NUECES FM 665 (0086-20-023)

Items: 96

County: NUECES
Length: N/A
Highway: FM 665
District: CORPUS CHRISTI
Control Number: 0086-20-023
DBE Goal: N/A
Project: STP 2021(877)HES
Guaranty: N/A
Time: 187 WORKING DAYS
Engineer's Estimate: $4,641,197.26
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$4,641,197.26
$4,508,717.90
Over/Under Est: -2.85% -$132,479.36
Over/Under Est: 4.28% $198,678.67
Amt Left: 7.34% $331,158.03
$5,442,187.55
Over/Under Est: 17.26% $800,990.29
Amt Left: 20.7% $933,469.65
Delta: -12.44% -$602,311.62
Subcontractor Percentage Amount
FUQUAY, INC. 45.06% $2,097,350.14
HIGHWAY BARRICADES AND SERVICES, LLC 4.96% $230,866.77
TEXAS GUARDRAIL CONTRACTORS LLC 2.82% $131,258.93
TIERRA LEASE SERVICE, LLC 2.58% $120,087.96
GP7 CONSTRUCTION INC. 1.12% $52,131.21
SOIL TECH ADVANCE INC. 0.33% $15,360.09
PINNACLE GRINDING AND GROOVING LLC 0.25% $11,636.43
ANTS CONTRACTORS LLC 0.21% $9,774.60
Total: 57.33% $2,668,466.13

