OCHILTREE US 83 (0030-02-044)

Items: 66

County: OCHILTREE
Length: N/A
Highway: US 83
District: AMARILLO
Control Number: 0030-02-044
DBE Goal: N/A
Project: STP 1602(301)
Guaranty: N/A
Time: 131 WORKING DAYS
Engineer's Estimate: $3,608,422.25
Date: 02/02/2017 (9 years ago)
Contract Number: N/A
Type: REHAB EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$3,608,422.25
$2,999,163.70
Over/Under Est: -16.88% -$609,258.55
Over/Under Est: -12.67% -$457,366.37
Amt Left: 5.06% $151,892.18
Over/Under Est: -4.8% -$173,329.90
Amt Left: 14.54% $435,928.65
Delta: -9.01% -$284,036.47
$3,527,541.62
Over/Under Est: -2.24% -$80,880.63
Amt Left: 17.62% $528,377.92
Delta: -2.69% -$92,449.27
$3,837,493.80
Over/Under Est: 6.35% $229,071.55
Amt Left: 27.95% $838,330.10
Delta: -8.79% -$309,952.18

Bid Items & Bid Tabulations

66 Total 0 of 66
OCHILTREE  |  US 83  |  AMARILLO  |  0030-02-044  |  02/02/2017  |  $3,608,422.25  |  STP 1602(301)  |  REHAB EXIST ROADWAY  |  131 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
HIGHWAY CONTRACTORS, INC.
L A FULLER & SONS CONSTRUCTION, LTD.
GILVIN-TERRILL, LTD.
RK HALL, LLC
REMOVING CONC (DRIVEWAYS)
SY 535.000 $25.000 $24.450 $12.950 $8.300 $25.000 $16.950
REMOVING CONC (CURB AND GUTTER)
LF 4,703.000 $6.000 $5.750 $15.000 $6.900 $5.000 $6.860
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 17,550.000 $10.000 $3.800 $7.000 $6.200 $6.000 $4.280
REMOVING STAB BASE AND ASPH PAV (7")
SY 275.000 $3.500 $6.650 $8.000 $10.900 $25.000 $11.460
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 115.000 $15.000 $75.000 $5.000 $51.000 $30.000 $43.770
BACKFILL (TY B)
STA 34.610 $200.000 $230.000 $100.000 $275.000 $200.000 $679.960
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
AC 1.660 $15,000.000 $2,000.000 $1,865.000 $2,500.000 $3,530.000 $2,051.500
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 1.660 $5,000.000 $1,020.000 $964.000 $1,300.000 $2,670.000 $1,060.400
VEGETATIVE WATERING
MG 135.000 $20.000 $50.000 $10.000 $85.000 $22.500 $44.800
FL BS (CMP IN PLC)(TY A OR B GR 4)(9")
SY 17,550.000 $20.000 $10.750 $18.500 $14.500 $14.000 $23.520
LIME (QUICKLIME (DRY))
TON 232.000 $250.000 $193.000 $178.440 $215.000 $200.000 $214.500
FLY ASH (CLASS CS)
TON 618.000 $150.000 $83.300 $78.950 $96.000 $85.000 $99.000
LFA TREAT SUBGRADE (12")
SY 18,084.000 $6.000 $4.300 $3.500 $4.700 $4.000 $5.280
CEMENT
TON 131.000 $300.000 $150.750 $160.670 $210.000 $150.000 $201.340
PRIME COAT (CSS-1H)
GAL 5,265.000 $3.000 $3.050 $2.500 $3.800 $2.750 $4.980
ASPH (MULTI OPTION)
GAL 8,775.000 $4.000 $2.900 $3.000 $3.500 $3.000 $4.170
AGGR(TY-A GR-4 SAC-B)
CY 160.000 $200.000 $158.000 $155.600 $165.000 $110.000 $181.060
D-GR HMA TY B SAC-B PG (64-22)
TON 2,631.000 $110.000 $99.400 $89.480 $126.000 $130.000 $129.280
SUPERPAVE MIXTURES SP-D SAC-A PG70-28
TON 6,416.000 $120.000 $103.000 $107.660 $136.000 $150.000 $139.060
PLANE ASPH CONC PAV(0" TO 2")
SY 6,431.000 $2.500 $4.350 $2.330 $5.050 $5.000 $2.410
PLANE ASPH CONC PAV (6")
SY 15,679.000 $5.000 $5.000 $3.500 $4.400 $5.000 $2.830
CL A CONC (MISC)
CY 22.000 $550.000 $369.000 $600.000 $470.000 $700.000 $606.090
RIPRAP (CONC)(4 IN)
CY 1.750 $525.000 $342.600 $100.000 $440.000 $600.000 $1,171.770
RIPRAP (CONC)(5 IN)
CY 20.000 $525.000 $339.400 $100.000 $435.000 $600.000 $709.350
RAIL (HANDRAIL)(TY E)
LF 50.000 $150.000 $220.000 $106.500 $150.000 $110.000 $230.090
CONC BOX CULV (7 FT X 3 FT)
LF 76.000 $550.000 $454.000 $435.000 $545.000 $375.000 $984.330
WINGWALL (FW - 0) (HW=4 FT)
EA 2.000 $7,500.000 $8,020.000 $7,500.000 $10,250.000 $10,000.000 $12,750.310
ADJUSTING MANHOLES
EA 1.000 $1,500.000 $1,550.000 $1,500.000 $1,300.000 $3,500.000 $3,917.120
ADJUSTING INLETS
EA 11.000 $4,000.000 $4,150.000 $10,450.000 $4,900.000 $3,500.000 $9,192.340
