Show Job Controls
Bid Cobra

NUECES PR 22 (0617-02-001)

Items: 66

County: NUECES
Length: N/A
Highway: PR 22
District: CORPUS CHRISTI
Control Number: 0617-02-001
DBE Goal: N/A
Project: BR 2021(752)
Guaranty: N/A
Time: 346 WORKING DAYS
Engineer's Estimate: $9,230,111.30
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$9,230,111.30
$8,685,850.35
Over/Under Est: -5.9% -$544,260.95
$10,089,272.16
Over/Under Est: 9.31% $859,160.86
Amt Left: 16.16% $1,403,421.81
Over/Under Est: 11.96% $1,104,113.90
Amt Left: 18.98% $1,648,374.85
Delta: -2.43% -$244,953.04
Subcontractor Percentage Amount
SCR CIVIL CONSTRUCTION, LLC 15.30% $1,596,662.31
INFRASTRUCTURE MAINTENANCE SERVICES, INC. 6.61% $689,799.86
MACIAS SPECIALTY CONTRACTING LLC 3.57% $372,554.54
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 2.31% $241,064.70
HOLES-SOUTH TEXAS LLC 1.00% $104,357.01
SOIL TECH ADVANCE INC. 0.83% $86,616.32
TEXOP CONSTRUCTION 0.61% $63,657.78
HIGHWAY BARRICADES AND SERVICES, LLC 0.46% $48,004.23
AREA WIDE PROTECTIVE, INC. 0.37% $38,612.10
NELSON INDUSTRIAL SERVICES, INC. 0.30% $31,307.10
A-CORE CONCRETE CUTTING, INC. 0.12% $12,522.84
TEXAS ICON CONSTRUCTION, LLC 0.09% $9,392.13
MALDONADO-BURKETT, LLP 0.03% $3,130.71
ADVANCED DIVING AND SALVAGE CORPORATION 0.00% $0.00
Total: 31.60% $3,297,681.63

