|
|
PREPARING ROW
|
STA
|
519.440
|
$1,200.000
|
$199.850
|
$250.000
|
$800.000
|
$447.710
|
$1,015.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
630.000
|
$15.000
|
$15.000
|
$17.500
|
$18.000
|
$15.000
|
$15.750
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
450.000
|
$9.000
|
$12.000
|
$13.000
|
$12.000
|
$12.000
|
$15.750
|
|
|
REMOVE STAB BASE AND ASPH PAV (2"-3")
|
SY
|
2,962.000
|
$6.000
|
$3.000
|
$5.750
|
$6.000
|
$15.000
|
$7.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
503.890
|
$300.000
|
$167.360
|
$250.000
|
$215.000
|
$224.000
|
$420.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
10,160.000
|
$20.000
|
$5.450
|
$22.000
|
$10.000
|
$15.000
|
$21.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
503.890
|
$125.000
|
$167.360
|
$75.000
|
$215.000
|
$267.000
|
$126.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
503.890
|
$300.000
|
$167.360
|
$75.000
|
$215.000
|
$304.000
|
$73.500
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
111,988.000
|
$1.000
|
$0.500
|
$0.950
|
$0.800
|
$0.960
|
$0.980
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
111,988.000
|
$0.100
|
$0.110
|
$0.160
|
$0.100
|
$0.110
|
$0.170
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
55,994.000
|
$0.100
|
$0.080
|
$0.150
|
$0.100
|
$0.080
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
12,235.000
|
$7.000
|
$2.470
|
$0.010
|
$1.000
|
$0.010
|
$1.050
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
|
SY
|
87,080.000
|
$8.000
|
$7.510
|
$8.900
|
$7.800
|
$9.100
|
$9.450
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
18,140.000
|
$25.000
|
$20.700
|
$22.200
|
$21.000
|
$28.270
|
$19.000
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(4")
|
SY
|
80,883.000
|
$7.000
|
$5.010
|
$6.550
|
$6.700
|
$6.060
|
$7.350
|
|
|
REWORK BS MTL (TY B) (6") (ORD COMP)
|
SY
|
167,963.000
|
$2.000
|
$1.680
|
$1.150
|
$2.000
|
$3.000
|
$0.500
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
190,358.000
|
$3.500
|
$2.050
|
$2.150
|
$3.000
|
$2.650
|
$1.000
|
|
|
LIME (HYDRATED OR COMMERCIAL)(SLURRY)
|
TON
|
3,807.000
|
$150.000
|
$165.000
|
$185.000
|
$165.000
|
$165.000
|
$175.000
|
|
|
CEMENT
|
TON
|
1,020.000
|
$130.000
|
$126.300
|
$150.000
|
$165.000
|
$125.000
|
$175.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
167,963.000
|
$2.000
|
$1.520
|
$1.350
|
$2.200
|
$2.050
|
$2.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
31,353.000
|
$3.250
|
$3.860
|
$2.750
|
$2.800
|
$5.000
|
$5.100
|
|
|
ASPH (CRS-2P)
|
GAL
|
40,583.000
|
$3.250
|
$3.940
|
$3.500
|
$3.000
|
$3.850
|
$4.750
|
|
|
ASPH (RC-250)
|
GAL
|
14,631.000
|
$3.500
|
$4.330
|
$4.350
|
$3.000
|
$4.000
|
$5.550
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
418.000
|
$100.000
|
$99.500
|
$225.000
|
$100.000
|
$95.000
|
$132.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
78,383.000
|
$3.000
|
$4.260
|
$3.250
|
$3.800
|
$4.000
|
$4.750
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
1,307.000
|
$115.000
|
$129.320
|
$145.000
|
$100.000
|
$155.000
|
$111.000
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
274.000
|
$120.000
|
$114.370
|
$125.000
|
$90.000
|
$112.000
|
$173.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
996.000
|
$115.000
|
$114.540
|
$150.000
|
$90.000
|
$140.000
|
$111.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG64-22
|
TON
|
685.000
|
$100.000
|
$98.400
|
$95.000
|
$110.000
|
$98.400
|
$135.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(16")
|
SY
|
1,640.000
|
$120.000
|
$19.150
|
$29.000
|
$30.000
|
$123.500
|
$44.600
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
6,220.000
|
$3.000
|
$0.980
|
$1.500
|
$2.000
|
$4.350
|
$1.030
|
|
|
CEM STABIL BKFL
|
CY
|
390.000
|
$130.000
|
$250.000
|
$100.000
|
$100.000
|
$250.000
|
$133.330
|
|
|
CUT & RESTORING PAV
|
SY
|
