NAVARRO BS 31D (0163-01-070)

Items: 104

County: NAVARRO
Length: 0.2070 MILES
Highway: BS 31D
District: DALLAS
Control Number: 0163-01-070
DBE Goal: 5.0%
Project: BR 2025(011)
Guaranty: $90,000.00
Time: 113 WORKING DAYS
Engineer's Estimate: $4,506,815.69
Date: 09/06/2024 (1 year ago)
Contract Number: 9243216
Type: BRIDGE REPLACEMENT
Project ID: A00180837
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
JUAN PAREDES
ELECIA MOORE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$4,506,815.69
$4,442,318.90
Over/Under Est: -1.43% -$64,496.79
$4,571,198.22
Over/Under Est: 1.43% $64,382.53
Amt Left: 2.9% $128,879.32
Over/Under Est: 1.74% $78,540.50
Amt Left: 3.22% $143,037.29
Delta: -0.31% -$14,157.97
Over/Under Est: 24.03% $1,082,896.09
Amt Left: 25.83% $1,147,392.88
Delta: -21.90% -$1,004,355.59
$5,621,448.76
Over/Under Est: 24.73% $1,114,633.07
Amt Left: 26.54% $1,179,129.86
Delta: -0.57% -$31,736.98
Subcontractor Percentage Amount
FORTSON CONTRACTING, INC. 0.49% $21,762.45
SOUTHEAST GRINDING AND GROOVING LLC 0.15% $6,661.97
HODGES AND SON CONSTRUCTION COMPANY, INC. 0.00% $0.00
LINDAMOOD, INC. 0.00% $0.00
PEACHTREE CONSTRUCTION, LTD. 0.00% $0.00
STRIPING TECHNOLOGY, L.P. 0.00% $0.00
TEJAS CUTTERS, LLC 0.00% $0.00
TEXOP CONSTRUCTION 0.00% $0.00
TORO BRAVO CONSTRUCTION, LLC 0.00% $0.00
TRAFFIC SIGNS & LINES, LLC 0.00% $0.00
TUCAN CONTRACTING, LLC 0.00% $0.00
BLUE BIRD CONSTRUCTION, LLC 0.00% $0.00
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.00% $0.00
DAVIS CRANE 0.00% $0.00
Total: 0.64% $28,424.42

Bid Items & Bid Tabulations

104 Total 0 of 104
NAVARRO  |  BS 31D  |  DALLAS  |  0163-01-070  |  09/06/2024  |  $4,506,815.69  |  BR 2025(011)  |  BRIDGE REPL  |  113 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TALBERT COMPANIES LLC
C. E. BARKER, LTD.
ED BELL CONSTRUCTION COMPANY
RAGLE CONSTRUCTION, INC.
A. L. HELMCAMP, INC.
PREPARING ROW
STA 10.900 $7,000.000 $3,285.000 $40,000.000 $9,500.000 $46,000.000 $750.000
REMOV CONC (RIPRAP)
SY 324.000 $30.000 $24.640 $25.690 $31.500 $17.600 $55.000
RMV (14"-18") TRT/UNTRT BASE & ASPH PAV
SY 4,456.000 $20.000 $6.790 $19.850 $21.000 $16.000 $20.000
EXCAV (ROADWAY)
CY 3,877.660 $29.000 $39.600 $10.510 $10.000 $33.100 $36.000
EMBANK (FNL)(DC)(TY C1)
CY 4,334.930 $25.000 $17.520 $19.850 $25.000 $28.000 $60.000
EMBANK (FNL)(DC)(TY C2)
CY 405.880 $50.000 $59.240 $31.520 $35.000 $60.300 $65.000
COMPOST MANUF TOPSOIL (4")
SY 4,880.000 $5.000 $1.260 $3.270 $1.250 $7.200 $6.000
DRILL SEED (PERM_URBAN_CLAY)
SY 4,880.000 $1.500 $0.550 $0.410 $0.750 $0.500 $0.500
DRILL SEED (TEMP_WARM_COOL)
SY 4,880.000 $1.500 $0.480 $0.880 $0.500 $0.440 $0.500
VEGETATIVE WATERING
TGL 726.000 $20.000 $60.230 $17.510 $3.000 $66.000 $33.000
FL BS (CMP IN PLC)(TY D GR 1-2) (10")
SY 4,652.900 $40.000 $35.040 $38.490 $33.000 $30.500 $30.000
LIME (COM OR QK)(SLURRY)
TON 53.600 $400.000 $365.730 $389.970 $400.000 $339.000 $370.000
LIME TRT (EXIST MATL)(6")
SY 4,765.900 $10.000 $11.100 $4.090 $8.000 $8.900 $16.000
PRIME COAT(MC-30 OR AE-P)
GAL 892.800 $11.000 $10.290 $11.990 $10.000 $9.400 $9.500
TACK COAT
GAL 260.000 $5.000 $2.190 $18.040 $2.000 $2.000 $12.000
SP MIXES SP-B PG64-22
TON 1,435.600 $170.000 $170.380 $234.260 $175.000 $155.600 $155.000
SP MIXES SP-C SAC-B PG70-22
TON 491.000 $170.000 $230.280 $279.430 $230.000 $210.300 $202.000
CEM STABIL BKFL
CY 337.200 $250.000 $229.950 $105.080 $275.000 $168.000 $220.000
DRILL SHAFT (24 IN)
LF 376.000 $300.000 $109.500 $211.170 $150.000 $120.000 $350.000
DRILL SHAFT (36 IN)
LF 504.000 $325.000 $224.480 $344.980 $275.000 $236.000 $380.000
CL C CONC (ABUT)(HPC)
CY 24.400 $1,500.000 $1,587.750 $1,416.250 $2,000.000 $1,370.000 $4,000.000
CL C CONC (CAP)(HPC)
CY 29.700 $1,700.000 $1,724.630 $1,778.190 $2,250.000 $1,990.000 $4,000.000
CL C CONC (COLUMN)(HPC)
CY 20.000 $1,600.000 $1,724.630 $1,778.190 $2,500.000 $2,010.000 $3,500.000
REINF CONC SLAB (SLAB BEAM)(HPC)