Bid Items & Bid Tabulations

66 Total 0 of 66
NUECES  |  PR 22  |  CORPUS CHRISTI  |  0617-02-001  |  08/04/2021  |  $9,230,111.30  |  BR 2021(752)  |  BRIDGE MAINT  |  346 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
CALLAN MARINE LTD
SOUTHERN ROAD & BRIDGE, LLC
SALV,HAUL & STKPL RCL APH PV (2")
SY 1,200.000 $3.000 $15.950 $29.000 $11.000
D-GR HMA(SQ) TY-D SAC-B PG64-22
TON 2.000 $200.000 $1,500.000 $1,650.000 $5,000.000
PLANE ASPH CONC PAV (2")
SY 1,200.000 $20.000 $15.950 $29.000 $11.000
EPOXY WATERPROOF FINISH (TY X)
SF 9,660.000 $15.000 $8.470 $12.000 $13.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 11,835.000 $13.000 $7.930 $11.500 $18.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 72.000 $175.000 $385.000 $330.000 $400.000
CONC STR REPAIR (EPOXY MORTAR)
SF 41.000 $200.000 $500.000 $298.000 $400.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 32.000 $120.000 $100.000 $266.500 $400.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 2,006.000 $250.000 $256.000 $527.000 $255.000
MULTI-LAYER POLYMER OVERLAY
SY 17,280.000 $40.000 $34.500 $49.500 $44.000
CLEAN & PAINT BASE PLATE
EA 14.000 $400.000 $1,400.000 $643.000 $6,500.000
SHOT BLASTING
SY 17,280.000 $4.000 $2.400 $5.000 $2.250
MILLING CONCRETE SLAB (1/4IN)
SY 2,400.000 $15.000 $13.200 $23.250 $10.000
MOBILIZATION
LS 1.000 $839,110.000 $750,500.000 $1,355,738.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $8,000.000 $11,500.000 $8,884.000 $18,500.000
CONSTRUCTION EXITS (INSTALL) (TY 3)
SY 156.000 $35.000 $30.000 $125.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $9.000 $10.000 $125.000 $10.000
SANDBAGS FOR EROSION CONTROL
EA 66.000 $12.000 $11.000 $32.000 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,000.000 $4.000 $4.400 $9.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,000.000 $2.000 $1.650 $1.500 $2.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 4.000 $5,300.000 $2,500.000 $4,695.000 $8,500.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 15,390.000 $13.000 $6.000 $4.500 $11.000
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 3,930.000 $51.000 $47.000 $79.000 $65.000
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
LF 3,780.000 $13.000 $6.000 $6.000 $18.000
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 3,930.000 $21.000 $8.000 $22.000 $18.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 60.000 $100.000 $100.000 $76.000 $150.000
PERM CTB (SGL SLOPE) (TY 4) (42 )
LF 10.000 $200.000 $200.000 $197.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $2,070.000 $1,000.000 $11,740.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $5,450.000 $750.000 $3,046.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $990.000 $9,200.000 $2,348.000 $12,000.000
WK ZN PAV MRK REMOV (REFL) TY I-A
EA 762.000 $5.000 $2.750 $3.250 $3.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 659.000 $5.000 $2.750 $3.250 $3.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 1,971.000 $3.000 $1.930 $2.000 $3.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 2,279.000 $3.000 $1.930 $2.000 $3.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 52.000 $20.000 $15.400 $18.000 $18.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 765.000 $2.000 $7.000 $2.000 $5.000
PREFAB PAV MRK TY B (W)(4")(BRK)CNTST
LF 1,640.000 $0.500 $8.250 $9.500 $10.000
REFL PAV MRKR TY II-C-R
EA 128.000 $5.000 $3.850 $4.500 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 7,491.000 $0.500 $0.550 $1.250 $1.000
PAV SURF PREP FOR MRK (4")
LF 14,042.000 $0.100 $0.020 $0.130 $0.100
PAV SURF PREP FOR MRK (7")
LF 1,640.000 $0.500 $0.040 $0.130 $0.100
REPAIR (STL POST RETROFIT)
EA 12.000 $100.000 $2,250.000 $1,713.000 $450.000
REPAIR METAL RAIL (C4)
LF 76.000 $100.000 $500.000 $158.500 $275.000
REPAIR (CORROSION MITIGATION)
EA 800.000 $15.000 $280.000 $120.500 $95.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 11.000 $120.000 $250.000 $108.000 $125.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 496.000 $25.000 $50.000 $37.000 $48.000
REPAIR STEEL (CORROSION MITIGATION)
EA 24.000 $30.000 $200.000 $235.000 $250.000
BRIDGE JOINT REPAIR (ARMOR)
LF 104.000 $400.000 $505.000 $508.000 $300.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 1,872.000 $700.000 $645.000 $622.000 $333.000
CARBON FIBER REINF POLYMER PROTECTION
SF 13,535.000 $120.000 $39.500 $41.500 $74.000
CARBON FIBER REINF POLYMER STRENGTHNING
SF 906.000 $300.000 $54.000 $202.500 $178.000
REPLACE ELASTOMERIC BEARING PADS
EA 155.000 $2,000.000 $4,250.000 $2,701.000 $4,225.000
REPLACE ELASTOMERIC BEARING PADS (LARGE
EA 16.000 $15,000.000 $12,800.000 $14,340.000 $19,850.000
POLYESTER POLYMER CONC OVERLAY (2-1/4")
SY 2,400.000 $225.000 $248.000 $368.000 $344.000
EMBEDDED GALVANIC ANODES
EA 3,240.000 $30.000 $20.000 $38.000 $55.000
FRP ENCAPSULATION
LS 1.000 $834,300.000 $1,125,000.000 $831,320.000 $1,100,000.000
CATHODIC PROTECTION SYSTEM
LS 1.000 $400,000.000 $679,000.000 $592,670.000 $1,228,000.000
FLOATING TURBIDITY BARRIER(FUR & INST)
LF 1,150.000 $100.000 $55.000 $110.000 $21.000
FLOATING TURBIDITY BARRIER (REMOVE)
LF 1,150.000 $50.000 $28.000 $41.000 $2.000
REPLACE ABOVE-GROUND CONDUIT
LF 5.000 $50.000 $500.000 $761.500 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $11,500.000 $34,000.000 $13,453.000 $18,500.000
MULTIPOLYMER PAV MRK (W)(4")(SLD)
LF 6,561.000 $0.800 $1.380 $2.000 $2.000
MULTIPOLYMER PAV MRK (W)(4")(BRK)
LF 2,560.000 $0.800 $1.490 $2.000 $2.000
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
LF 6,561.000 $0.800 $1.380 $2.000 $2.000
TMA (STATIONARY)
DAY 12.000 $200.000 $750.000 $444.000 $200.000
TMA (MOBILE OPERATION)
HR 48.000 $70.000 $100.000 $108.000 $100.000
Totals: $9,230,111.300 $8,685,850.350 $10,089,272.160 $10,334,225.200