Job Info for 6396-71-001

County: NAVARRO Highway: IH0045 Date: 05/04/2022 (2 years ago) Engineer's Estimate: $1,005,678 Control Number: 6396-71-001
Project: RMC - 639671001 District: DALLAS Time: 730 CALENDAR DAYS Type: MBGF/CABLE BARRIER REPAIR
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11
Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,005,677.50
FIREMAN EXCAVATING, INC.   $864,965.26 1
-13.99% | -$140,712.24
ABOVE ALL CONSTRUCTION   $945,151.00 2
-6.02% | -$60,526.50
9.27% | $80,185.74
BK FIELD OPERATIONS LLC   $1,062,027.00 3
5.6% | $56,349.50
22.78% | $197,061.74
12.37% | $116,876.00
ROY JORGENSEN ASSOCIATES, INC.   $1,186,395.00 4
17.97% | $180,717.50
37.16% | $321,429.74
11.71% | $124,368.00
CATOCON, INC.   $1,535,900.00 5
52.72% | $530,222.50
77.57% | $670,934.74
29.46% | $349,505.00
VANN/ELLI, INC.   $1,878,130.00 6
86.75% | $872,452.50
117.13% | $1,013,164.74
22.28% | $342,230.00

Bid Items

Items: 35, 0 filtered
NAVARRO IH0045  |  DALLAS  |  6396-71-001  |  05/04/2022  |  $1,005,678  |  RMC - 639671001  |  MBGF/CABLE BARRIER REPAIR  |  730 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate FIREMAN EXCAVATING, INC. ABOVE ALL CONSTRUCTION BK FIELD OPERATIONS LLC ROY JORGENSEN ASSOCIATES, INC. CATOCON, INC. VANN/ELLI, INC.
500 6033 MOBILIZATION (CALLOUT) EA 50.000 $520.000 $1.000 $200.000 $1.000 $3,000.000 $1,500.000 $2,000.000
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 15.000 $20.000 $5.000 $50.000 $50.000 $5.000 $40.000 $30.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 15.000 $20.000 $5.000 $50.000 $50.000 $20.000 $40.000 $30.000
658 6026 INSTL DEL ASSM (D-SY)SZ (BRF)CTB EA 115.000 $15.000 $5.000 $25.000 $200.000 $20.000 $40.000 $30.000
658 6047 INSTL OM ASSM (OM-2Y)(WC)GND EA 15.000 $50.000 $5.000 $50.000 $20.000 $25.000 $40.000 $150.000
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 75.000 $7.500 $1.000 $20.000 $10.000 $25.000 $40.000 $20.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 15.000 $50.000 $50.000 $50.000 $25.000 $25.000 $40.000 $75.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 15.000 $25.000 $5.000 $50.000 $25.000 $25.000 $50.000 $75.000
658 6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 15.000 $25.000 $50.000 $50.000 $25.000 $25.000 $50.000 $75.000
658 6067 INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2 EA 15.000 $25.000 $5.000 $50.000 $25.000 $25.000 $50.000 $75.000
658 6068 INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2 EA 4,026.000 $7.500 $0.010 $1.000 $22.000 $20.000 $25.000 $75.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 4,000.000 $18.000 $30.000 $50.000 $35.000 $30.000 $45.000 $27.000
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 50.000 $150.000 $20.000 $50.000 $25.000 $20.000 $70.000 $75.000
770 6003 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 50.000 $100.000 $20.000 $50.000 $30.000 $20.000 $70.000 $75.000
770 6012 REM / REPL TIMBER POST W / O CONC FND EA 640.000 $125.000 $25.000 $40.000 $12.000 $25.000 $65.000 $75.000
770 6016 REPAIR STEEL POST WITH BASE PLATE EA 3.000 $150.000 $300.000 $400.000 $180.000 $300.000 $1,000.000 $500.000
770 6017 REALIGN POSTS EA 150.000 $25.000 $20.000 $25.000 $1.000 $10.000 $40.000 $40.000
770 6019 REMOVE & REPLACE BLOCKOUT EA 640.000 $45.000 $15.000 $10.000 $10.000 $12.000 $45.000 $35.000
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 1,000.000 $40.000 $25.000 $40.000 $40.000 $35.000 $60.000 $50.000
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA 160.000 $60.000 $40.000 $100.000 $65.000 $60.000 $125.000 $200.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 100.000 $2,650.000 $3,500.000 $3,100.000 $4,000.000 $3,200.000 $4,700.000 $4,400.000
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 25.000 $1,250.000 $1,000.000 $1,000.000 $1,200.000 $1,200.000 $1,500.000 $1,100.000
770 6029 REM & RESET SGT IMPACT HEAD EA 5.000 $75.000 $200.000 $200.000 $1.000 $250.000 $300.000 $350.000
770 6030 REPLACE SGT CABLE ASSEMBLY EA 30.000 $75.000 $50.000 $100.000 $40.000 $80.000 $150.000 $120.000
770 6031 REPLACE SGT CABLE ANCHOR EA 30.000 $80.000 $50.000 $100.000 $40.000 $80.000 $150.000 $120.000
770 6032 REPLACE SGT STRUT EA 14.000 $80.000 $50.000 $100.000 $70.000 $80.000 $200.000 $120.000
770 6033 REPLACE SGT OBJECT MARKER EA 5.000 $45.000 $50.000 $50.000 $50.000 $20.000 $200.000 $50.000
770 6060 REMOVE AND REPLACE DAT EA 3.000 $3,750.000 $2,500.000 $1,500.000 $3,000.000 $2,000.000 $3,000.000 $2,000.000
771 6002 REPLACE POSTS (TL-4) EA 400.000 $450.000 $300.000 $190.000 $220.000 $150.000 $200.000 $375.000
771 6004 CABLE SPLICE / TURNBUCKLE (TL-4) EA 2.000 $250.000 $2,000.000 $200.000 $50.000 $1,000.000 $400.000 $400.000
771 6008 REPR OR REPLC CABLE BARR TERM SEC(TL-4) EA 25.000 $1,300.000 $5,000.000 $2,000.000 $3,000.000 $1,500.000 $3,000.000 $6,000.000
771 6011 CHECK / RE-TENSION CABLE EA 50.000 $500.000 $50.000 $100.000 $50.000 $400.000 $100.000 $500.000
774 6044 REMOVE AND REPLACE (SMTC) (N) EA 3.000 $10,000.000 $100.000 $28,000.000 $30,000.000 $28,000.000 $20,000.000 $36,000.000
774 6068 REPAIR (SMTC) (N) LF 200.000 $200.000 $200.000 $100.000 $200.000 $200.000 $500.000 $1,200.000
6185 6002 TMA (STATIONARY) DAY 200.000 $375.000 $1.000 $200.000 $1.000 $750.000 $750.000 $150.000
Totals: $1,005,677.50 $864,965.26 $945,151.00 $1,062,027.00 $1,186,395.00 $1,535,900.00 $1,878,130.00