SF 8,025.000 $30.000 $26.430 $28.070 $25.000 $21.000 $45.000
APPROACH SLAB (HPC)
CY 61.200 $820.000 $930.750 $1,004.000 $900.000 $705.000 $1,200.000
RETAINING WALL (SPREAD FOOTING)
SF 2,784.000 $100.000 $109.500 $76.820 $110.000 $87.000 $300.000
PRESTR CONC SLAB BEAM (5SB15)
LF 1,584.000 $300.000 $198.200 $218.630 $250.000 $226.000 $240.000
RIPRAP (MOW STRIP)(4 IN)
CY 31.200 $750.000 $711.750 $764.750 $800.000 $833.000 $990.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 1,377.000 $210.000 $312.080 $117.090 $250.000 $252.000 $125.000
RAIL (TY SSTR)
LF 458.000 $90.000 $130.160 $92.240 $100.000 $79.000 $140.000
RAIL (TY SSTR)(HPC)
LF 412.000 $80.000 $105.550 $145.950 $120.000 $78.000 $165.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 116.700 $200.000 $291.270 $216.000 $210.000 $228.000 $330.000
RC PIPE (CL III)(18 IN)
LF 910.000 $100.000 $116.630 $44.320 $60.000 $64.500 $85.000
RC PIPE (CL III)(24 IN)
LF 626.000 $135.000 $170.210 $63.690 $95.000 $77.000 $120.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 4.000 $1,500.000 $821.250 $762.810 $750.000 $1,188.000 $800.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $2,000.000 $2,080.500 $1,181.180 $2,000.000 $1,513.000 $1,100.000
REMOV STR (SET)
EA 4.000 $600.000 $328.500 $389.190 $800.000 $622.000 $1,000.000
REMOV STR (PIPE)
LF 1,010.000 $35.000 $21.900 $7.780 $35.000 $18.700 $10.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $75,000.000 $44,114.270 $76,226.490 $75,000.000 $550,000.000 $48,000.000
MOBILIZATION
LS 1.000 $400,000.000 $400,000.000 $450,000.000 $450,000.000 $550,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $12,000.000 $2,269.300 $5,254.020 $15,000.000 $78,000.000 $12,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,000.000 $10,731.000 $8,172.920 $8,000.000 $12,260.000 $16,000.000
TMA (STATIONARY)
DAY 20.000 $250.000 $384.880 $875.670 $250.000 $346.000 $260.000
TMA (MOBILE OPERATION)
HR 60.000 $70.000 $106.090 $107.270 $100.000 $81.000 $80.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 210.000 $45.000 $36.140 $58.380 $52.680 $49.000 $48.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 40.000 $60.000 $71.180 $116.760 $69.880 $105.000 $100.000
ROCK FILTER DAMS (REMOVE)
LF 250.000 $15.000 $16.430 $23.350 $25.160 $25.000 $21.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 340.000 $30.000 $38.330 $75.890 $37.630 $35.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 340.000 $10.000 $16.430 $35.030 $16.130 $15.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,605.000 $5.000 $3.560 $5.840 $3.490 $3.250 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,605.000 $1.500 $1.310 $2.340 $1.290 $1.200 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 40.000 $10.000 $7.670 $35.030 $7.530 $7.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 40.000 $3.000 $2.190 $11.680 $2.150 $2.000 $1.200
CONSTRUCTING DETOURS
SY 1,855.000 $150.000 $159.210 $210.160 $262.000 $163.000 $250.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,635.000 $60.000 $82.130 $82.700 $25.000 $26.000 $80.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,350.000 $13.000 $28.470 $12.650 $10.000 $10.000 $20.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,635.000 $15.000 $21.900 $12.650 $12.500 $14.500 $20.000
DRIVEWAYS (ACP)
SY 145.700 $80.000 $87.600 $134.270 $110.000 $69.800 $200.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 758.000 $1.000 $11.210 $11.960 $11.000 $3.320 $13.000
MTL W-BEAM GD FEN (TIM POST)
LF 287.500 $30.000 $26.830 $26.270 $24.190 $22.500 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,400.000 $1,914.060 $2,101.610 $2,863.780 $2,426.000 $2,100.000
SHORT RADIUS (28")
LF 59.000 $80.000 $382.700 $27.440 $25.260 $23.500 $400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,600.000 $1,500.150 $1,401.070 $1,290.000 $1,200.000 $1,800.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $725.000 $672.330 $700.540 $645.000 $600.000 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 201.000 $7.500 $6.570 $3.210 $2.960 $2.750 $12.000
