Show Job Controls
Bid Cobra

NAVARRO FM 3041 (3090-01-012)

Items: 93

County: NAVARRO
Length: N/A
Highway: FM 3041
District: DALLAS
Control Number: 3090-01-012
DBE Goal: N/A
Project: F 2023(609)
Guaranty: N/A
Time: 247 WORKING DAYS
Engineer's Estimate: $6,720,750.07
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: RECONSTRUCT EXISTING ROADWAY
Mail/Deliver Bids To: N/A
JUAN PAREDES
AMANDA MCKITTRICK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$6,720,750.07
$6,473,924.21
Over/Under Est: -3.67% -$246,825.86
Over/Under Est: 12.95% $870,454.98
Amt Left: 17.26% $1,117,280.84
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 20.09% $1,356,292.91
A. E. MOORE CONSTRUCTION, INC. 3.55% $239,663.51
FORTSON CONTRACTING, INC. 1.35% $91,139.64
WITHERS CONSTRUCTION, LLC 0.96% $64,810.41
D. I. J. CONSTRUCTION, INC. 0.58% $39,156.29
TEXAS TRAFFIC AND BARRICADE, LLC 0.32% $21,603.47
WEST TEXAS ROCK RESOURCES, LLC 0.10% $6,751.08
PROFESSIONAL TRAFFIC CONTROL LLC 0.00% $0.00
BEAR CREEK CONSTRUCTION, LLC 0.00% $0.00
AREA WIDE PROTECTIVE, INC. 0.00% $0.00
CHEROKEE SERVICES 0.00% $0.00
Total: 26.95% $1,819,417.31