REMOV STR (HEADWALL)
EA 2.000 $2,000.000 $2,240.000 $4,000.000 $6,400.000 $3,000.000 $9,394.370
MOBILIZATION
LS 1.000 $326,550.000 $290,000.000 $300,000.000 $327,800.000 $345,000.000 $361,294.540
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $8,000.000 $13,000.000 $16,100.000 $3,650.000 $11,000.000 $2,976.880
CONSTRUCTION PERIMETER FENCE
LF 531.000 $5.000 $6.650 $0.650 $5.400 $5.000 $5.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 777.000 $5.000 $11.900 $3.720 $7.300 $5.000 $4.090
BIODEG EROSN CONT LOGS (REMOVE)
LF 777.000 $2.000 $1.550 $0.600 $3.800 $1.000 $0.660
CONC CURB & GUTTER (TY II)
LF 3,857.000 $22.500 $20.550 $27.500 $26.200 $20.000 $37.800
TURNOUTS (ACP)
SY 921.000 $80.000 $73.350 $100.000 $94.000 $70.000 $71.070
CONC SIDEWALKS (4")
SY 1,280.000 $75.000 $74.150 $50.000 $73.000 $60.000 $74.050
CURB RAMPS (TY 7)
SY 48.000 $150.000 $125.000 $48.000 $155.000 $120.000 $168.900
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 5.000 $800.000 $620.000 $700.000 $620.000 $550.000 $1,457.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $1,000.000 $695.000 $700.000 $516.000 $500.000 $1,512.500
REMOVE SM RD SN SUP&AM
EA 7.000 $125.000 $125.000 $100.000 $72.000 $50.000 $165.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 2.000 $125.000 $230.000 $500.000 $152.000 $140.000 $220.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 2.000 $15.000 $27.000 $500.000 $63.000 $16.000 $22.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 110.000 $0.500 $0.540 $0.510 $0.700 $0.510 $0.560
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 6,515.000 $0.500 $0.540 $0.510 $0.700 $0.510 $0.560
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 80.000 $0.500 $0.540 $0.510 $0.700 $0.510 $0.560
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 12,537.000 $0.500 $0.540 $0.510 $0.700 $0.510 $0.560
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 300.000 $5.000 $4.220 $4.000 $5.400 $4.000 $4.400
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 213.000 $6.000 $4.220 $4.000 $5.400 $4.000 $4.400
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 243.000 $5.000 $3.160 $3.000 $4.000 $3.000 $3.300
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 419.000 $5.000 $3.160 $3.000 $4.000 $3.000 $3.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,195.000 $1.000 $1.200 $0.550 $1.000 $1.000 $0.970
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 4,612.000 $1.000 $1.250 $0.550 $1.000 $1.000 $0.970
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 345.000 $0.750 $0.530 $0.500 $0.700 $0.500 $0.550
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 660.000 $2.000 $2.110 $2.000 $2.700 $2.000 $2.200
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 155.000 $5.500 $6.320 $6.000 $8.000 $6.000 $6.600
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 7.000 $150.000 $158.120 $150.000 $202.000 $150.000 $165.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 4.000 $225.000 $210.830 $200.000 $269.000 $200.000 $220.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 5,920.000 $0.350 $0.260 $0.250 $0.350 $0.250 $0.280
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 4,020.000 $0.350 $0.260 $0.250 $0.350 $0.250 $0.280
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 18,995.000 $0.350 $0.260 $0.250 $0.350 $0.250 $0.280
ELIM EXT PAV MRK & MRKS (4")
LF 7,338.000 $1.000 $1.210 $1.150 $1.500 $1.150 $1.270
EMULSION
GAL 118,168.000 $3.500 $3.100 $2.520 $3.700 $3.500 $3.810
EMUL TRTMNT(MX EXST MTRL & NEW BASE) 9"
SY 17,550.000 $8.000 $7.300 $4.500 $2.300 $7.700 $8.090
GEOGRID BASE REINFORCEMENT (TY II)
SY 17,550.000 $2.250 $1.750 $2.000 $2.200 $2.000 $1.390
Totals: $3,608,422.250 $2,999,163.700 $3,151,055.880 $3,435,092.350 $3,527,541.620 $3,837,493.817