NAVARRO FM 55 (0121-08-019)

Items: 125

County: NAVARRO
Length: N/A
Highway: FM 55
District: DALLAS
Control Number: 0121-08-019
DBE Goal: N/A
Project: STP 2019(137)
Guaranty: N/A
Time: 486 WORKING DAYS
Engineer's Estimate: $9,513,500.30
Date: 10/02/2018 (7 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$9,513,500.30
$7,343,202.30
Over/Under Est: -22.81% -$2,170,298.00
Over/Under Est: -8.9% -$847,159.60
Amt Left: 18.02% $1,323,138.40
$8,673,698.85
Over/Under Est: -8.83% -$839,801.45
Amt Left: 18.12% $1,330,496.55
Delta: -0.08% -$7,358.15
Over/Under Est: -6.07% -$577,181.64
Amt Left: 21.7% $1,593,116.36
Delta: -3.03% -$262,619.81
Over/Under Est: -2.29% -$218,300.81
Amt Left: 26.58% $1,951,997.19
Delta: -4.02% -$358,880.83

Bid Items & Bid Tabulations

125 Total 0 of 125
NAVARRO  |  FM 55  |  DALLAS  |  0121-08-019  |  10/02/2018  |  $9,513,500.30  |  STP 2019(137)  |  REHAB EXIST PAVMT AND ADD SHOULDERS  |  486 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. K. GILLIS & SONS, INC.
KNIFE RIVER CORPORATION - SOUTH
A. L. HELMCAMP, INC.
D. L. LENNON INCORPORATED - CONTRACTOR
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 519.440 $1,200.000 $199.850 $250.000 $800.000 $447.710 $1,015.000
REMOVING CONC (DRIVEWAYS)
SY 630.000 $15.000 $15.000 $17.500 $18.000 $15.000 $15.750
REMOVING CONC (CURB AND GUTTER)
LF 450.000 $9.000 $12.000 $13.000 $12.000 $12.000 $15.750
REMOVE STAB BASE AND ASPH PAV (2"-3")
SY 2,962.000 $6.000 $3.000 $5.750 $6.000 $15.000 $7.000
SUBGRADE WIDENING (ORD COMP)
STA 503.890 $300.000 $167.360 $250.000 $215.000 $224.000 $420.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 10,160.000 $20.000 $5.450 $22.000 $10.000 $15.000 $21.000
BACKFILL (TY A OR B)
STA 503.890 $125.000 $167.360 $75.000 $215.000 $267.000 $126.000
ROAD GRADER WORK (ORD COMP)
STA 503.890 $300.000 $167.360 $75.000 $215.000 $304.000 $73.500
COMPOST MANUF TOPSOIL (4")
SY 111,988.000 $1.000 $0.500 $0.950 $0.800 $0.960 $0.980
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 111,988.000 $0.100 $0.110 $0.160 $0.100 $0.110 $0.170
DRILL SEED (TEMP)(WARM OR COOL)
SY 55,994.000 $0.100 $0.080 $0.150 $0.100 $0.080 $0.150
VEGETATIVE WATERING
MG 12,235.000 $7.000 $2.470 $0.010 $1.000 $0.010 $1.050
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 87,080.000 $8.000 $7.510 $8.900 $7.800 $9.100 $9.450
FL BS (RDWY DEL) (TY D GR 1-2)
TON 18,140.000 $25.000 $20.700 $22.200 $21.000 $28.270 $19.000
FL BS (CMP IN PLACE) (TY D GR 1-2)(4")
SY 80,883.000 $7.000 $5.010 $6.550 $6.700 $6.060 $7.350
REWORK BS MTL (TY B) (6") (ORD COMP)
SY 167,963.000 $2.000 $1.680 $1.150 $2.000 $3.000 $0.500
LIME TRT (EXST MATL)(8")
SY 190,358.000 $3.500 $2.050 $2.150 $3.000 $2.650 $1.000
LIME (HYDRATED OR COMMERCIAL)(SLURRY)
TON 3,807.000 $150.000 $165.000 $185.000 $165.000 $165.000 $175.000
CEMENT
TON 1,020.000 $130.000 $126.300 $150.000 $165.000 $125.000 $175.000
CEMENT TREAT (MX EXST MTL & NW BS) (6")
SY 167,963.000 $2.000 $1.520 $1.350 $2.200 $2.050 $2.000
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 31,353.000 $3.250 $3.860 $2.750 $2.800 $5.000 $5.100
ASPH (CRS-2P)
GAL 40,583.000 $3.250 $3.940 $3.500 $3.000 $3.850 $4.750
ASPH (RC-250)
GAL 14,631.000 $3.500 $4.330 $4.350 $3.000 $4.000 $5.550
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 418.000 $100.000 $99.500 $225.000 $100.000 $95.000 $132.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 78,383.000 $3.000 $4.260 $3.250 $3.800 $4.000 $4.750