170.000
|
$125.000
|
$150.000
|
$115.000
|
$105.000
|
$150.000
|
$94.500
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
190.000
|
$8.000
|
$12.000
|
$6.500
|
$7.000
|
$12.000
|
$15.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,469.000
|
$22.000
|
$20.000
|
$22.000
|
$22.000
|
$46.000
|
$25.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
42.000
|
$375.000
|
$425.000
|
$550.000
|
$550.000
|
$425.000
|
$525.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
331.000
|
$120.000
|
$161.000
|
$95.000
|
$90.000
|
$95.200
|
$157.500
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
102.000
|
$250.000
|
$350.000
|
$335.000
|
$320.000
|
$350.000
|
$169.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
45.000
|
$260.000
|
$550.000
|
$450.000
|
$425.000
|
$550.000
|
$246.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
39.000
|
$500.000
|
$400.000
|
$365.000
|
$340.000
|
$400.000
|
$1,100.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
9.000
|
$520.000
|
$475.000
|
$450.000
|
$450.000
|
$475.000
|
$1,150.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
5.000
|
$570.000
|
$550.000
|
$480.000
|
$460.000
|
$550.000
|
$1,200.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
20.000
|
$670.000
|
$550.000
|
$500.000
|
$480.000
|
$550.000
|
$1,250.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
27.000
|
$680.000
|
$650.000
|
$535.000
|
$500.000
|
$650.000
|
$1,400.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
|
LF
|
7.000
|
$800.000
|
$750.000
|
$700.000
|
$660.000
|
$750.000
|
$1,600.000
|
|
|
CONC BOX CULV (8 FT X 3 FT)
|
LF
|
6.000
|
$600.000
|
$750.000
|
$675.000
|
$640.000
|
$750.000
|
$1,650.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,546.000
|
$50.000
|
$48.000
|
$45.000
|
$43.000
|
$48.000
|
$50.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
814.000
|
$70.000
|
$60.000
|
$90.000
|
$85.000
|
$60.000
|
$65.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
118.000
|
$85.000
|
$80.000
|
$135.000
|
$127.000
|
$80.000
|
$80.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
124.000
|
$120.000
|
$105.000
|
$185.000
|
$174.000
|
$105.000
|
$110.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
48.000
|
$140.000
|
$130.000
|
$210.000
|
$200.000
|
$130.000
|
$180.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$3,600.000
|
$3,000.000
|
$3,300.000
|
$3,200.000
|
$3,000.000
|
$4,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
1.000
|
$8,500.000
|
$6,500.000
|
$7,300.000
|
$7,000.000
|
$6,500.000
|
$7,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
2.000
|
$4,200.000
|
$3,500.000
|
$3,900.000
|
$3,700.000
|
$3,500.000
|
$4,750.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
$6,700.000
|
$6,500.000
|
$2,800.000
|
$2,600.000
|
$6,500.000
|
$5,500.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$9,400.000
|
$8,000.000
|
$3,900.000
|
$3,700.000
|
$8,000.000
|
$8,250.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
4.000
|
$9,000.000
|
$9,500.000
|
$5,600.000
|
$5,300.000
|
$9,500.000
|
$8,500.000
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
1.000
|
$9,600.000
|
$12,000.000
|
$7,000.000
|
$6,600.000
|
$12,000.000
|
$9,000.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
2.000
|
$12,200.000
|
$9,000.000
|
$13,500.000
|
$13,000.000
|
$9,000.000
|
$11,250.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$13,400.000
|
$12,000.000
|
$15,000.000
|
$14,000.000
|
$12,000.000
|
$17,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$22,000.000
|
$20,000.000
|
$33,000.000
|
$32,000.000
|
$20,000.000
|
$27,500.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
12.000
|
$4,300.000
|
$5,800.000
|
$3,900.000
|
$3,700.000
|
$5,800.000
|
$6,700.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$6,600.000
|
$7,000.000
|
$5,000.000
|
$4,700.000
|
