PREPARING ROW
|
STA
|
301.000
|
$2,950.000
|
$300.000
|
$750.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,600.000
|
$8.520
|
$11.000
|
$11.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
301.000
|
$162.280
|
$350.000
|
$180.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,449.000
|
$9.910
|
$16.500
|
$8.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
300.400
|
$276.450
|
$90.000
|
$150.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
164,632.000
|
$3.000
|
$0.650
|
$0.700
|
|
|
BLOCK SODDING
|
SY
|
201.000
|
$3.950
|
$5.200
|
$7.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
164,632.000
|
$0.170
|
$0.090
|
$0.120
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
164,632.000
|
$0.150
|
$0.050
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
57,120.000
|
$10.650
|
$0.010
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
|
SY
|
102,334.000
|
$7.550
|
$6.750
|
$7.700
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
11,370.000
|
$27.590
|
$18.250
|
$26.000
|
|
|
REWORK BS MTL (TY B) (6") (ORD COMP)
|
SY
|
102,334.000
|
$1.400
|
$1.750
|
$2.500
|
|
|
LIME (HYDRATED OR COMMERCIAL)(SLURRY)
|
TON
|
3,670.000
|
$169.550
|
$125.000
|
$170.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
122,355.000
|
$5.160
|
$3.000
|
$3.200
|
|
|
CEMENT
|
TON
|
599.000
|
$132.080
|
$135.000
|
$120.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
102,334.000
|
$2.190
|
$1.750
|
$1.500
|
|
|
SALV, HAUL & STKPL RCL APH PV (3")
|
SY
|
45,760.000
|
$4.130
|
$1.150
|
$1.700
|
|
|
SALV, HAUL & STKPL RCL APH PV (4")
|
SY
|
82,587.000
|
$2.140
|
$0.950
|
$2.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
20,467.000
|
$3.390
|
$2.500
|
$2.800
|
|
|
ASPH (CRS-2P)
|
GAL
|
30,029.000
|
$3.080
|
$3.250
|
$3.000
|
|
|
ASPH (RC-250)
|
GAL
|
8,721.000
|
$2.110
|
$3.500
|
$3.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
250.000
|
$128.070
|
$115.000
|
$60.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
46,718.000
|
$2.860
|
$3.500
|
$3.000
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
274.000
|
$136.900
|
$150.000
|
$100.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
594.000
|
$116.490
|
$120.000
|
$100.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG64-22
|
TON
|
7,551.000
|
$72.000
|
$70.000
|
$91.000
|
|
|
FULL-DEPTH REPAIR CRCP (5"-9")
|
SY
|
3,060.000
|
$233.820
|
$250.000
|
$240.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
13.000
|
$67.960
|
$965.000
|
$220.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
28.000
|
$1.810
|
$32.000
|
$22.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,990.000
|
$16.360
|
$12.250
|
$38.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(8 IN)
|
CY
|
230.000
|
$181.340
|
$280.000
|
$100.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
744.000
|
$55.820
|
$39.000
|
$54.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
195.000
|
$61.990
|
$55.000
|
$96.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
12.000
|
$580.000
|
$680.000
|
$450.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
138.000
|
$585.250
|
$445.000
|
$520.000
|
|
|
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
|
LF
|
5.000
|
$791.930
|
$1,090.000
|
$540.000
|
|
|
CONC BOX CULV (9 FT X 4 FT)(EXTEND)
|
LF
|
21.000
|
$800.000
|
$980.000
|
$1,000.000
|
|
|
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
|
LF
|
19.000
|
$672.000
|
$1,990.000
|
$960.000
|
|
|
CONC BOX CULV (9FT X 2FT)(EXTEND)
|
LF
|
6.000
|
$850.000
|
$840.000
|
$900.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
198.000
|
$56.000
|
$63.000
|
$50.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
215.000
|
$48.950
|
$62.000
|
$60.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
20.000
|
$63.370
|
$106.000
|
$120.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
12.000
|
$83.150
|
$162.000
|
$160.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
4.000
|
$10,411.700
|
$9,000.000
|
$11,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$12,919.550
|
$11,200.000
|
$16,000.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
2.000
|
$36,675.000
|
$15,900.000
|
$31,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$4,852.160
|
$8,200.000
|
$5,400.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$8,866.660
|
$8,400.000
|
$6,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$5,285.720
|
$9,700.000
|
$7,800.000
|
|
|
SET (TY I)(S= 9 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
1.000
|
$3,000.000
|
$10,600.000
|
$9,000.000
|
|
|
SET (TY I)(S= 9 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
2.000
|
$1,000.000
|
$9,500.000
|