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 1,307.000 $115.000 $129.320 $145.000 $100.000 $155.000 $111.000
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
CY 274.000 $120.000 $114.370 $125.000 $90.000 $112.000 $173.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 996.000 $115.000 $114.540 $150.000 $90.000 $140.000 $111.000
SUPERPAVE MIXTURES SP-D SAC-B PG64-22
TON 685.000 $100.000 $98.400 $95.000 $110.000 $98.400 $135.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(16")
SY 1,640.000 $120.000 $19.150 $29.000 $30.000 $123.500 $44.600
PLANE ASPH CONC PAV (2")
SY 6,220.000 $3.000 $0.980 $1.500 $2.000 $4.350 $1.030
CEM STABIL BKFL
CY 390.000 $130.000 $250.000 $100.000 $100.000 $250.000 $133.330
CUT & RESTORING PAV
SY 170.000 $125.000 $150.000 $115.000 $105.000 $150.000 $94.500
TRENCH EXCAVATION PROTECTION
LF 190.000 $8.000 $12.000 $6.500 $7.000 $12.000 $15.000
TEMPORARY SPL SHORING
SF 3,469.000 $22.000 $20.000 $22.000 $22.000 $46.000 $25.000
RIPRAP (CONC)(5 IN)
CY 42.000 $375.000 $425.000 $550.000 $550.000 $425.000 $525.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 331.000 $120.000 $161.000 $95.000 $90.000 $95.200 $157.500
CONC BOX CULV (3 FT X 2 FT)
LF 102.000 $250.000 $350.000 $335.000 $320.000 $350.000 $169.000
CONC BOX CULV (5 FT X 3 FT)
LF 45.000 $260.000 $550.000 $450.000 $425.000 $550.000 $246.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 39.000 $500.000 $400.000 $365.000 $340.000 $400.000 $1,100.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 9.000 $520.000 $475.000 $450.000 $450.000 $475.000 $1,150.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 5.000 $570.000 $550.000 $480.000 $460.000 $550.000 $1,200.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 20.000 $670.000 $550.000 $500.000 $480.000 $550.000 $1,250.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 27.000 $680.000 $650.000 $535.000 $500.000 $650.000 $1,400.000
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
LF 7.000 $800.000 $750.000 $700.000 $660.000 $750.000 $1,600.000
CONC BOX CULV (8 FT X 3 FT)
LF 6.000 $600.000 $750.000 $675.000 $640.000 $750.000 $1,650.000
RC PIPE (CL III)(18 IN)
LF 2,546.000 $50.000 $48.000 $45.000 $43.000 $48.000 $50.000
RC PIPE (CL III)(24 IN)
LF 814.000 $70.000 $60.000 $90.000 $85.000 $60.000 $65.000
RC PIPE (CL III)(30 IN)
LF 118.000 $85.000 $80.000 $135.000 $127.000 $80.000 $80.000
RC PIPE (CL III)(36 IN)
LF 124.000 $120.000 $105.000 $185.000 $174.000 $105.000 $110.000
RC PIPE (CL III)(42 IN)
LF 48.000 $140.000 $130.000 $210.000 $200.000 $130.000 $180.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 2.000 $3,600.000 $3,000.000 $3,300.000 $3,200.000 $3,000.000 $4,500.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 1.000 $8,500.000 $6,500.000 $7,300.000 $7,000.000 $6,500.000 $7,500.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 2.000 $4,200.000 $3,500.000 $3,900.000 $3,700.000 $3,500.000 $4,750.000
WINGWALL (FW - 0) (HW=4 FT)
EA 2.000 $6,700.000 $6,500.000 $2,800.000 $2,600.000 $6,500.000 $5,500.000
WINGWALL (FW - 0) (HW=5 FT)
EA 1.000 $9,400.000 $8,000.000 $3,900.000 $3,700.000 $8,000.000 $8,250.000
WINGWALL (FW - 0) (HW=6 FT)
EA 4.000 $9,000.000 $9,500.000 $5,600.000 $5,300.000 $9,500.000 $8,500.000
WINGWALL (FW - 0) (HW=7 FT)
