Show Job Controls
Bid Cobra

NOLAN FM 608 (2379-02-010)

Items: 44

County: NOLAN
Length: N/A
Highway: FM 608
District: ABILENE
Control Number: 2379-02-010
DBE Goal: N/A
Project: C 2379-2-10
Guaranty: N/A
Time: 134 WORKING DAYS
Engineer's Estimate: $3,586,298.75
Date: 09/06/2023 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
RYAN SAYLES
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$3,586,298.75
Over/Under Est: 13.91% $498,696.50
$4,630,894.90
Over/Under Est: 29.13% $1,044,596.15
Amt Left: 13.36% $545,899.65
Subcontractor Percentage Amount
FLAT LINE, INC. 2.30% $93,954.89
HJC FARMS, INC. 1.08% $44,117.95
CONTRACTORS SERVICE, LTD. 0.95% $38,807.45
Total: 4.33% $176,880.29

Bid Items & Bid Tabulations

44 Total 0 of 44
NOLAN  |  FM 608  |  ABILENE  |  2379-02-010  |  09/06/2023  |  $3,586,298.75  |  C 2379-2-10  |  REHAB EXIST ROADWAY  |  134 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BONTKE BROTHERS CONSTRUCTION COMPANY
GILVIN-TERRILL, LTD.
EXCAVATION (ROADWAY)
CY 4,717.000 $50.000 $15.000 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 5,201.000 $15.000 $20.000 $15.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 6,629.000 $75.000 $65.000 $45.000
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 62,663.000 $2.000 $7.000 $5.000
CEMENT
TON 1,218.000 $250.000 $270.000 $340.000
CEMENT TREAT (MX EXST MTL & NW BS)(8")
SY 81,016.000 $2.500 $8.000 $6.000
PRIME COAT (RC-250)
GAL 20,255.000 $6.000 $8.500 $12.500
ASPH (MULTI OPTION)
GAL 34,038.000 $6.000 $9.500 $12.500
ASPH (AC-20-5TR)
GAL 32,417.000 $6.000 $10.000 $12.500
AGGR(TY-B GR-5 SAC-B)
CY 651.000 $165.000 $250.000 $175.000
AGGR(TY-PB GR-3 SAC-B)
CY 708.000 $175.000 $250.000 $175.000
AGGR(TY-PB GR-4 SAC-B)
CY 651.000 $165.000 $250.000 $175.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 10.000 $650.000 $2,000.000 $2,000.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 8.000 $750.000 $2,500.000 $2,500.000
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
LF 17.000 $1,000.000 $3,000.000 $3,500.000
RC PIPE (CL III)(24 IN)
LF 4.000 $100.000 $250.000 $400.000
RC PIPE (CL III)(36 IN)
LF 4.000 $300.000 $250.000 $400.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $65,000.000 $15,000.000 $85,000.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 2.000 $4,000.000 $4,000.000 $15,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 4.000 $4,500.000 $4,500.000 $16,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $6,000.000 $5,000.000 $17,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,800.000 $4,000.000 $2,000.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $2,400.000 $5,000.000 $2,500.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $3,600.000 $6,000.000 $3,000.000
MOBILIZATION
LS 1.000 $315,500.000 $200,000.000 $450,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $15,000.000 $12,000.000 $50,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 270.000 $50.000 $6.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 270.000 $5.000 $3.000 $2.000
DRIVEWAYS (SURF TREAT)
SY 1,547.000 $150.000 $22.000 $40.640
TURNOUTS (SURF TREAT)
SY 179.000 $40.000 $25.000 $40.640
DRIVEWAYS (BASE)
SY 1,867.000 $135.000 $15.000 $8.800
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 7.000 $250.000 $1,200.000 $250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 34.000 $800.000 $600.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $1,000.000 $600.000 $950.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,200.000 $600.000 $975.000
REMOVE SM RD SN SUP&AM
EA 19.000 $150.000 $600.000 $100.000
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 55,711.000 $0.750 $1.250 $1.060
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 4,862.000 $0.750 $2.000 $1.100
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 23,708.000 $1.000 $1.500 $1.100
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 98.000 $35.000 $33.000 $30.000
PREFAB PAV MRK TY B (W)(18")(YLD TRI)
EA 9.000 $100.000 $33.000 $100.000
REFL PAV MRKR TY II-A-A
EA 697.000 $6.000 $8.000 $5.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 1,562.000 $4.000 $11.000 $12.000
TMA (MOBILE OPERATION)
DAY 15.000 $500.000 $250.000 $2,200.000
Totals: $3,586,298.750 $4,084,995.250 $4,630,894.900