Bid Items & Bid Tabulations

96 Total 0 of 96
NUECES  |  FM 665  |  CORPUS CHRISTI  |  0086-20-023  |  08/04/2021  |  $4,641,197.26  |  STP 2021(877)HES  |  HAZARD ELIM & SAFETY  |  187 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CK NEWBERRY, LLC
HAAS-ANDERSON CONSTRUCTION, LTD.
BAY LTD.
PREPARING ROW
STA 67.000 $278.000 $500.000 $530.000 $1,451.700
REMOVING CONC (RIPRAP)
CY 8.000 $58.000 $150.000 $125.000 $220.000
REMOVING CONC (DRIVEWAYS)
SY 356.000 $14.600 $25.000 $24.000 $15.250
SUBGRADE WIDENING (DENS CONT)
STA 67.000 $447.000 $400.000 $474.000 $730.000
BACKFILL (TY A OR B)
STA 511.000 $125.540 $150.000 $185.000 $220.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 4,725.000 $70.000 $75.000 $72.000 $83.000
REWORK BS MTL (TY C)(7")(DENS CONT)
SY 23,022.000 $2.500 $1.000 $0.950 $2.300
CEMENT
TON 168.000 $147.000 $200.000 $170.000 $180.000
CEMENT TREAT(EXIST MATL)(8")
SY 25,264.000 $1.700 $1.500 $2.350 $1.950
ASPH (MULTI OPTION)
GAL 63,577.000 $3.680 $2.500 $2.400 $3.000
ASPH (RC-250)
GAL 5,588.000 $3.700 $3.750 $3.250 $4.200
AGGR(TY-PB GR-5 SAC-B)
CY 178.000 $125.600 $125.000 $158.000 $260.000
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 1,653.000 $112.030 $90.000 $132.000 $170.000
PLANE ASPH CONC PAV(0" TO 2")
SY 4,609.000 $2.000 $5.000 $8.350 $12.250
PLANE ASPH CONC PAV(0" TO 3")
SY 2,836.000 $2.250 $3.000 $4.900 $6.600
CEM STABIL BKFL
CY 73.000 $165.000 $150.000 $41.000 $100.000
FLOWABLE BACKFILL
CY 14.330 $225.000 $425.000 $226.000 $790.000
RIPRAP (CONC)(4 IN)
CY 40.800 $480.350 $600.000 $574.000 $750.000
RIPRAP (MOW STRIP)(4 IN)
CY 26.000 $470.000 $625.000 $750.000 $650.000
RC PIPE (CL III)(18 IN)
LF 821.000 $63.000 $65.000 $71.000 $99.000
RC PIPE (CL III)(24 IN)
LF 68.000 $80.000 $85.000 $185.000 $150.000
RC PIPE (CL III)(30 IN)
LF 20.000 $126.000 $130.000 $215.000 $180.000
RC PIPE (CL III)(42 IN)
LF 80.000 $147.000 $150.000 $248.000 $180.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 2.000 $4,845.000 $7,000.000 $5,510.000 $2,500.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 12.000 $6,100.000 $7,500.000 $7,290.000 $3,100.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
EA 6.000 $5,732.540 $7,500.000 $8,950.000 $4,400.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
EA 4.000 $9,383.000 $8,500.000 $10,000.000 $5,300.000
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 4.000 $1,361.000 $1,500.000 $1,300.000 $1,400.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 2.000 $3,005.000 $1,850.000 $1,410.000 $1,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 58.000 $1,084.000 $1,850.000 $1,410.000 $1,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 6.000 $1,694.000 $2,400.000 $1,530.000 $1,900.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 6.000 $2,065.000 $2,500.000 $1,700.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,710.000 $2,500.000 $1,700.000 $1,700.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 4.000 $2,095.850 $3,500.000 $3,220.000 $2,300.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 4.000 $4,400.000 $6,500.000 $8,320.000 $3,400.000
CLEAN EXIST CULVERTS
EA 19.000 $1,460.000 $500.000 $1,400.000 $910.000
REMOV STR (WINGWALL)
EA 24.000 $1,500.000 $1,000.000 $1,270.000 $3,000.000
REMOV STR (HEADWALL)
EA 8.000 $1,150.000 $1,200.000 $633.000 $2,900.000
REMOV STR (PIPE)
LF 1,101.000 $13.000 $12.000 $9.250 $17.500
MOBILIZATION
LS 1.000 $315,000.000 $350,000.000 $410,000.000 $125,800.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $10,000.000 $2,500.000 $2,330.000 $19,900.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,840.000 $5.000 $3.250 $3.000 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,840.000 $1.500 $2.250 $1.500 $1.700
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,140.000 $7.300 $5.500 $8.750 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,140.000 $2.530 $2.000 $1.400 $1.600
DRIVEWAYS (CONC)
SY 356.000 $75.000 $100.000 $86.000 $91.000
TURNOUTS (ACP)
SY 22.200 $57.580 $30.000 $40.000 $490.000
DRIVEWAYS (ACP)(TYPE 1)
SY 2,429.000 $30.000 $45.000 $68.000 $98.000
DRIVEWAYS (ACP) (TYPE 2)
SY 2,054.000 $25.000 $35.000 $44.000 $69.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 100,519.000 $0.190 $0.200 $0.150 $0.200
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 49,878.000 $0.370 $0.200 $0.100 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 1,075.000 $18.000 $26.000 $25.000 $32.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,650.000 $1,600.000 $1,870.000 $1,900.000
REMOVE METAL BEAM GUARD FENCE
LF 1,086.000 $2.000 $2.000 $2.700 $2.400
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,268.180 $2,800.000 $2,840.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $274.050 $300.000 $207.000 $430.000
MAILBOX INSTALL-S (RR-POST) TY 4
EA 12.000 $214.000 $165.000 $186.000 $970.000
MAILBOX INSTALL-D (RR-POST) TY 4
EA 1.000 $321.110 $220.000 $239.000 $1,000.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $489.170 $550.000 $610.000 $590.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 52.000 $568.000 $575.000 $637.000 $730.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 13.000 $627.000 $725.000 $822.000 $940.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 6.000 $842.000 $1,000.000 $1,110.000 $1,300.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 1.000 $1,646.440 $1,000.000 $1,540.000 $1,800.000
REMOVE SM RD SN SUP&AM
EA 69.000 $75.000 $50.000 $80.000 $91.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 2.000 $31.200 $25.000 $27.000 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 13.000 $24.400 $25.000 $27.000 $30.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 8.000 $12.000 $25.000 $27.000 $30.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 10.000 $62.000 $95.000 $90.000 $100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 10.000 $53.100 $95.000 $101.000 $120.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 10.000 $26.000 $35.000 $34.000 $40.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $26.000 $35.000 $36.000 $41.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 8.000 $26.000 $35.000 $36.000 $41.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 35.000 $55.160 $120.000 $122.000 $140.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 10.000 $65.060 $95.000 $90.000 $100.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
EA 40.000 $126.070 $150.000 $133.000 $150.000
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 1.000 $112.000 $550.000 $530.000 $610.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 101,984.000 $0.300 $0.300 $0.300 $0.350
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,100.000 $1.000 $0.550 $1.100 $1.200
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 175.000 $0.650 $1.000 $1.050 $1.200
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 80.000 $0.290 $0.500 $0.400 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 101,956.000 $0.250 $0.350 $0.350 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 11,630.000 $0.250 $0.400 $0.400 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 15,718.000 $0.250 $0.400 $0.400 $0.400
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 80.000 $8.000 $15.000 $15.000 $17.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $200.000 $200.000 $196.000 $300.000
PREFAB PAV MRK TY C (W) (WORD)
EA 3.000 $227.000 $275.000 $265.000 $300.000
REFL PAV MRKR TY II-A-A
EA 974.000 $4.000 $3.750 $3.700 $4.300
REFL PAV MRKR TY II-C-R
EA 18.000 $2.680 $3.750 $3.700 $4.300
TREE TRIMMING / BRUSH REMOVAL
MI 0.180 $25,000.000 $12,000.000 $24,000.000 $20,000.000
TREE AND BRUSH REMOVAL
AC 0.420 $6,200.000 $13,000.000 $33,000.000 $30,000.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 117.000 $4.900 $13.000 $15.000 $24.000
D-GR HMA TY-D SAC-B PG70-22
TON 19,910.000 $100.000 $100.000 $104.500 $110.000
TACK COAT
GAL 14,263.000 $3.130 $3.250 $3.750 $4.900
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 660.000 $90.000 $20.000 $49.000 $60.000
TMA (STATIONARY)
DAY 153.000 $106.670 $255.000 $10.000 $150.000
TMA (MOBILE OPERATION)
HR 180.000 $870.000 $30.000 $10.000 $300.000
Totals: $4,641,197.256 $4,508,717.900 $4,839,875.930 $5,442,187.550