$7,000.000
|
$7,200.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
4.000
|
$7,000.000
|
$8,000.000
|
$5,500.000
|
$5,300.000
|
$8,000.000
|
$10,750.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
4.000
|
$7,200.000
|
$9,000.000
|
$7,300.000
|
$6,900.000
|
$9,000.000
|
$12,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$8,000.000
|
$10,000.000
|
$9,600.000
|
$9,000.000
|
$10,000.000
|
$12,100.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
262.000
|
$700.000
|
$600.000
|
$1,000.000
|
$950.000
|
$600.000
|
$630.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
6.000
|
$800.000
|
$650.000
|
$1,000.000
|
$1,000.000
|
$650.000
|
$550.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
54.000
|
$1,100.000
|
$875.000
|
$1,100.000
|
$1,100.000
|
$875.000
|
$775.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,200.000
|
$1,000.000
|
$3,900.000
|
$3,700.000
|
$1,000.000
|
$775.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$2,000.000
|
$4,500.000
|
$4,300.000
|
$2,000.000
|
$1,365.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$2,800.000
|
$2,000.000
|
$5,000.000
|
$4,800.000
|
$2,000.000
|
$1,365.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$3,900.000
|
$4,200.000
|
$5,600.000
|
$5,300.000
|
$4,200.000
|
$2,750.000
|
|
|
SET (TY II) (42 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,900.000
|
$3,200.000
|
$6,200.000
|
$5,800.000
|
$3,200.000
|
$3,150.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
15.000
|
$1,500.000
|
$1,200.000
|
$1,000.000
|
$1,000.000
|
$1,200.000
|
$1,470.000
|
|
|
REMOV STR (SET)
|
EA
|
22.000
|
$385.000
|
$150.000
|
$500.000
|
$480.000
|
$150.000
|
$210.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
34.000
|
$1,400.000
|
$800.000
|
$1,100.000
|
$1,100.000
|
$800.000
|
$1,680.000
|
|
|
REMOV STR (PIPE)
|
LF
|
4,424.000
|
$15.000
|
$12.000
|
$16.500
|
$16.000
|
$12.000
|
$11.550
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
82.000
|
$84.000
|
$58.000
|
$100.000
|
$95.000
|
$58.000
|
$52.500
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$840,818.000
|
$527,167.000
|
$850,000.000
|
$750,000.000
|
$505,500.000
|
$925,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
23.000
|
$11,500.000
|
$6,120.000
|
$15,000.000
|
$10,250.000
|
$4,533.000
|
$21,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,315.000
|
$25.000
|
$25.000
|
$28.000
|
$27.000
|
$25.000
|
$26.250
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,315.000
|
$7.000
|
$6.000
|
$8.500
|
$8.000
|
$6.000
|
$8.400
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
233.000
|
$22.000
|
$20.000
|
$20.500
|
$8.000
|
$20.000
|
$21.530
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
233.000
|
$7.000
|
$5.000
|
$8.000
|
$1.000
|
$5.000
|
$8.400
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,400.000
|
$2.000
|
$2.500
|
$3.500
|
$2.700
|
$2.500
|
$1.730
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,400.000
|
$0.500
|
$0.750
|
$0.550
|
$0.600
|
$0.750
|
$0.530
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
6,688.000
|
$4.000
|
$3.500
|
$7.250
|
$5.500
|
$3.500
|
$5.360
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
6,688.000
|
$0.600
|
$0.600
|
$0.800
|
$0.750
|
$0.600
|
$0.790
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
450.000
|
$30.000
|
$28.000
|
$33.000
|
$32.000
|
$28.000
|
$73.500
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
741.000
|
$35.000
|
$76.500
|
$39.000
|
$44.000
|
$35.000
|
$40.850
|
|
|
DRIVEWAYS (CONC)
|
SY
|
633.000
|
$100.000
|
$90.000
|
$117.000
|
$110.000
|
$105.000
|
$80.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
11,706.000
|
$30.000
|
$14.350
|
$27.500
|
$22.000
|
$20.350
|
$17.640
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
93.000
|
$280.000
|
$190.000
|
$225.000
|
$200.000
|
$185.000
|
$199.500
