Show Job Controls
Bid Cobra

NUECES VA (0916-00-250)

Items: 66

County: NUECES
Length: N/A
Highway: VA
District: CORPUS CHRISTI
Control Number: 0916-00-250
DBE Goal: N/A
Project: C 916-00-250
Guaranty: N/A
Time: 277 WORKING DAYS
Engineer's Estimate: $3,358,443.00
Date: 03/08/2023 (3 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
NICK NOVOSAD
ROBERTO A JIMENEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,358,443.00
$3,123,217.40
Over/Under Est: -7% -$235,225.60
$3,883,300.80
Over/Under Est: 15.63% $524,857.80
Amt Left: 24.34% $760,083.40
$4,112,751.50
Over/Under Est: 22.46% $754,308.50
Amt Left: 31.68% $989,534.10
Delta: -5.91% -$229,450.70
Subcontractor Percentage Amount
F & W ELECTRICAL CONTRACTORS, INC. 1.92% $61,322.80
KING & GEORGE, LLC 0.96% $30,661.40
PBJ CONSTRUCTION 0.78% $24,912.39
HIGHWAY BARRICADES AND SERVICES, LLC 0.65% $20,760.32
ROBIN STEEL LLC 0.59% $18,843.99
Total: 4.90% $156,500.90

Bid Items & Bid Tabulations

66 Total 0 of 66
NUECES  |  VA  |  CORPUS CHRISTI  |  0916-00-250  |  03/08/2023  |  $3,358,443.00  |  C 916-00-250  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  277 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
MAKO CONTRACTING, LLC
FNH CONSTRUCTION, LLC
PREPARING ROW
AC 1.000 $25,000.000 $10,000.000 $50,000.000 $165,000.000
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 1.000 $1,600.000 $1,000.000 $800.000 $5,000.000
REMOVING CONC (RIPRAP)
SY 203.000 $20.000 $20.000 $55.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 3,651.000 $25.000 $20.000 $50.000 $20.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 4,897.000 $10.000 $10.000 $15.000 $15.500
REMOVING CONC (SIDEWALK OR RAMP)
SY 210.000 $20.000 $20.000 $60.000 $20.000
REMOVING CONC (MISC)
CY 0.400 $110.000 $1,500.000 $500.000 $1,000.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 2,086.000 $28.000 $18.000 $20.000 $15.000
FURNISHING AND PLACING TOPSOIL (4")
SY 7,260.000 $5.000 $5.000 $8.000 $10.000
BLOCK SODDING
SY 7,260.000 $7.000 $6.000 $15.000 $10.000
VEGETATIVE WATERING
MG 132.400 $50.000 $1.000 $125.000 $60.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 1,409.000 $75.000 $60.000 $45.000 $100.000
CL C CONC (MISC)
CY 10.400 $1,000.000 $700.000 $300.000 $1,500.000
CL A CONC (STEPS)
CY 5.000 $1,000.000 $700.000 $300.000 $1,500.000
RIPRAP (CONC)(6 IN)
CY 40.700 $800.000 $700.000 $400.000 $650.000
RAIL (HANDRAIL)(TY A)
LF 31.000 $165.000 $200.000 $282.000 $185.000
RAIL (HANDRAIL)(TY B)
LF 92.000 $170.000 $225.000 $129.600 $185.000
INLET (CURB)(SPL)
EA 6.000 $1,500.000 $500.000 $14,000.000 $12,500.000
GRATE & FRAME
EA 51.000 $2,900.000 $1,000.000 $3,500.000 $8,000.000
ADJUSTING MANHOLES
EA 2.000 $1,400.000 $750.000 $2,000.000 $2,500.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 17.000 $1,360.000 $440.000 $1,500.000 $850.000
REMOV STR (SMALL FENCE)
LF 8.000 $12.000 $95.000 $75.000 $20.000
REMOVE STR (RAIL)
LF 15.000 $25.000 $50.000 $50.000 $20.000
MOBILIZATION
LS 1.000 $305,000.000 $200,000.000 $50,000.000 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $5,000.000 $1,100.000 $1,800.000 $8,500.000