CABLE BARRIER SYSTEM (INSTALL)(TL-3)
LF 1,510.000 $30.000 $50.460 $40.860 $49.540 $50.000 $25.000
CABLE BARRIER TERM SEC (INSTL)(TL-3)
EA 2.000 $1,550.000 $2,441.850 $6,421.580 $2,397.250 $3,500.000 $1,800.000
CABLE BARRIER (REMOVE)
LF 1,510.000 $6.000 $19.960 $5.840 $19.600 $9.400 $6.000
CABLE BARRIER TERMINAL SECTION (REMOVE)
EA 2.000 $600.000 $1,314.000 $875.670 $1,290.000 $1,000.000 $600.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,300.000 $3,461.300 $3,359.650 $3,093.320 $2,877.500 $3,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $450.000 $328.500 $291.890 $268.750 $250.000 $320.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $2,200.000 $3,504.000 $1,167.560 $1,500.000 $1,000.000 $1,200.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $1,500.000 $2,737.500 $992.430 $1,000.000 $850.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 5.000 $11,500.000 $10,840.500 $10,185.790 $10,000.000 $6,974.000 $10,000.000
PIPE UNDERDRAINS (TY 8) (6")
LF 462.000 $50.000 $60.900 $23.350 $36.750 $64.000 $80.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 3.000 $70.000 $24.090 $23.350 $21.500 $20.000 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 3.000 $70.000 $24.090 $29.190 $21.500 $20.000 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 3.000 $100.000 $29.570 $379.460 $26.880 $25.000 $50.000
INSTL OM ASSM (OM-3L)(TWT)GND
EA 1.000 $300.000 $240.900 $379.460 $349.380 $325.000 $140.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 1.000 $300.000 $240.900 $350.270 $349.380 $325.000 $140.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 2,483.000 $2.000 $4.380 $1.480 $3.230 $0.930 $1.100
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 14.000 $20.000 $27.380 $8.890 $14.190 $7.000 $8.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 1,925.000 $2.500 $4.380 $1.480 $3.230 $0.930 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 64.000 $1.500 $5.380 $2.040 $5.380 $3.000 $3.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 15.000 $12.000 $10.950 $12.240 $26.880 $7.000 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $185.000 $273.750 $220.380 $537.500 $185.000 $210.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $215.000 $383.250 $254.740 $752.500 $200.000 $230.000
PAVEMENT SLER 6"
LF 2,591.000 $0.500 $1.100 $0.670 $2.150 $1.800 $2.000
PAVEMENT SLER 8"
LF 64.000 $1.000 $1.640 $0.960 $4.300 $1.900 $2.000
PAVEMENT SLER 24"
LF 15.000 $3.000 $3.290 $4.920 $21.500 $2.750 $3.000
PAVEMENT SLER (ARROW)
EA 2.000 $50.000 $164.250 $64.720 $215.000 $90.000 $100.000
PAVEMENT SLER (WORD)
EA 2.000 $50.000 $219.000 $64.470 $322.500 $98.000 $110.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 270.000 $1.500 $2.190 $5.840 $5.380 $2.000 $2.300
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 1,090.000 $1.500 $2.190 $2.290 $5.380 $2.000 $2.300
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 1,231.000 $1.500 $2.190 $2.210 $5.380 $2.000 $2.300
MOBILE RETROREFLECTIVITY DATA COLLECT
MI 1,960.000 $1.000 $1.200 $2.340 $1.000 $1.000 $19.000
REFL PAV MRKR TY II-C-R
EA 20.000 $7.000 $27.380 $10.440 $12.900 $9.000 $10.000
PAV SURF PREP FOR MRK (6")
LF 2,591.000 $0.500 $1.100 $0.500 $1.080 $0.520 $0.600
PAV SURF PREP FOR MRK (8")
LF 64.000 $0.500 $1.640 $2.320 $1.610 $0.630 $0.700
PAV SURF PREP FOR MRK (24")
LF 15.000 $2.500 $3.290 $3.220 $3.230 $1.000 $1.200
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $40.000 $82.130 $42.090 $107.500 $55.000 $65.000
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $40.000 $109.500 $48.200 $161.250 $75.000 $85.000
PAV SURF PREP FOR MRK (RPM)
EA 20.000 $7.000 $5.480 $1.620 $2.150 $2.000 $2.300
FULL - WIDTH MOWING
CYC 2.000 $4,500.000 $4,380.000 $5,837.800 $3,150.000 $2,500.000 $2,000.000
Totals: $4,506,815.690 $4,442,318.950 $4,571,198.270 $4,585,356.195 $5,589,711.790 $5,621,448.760