|
|
PREPARING ROW
|
STA
|
67.000
|
$278.000
|
$500.000
|
$530.000
|
$1,451.700
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
8.000
|
$58.000
|
$150.000
|
$125.000
|
$220.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
356.000
|
$14.600
|
$25.000
|
$24.000
|
$15.250
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
67.000
|
$447.000
|
$400.000
|
$474.000
|
$730.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
511.000
|
$125.540
|
$150.000
|
$185.000
|
$220.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
4,725.000
|
$70.000
|
$75.000
|
$72.000
|
$83.000
|
|
|
REWORK BS MTL (TY C)(7")(DENS CONT)
|
SY
|
23,022.000
|
$2.500
|
$1.000
|
$0.950
|
$2.300
|
|
|
CEMENT
|
TON
|
168.000
|
$147.000
|
$200.000
|
$170.000
|
$180.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
25,264.000
|
$1.700
|
$1.500
|
$2.350
|
$1.950
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
63,577.000
|
$3.680
|
$2.500
|
$2.400
|
$3.000
|
|
|
ASPH (RC-250)
|
GAL
|
5,588.000
|
$3.700
|
$3.750
|
$3.250
|
$4.200
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
178.000
|
$125.600
|
$125.000
|
$158.000
|
$260.000
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
1,653.000
|
$112.030
|
$90.000
|
$132.000
|
$170.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
4,609.000
|
$2.000
|
$5.000
|
$8.350
|
$12.250
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
2,836.000
|
$2.250
|
$3.000
|
$4.900
|
$6.600
|
|
|
CEM STABIL BKFL
|
CY
|
73.000
|
$165.000
|
$150.000
|
$41.000
|
$100.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
14.330
|
$225.000
|
$425.000
|
$226.000
|
$790.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
40.800
|
$480.350
|
$600.000
|
$574.000
|
$750.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
26.000
|
$470.000
|
$625.000
|
$750.000
|
$650.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
821.000
|
$63.000
|
$65.000
|
$71.000
|
$99.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
68.000
|
$80.000
|
$85.000
|
$185.000
|
$150.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
20.000
|
$126.000
|
$130.000
|
$215.000
|
$180.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
80.000
|
$147.000
|
$150.000
|
$248.000
|
$180.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
2.000
|
$4,845.000
|
$7,000.000
|
$5,510.000
|
$2,500.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
12.000
|
$6,100.000
|
$7,500.000
|
$7,290.000
|
$3,100.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
6.000
|
$5,732.540
|
$7,500.000
|
$8,950.000
|
$4,400.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
4.000
|
$9,383.000
|
$8,500.000
|
$10,000.000
|
$5,300.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$1,361.000
|
$1,500.000
|
$1,300.000
|
$1,400.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$3,005.000
|
$1,850.000
|
$1,410.000
|
$1,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
58.000
|
$1,084.000
|
$1,850.000
|
$1,410.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,694.000
|
$2,400.000
|
$1,530.000
|
$1,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
6.000
|
$2,065.000
|
$2,500.000
|
$1,700.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,710.000
|
$2,500.000
|
$1,700.000
|
$1,700.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,095.850
|
$3,500.000
|
$3,220.000
|
$2,300.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$4,400.000
|
$6,500.000
|
$8,320.000
|
$3,400.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
19.000
|
$1,460.000
|
$500.000
|
$1,400.000
|
$910.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
24.000
|
$1,500.000
|
$1,000.000
|
$1,270.000
|
$3,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
8.000
|
$1,150.000
|
$1,200.000
|
$633.000
|
$2,900.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,101.000
|
$13.000
|
$12.000
|
$9.250
|
$17.500
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$315,000.000
|
$350,000.000
|
$410,000.000
|
$125,800.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$10,000.000
|
$2,500.000
|
$2,330.000
|
$19,900.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,840.000
|
$5.000
|
$3.250
|
$3.000
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,840.000
|
$1.500
|
$2.250
|
$1.500
|
$1.700
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,140.000
|
$7.300
|
$5.500
|
$8.750
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,140.000
|
$2.530
|
$2.000
|
$1.400
|
$1.600
|
|
|
DRIVEWAYS (CONC)
|
SY
|
356.000
|
$75.000
|
$100.000
|
$86.000
|
$91.000
|
|
|
TURNOUTS (ACP)
|
SY
|
22.200
|
$57.580
|
$30.000
|
$40.000
|
$490.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
2,429.000
|
$30.000
|
$45.000
|
$68.000
|
$98.000
