Show Job Controls
Bid Cobra

NAVARRO BI 45-F (0092-13-023)

Items: 105

County: NAVARRO
Length: N/A
Highway: BI 45-F
District: DALLAS
Control Number: 0092-13-023
DBE Goal: N/A
Project: NH 1802(182)
Guaranty: N/A
Time: 169 WORKING DAYS
Engineer's Estimate: $9,226,088.33
Date: 06/05/2018 (8 years ago)
Contract Number: N/A
Type: PAVEMENT REPAIR OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$9,226,088.33
$6,555,440.96
Over/Under Est: -28.95% -$2,670,647.37
$7,375,075.40
Over/Under Est: -20.06% -$1,851,012.93
Amt Left: 12.5% $819,634.44

Bid Items & Bid Tabulations

105 Total 0 of 105
NAVARRO  |  BI 45-F  |  DALLAS  |  0092-13-023  |  06/05/2018  |  $9,226,088.33  |  NH 1802(182)  |  PAVMT REPAIR OVERLAY  |  169 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
A. L. HELMCAMP, INC.
PREPARING ROW
STA 301.000 $2,950.000 $300.000 $750.000
EXCAVATION (ROADWAY)
CY 2,600.000 $8.520 $11.000 $11.000
SUBGRADE WIDENING (ORD COMP)
STA 301.000 $162.280 $350.000 $180.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 4,449.000 $9.910 $16.500 $8.000
BACKFILL (TY A OR B)
STA 300.400 $276.450 $90.000 $150.000
COMPOST MANUF TOPSOIL (4")
SY 164,632.000 $3.000 $0.650 $0.700
BLOCK SODDING
SY 201.000 $3.950 $5.200 $7.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 164,632.000 $0.170 $0.090 $0.120
DRILL SEED (TEMP)(WARM OR COOL)
SY 164,632.000 $0.150 $0.050 $0.120
VEGETATIVE WATERING
MG 57,120.000 $10.650 $0.010 $1.000
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 102,334.000 $7.550 $6.750 $7.700
FL BS (RDWY DEL) (TY D GR 1-2)
TON 11,370.000 $27.590 $18.250 $26.000
REWORK BS MTL (TY B) (6") (ORD COMP)
SY 102,334.000 $1.400 $1.750 $2.500
LIME (HYDRATED OR COMMERCIAL)(SLURRY)
TON 3,670.000 $169.550 $125.000 $170.000
LIME TRT (SUBGRADE)(8")
SY 122,355.000 $5.160 $3.000 $3.200
CEMENT
TON 599.000 $132.080 $135.000 $120.000
CEMENT TREAT (MX EXST MTL & NW BS) (6")
SY 102,334.000 $2.190 $1.750 $1.500
SALV, HAUL & STKPL RCL APH PV (3")
SY 45,760.000 $4.130 $1.150 $1.700
SALV, HAUL & STKPL RCL APH PV (4")
SY 82,587.000 $2.140 $0.950 $2.000
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 20,467.000 $3.390 $2.500 $2.800
ASPH (CRS-2P)
GAL 30,029.000 $3.080 $3.250 $3.000
ASPH (RC-250)
GAL 8,721.000 $2.110 $3.500 $3.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 250.000 $128.070 $115.000 $60.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 46,718.000 $2.860 $3.500 $3.000
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
CY 274.000 $136.900 $150.000 $100.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 594.000 $116.490 $120.000 $100.000
SUPERPAVE MIXTURES SP-D SAC-B PG64-22
TON 7,551.000 $72.000 $70.000 $91.000
FULL-DEPTH REPAIR CRCP (5"-9")
SY 3,060.000 $233.820 $250.000 $240.000
CUT & RESTORE ASPH PAVING
SY 13.000 $67.960 $965.000 $220.000
TRENCH EXCAVATION PROTECTION
LF 28.000 $1.810 $32.000 $22.000
TEMPORARY SPL SHORING
SF 3,990.000 $16.360 $12.250 $38.000
RIPRAP (STONE COMMON)(GROUT)(8 IN)
CY 230.000 $181.340 $280.000 $100.000
CMP (GAL STL 18 IN)
LF 744.000 $55.820 $39.000 $54.000
CMP (GAL STL 24 IN)
LF 195.000 $61.990 $55.000 $96.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 12.000 $580.000 $680.000 $450.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 138.000 $585.250 $445.000 $520.000
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 5.000 $791.930 $1,090.000 $540.000
CONC BOX CULV (9 FT X 4 FT)(EXTEND)
LF 21.000 $800.000 $980.000 $1,000.000
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
LF 19.000 $672.000 $1,990.000 $960.000
CONC BOX CULV (9FT X 2FT)(EXTEND)
LF 6.000 $850.000 $840.000 $900.000
RC PIPE (CL III)(12 IN)
LF 198.000 $56.000 $63.000 $50.000
RC PIPE (CL III)(18 IN)
LF 215.000 $48.950 $62.000 $60.000
RC PIPE (CL III)(24 IN)
LF 20.000 $63.370 $106.000 $120.000
RC PIPE (CL III)(30 IN)
LF 12.000 $83.150 $162.000 $160.000
WINGWALL (PW - 1) (HW=5 FT)
EA 4.000 $10,411.700 $9,000.000 $11,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $12,919.550 $11,200.000 $16,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $36,675.000 $15,900.000 $31,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $4,852.160 $8,200.000 $5,400.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $8,866.660 $8,400.000 $6,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $5,285.720 $9,700.000 $7,800.000