$10,000.000
|
|
|
SET (TY II) (12 IN) (CMP) (4: 1) (P)
|
EA
|
2.000
|
$1,000.000
|
$1,100.000
|
$780.000
|
|
|
SET (TY II) (12 IN) (RCP) (4: 1) (P)
|
EA
|
26.000
|
$1,000.000
|
$875.000
|
$780.000
|
|
|
SET (TY II) (18 IN) (CMP) (4: 1) (P)
|
EA
|
40.000
|
$1,000.000
|
$995.000
|
$850.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
30.000
|
$991.000
|
$925.000
|
$850.000
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (P)
|
EA
|
10.000
|
$1,000.000
|
$1,125.000
|
$960.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,582.940
|
$1,075.000
|
$960.000
|
|
|
SET (TY II) (36 IN) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$2,331.000
|
$1,750.000
|
$3,600.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
14.000
|
$2,079.310
|
$2,100.000
|
$1,800.000
|
|
|
REMOV STR (SET)
|
EA
|
8.000
|
$578.460
|
$710.000
|
$600.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
10.000
|
$1,582.140
|
$710.000
|
$1,200.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
28.000
|
$55.620
|
$119.000
|
$110.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
58.000
|
$435.470
|
$590.000
|
$850.000
|
|
|
REMOVE STR (GABION)
|
LF
|
146.000
|
$50.000
|
$25.000
|
$110.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$812,685.490
|
$650,000.000
|
$600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$10,000.000
|
$10,000.000
|
$12,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,600.000
|
$27.190
|
$25.750
|
$31.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,600.000
|
$8.270
|
$8.000
|
$4.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$18.610
|
$15.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$7.220
|
$5.000
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
11,490.000
|
$2.040
|
$2.750
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
11,490.000
|
$0.610
|
$0.450
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
100.000
|
$1.000
|
$5.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
100.000
|
$1.000
|
$0.750
|
$3.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
525.000
|
$37.270
|
$40.000
|
$36.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
4,273.000
|
$14.620
|
$25.000
|
$18.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
300.000
|
$19.650
|
$25.000
|
$25.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
22.000
|
$2,158.000
|
$2,550.000
|
$2,600.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
22.000
|
$224.900
|
$230.000
|
$250.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
3.000
|
$255.330
|
$235.000
|
$320.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$539.500
|
$520.000
|
$680.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
$466.330
|
$465.000
|
$560.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$612.810
|
$825.000
|
$940.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
21.000
|
$411.490
|
$360.000
|
$450.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
5.000
|
$413.460
|
$465.000
|
$530.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
30.000
|
$54.540
|
$46.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
3,148.000
|
$0.630
|
$0.520
|
$0.520
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
36.000
|
$3.270
|
$5.210
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
9,792.000
|
$0.260
|
$0.420
|
$0.420
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
33,910.000
|
$0.300
|
$0.420
|
$0.420
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
945.000
|
$0.830
|
$1.150
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
4,701.000
|
$0.840
|
$1.150
|
$0.600
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
36.000
|
$5.990
|
$5.730
|
$6.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
2.000
|
$618.000
|
$570.000
|
$600.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
3,148.000
|
$0.360
|
$0.520
|
$0.550
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
72,259.000
|
$0.350
|
$0.480
|
$0.510
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
282.000
|
$0.400
|
$2.080
|
$2.200
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
8,418.000
|
$0.410
|
$0.520
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
68,363.000
|
$0.350
|
$0.480
|
$0.510
|
|
REFL PAV MRKR TY I-C
|
EA
|
371.000
|
$3.690
|
$3.400
|
$3.600
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
820.000
|
$3.540
|
$3.400
|
$3.600
|
|
|
FULL - WIDTH MOWING
|
AC
|
34.000
|
$82.100
|
$150.000
|
$130.000
|
|
|
TMA (STATIONARY)
|
DAY
|
160.000
|
$250.000
|
$200.000
|
$280.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
96.000
|
$150.000
|
$50.000
|
$50.000
|
|
Totals: |
$9,226,088.330
|
$6,555,440.960
|
$7,375,075.400
|