Job Info for 2379-02-010

County: NOLAN Highway: FM 608 Date: 09/06/2023 (1 year ago) Engineer's Estimate: $3,586,299 Control Number: 2379-02-010
Project: C 2379-2-10 District: ABILENE Time: 134 WORKING DAYS Type: REHABILITATE EXISTING ROADWAY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,586,298.75
BONTKE BROTHERS CONSTRUCTION COMPANY   $4,084,995.25 1
13.91% | $498,696.50
GILVIN-TERRILL, LTD.   $4,630,894.90 2
29.13% | $1,044,596.15
13.36% | $545,899.65
Subcontractor Percentage Amount
FLAT LINE, INC. 2.30% $93,954.89
HJC FARMS, INC. 1.08% $44,117.95
CONTRACTORS SERVICE, LTD. 0.95% $38,807.45
Total: 4.33% $176,880.29

Bid Items

Items: 44, 0 filtered
NOLAN FM 608  |  ABILENE  |  2379-02-010  |  09/06/2023  |  $3,586,299  |  C 2379-2-10  |  REHAB EXIST ROADWAY  |  134 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate BONTKE BROTHERS CONSTRUCTION COMPANY GILVIN-TERRILL, LTD.
110 6001 EXCAVATION (ROADWAY) CY 4,717.000 $50.000 $15.000 $15.000
132 6008 EMBANKMENT (FINAL)(DENS CONT)(TY D) CY 5,201.000 $15.000 $20.000 $15.000
247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 6,629.000 $75.000 $65.000 $45.000
251 6034 REWORK BS MTL (TY C) (8") (ORD COMP) SY 62,663.000 $2.000 $7.000 $5.000
275 6001 CEMENT TON 1,218.000 $250.000 $270.000 $340.000
275 6014 CEMENT TREAT (MX EXST MTL & NW BS)(8") SY 81,016.000 $2.500 $8.000 $6.000
310 6012 PRIME COAT (RC-250) GAL 20,255.000 $6.000 $8.500 $12.500
316 6001 ASPH (MULTI OPTION) GAL 34,038.000 $6.000 $9.500 $12.500
316 6017 ASPH (AC-20-5TR) GAL 32,417.000 $6.000 $10.000 $12.500
316 6177 AGGR(TY-B GR-5 SAC-B) CY 651.000 $165.000 $250.000 $175.000
316 6222 AGGR(TY-PB GR-3 SAC-B) CY 708.000 $175.000 $250.000 $175.000
316 6224 AGGR(TY-PB GR-4 SAC-B) CY 651.000 $165.000 $250.000 $175.000
462 6047 CONC BOX CULV (4 FT X 2 FT)(EXTEND) LF 10.000 $650.000 $2,000.000 $2,000.000
462 6050 CONC BOX CULV (5 FT X 2 FT)(EXTEND) LF 8.000 $750.000 $2,500.000 $2,500.000
462 6064 CONC BOX CULV (8 FT X 5 FT)(EXTEND) LF 17.000 $1,000.000 $3,000.000 $3,500.000
464 6005 RC PIPE (CL III)(24 IN) LF 4.000 $100.000 $250.000 $400.000
464 6008 RC PIPE (CL III)(36 IN) LF 4.000 $300.000 $250.000 $400.000
466 6182 WINGWALL (PW - 1) (HW=7 FT) EA 2.000 $65,000.000 $15,000.000 $85,000.000
467 6106 SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C) EA 2.000 $4,000.000 $4,000.000 $15,000.000
467 6139 SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C) EA 4.000 $4,500.000 $4,500.000 $16,000.000
467 6172 SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C) EA 2.000 $6,000.000 $5,000.000 $17,000.000
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 2.000 $1,800.000 $4,000.000 $2,000.000
467 6419 SET (TY II) (30 IN) (RCP) (4: 1) (C) EA 2.000 $2,400.000 $5,000.000 $2,500.000
467 6450 SET (TY II) (36 IN) (RCP) (4: 1) (C) EA 2.000 $3,600.000 $6,000.000 $3,000.000
500 6001 MOBILIZATION LS 1.000 $315,500.000 $200,000.000 $450,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 $15,000.000 $12,000.000 $50,000.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 270.000 $50.000 $6.000 $10.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 270.000 $5.000 $3.000 $2.000
530 6006 DRIVEWAYS (SURF TREAT) SY 1,547.000 $150.000 $22.000 $40.640
530 6009 TURNOUTS (SURF TREAT) SY 179.000 $40.000 $25.000 $40.640
530 6016 DRIVEWAYS (BASE) SY 1,867.000 $135.000 $15.000 $8.800
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 7.000 $250.000 $1,200.000 $250.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 34.000 $800.000 $600.000 $650.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 2.000 $1,000.000 $600.000 $950.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 2.000 $1,200.000 $600.000 $975.000
644 6076 REMOVE SM RD SN SUP&AM EA 19.000 $150.000 $600.000 $100.000
666 6343 REF PROF PAV MRK TY I(W)6"(SLD)(100MIL) LF 55,711.000 $0.750 $1.250 $1.060
666 6346 REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL) LF 4,862.000 $0.750 $2.000 $1.100
666 6347 REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL) LF 23,708.000 $1.000 $1.500 $1.100
668 6018 PREFAB PAV MRK TY B (W)(24")(SLD) LF 98.000 $35.000 $33.000 $30.000
668 6033 PREFAB PAV MRK TY B (W)(18")(YLD TRI) EA 9.000 $100.000 $33.000 $100.000
672 6009 REFL PAV MRKR TY II-A-A EA 697.000 $6.000 $8.000 $5.000
6056 6002 PREFORMED CENTERLINE RUMBLE STRIP LF 1,562.000 $4.000 $11.000 $12.000
6185 6005 TMA (MOBILE OPERATION) DAY 15.000 $500.000 $250.000 $2,200.000
Totals: $3,586,298.75 $4,084,995.25 $4,630,894.90