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
4.000
|
$650.000
|
$430.000
|
$500.000
|
$450.000
|
$265.000
|
$451.500
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
80.000
|
$11.500
|
$10.000
|
$11.000
|
$12.000
|
$10.000
|
$15.750
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
480.000
|
$1.000
|
$1.250
|
$1.500
|
$2.000
|
$1.500
|
$3.150
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
11.000
|
$25.000
|
$22.000
|
$30.000
|
$30.000
|
$50.000
|
$23.100
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
11.000
|
$40.000
|
$24.000
|
$30.000
|
$26.000
|
$50.000
|
$25.200
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
92.000
|
$450.000
|
$405.000
|
$445.000
|
$430.000
|
$467.000
|
$425.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$560.000
|
$525.000
|
$500.000
|
$550.000
|
$740.000
|
$551.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$600.000
|
$565.000
|
$550.000
|
$600.000
|
$807.000
|
$593.250
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$750.000
|
$675.000
|
$775.000
|
$710.000
|
$1,079.000
|
$708.750
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$900.000
|
$720.000
|
$825.000
|
$760.000
|
$1,132.000
|
$756.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
10.000
|
$1,100.000
|
$745.000
|
$875.000
|
$800.000
|
$1,225.000
|
$782.250
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
52.000
|
$58.000
|
$55.000
|
$65.000
|
$60.000
|
$45.000
|
$57.750
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
12,986.000
|
$0.600
|
$0.300
|
$0.340
|
$0.350
|
$0.300
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
103,888.000
|
$0.300
|
$0.300
|
$0.340
|
$0.350
|
$0.300
|
$0.320
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,896.000
|
$1.000
|
$2.000
|
$1.400
|
$0.750
|
$0.790
|
$1.770
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
45.000
|
$2.000
|
$1.000
|
$1.050
|
$1.200
|
$1.000
|
$1.050
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
66.000
|
$4.000
|
$5.000
|
$5.250
|
$6.000
|
$5.000
|
$5.250
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
291.000
|
$6.000
|
$5.500
|
$5.750
|
$6.400
|
$5.500
|
$5.780
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
88,259.000
|
$0.350
|
$0.420
|
$0.450
|
$0.500
|
$0.420
|
$0.440
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
14,329.000
|
$0.600
|
$0.500
|
$0.540
|
$0.600
|
$0.500
|
$0.530
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,880.000
|
$0.400
|
$0.500
|
$0.540
|
$0.600
|
$0.500
|
$0.530
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
63,150.000
|
$0.350
|
$0.420
|
$0.450
|
$0.500
|
$0.420
|
$0.440
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,145.000
|
$4.000
|
$3.300
|
$3.500
|
$3.900
|
$3.300
|
$3.470
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$265.000
|
$225.000
|
$250.000
|
$300.000
|
$260.000
|
$1,010.000
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$4,000.000
|
$6,000.000
|
$6,500.000
|
$7,500.000
|
$3,500.000
|
$13,650.000
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$1,000.000
|
$1,500.000
|
$1,650.000
|
$1,800.000
|
$500.000
|
$2,750.000
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
1.000
|
$300.000
|
$100.000
|
$110.000
|
$200.000
|
$250.000
|
$475.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$2,700.000
|
$1,475.000
|
$1,500.000
|
$2,000.000
|
$2,500.000
|
$7,350.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,500.000
|
$12,000.000
|
$20,000.000
|
$7,500.000
|
$25,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$15,000.000
|
$5,000.000
|
$25,000.000
|
$22,000.000
|
$25,000.000
|
$10,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
36.000
|
$300.000
|
$100.000
|
$475.000
|
$31.000
|
$350.000
|
$420.000
|
|
Totals: |
$9,513,500.300
|
$7,343,202.305
|
$8,666,340.700
|
$8,673,698.850
|
$8,936,318.662
|
$9,295,199.495
|