|
|
PREPARING ROW
|
STA
|
389.120
|
$1,200.000
|
$469.000
|
$440.230
|
$450.000
|
$750.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
27.000
|
$23.000
|
$15.000
|
$15.000
|
$16.000
|
$100.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
43.000
|
$9.000
|
$15.460
|
$75.000
|
$75.000
|
$100.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
17.000
|
$15.000
|
$39.100
|
$235.000
|
$150.000
|
$100.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
778.240
|
$135.000
|
$223.940
|
$230.000
|
$385.000
|
$350.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
17,538.000
|
$2.000
|
$1.000
|
$1.090
|
$5.750
|
$1.500
|
|
|
BLOCK SODDING
|
SY
|
244.000
|
$2.850
|
$8.000
|
$6.450
|
$8.500
|
$12.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
17,294.000
|
$0.450
|
$0.600
|
$0.352
|
$0.500
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
2,614.000
|
$5.000
|
$3.730
|
$0.010
|
$1.000
|
$5.000
|
|
|
REWORK BS MTL (TY C) (8") (ORD COMP)
|
SY
|
20,548.000
|
$2.000
|
$1.840
|
$3.150
|
$4.600
|
$2.500
|
|
|
CEMENT
|
TON
|
137.000
|
$178.000
|
$183.000
|
$210.000
|
$215.000
|
$300.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
20,548.000
|
$2.450
|
$1.840
|
$2.100
|
$4.750
|
$3.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
4,110.000
|
$3.500
|
$4.950
|
$6.350
|
$6.250
|
$5.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
10,274.000
|
$3.500
|
$5.200
|
$5.230
|
$4.500
|
$5.000
|
|
|
ASPH (RC-250)
|
GAL
|
5,754.000
|
$4.250
|
$6.000
|
$5.000
|
$5.500
|
$5.000
|
|
|
AGGR(TY-PL GR-3LW SAC-B)
|
CY
|
1,426.000
|
$132.010
|
$148.800
|
$125.000
|
$190.000
|
$210.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
165.000
|
$125.000
|
$137.420
|
$99.000
|
$175.000
|
$200.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
81,826.000
|
$4.000
|
$5.510
|
$5.100
|
$4.500
|
$5.500
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
172.000
|
$180.000
|
$148.450
|
$125.000
|
$195.000
|
$275.000
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
172.000
|
$139.000
|
$134.550
|
$114.000
|
$180.000
|
$250.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
196.000
|
$180.000
|
$134.190
|
$114.000
|
$165.000
|
$250.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
35,000.000
|
$85.000
|
$63.830
|
$65.570
|
$67.000
|
$80.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
51,576.000
|
$1.750
|
$1.000
|
$2.980
|
$3.400
|
$2.700
|
|
|
FLOWABLE BACKFILL
|
CY
|
10.000
|
$200.000
|
$250.000
|
$250.000
|
$263.000
|
$1,000.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
8.000
|
$650.000
|
$500.000
|
$500.000
|
$525.000
|
$1,850.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
10.000
|
$550.000
|
$500.000
|
$500.000
|
$525.000
|
$1,000.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
7.000
|
$120.000
|
$293.940
|
$130.000
|
$367.500
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
642.000
|
$450.000
|
$500.000
|
$500.000
|
$525.000
|
$650.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
4.000
|
$80.000
|
$70.000
|
$70.000
|
$73.500
|
$300.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8.000
|
$100.000
|
$100.000
|
$100.000
|
$105.000
|
$400.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$6,750.000
|
$6,000.000
|
$6,000.000
|
$6,300.000
|
$7,500.000
|
|
|
HEADWALL (CH - FW - 45) (DIA= 48 IN)
|
EA
|
1.000
|
$11,500.000
|
$10,000.000
|
$10,000.000
|
$10,500.000
|
$25,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$685.000
|
$700.000
|
$700.000
|
$735.000
|
$2,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,210.000
|
$1,000.000
|
$1,000.000
|
$1,050.000
|
$3,100.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
14.000
|
$1,900.000
|
$1,000.000
|
$1,000.000
|
$1,050.000
|
$2,000.000
|
|
|
REMOV STR (SET)
|
EA
|
3.000
|
$450.000
|
$250.000
|
$250.000
|
$262.500
|
$500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,650.000
|
$1,000.000
|
$1,000.000
|
$1,050.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
12.000
|
$20.000
|
$20.000
|
$20.000
|
$21.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$650,000.000
|
$526,129.000
|
$340,800.000
|
$700,000.000
|
$890,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$10,000.000
|
$6,685.000
|
$6,600.000
|
$14,800.000
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
90.000
|
$32.000
|
$40.000
|
$40.000
|
$35.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
90.000
|
$9.660
|
$10.000
|
$12.000
|
$12.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,595.000
|
$2.660
|
$3.000
|
$3.000
|
$2.500
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,595.000
|
$0.500
|
$0.500
|
$1.000
|
$0.900
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
200.000
|
$4.250
|
$5.000
|
$5.500
|
$5.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
200.000
|
$0.850
|
$1.000
|
$1.000
|
$1.000
