NOLAN FM 608 (0053-15-024)

Items: 60

County: NOLAN
Length: N/A
Highway: FM 608
District: ABILENE
Control Number: 0053-15-024
DBE Goal: N/A
Project: STP 2018(628)HES
Guaranty: N/A
Time: 253 WORKING DAYS
Engineer's Estimate: $2,676,115.50
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: SAFETY TREAT ENDS & WIDEN PAVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$2,676,115.50
Over/Under Est: 59.25% $1,585,663.98
$4,344,373.30
Over/Under Est: 62.34% $1,668,257.80
Amt Left: 1.94% $82,593.82

Bid Items & Bid Tabulations

60 Total 0 of 60
NOLAN  |  FM 608  |  ABILENE  |  0053-15-024  |  05/07/2019  |  $2,676,115.50  |  STP 2018(628)HES  |  SAFETY TREAT ENDS & WIDEN PAVMT  |  253 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
A. L. HELMCAMP, INC.
PREPARING ROW
STA 429.000 $500.000 $850.000 $310.000
REMOVING CONC (DRIVEWAYS)
SY 78.000 $75.000 $50.000 $49.000
EXCAVATION (ROADWAY)
CY 6,583.000 $15.000 $18.250 $60.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,606.000 $10.000 $13.500 $30.000
BACKFILL (TY B)
STA 429.000 $174.000 $225.000 $425.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 8.000 $390.000 $1,640.000 $1,100.000
VEGETATIVE WATERING
MG 447.000 $30.000 $48.000 $45.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 7,711.000 $60.000 $68.000 $86.000
RWRK BS MTL(TY C)(6")(DEN CNT)(ORG POS)
CY 13,329.000 $8.000 $27.000 $21.000
PRIME COAT (AE-P)
GAL 19,046.000 $5.000 $4.750 $4.000
ASPH (MULTI OPTION)
GAL 34,282.000 $4.000 $4.350 $4.500
ASPH (AC-20-5TR)
GAL 47,995.000 $2.000 $4.550 $4.500
AGGR(TY-PB GR-3 SAC-B)
CY 726.000 $100.000 $170.000 $200.000
AGGR(TY-PB GR-4 SAC-B)
CY 1,159.000 $92.000 $158.000 $160.000
SUPERPAV MIX SP-D SAC-B PG70-22(LEV-UP)
TON 1,779.000 $100.000 $135.000 $165.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 3,332.000 $40.000 $52.000 $42.000
RIPRAP (CONC)(4 IN)
CY 2.000 $450.000 $2,500.000 $1,350.000
CMP (GAL STL 18 IN)
LF 134.000 $65.000 $58.000 $75.000
CMP (GAL STL 24 IN)
LF 15.000 $90.000 $125.000 $150.000
CMP (GAL STL 36 IN)
LF 2.000 $110.000 $400.000 $350.000
SET (TY II) (18 IN) (CMP) (3: 1) (P)
EA 2.000 $1,000.000 $1,025.000 $1,100.000
SET (TY II) (18 IN) (CMP) (4: 1) (P)
EA 6.000 $1,000.000 $1,100.000 $1,200.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 6.000 $1,110.000 $1,350.000 $1,500.000
SET (TY II) (36 IN) (CMP) (3: 1) (C)
EA 1.000 $1,250.000 $2,250.000 $2,500.000
CLEAN EXIST CULVERTS
EA 16.000 $1,850.000 $3,800.000 $2,000.000
REMOV STR (SET)
EA 13.000 $435.000 $450.000 $400.000
REMOV STR (PIPE)
LF 132.000 $17.000 $15.000 $20.000
MOBILIZATION
LS 1.000 $200,000.000 $558,977.230 $424,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $6,000.000 $3,950.250 $20,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 13,813.000 $3.500 $3.130 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 13,813.000 $1.500 $0.890 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 740.000 $6.250 $11.330 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 740.000 $1.150 $2.000 $3.000
INTERSECTIONS (SURF TREAT)
SY 227.000 $20.000 $52.000 $36.000
DRIVEWAYS (SURF TREAT)
SY 7,819.000 $15.000 $38.000 $22.000
TURNOUTS (SURF TREAT)
SY 160.000 $20.000 $52.000 $40.000
DRIVEWAYS (CONC) (HES)
SY 96.000 $85.000 $180.000 $180.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 5.000 $220.000 $288.000 $235.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 2.000 $250.000 $374.000 $290.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 1.000 $650.000 $489.000 $440.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 63.000 $500.000 $834.000 $540.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 38.000 $700.000 $920.000 $610.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $975.000 $7,993.000 $720.000
REMOVE SM RD SN SUP&AM
EA 92.000 $88.000 $115.000 $100.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 18.000 $70.000 $161.000 $60.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 18.000 $20.000 $18.000 $45.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 85,705.000 $0.500 $0.250 $0.220
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,367.000 $1.000 $5.400 $0.600
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 418.000 $8.000 $8.050 $8.000
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 82,908.000 $0.500 $0.770 $0.750
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 6,980.000 $0.500 $0.890 $0.900
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 38,394.000 $0.500 $0.770 $0.750
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $640.000 $1,121.250 $1,100.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 7.000 $45.000 $86.250 $85.000
REFL PAV MRKR TY II-A-A
EA 899.000 $4.000 $4.600 $4.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,600.000 $23,400.000 $20,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 2,290.000 $6.000 $6.900 $6.500
TMA (STATIONARY)
DAY 239.000 $250.000 $230.000 $220.000
TMA (MOBILE OPERATION)
DAY 44.000 $155.000 $800.000 $60.000
TEMP SPEED MONITOR SYS
EA 2.000 $5,000.000 $1,800.000 $12,000.000
Totals: $2,676,115.500 $4,261,779.480 $4,344,373.300