SANDBAGS FOR EROSION CONTROL
EA 1,000.000 $8.000 $0.010 $25.000 $6.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 8,000.000 $5.000 $0.010 $9.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 8,000.000 $2.000 $0.011 $3.000 $6.000
CONC CURB (TY II)
LF 1,518.000 $25.000 $40.000 $45.000 $35.000
CONC CURB & GUTTER (TY II)
LF 5,310.000 $35.000 $40.000 $45.000 $50.000
CONC CURB & GUTTER (ARMOR CURB)
LF 14.000 $285.000 $385.000 $75.000 $350.000
DRIVEWAYS (CONC)
SY 6,077.000 $100.000 $109.000 $90.000 $85.000
DRIVEWAYS (ACP)
SY 386.000 $85.000 $75.000 $90.000 $55.000
CONC SIDEWALKS (4")
SY 7,554.000 $80.000 $93.000 $85.000 $60.000
CURB RAMPS (TY 1)
SY 537.000 $150.000 $120.000 $300.000 $185.000
CURB RAMPS (TY 2)
SY 126.000 $150.000 $120.000 $300.000 $185.000
CURB RAMPS (TY 3)
SY 349.000 $150.000 $120.000 $300.000 $185.000
CURB RAMPS (TY 5)
SY 7.000 $150.000 $120.000 $300.000 $185.000
CURB RAMPS (TY 6)
SY 412.000 $150.000 $120.000 $300.000 $185.000
CURB RAMPS (TY 7)
SY 265.000 $150.000 $120.000 $300.000 $185.000
CURB RAMPS (TY 10)
SY 94.000 $150.000 $120.000 $300.000 $185.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 1,675.000 $105.000 $225.000 $150.000 $75.000
RELOCATE EXISTING MAILBOX
EA 8.000 $300.000 $275.000 $100.000 $850.000
GROUND BOX TY D (162922)
EA 23.000 $1,100.000 $775.000 $1,560.000 $1,100.000
GROUND BOX TY D (162922)W/APRON
EA 6.000 $1,500.000 $1,000.000 $2,107.200 $1,500.000
REMOVE GROUND BOX
EA 29.000 $500.000 $55.000 $529.200 $500.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 13.000 $875.000 $300.000 $1,307.000 $1,000.000
RELOCATE SM RD SN SUP&AM TY S80
EA 56.000 $675.000 $350.000 $912.000 $850.000
REMOVE SM RD SN SUP&AM
EA 6.000 $160.000 $400.000 $88.800 $100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 2.000 $110.000 $300.000 $70.800 $100.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 2.000 $35.000 $10.000 $18.000 $100.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,960.000 $7.000 $6.500 $7.020 $10.000
REFL PAV MRK TY II (W) 36" (YLD TRI)
EA 19.000 $5.000 $40.000 $42.000 $500.000
PAVEMENT SEALER 4"
LF 480.000 $0.200 $0.200 $0.240 $1.000
PAVEMENT SEALER 24"
LF 2,960.000 $2.000 $0.800 $0.900 $6.000
PAVEMENT SEALER (YLD TRI)
EA 19.000 $30.000 $5.000 $6.000 $250.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 480.000 $1.000 $1.000 $1.200 $1.000
ELIM EXT PAV MRK & MRKS (4")
LF 192.000 $1.000 $1.000 $1.200 $1.000
ELIM EXT PAV MRK & MRKS (12")
LF 3,156.000 $2.000 $2.000 $1.200 $6.000
ELIM EXT PAV MRK & MRKS (24")
LF 916.000 $4.000 $3.500 $4.200 $6.000
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
EA 8.000 $12.000 $16.000 $18.000 $250.000
PED DETECT PUSH BUTTON (STANDARD)
EA 55.000 $500.000 $500.000 $553.200 $950.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 55.000 $80.000 $50.000 $91.200 $500.000
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 167.000 $200.000 $285.000 $500.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 560.000 $75.000 $1.000 $68.750 $100.000
TMA (STATIONARY)
DAY 277.000 $200.000 $1.000 $300.000 $250.000
Totals: $3,358,443.000 $3,123,217.400 $3,883,300.800 $4,112,751.500