|
$2.000
|
|
|
CONC CURB (TY II)
|
LF
|
24.000
|
$40.000
|
$60.000
|
$60.000
|
$63.000
|
$90.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
10,500.000
|
$25.500
|
$22.000
|
$22.000
|
$23.100
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,000.000
|
$1,700.000
|
$1,950.000
|
$1,785.000
|
$3,500.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
2.000
|
$1,375.000
|
$925.000
|
$925.000
|
$971.250
|
$1,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
28.000
|
$1,400.000
|
$1,050.000
|
$1,050.000
|
$1,102.500
|
$1,750.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
10,500.000
|
$2.320
|
$2.250
|
$2.250
|
$2.360
|
$3.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
9.000
|
$210.000
|
$130.000
|
$130.000
|
$136.500
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
39.000
|
$2,880.000
|
$2,725.000
|
$2,725.000
|
$2,861.250
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
39.000
|
$272.500
|
$225.000
|
$225.000
|
$236.250
|
$350.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
11.000
|
$30.000
|
$30.000
|
$135.000
|
$31.500
|
$50.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
206.000
|
$625.000
|
$650.000
|
$940.000
|
$682.500
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
91.000
|
$700.000
|
$750.000
|
$985.000
|
$787.500
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,150.000
|
$1,180.000
|
$1,700.000
|
$1,239.000
|
$1,800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$1,150.000
|
$1,300.000
|
$1,950.000
|
$1,365.000
|
$2,000.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
19.000
|
$1,870.500
|
$3,000.000
|
$4,885.000
|
$3,281.250
|
$4,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
303.000
|
$115.500
|
$100.000
|
$100.000
|
$105.000
|
$150.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
19.000
|
$301.090
|
$300.000
|
$350.000
|
$525.000
|
$1,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
59.000
|
$20.750
|
$17.000
|
$17.000
|
$17.850
|
$26.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$29.000
|
$17.500
|
$17.500
|
$18.380
|
$27.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
48.000
|
$18.000
|
$17.000
|
$17.000
|
$17.850
|
$27.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
15.000
|
$146.500
|
$35.000
|
$39.000
|
$84.000
|
$55.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
9,308.000
|
$1.210
|
$2.190
|
$1.500
|
$1.000
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
5,241.000
|
$1.600
|
$2.190
|
$1.500
|
$1.000
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
285.000
|
$7.500
|
$4.850
|
$6.000
|
$10.500
|
$9.240
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
10.000
|
$807.500
|
$325.000
|
$500.000
|
$682.500
|
$770.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
10.000
|
$1,189.000
|
$325.000
|
$1,250.000
|
$945.000
|
$1,925.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
3.000
|
$60.000
|
$20.000
|
$100.000
|
$78.750
|
$154.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
5,252.000
|
$1.000
|
$0.850
|
$0.850
|
$1.000
|
$1.310
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
1,851.000
|
$5.750
|
$4.800
|
$5.000
|
$9.450
|
$7.700
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
14,630.000
|
$0.550
|
$0.420
|
$0.500
|
$0.420
|
$0.770
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
39,819.000
|
$0.360
|
$0.420
|
$0.450
|
$0.410
|
$0.690
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,187.000
|
$0.360
|
$0.420
|
$0.500
|
$0.420
|
$0.770
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
33,179.000
|
$0.370
|
$0.420
|
$0.450
|
$0.410
|
$0.690
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
46,481.000
|
$0.600
|
$0.510
|
$0.700
|
$0.670
|
$1.080
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
47,548.000
|
$0.600
|
$0.510
|
$0.700
|
$0.670
|
$1.080
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
993.000
|
$5.000
|
$4.500
|
$3.300
|
$4.460
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
732.000
|
$5.000
|
$4.500
|
$3.300
|
$4.460
|
$5.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$4,500.000
|
$3,000.000
|
$5,000.000
|
$1,000.000
|
$9,500.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
7.000
|
$300.000
|
$500.000
|
$2,500.000
|
$200.000
|
$1,500.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
5,674.000
|
$90.000
|
$129.750
|
$134.250
|
$128.000
|
$188.000
|
|
|
TACK COAT
|
GAL
|
5,674.000
|
$2.750
|
$1.800
|
$1.800
|
$4.000
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$15,000.000
|
$14,500.000
|
$10,000.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$150.000
|
$150.000
|
$250.000
|
$400.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
160.000
|
$68.500
|
$75.000
|
$115.000
|
$35.000
|
$50.000
|
|
Totals: |
$7,146,296.840
|
$6,333,011.916
|
$6,448,455.746
|
$7,224,804.310
|
$8,902,357.950
|