Show Job Controls
Bid Cobra

NAVARRO SH 22 (0121-05-051)

Items: 47

County: NAVARRO
Length: N/A
Highway: SH 22
District: DALLAS
Control Number: 0121-05-051
DBE Goal: N/A
Project: C 121-5-51
Guaranty: N/A
Time: 146 WORKING DAYS
Engineer's Estimate: $3,806,667.78
Date: 10/02/2020 (5 years ago)
Contract Number: N/A
Type: OVERLAY, SHOULDER TEXTURE,SAFETY END TREATMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$3,806,667.78
$2,364,532.69
Over/Under Est: -37.88% -$1,442,135.09
Over/Under Est: -32.14% -$1,223,283.18
Amt Left: 9.26% $218,851.91
Over/Under Est: -15.02% -$571,888.16
Amt Left: 36.8% $870,246.93
Delta: -25.21% -$651,395.02
Over/Under Est: -11.86% -$451,426.67
Amt Left: 41.9% $990,708.42
Delta: -3.72% -$120,461.49

Bid Items & Bid Tabulations

47 Total 0 of 47
NAVARRO  |  SH 22  |  DALLAS  |  0121-05-051  |  10/02/2020  |  $3,806,667.78  |  C 121-5-51  |  OVERLAY, SHOULDER TEXTURE,SAFETY END...  |  146 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
PEACHTREE CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 327.000 $2,923.000 $152.400 $50.000 $153.000 $188.000
BACKFILL (TY A OR B)
STA 327.000 $148.000 $86.000 $150.000 $230.000 $248.000
COMPOST MANUF TOPSOIL (4")
SY 606.000 $1.000 $2.950 $5.000 $7.500 $3.170
BLOCK SODDING
SY 606.000 $5.000 $4.800 $7.000 $7.000 $5.200
DRILL SEED (TEMP)(WARM OR COOL)
SY 606.000 $0.850 $2.650 $2.000 $2.600 $2.881
VEGETATIVE WATERING
MG 78.000 $12.000 $1.000 $25.000 $63.000 $47.000
SALV,HAUL & STKPL RCL APH PV (2")
SY 147,569.000 $1.050 $1.950 $1.500 $1.300 $1.430
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 5,000.000 $55.000 $42.300 $44.000 $60.000 $63.750
TEMPORARY SPL SHORING
SF 2,080.000 $28.000 $17.900 $50.000 $37.000 $40.000
CL C CONC (CULV)(EXTEND)
CY 42.000 $1,297.000 $2,210.500 $2,000.000 $1,300.000 $1,366.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 179.200 $112.000 $170.500 $150.000 $165.000 $176.500
RIPRAP (MOW STRIP)(4 IN)
CY 54.000 $600.000 $555.000 $550.000 $550.000 $600.000
MOBILIZATION
LS 1.000 $346,060.710 $148,221.000 $200,000.000 $275,000.000 $297,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $7,500.000 $5,495.000 $5,000.000 $15,250.000 $25,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 90.000 $28.000 $31.050 $25.000 $53.000 $33.500
ROCK FILTER DAMS (REMOVE)
LF 90.000 $8.000 $10.500 $5.000 $10.500 $11.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 300.000 $3.000 $6.150 $3.000 $4.250 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 300.000 $1.000 $0.750 $0.500 $1.050 $0.800
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 600.000 $4.320 $4.050 $5.000 $5.500 $4.400
BIODEG EROSN CONT LOGS (REMOVE)
LF 600.000 $1.250 $1.000 $1.000 $1.050 $1.100
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 540.000 $35.000 $28.000 $30.000 $54.000 $38.750
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 540.000 $4.600 $10.700 $15.000 $22.000 $11.500
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 540.000 $8.600 $23.000 $15.000 $27.000 $16.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 65,368.000 $0.180 $0.150 $0.200 $0.100 $0.230
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 34,556.000 $0.180 $0.180 $0.200 $0.090 $0.350
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $30.000 $20.000 $25.000 $25.000 $18.850
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 6.000 $1,500.000 $1,265.000 $1,200.000 $1,100.000 $954.000
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $2.500 $3.700 $4.000 $4.250 $3.420
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,800.000 $2,580.000 $2,500.000 $2,650.000 $2,704.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $210.000 $200.000 $210.000 $228.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $2,000.000 $2,105.000 $2,000.000 $850.000 $2,847.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $1,128.000 $845.000 $1,000.000 $650.000 $1,708.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 3.000 $15,000.000 $9,105.000 $10,000.000 $21,000.000 $14,231.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 18.000 $88.750 $78.950 $100.000 $48.000 $52.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 5,727.000 $0.650 $0.210 $0.300 $0.430 $0.350
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 39,200.000 $0.550 $0.190 $0.300 $0.430 $0.350
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 14,268.000 $1.190 $0.890 $1.000 $2.000 $0.650
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 247.000 $6.500 $10.530 $7.000 $8.500 $7.400
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 72,566.000 $0.410 $0.340 $0.400 $0.530 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,727.000 $0.410 $0.370 $0.400 $0.670 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 39,200.000 $0.410 $0.340 $0.400 $0.590 $0.400
REFL PAV MRKR TY II-A-A
EA 1,001.000 $5.000 $3.890 $4.000 $5.000 $4.000
SP MIXES SP-C SAC-B PG64-22
TON 16,233.000 $90.000 $70.510 $80.000 $99.000 $100.500
TACK COAT
GAL 16,233.000 $2.400 $2.370 $2.000 $3.100 $3.550
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,500.000 $2,650.000 $5,000.000 $15,000.000 $6,500.000
TMA (STATIONARY)
DAY 100.000 $192.700 $4.000 $150.000 $250.000 $345.000
TMA (MOBILE OPERATION)
HR 72.000 $50.000 $75.000 $50.000 $70.000 $60.000
Totals: $3,806,667.780 $2,364,532.690 $2,583,384.600 $3,234,779.620 $3,355,241.116