SET (TY I)(S= 9 FT)(HW= 3 FT)(4:1) (C)
EA 1.000 $3,000.000 $10,600.000 $9,000.000
SET (TY I)(S= 9 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $1,000.000 $9,500.000 $10,000.000
SET (TY II) (12 IN) (CMP) (4: 1) (P)
EA 2.000 $1,000.000 $1,100.000 $780.000
SET (TY II) (12 IN) (RCP) (4: 1) (P)
EA 26.000 $1,000.000 $875.000 $780.000
SET (TY II) (18 IN) (CMP) (4: 1) (P)
EA 40.000 $1,000.000 $995.000 $850.000
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 30.000 $991.000 $925.000 $850.000
SET (TY II) (24 IN) (CMP) (4: 1) (P)
EA 10.000 $1,000.000 $1,125.000 $960.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,582.940 $1,075.000 $960.000
SET (TY II) (36 IN) (CMP) (4: 1) (C)
EA 2.000 $2,331.000 $1,750.000 $3,600.000
CLEAN EXIST CULVERTS
EA 14.000 $2,079.310 $2,100.000 $1,800.000
REMOV STR (SET)
EA 8.000 $578.460 $710.000 $600.000
REMOV STR (WINGWALL)
EA 10.000 $1,582.140 $710.000 $1,200.000
REMOV STR (BOX CULVERT)
LF 28.000 $55.620 $119.000 $110.000
REMOV STR (DRIVEWAY CULVERT)
EA 58.000 $435.470 $590.000 $850.000
REMOVE STR (GABION)
LF 146.000 $50.000 $25.000 $110.000
MOBILIZATION
LS 1.000 $812,685.490 $650,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $10,000.000 $10,000.000 $12,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,600.000 $27.190 $25.750 $31.000
ROCK FILTER DAMS (REMOVE)
LF 3,600.000 $8.270 $8.000 $4.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $18.610 $15.000 $15.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $7.220 $5.000 $2.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 11,490.000 $2.040 $2.750 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 11,490.000 $0.610 $0.450 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $1.000 $5.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.000 $0.750 $3.000
DRIVEWAYS (ACP)
SY 525.000 $37.270 $40.000 $36.000
DRIVEWAYS (SURF TREAT)
SY 4,273.000 $14.620 $25.000 $18.000
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $19.650 $25.000 $25.000
GUARDRAIL END TREATMENT (INSTALL)
EA 22.000 $2,158.000 $2,550.000 $2,600.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 22.000 $224.900 $230.000 $250.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 3.000 $255.330 $235.000 $320.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $539.500 $520.000 $680.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 5.000 $466.330 $465.000 $560.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $612.810 $825.000 $940.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 21.000 $411.490 $360.000 $450.000
RELOCATE SM RD SN SUP&AM TY S80
EA 5.000 $413.460 $465.000 $530.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 30.000 $54.540 $46.000 $50.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 3,148.000 $0.630 $0.520 $0.520
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 36.000 $3.270 $5.210 $5.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 9,792.000 $0.260 $0.420 $0.420
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 33,910.000 $0.300 $0.420 $0.420
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 945.000 $0.830 $1.150 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 4,701.000 $0.840 $1.150 $0.600
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 36.000 $5.990 $5.730 $6.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 2.000 $618.000 $570.000 $600.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,148.000 $0.360 $0.520 $0.550
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 72,259.000 $0.350 $0.480 $0.510
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 282.000 $0.400 $2.080 $2.200
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 8,418.000 $0.410 $0.520 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 68,363.000 $0.350 $0.480 $0.510
REFL PAV MRKR TY I-C
EA 371.000 $3.690 $3.400 $3.600
REFL PAV MRKR TY II-A-A
EA 820.000 $3.540 $3.400 $3.600
FULL - WIDTH MOWING
AC 34.000 $82.100 $150.000 $130.000
TMA (STATIONARY)
DAY 160.000 $250.000 $200.000 $280.000
TMA (MOBILE OPERATION)
HR 96.000 $150.000 $50.000 $50.000
Totals: $9,226,088.330 $6,555,440.960 $7,375,075.400