000 $54.360 $45.500 $76.620 $66.630 $45.000
CONC CURB & GUTTER (TY II)
LF 3,370.000 $50.000 $60.000 $50.500 $67.050 $58.300 $50.000
DRIVEWAYS (CONC)
SY 4,008.000 $130.000 $164.290 $135.000 $157.010 $136.530 $145.000
DRIVEWAYS (ACP)
SY 350.000 $82.000 $114.640 $135.000 $176.170 $90.920 $85.000
CONC SIDEWALKS (4")
SY 5,580.000 $104.000 $109.980 $86.000 $117.690 $102.340 $93.000
CURB RAMPS (TY 1)
SY 11.000 $150.000 $226.280 $195.000 $167.570 $145.710 $195.000
CURB RAMPS (TY 2)
SY 14.000 $150.000 $211.030 $180.000 $167.570 $145.710 $180.000
CURB RAMPS (TY 5)
SY 35.000 $150.000 $285.610 $250.000 $167.570 $145.710 $250.000
CURB RAMPS (TY 7)
SY 581.000 $150.000 $202.640 $175.000 $167.570 $145.710 $170.000
CURB RAMPS (TY 10)
SY 60.000 $150.000 $226.280 $195.000 $167.570 $145.710 $200.000
CONCRETE SIDEWALK (RETAINING WALL)
CY 142.000 $1,400.000 $749.320 $690.000 $1,169.440 $1,016.900 $845.000
FIXED BOLLARD
EA 2.000 $1,000.000 $1,648.050 $1,700.000 $1,581.250 $1,375.000 $2,500.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 151,791.000 $0.400 $0.070 $0.080 $0.070 $0.060 $0.350
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 75,895.000 $0.600 $0.060 $0.070 $0.060 $0.050 $0.350
MTL W-BEAM GD FEN (STEEL POST)
LF 400.000 $36.000 $39.550 $35.500 $37.950 $34.000 $37.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 16.000 $1,800.000 $3,356.040 $3,000.000 $3,220.000 $2,500.000 $3,125.000
REMOVE METAL BEAM GUARD FENCE
LF 2,200.000 $7.000 $2.400 $2.150 $2.300 $4.000 $2.250
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $3,400.000 $4,135.120 $3,500.000 $3,737.500 $3,400.000 $3,625.000
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $900.000 $239.720 $215.000 $230.000 $500.000 $55.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $800.000 $425.500 $460.000 $408.250 $426.000 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 65.000 $980.000 $989.790 $760.000 $949.670 $702.000 $925.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 81.000 $1,100.000 $1,165.020 $935.000 $1,117.800 $865.000 $1,085.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,200.000 $1,470.240 $1,200.000 $1,410.650 $1,110.000 $1,370.000
REMOVE SM RD SN SUP&AM
EA 148.000 $200.000 $119.860 $160.000 $115.000 $100.000 $115.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 110.000 $155.000 $176.790 $130.000 $169.630 $122.000 $165.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 24.000 $26.000 $53.940 $48.500 $51.750 $46.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 48.000 $45.000 $53.940 $48.500 $51.750 $46.000 $50.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 203.000 $155.000 $182.780 $130.000 $175.380 $122.000 $170.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 115.000 $35.000 $17.980 $43.000 $17.250 $25.000 $17.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 172,893.000 $0.450 $0.260 $0.240 $0.860 $0.230 $0.250
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,003.000 $0.700 $0.600 $0.540 $0.580 $0.530 $0.550
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 902.000 $10.000 $7.190 $6.500 $6.900 $6.350 $6.700
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 24,116.000 $0.500 $0.300 $0.270 $1.150 $0.260 $0.300
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 32,641.000 $0.450 $0.300 $0.270 $1.150 $0.260 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 986.000 $2.000 $2.400 $1.650 $2.810 $0.530 $1.700
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 18,263.000 $2.000 $2.400 $1.650 $2.980 $0.530 $1.750
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,103.000 $1.400 $1.200 $1.100 $1.150 $1.060 $1.150
TY I HIGH PERF PM (W)6"(SLD)(090MIL)
LF 172,893.000 $0.800 $0.820 $0.730 $0.780 $0.720 $0.750
TY I HIGH PERF PM (Y)6"(BRK)(090MIL)
LF 24,116.000 $0.850 $0.840 $0.760 $0.810 $0.740 $0.800
TY I HIGH PERF PM (Y)6"(SLD)(090MIL)
LF 32,641.000 $0.800 $0.840 $0.760 $0.810 $0.740 $0.800
PREFAB PM TY C (W)(24")(SLD)
LF 1,430.000 $25.000 $17.380 $15.500 $16.680 $15.350 $16.200
PREFAB PM TY C (W)(ARROW)
EA 6.000 $350.000 $299.650 $270.000 $287.500 $264.650 $280.000
PREFAB PM TY C (W)(WORD)
EA 6.000 $350.000 $449.470 $405.000 $431.250 $396.970 $420.000
COLD-IN-PLACE RECYCLE (4")
SY 239,971.000 $9.000 $8.570 $6.450 $9.200 $6.500 $8.350
EMUL ASPH (CSS-1H)
GAL 251,969.000 $4.250 $5.090 $4.600 $4.030 $4.250 $4.750
LIME (COMMERCIAL OR QUICKLINE)(SLURRY)
TON 529.000 $400.000 $628.640 $530.000 $920.000 $489.000 $550.000
RECYCLED MATERIAL PATCHING
TON 360.000 $300.000 $441.700 $325.000 $143.750 $282.000 $225.000
REC REFL PAV MRKR TY II-A-A
EA 3,074.000 $30.000 $47.940 $43.000 $46.000 $42.340 $44.650
REC REFL PAV MRKR TY II-C-C
EA 25.000 $30.000 $89.890 $81.000 $86.250 $79.390 $83.700
Totals: $30,107,140.000 $28,843,111.110 $29,190,032.720 $29,910,076.560 $30,483,867.340 $32,438,431.550