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
2,054.000
|
$25.000
|
$35.000
|
$44.000
|
$69.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
100,519.000
|
$0.190
|
$0.200
|
$0.150
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
49,878.000
|
$0.370
|
$0.200
|
$0.100
|
$0.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,075.000
|
$18.000
|
$26.000
|
$25.000
|
$32.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,650.000
|
$1,600.000
|
$1,870.000
|
$1,900.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,086.000
|
$2.000
|
$2.000
|
$2.700
|
$2.400
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,268.180
|
$2,800.000
|
$2,840.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$274.050
|
$300.000
|
$207.000
|
$430.000
|
|
|
MAILBOX INSTALL-S (RR-POST) TY 4
|
EA
|
12.000
|
$214.000
|
$165.000
|
$186.000
|
$970.000
|
|
|
MAILBOX INSTALL-D (RR-POST) TY 4
|
EA
|
1.000
|
$321.110
|
$220.000
|
$239.000
|
$1,000.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$489.170
|
$550.000
|
$610.000
|
$590.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
52.000
|
$568.000
|
$575.000
|
$637.000
|
$730.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
13.000
|
$627.000
|
$725.000
|
$822.000
|
$940.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
6.000
|
$842.000
|
$1,000.000
|
$1,110.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
1.000
|
$1,646.440
|
$1,000.000
|
$1,540.000
|
$1,800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
69.000
|
$75.000
|
$50.000
|
$80.000
|
$91.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
2.000
|
$31.200
|
$25.000
|
$27.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
13.000
|
$24.400
|
$25.000
|
$27.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
8.000
|
$12.000
|
$25.000
|
$27.000
|
$30.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
10.000
|
$62.000
|
$95.000
|
$90.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
10.000
|
$53.100
|
$95.000
|
$101.000
|
$120.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
10.000
|
$26.000
|
$35.000
|
$34.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$26.000
|
$35.000
|
$36.000
|
$41.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
|
EA
|
8.000
|
$26.000
|
$35.000
|
$36.000
|
$41.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
35.000
|
$55.160
|
$120.000
|
$122.000
|
$140.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
10.000
|
$65.060
|
$95.000
|
$90.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
|
EA
|
40.000
|
$126.070
|
$150.000
|
$133.000
|
$150.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(RR XING)
|
EA
|
1.000
|
$112.000
|
$550.000
|
$530.000
|
$610.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
101,984.000
|
$0.300
|
$0.300
|
$0.300
|
$0.350
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,100.000
|
$1.000
|
$0.550
|
$1.100
|
$1.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
175.000
|
$0.650
|
$1.000
|
$1.050
|
$1.200
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
80.000
|
$0.290
|
$0.500
|
$0.400
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
101,956.000
|
$0.250
|
$0.350
|
$0.350
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
11,630.000
|
$0.250
|
$0.400
|
$0.400
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
15,718.000
|
$0.250
|
$0.400
|
$0.400
|
$0.400
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
80.000
|
$8.000
|
$15.000
|
$15.000
|
$17.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$200.000
|
$200.000
|
$196.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
3.000
|
$227.000
|
$275.000
|
$265.000
|
$300.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
974.000
|
$4.000
|
$3.750
|
$3.700
|
$4.300
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
18.000
|
$2.680
|
$3.750
|
$3.700
|
$4.300
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
0.180
|
$25,000.000
|
$12,000.000
|
$24,000.000
|
$20,000.000
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
0.420
|
$6,200.000
|
$13,000.000
|
$33,000.000
|
$30,000.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
117.000
|
$4.900
|
$13.000
|
$15.000
|
$24.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
19,910.000
|
$100.000
|
$100.000
|
$104.500
|
$110.000
|
|
|
TACK COAT
|
GAL
|
14,263.000
|
$3.130
|
$3.250
|
$3.750
|
$4.900
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
660.000
|
$90.000
|
$20.000
|
$49.000
|
$60.000
|
|
|
TMA (STATIONARY)
|
DAY
|
153.000
|
$106.670
|
$255.000
|
$10.000
|
$150.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
180.000
|
$870.000
|
$30.000
|
$10.000
|
$300.000
|
|
Totals: |
$4,641,197.256
|
$4,508,717.900
|
$4,839,875.930
|
$5,442,187.550
|