NUECES SH 358 (0617-01-206)

Items: 57

County: NUECES
Length: N/A
Highway: SH 358
District: CORPUS CHRISTI
Control Number: 0617-01-206
DBE Goal: N/A
Project: F 2022(547)
Guaranty: N/A
Time: 55 WORKING DAYS
Engineer's Estimate: $6,173,145.09
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$6,173,145.09
1
Awarded
$7,618,726.75
Over/Under Est: 23.42% $1,445,581.66
Over/Under Est: 29.57% $1,825,706.26
Amt Left: 4.99% $380,124.60

Bid Items & Bid Tabulations

57 Total 0 of 57
NUECES  |  SH 358  |  CORPUS CHRISTI  |  0617-01-206  |  05/05/2022  |  $6,173,145.09  |  F 2022(547)  |  RESURF ROADWAY  |  55 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BAY LTD.
HAAS-ANDERSON CONSTRUCTION, LTD.
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 87.000 $25.000 $30.000 $100.000
ASPH (MULTI OPTION)
GAL 51,867.000 $3.000 $4.300 $3.300
AGGR (MULTI OPTION)
CY 1,347.000 $25.000 $220.000 $118.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 28,445.000 $26.000 $44.000 $48.000
PLANE ASPH CONC PAV (3")
SY 148,192.000 $1.500 $2.200 $3.600
RIPRAP (CONC)(4 IN)
CY 48.000 $500.000 $580.000 $710.000
RIPRAP (MOW STRIP)(4 IN)
CY 42.000 $520.000 $570.000 $632.000
ADJUSTING INLETS
EA 1.000 $4,500.000 $2,200.000 $2,770.000
ADJUSTING INLET (CAP)
EA 1.000 $2,500.000 $3,100.000 $2,770.000
REMOVE STR (RAIL)
LF 120.000 $500.000 $170.000 $134.000
MOBILIZATION
LS 1.000 $544,171.000 $297,570.000 $392,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $30,000.000 $42,000.000 $74,800.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 948.000 $4.000 $6.200 $6.100
BIODEG EROSN CONT LOGS (REMOVE)
LF 948.000 $1.000 $3.800 $1.450
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 600.000 $30.000 $18.250 $21.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 600.000 $8.000 $15.750 $18.000
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $25.000 $34.000 $28.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,350.000 $2,200.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 570.000 $5.000 $5.900 $2.200
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,750.000 $4,100.000 $2,740.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,000.000 $3,000.000 $831.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $24,000.000 $34,100.000 $38,200.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $8,000.000 $11,700.000 $8,310.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $650.000 $460.000 $554.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 13,480.000 $0.400 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 25,427.000 $0.350 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 13,959.000 $2.000 $0.700 $0.650
WK ZN PAV MRK NON-REMOV (W)12"(LNDP)
LF 1,623.000 $2.750 $2.300 $2.200
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 1,200.000 $2.000 $2.100 $2.050
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 24,821.000 $0.350 $0.300 $0.300
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 7,709.000 $4.500 $3.700 $3.600
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 5,474.000 $0.450 $2.300 $1.400
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 7,709.000 $0.700 $0.750 $0.750
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 1,623.000 $3.000 $2.100 $2.050
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,200.000 $3.000 $2.100 $2.050
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 13,474.000 $0.320 $0.500 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 25,427.000 $0.220 $0.500 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 24,821.000 $0.220 $0.500 $0.450
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 1,200.000 $5.000 $10.250 $10.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 14.000 $175.000 $230.000 $222.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 3.000 $400.000 $460.000 $443.000
PREFAB PAV MRK TY C (W) (WORD)
EA 14.000 $225.000 $260.000 $244.000
REFL PAV MRKR TY II-C-R
EA 7,914.000 $2.800 $3.800 $3.600
ELIM EXT PAV MRK & MRKS (4")
LF 3,478.000 $0.500 $1.200 $0.550
ELIM EXT PAV MRK & MRKS (12")
LF 250.000 $2.000 $2.500 $1.650
ELIM EXT PAV MRK & MRKS (ARROW)
EA 3.000 $60.000 $250.000 $72.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 1.000 $100.000 $360.000 $94.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 3.000 $45.000 $260.000 $83.000
DRAIN INLET CLEANING
EA 10.000 $185.000 $3,100.000 $837.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 3,750.000 $64.000 $10.000 $21.000
D-GR HMA TY-B SAC-B PG70-22
TON 20,376.000 $110.000 $130.000 $140.000
TACK COAT
GAL 11,411.000 $3.500 $3.700 $3.600
TBWC (MEMBRANE)
GAL 32,364.000 $3.500 $4.900 $3.600
TBWC PG76-22 SAC-A TY C
TON 8,091.000 $164.000 $200.000 $199.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 160.000 $65.000 $140.000 $71.000
TMA (STATIONARY)
DAY 212.000 $65.000 $340.000 $10.000
TMA (MOBILE OPERATION)
DAY 90.000 $80.000 $590.000 $10.000
Totals: $6,173,145.090 $7,618,726.750 $7,998,851.350