Bid Items & Bid Tabulations

93 Total 0 of 93
NAVARRO  |  FM 3041  |  DALLAS  |  3090-01-012  |  04/05/2023  |  $6,720,750.07  |  F 2023(609)  |  RECON EXIST ROADWAY  |  247 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 156.000 $3,500.000 $850.000 $800.000
REMOVING CONC (PAV)
SY 11,305.000 $12.600 $20.000 $8.500
REMOVING CONC (DRIVEWAYS)
SY 47.000 $17.450 $40.000 $31.500
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 219.000 $9.000 $10.000 $15.000
REMOV STAB BASE AND ASPH PAV (10"-18")
SY 8,399.000 $8.500 $12.000 $13.130
SUBGRADE WIDENING (ORD COMP)
STA 147.000 $130.000 $750.000 $502.200
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 8,489.000 $10.000 $25.000 $29.460
BACKFILL (TY A OR B)
STA 156.000 $202.150 $210.000 $415.590
ROAD GRADER WORK (ORD COMP)
STA 156.000 $163.150 $150.000 $620.500
COMPOST MANUF TOPSOIL (4")
SY 125,831.000 $1.500 $1.000 $1.030
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 125,831.000 $0.350 $0.180 $0.180
DRILL SEED (TEMP)(WARM OR COOL)
SY 18,874.000 $0.360 $0.110 $0.160
VEGETATIVE WATERING
MG 21,528.000 $5.000 $0.010 $0.100
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 8,848.000 $13.070 $11.000 $16.000
FL BS (RDWY DEL) (TY D GR 1-2)
TON 6,175.000 $43.610 $32.000 $27.500
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
SY 47,916.000 $25.000 $20.000 $25.000
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 31,049.000 $3.000 $2.000 $2.000
CEMENT
TON 299.000 $224.490 $250.000 $250.000
CEMENT TREAT (NEW BASE) (6")
SY 8,848.000 $8.000 $2.000 $2.500
CEMENT TREAT (MX EXST MTL & NW BS) (6")
SY 42,340.000 $1.300 $2.000 $1.750
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 9,583.000 $5.660 $3.750 $8.290
ASPH (CRS-2P)
GAL 7,986.000 $5.810 $4.500 $5.150
ASPH (RC-250)
GAL 4,472.000 $6.290 $5.000 $6.800
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 128.000 $158.680 $150.000 $225.750
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 23,958.000 $6.180 $4.500 $5.250
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
CY 133.000 $130.000 $235.000 $241.500
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 152.000 $250.030 $235.000 $267.750
PLANE ASPH CONC PAV (2")
SY 28,227.000 $2.110 $1.500 $2.190
CUT & RESTORING PAV
SY 299.000 $133.450 $350.000 $150.000
TRENCH EXCAVATION PROTECTION
LF 458.000 $3.260 $11.000 $10.000
TEMPORARY SPL SHORING
SF 3,329.000 $32.000 $33.000 $50.000
RIPRAP (CONC)(4 IN)
CY 52.000 $482.560 $775.000 $750.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 943.000 $153.800 $220.000 $210.000
RIPRAP (MOW STRIP)(4 IN)
CY 100.000 $496.000 $875.000 $750.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 24.000 $2,000.000 $2,100.000 $2,500.000
RC PIPE (CL III)(18 IN)
LF 1,102.000 $88.040 $66.000 $97.930
RC PIPE (CL III)(24 IN)
LF 236.000 $108.950 $155.000 $158.650
RC PIPE (CL III)(30 IN)
LF 30.000 $132.350 $188.000 $168.980
RC PIPE (CL III)(36 IN)
LF 286.000 $165.840 $222.000 $285.410
RC PIPE (CL III)(42 IN)
LF 100.000 $208.300 $250.000 $314.680
RC PIPE (CL III)(48 IN)
LF 111.000 $250.400 $277.000 $363.030
RC PIPE (CL III)(66 IN)
LF 387.000 $44.000 $500.000 $725.210
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $6,608.880 $6,000.000 $11,270.980
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
EA 2.000 $10,052.010 $8,800.000 $15,636.420
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $7,098.480 $5,000.000 $5,469.270
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 4.000 $10,276.230 $10,500.000 $12,481.750
HEADWALL (CH - PW - 0) (DIA= 66 IN)
EA 2.000 $16,060.000 $22,000.000 $26,856.640
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 1.000 $8,846.000 $11,500.000 $14,974.660
HEADWALL (CH - PW - S) (DIA= 48 IN)
EA 1.000 $9,538.000 $14,000.000 $23,468.860
HEADWALL (CH - PW - S) (DIA= 66 IN)
EA 2.000 $18,276.000 $26,000.000 $38,864.560
WINGWALL (PW - 1) (HW=13 FT)
EA 2.000 $57,700.000 $100,000.000 $162,216.520
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 72.000 $800.000 $1,100.000 $2,004.920
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,710.370 $1,600.000 $2,537.800
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,452.200 $2,700.000 $6,435.480
CLEAN EXIST CULVERTS
EA 1.000 $5,000.000 $3,800.000 $14,886.210
REMOV STR (WINGWALL)
EA 2.000 $1,897.000 $2,200.000 $11,135.250
REMOV STR (HEADWALL)
EA 12.000 $1,829.390 $2,200.000 $3,971.100
REMOV STR (PIPE)
LF 1,782.000 $24.020 $44.000 $36.940
MOBILIZATION
LS 1.000 $666,123.000 $645,000.000 $736,400.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $10,200.000 $13,000.000 $29,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 208.000 $33.860 $38.000 $46.200
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 529.000 $55.000 $60.000 $141.750
ROCK FILTER DAMS (REMOVE)
LF 737.000 $12.100 $11.000 $21.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 111.000 $27.320 $26.000 $27.830
CONSTRUCTION EXITS (REMOVE)
SY 111.000 $8.960 $11.000 $9.980
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,364.000 $3.260 $4.000 $2.780
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,364.000 $0.780 $0.550 $0.680
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,449.000 $5.070 $5.500 $4.460
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,449.000 $1.480 $0.550 $0.950
DRIVEWAYS (ACP)
SY 3,082.000 $70.000 $60.000 $53.730
DRIVEWAYS (CONC) (HES)
SY 53.000 $81.210 $190.000 $239.770
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 30,950.000 $0.520 $0.330 $0.150
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 15,587.000 $0.290 $0.330 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 1,450.000 $26.880 $29.000 $20.740
REMOVE METAL BEAM GUARD FENCE
LF 1,116.000 $3.210 $4.400 $3.680
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,287.420 $3,650.000 $2,782.500
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 13.000 $297.070 $300.000 $304.500
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000 $557.880 $330.000 $383.250
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 34.000 $729.070 $630.000 $614.250
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $700.000 $750.000 $709.010
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 36.000 $85.530 $80.000 $42.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,169.000 $1.610 $1.500 $4.810
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 32.000 $9.320 $13.000 $9.450
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 30,950.000 $0.650 $0.680 $0.610
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 11,494.000 $0.610 $0.720 $0.560
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 16,289.000 $0.530 $0.680 $0.560
REFL PAV MRKR TY II-A-A
EA 390.000 $6.000 $7.500 $4.070
FULL - WIDTH MOWING
CYC 3.000 $4,493.390 $2,500.000 $4,000.000
SP MIXES SP-C SAC-B PG64-22
TON 5,274.000 $130.000 $130.000 $138.080
TACK COAT
GAL 2,875.000 $20.000 $3.900 $1.050
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,987.890 $7,500.000 $9,000.000
TMA (STATIONARY)
DAY 10.000 $149.800 $750.000 $250.000
TMA (MOBILE OPERATION)
HR 120.000 $93.350 $85.000 $100.000
Totals: $6,720,750.070 $6,473,924.210 $7,591,205.050