EA 1.000 $9,600.000 $12,000.000 $7,000.000 $6,600.000 $12,000.000 $9,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $12,200.000 $9,000.000 $13,500.000 $13,000.000 $9,000.000 $11,250.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $13,400.000 $12,000.000 $15,000.000 $14,000.000 $12,000.000 $17,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $22,000.000 $20,000.000 $33,000.000 $32,000.000 $20,000.000 $27,500.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 12.000 $4,300.000 $5,800.000 $3,900.000 $3,700.000 $5,800.000 $6,700.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $6,600.000 $7,000.000 $5,000.000 $4,700.000 $7,000.000 $7,200.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
EA 4.000 $7,000.000 $8,000.000 $5,500.000 $5,300.000 $8,000.000 $10,750.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
EA 4.000 $7,200.000 $9,000.000 $7,300.000 $6,900.000 $9,000.000 $12,000.000
SET (TY I)(S= 8 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $8,000.000 $10,000.000 $9,600.000 $9,000.000 $10,000.000 $12,100.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 262.000 $700.000 $600.000 $1,000.000 $950.000 $600.000 $630.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 6.000 $800.000 $650.000 $1,000.000 $1,000.000 $650.000 $550.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 54.000 $1,100.000 $875.000 $1,100.000 $1,100.000 $875.000 $775.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 4.000 $1,200.000 $1,000.000 $3,900.000 $3,700.000 $1,000.000 $775.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,000.000 $2,000.000 $4,500.000 $4,300.000 $2,000.000 $1,365.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 2.000 $2,800.000 $2,000.000 $5,000.000 $4,800.000 $2,000.000 $1,365.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 6.000 $3,900.000 $4,200.000 $5,600.000 $5,300.000 $4,200.000 $2,750.000
SET (TY II) (42 IN) (RCP) (3: 1) (C)
EA 1.000 $2,900.000 $3,200.000 $6,200.000 $5,800.000 $3,200.000 $3,150.000
CLEAN EXIST CULVERTS
EA 15.000 $1,500.000 $1,200.000 $1,000.000 $1,000.000 $1,200.000 $1,470.000
REMOV STR (SET)
EA 22.000 $385.000 $150.000 $500.000 $480.000 $150.000 $210.000
REMOV STR (WINGWALL)
EA 34.000 $1,400.000 $800.000 $1,100.000 $1,100.000 $800.000 $1,680.000
REMOV STR (PIPE)
LF 4,424.000 $15.000 $12.000 $16.500 $16.000 $12.000 $11.550
REMOV STR (BOX CULVERT)
LF 82.000 $84.000 $58.000 $100.000 $95.000 $58.000 $52.500
MOBILIZATION
LS 1.000 $840,818.000 $527,167.000 $850,000.000 $750,000.000 $505,500.000 $925,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $11,500.000 $6,120.000 $15,000.000 $10,250.000 $4,533.000 $21,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,315.000 $25.000 $25.000 $28.000 $27.000 $25.000 $26.250
ROCK FILTER DAMS (REMOVE)
LF 1,315.000 $7.000 $6.000 $8.500 $8.000 $6.000 $8.400
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 233.000 $22.000 $20.000 $20.500 $8.000 $20.000 $21.530
CONSTRUCTION EXITS (REMOVE)
SY 233.000 $7.000 $5.000 $8.000 $1.000 $5.000 $8.400
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,400.000 $2.000 $2.500 $3.500 $2.700 $2.500 $1.730
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,400.000 $0.500 $0.750 $0.550 $0.600 $0.750 $0.530
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 6,688.000 $4.000 $3.500 $7.250 $5.500 $3.500 $5.360
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,688.000 $0.600 $0.600 $0.800 $0.750 $0.600 $0.790
CONC CURB & GUTTER (TY II)
LF 450.000 $30.000 $28.000 $33.000 $32.000 $28.000 $73.500
INTERSECTIONS (SURF TREAT)
SY 741.000 $35.000 $76.500 $39.000 $44.000 $35.000 $40.850
DRIVEWAYS (CONC)
SY 633.000 $100.000 $90.000 $117.000 $110.000 $105.000 $80.000
DRIVEWAYS (ACP)
