Show Job Controls
Bid Cobra

NUECES SH 44 (0102-01-123)

Items: 29

County: NUECES
Length: N/A
Highway: SH 44
District: CORPUS CHRISTI
Control Number: 0102-01-123
DBE Goal: N/A
Project: F 2022(994)
Guaranty: N/A
Time: 40 WORKING DAYS
Engineer's Estimate: $270,848.40
Date: 08/04/2022 (3 years ago)
Contract Number: N/A
Type: INSTALL ILLUMINATION
Mail/Deliver Bids To: N/A
ERNEST LONGORIA
FIDENCIO LOPEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$270,848.40
$279,981.10
Over/Under Est: 3.37% $9,132.70
Over/Under Est: 16.06% $43,504.70
Amt Left: 12.28% $34,372.00
Over/Under Est: 18.95% $51,317.72
Amt Left: 15.07% $42,185.02
Delta: -2.49% -$7,813.02

Bid Items & Bid Tabulations

29 Total 0 of 29
NUECES  |  SH 44  |  CORPUS CHRISTI  |  0102-01-123  |  08/04/2022  |  $270,848.40  |  F 2022(994)  |  INSTL ILLUM  |  40 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VACA UNDERGROUND UTILITIES INC
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
MALDONADO-BURKETT, LLP
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 160.000 $200.000 $175.000 $210.000 $171.820
RIPRAP (CONC)(CL B)
CY 9.000 $615.000 $750.000 $780.000 $1,564.660
MOBILIZATION
LS 1.000 $24,600.000 $32,500.000 $18,500.000 $29,290.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $5,000.000 $1,500.000 $3,100.000 $5,049.600
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 200.000 $5.500 $1.000 $8.000 $9.030
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $1.500 $0.250 $2.000 $6.650
REMOVE RD IL ASM (U/P)
EA 6.000 $110.000 $35.000 $350.000 $288.850
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 6.000 $1,150.000 $975.000 $650.000 $3,101.620
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 20.000 $4,000.000 $3,800.000 $4,200.000 $3,697.500
CONDT (PVC) (SCH 40) (2")
LF 2,992.000 $9.000 $11.000 $8.000 $10.120
CONDT (PVC) (SCH 80) (2") (BORE)
LF 583.000 $30.000 $25.000 $32.000 $41.930
CONDT (PVC) (SCH 80) (3")
LF 20.000 $20.000 $60.000 $45.000 $52.070
CONDT (RM) (3/4")
LF 38.000 $16.000 $27.000 $25.000 $26.160
ELEC CONDR (NO.12) INSULATED
LF 1,854.000 $1.100 $1.400 $1.400 $1.940
ELEC CONDR (NO.8) INSULATED
LF 13,820.000 $1.000 $1.750 $1.300 $1.350
GROUND BOX TY A (122311)W/APRON
EA 10.000 $810.000 $975.000 $850.000 $1,495.790
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
EA 1.000 $6,710.000 $6,500.000 $5,800.000 $6,630.190
REMOVE ABOVE-GROUND CONDUIT
LF 60.000 $15.000 $24.000 $15.000 $9.540
REMOVE UNDERGROUND CONDUIT
LF 300.000 $7.000 $7.000 $6.000 $4.970
REMOVE CONDUCTOR
LF 3,670.000 $0.600 $0.750 $0.750 $0.810
REMOVE ROADWAY ILLUM ASSEMBLY (HPS)
EA 1.000 $175.000 $600.000 $150.000 $806.000
REMOVE GROUND BOX
EA 6.000 $225.000 $350.000 $250.000 $492.330
INSTALL FUSED DISCONNECT
EA 1.000 $820.000 $800.000 $680.000 $1,292.100
REPLACE FUSED DISCONNECT
EA 1.000 $820.000 $800.000 $680.000 $1,292.100
REPLACE BREAKAWAY FUSE HOLDER
EA 4.000 $100.000 $125.000 $150.000 $203.630
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 170.000 $50.000 $65.000 $200.000 $76.840
CONDUIT (PREPARE)
LF 1,110.000 $0.600 $1.000 $1.200 $1.290
GROUND BOX (PREPARE)
EA 1.000 $100.000 $575.000 $485.000 $250.000
TMA (STATIONARY)
DAY 85.000 $125.000 $110.000 $350.000 $131.580
Totals: $270,848.400 $279,981.100 $314,353.100 $322,166.120