SY 11,706.000 $30.000 $14.350 $27.500 $22.000 $20.350 $17.640
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 93.000 $280.000 $190.000 $225.000 $200.000 $185.000 $199.500
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 4.000 $650.000 $430.000 $500.000 $450.000 $265.000 $451.500
CONDT (PVC) (SCH 40) (2")
LF 80.000 $11.500 $10.000 $11.000 $12.000 $10.000 $15.750
ELEC CONDR (NO.12) INSULATED
LF 480.000 $1.000 $1.250 $1.500 $2.000 $1.500 $3.150
ALUMINUM SIGNS (TY A)
SF 11.000 $25.000 $22.000 $30.000 $30.000 $50.000 $23.100
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 11.000 $40.000 $24.000 $30.000 $26.000 $50.000 $25.200
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 92.000 $450.000 $405.000 $445.000 $430.000 $467.000 $425.250
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $560.000 $525.000 $500.000 $550.000 $740.000 $551.250
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $600.000 $565.000 $550.000 $600.000 $807.000 $593.250
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $750.000 $675.000 $775.000 $710.000 $1,079.000 $708.750
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $900.000 $720.000 $825.000 $760.000 $1,132.000 $756.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 10.000 $1,100.000 $745.000 $875.000 $800.000 $1,225.000 $782.250
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 52.000 $58.000 $55.000 $65.000 $60.000 $45.000 $57.750
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 12,986.000 $0.600 $0.300 $0.340 $0.350 $0.300 $0.320
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 103,888.000 $0.300 $0.300 $0.340 $0.350 $0.300 $0.320
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,896.000 $1.000 $2.000 $1.400 $0.750 $0.790 $1.770
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 45.000 $2.000 $1.000 $1.050 $1.200 $1.000 $1.050
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 66.000 $4.000 $5.000 $5.250 $6.000 $5.000 $5.250
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 291.000 $6.000 $5.500 $5.750 $6.400 $5.500 $5.780
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 88,259.000 $0.350 $0.420 $0.450 $0.500 $0.420 $0.440
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 14,329.000 $0.600 $0.500 $0.540 $0.600 $0.500 $0.530
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,880.000 $0.400 $0.500 $0.540 $0.600 $0.500 $0.530
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 63,150.000 $0.350 $0.420 $0.450 $0.500 $0.420 $0.440
REFL PAV MRKR TY II-A-A
EA 1,145.000 $4.000 $3.300 $3.500 $3.900 $3.300 $3.470
VEH SIG SEC (12")LED(YEL)
EA 4.000 $265.000 $225.000 $250.000 $300.000 $260.000 $1,010.000
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 1.000 $4,000.000 $6,000.000 $6,500.000 $7,500.000 $3,500.000 $13,650.000
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $1,000.000 $1,500.000 $1,650.000 $1,800.000 $500.000 $2,750.000
REMOVAL OF SIGNAL HEAD ASSM
EA 1.000 $300.000 $100.000 $110.000 $200.000 $250.000 $475.000
FULL - WIDTH MOWING
CYC 4.000 $2,700.000 $1,475.000 $1,500.000 $2,000.000 $2,500.000 $7,350.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,500.000 $12,000.000 $20,000.000 $7,500.000 $25,000.000 $15,000.000
TMA (STATIONARY)
EA 1.000 $15,000.000 $5,000.000 $25,000.000 $22,000.000 $25,000.000 $10,000.000
TMA (MOBILE OPERATION)
DAY 36.000 $300.000 $100.000 $475.000 $31.000 $350.000 $420.000
Totals: $9,513,500.300 $7,343,202.305 $8,666,340.700 $8,673,698.850 $8,936,318.662 $9,295,199.495