Job Info for 0092-06-105

County: NAVARRO Highway: IH 45 Date: 05/04/2022 (2 years ago) Engineer's Estimate: $7,146,297 Control Number: 0092-06-105
Project: C 92-6-105 District: DALLAS Time: 237 WORKING DAYS Type: PAVEMENT REPAIR, MILLING, OVERLAY, SC, PAV' MRKS
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $7,146,296.84
A. K. GILLIS & SONS, LLC   $6,333,011.91 1
-11.38% | -$813,284.93
D. L. LENNON INCORPORATED - CONTRACTOR   $6,448,455.73 2
-9.77% | -$697,841.11
1.82% | $115,443.82
A. L. HELMCAMP, INC.   $7,224,804.31 3
1.1% | $78,507.47
14.08% | $891,792.40
12.04% | $776,348.58
KNIFE RIVER CORPORATION - SOUTH   $8,902,357.95 4
24.57% | $1,756,061.11
40.57% | $2,569,346.04
23.22% | $1,677,553.64

Bid Items

Items: 90, 0 filtered
NAVARRO IH 45  |  DALLAS  |  0092-06-105  |  05/04/2022  |  $7,146,297  |  C 92-6-105  |  PAVMT REPAIR, MILLING, OVERLAY, SC, PAV' MRKS  |  237 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate A. K. GILLIS & SONS, LLC D. L. LENNON INCORPORATED - CONTRACTOR A. L. HELMCAMP, INC. KNIFE RIVER CORPORATION - SOUTH
100 6002 PREPARING ROW STA 389.120 $1,200.000 $469.000 $440.230 $450.000 $750.000
104 6009 REMOVING CONC (RIPRAP) SY 27.000 $23.000 $15.000 $15.000 $16.000 $100.000
110 6001 EXCAVATION (ROADWAY) CY 43.000 $9.000 $15.460 $75.000 $75.000 $100.000
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 17.000 $15.000 $39.100 $235.000 $150.000 $100.000
134 6004 BACKFILL (TY A OR B) STA 778.240 $135.000 $223.940 $230.000 $385.000 $350.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 17,538.000 $2.000 $1.000 $1.090 $5.750 $1.500
162 6002 BLOCK SODDING SY 244.000 $2.850 $8.000 $6.450 $8.500 $12.000
164 6023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 17,294.000 $0.450 $0.600 $0.352 $0.500 $0.500
168 6001 VEGETATIVE WATERING MG 2,614.000 $5.000 $3.730 $0.010 $1.000 $5.000
251 6034 REWORK BS MTL (TY C) (8") (ORD COMP) SY 20,548.000 $2.000 $1.840 $3.150 $4.600 $2.500
275 6001 CEMENT TON 137.000 $178.000 $183.000 $210.000 $215.000 $300.000
275 6011 CEMENT TREAT(EXIST MATL)(8") SY 20,548.000 $2.450 $1.840 $2.100 $4.750 $3.000
314 6021 EMULS ASPH (PRIME)(MS-2 OR SS-1) GAL 4,110.000 $3.500 $4.950 $6.350 $6.250 $5.000
316 6024 ASPH (CRS-2P) GAL 10,274.000 $3.500 $5.200 $5.230 $4.500 $5.000
316 6029 ASPH (RC-250) GAL 5,754.000 $4.250 $6.000 $5.000 $5.500 $5.000
316 6255 AGGR(TY-PL GR-3LW SAC-B) CY 1,426.000 $132.010 $148.800 $125.000 $190.000 $210.000
316 6403 AGGR (TY-B GR-5 OR TY-L GR-5) CY 165.000 $125.000 $137.420 $99.000 $175.000 $200.000
316 6419 ASPH (AC-15P, AC-20-5TR OR AC-20XP) GAL 81,826.000 $4.000 $5.510 $5.100 $4.500 $5.500
316 6434 AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B) CY 172.000 $180.000 $148.450 $125.000 $195.000 $275.000
316 6435 AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B) CY 172.000 $139.000 $134.550 $114.000 $180.000 $250.000
316 6440 AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B) CY 196.000 $180.000 $134.190 $114.000 $165.000 $250.000
351 6008 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") SY 35,000.000 $85.000 $63.830 $65.570 $67.000 $80.000
354 6045 PLANE ASPH CONC PAV (2") SY 51,576.000 $1.750 $1.000 $2.980 $3.400 $2.700
401 6001 FLOWABLE BACKFILL CY 10.000 $200.000 $250.000 $250.000 $263.000 $1,000.000
420 6009 CL A CONC (COLLAR) EA 8.000 $650.000 $500.000 $500.000 $525.000 $1,850.000
432 6009 RIPRAP (CONC) (CL B) (4") CY 10.000 $550.000 $500.000 $500.000 $525.000 $1,000.000
432 6024 RIPRAP (STONE COMMON)(DRY)(12 IN) CY 7.000 $120.000 $293.940 $130.000 $367.500 $500.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 642.000 $450.000 $500.000 $500.000 $525.000 $650.000
464 6003 RC PIPE (CL III)(18 IN) LF 4.000 $80.000 $70.000 $70.000 $73.500 $300.000
464 6005 RC PIPE (CL III)(24 IN) LF 8.000 $100.000 $100.000 $100.000 $105.000 $400.000
466 6007 HEADWALL (CH - FW - 0) (DIA= 30 IN) EA 1.000 $6,750.000 $6,000.000 $6,000.000 $6,300.000 $7,500.000
466 6056 HEADWALL (CH - FW - 45) (DIA= 48 IN) EA 1.000 $11,500.000 $10,000.000 $10,000.000 $10,500.000 $25,000.000
467 6356 SET (TY II) (18 IN) (RCP) (3: 1) (C) EA 1.000 $685.000 $700.000 $700.000 $735.000 $2,900.000
467 6388 SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 2.000 $1,210.000 $1,000.000 $1,000.000 $1,050.000 $3,100.000
480 6001 CLEAN EXIST CULVERTS EA 14.000 $1,900.000 $1,000.000 $1,000.000 $1,050.000 $2,000.000
496 6004 REMOV STR (SET) EA 3.000 $450.000 $250.000 $250.000 $262.500 $500.000
496 6006 REMOV STR (HEADWALL) EA 2.000 $1,650.000 $1,000.000 $1,000.000 $1,050.000 $1,500.000
496 6007 REMOV STR (PIPE) LF 12.000 $20.000 $20.000 $20.000 $21.000 $50.000
500 6001 MOBILIZATION LS 1.000 $650,000.000 $526,129.000 $340,800.000 $700,000.000 $890,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 12.000 $10,000.000 $6,685.000 $6,600.000 $14,800.000 $15,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 90.000 $32.000 $40.000 $40.000 $35.000 $50.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 90.000 $9.660 $10.000 $12.000 $12.000 $20.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 9,595.000 $2.660 $3.000 $3.000 $2.500 $4.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 9,595.000 $0.500 $0.500 $1.000 $0.900 $1.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 200.000 $4.250 $5.000 $5.500 $5.000 $10.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 200.000 $0.850 $1.000 $1.000 $1.000 $2.000
529 6002 CONC CURB (TY II) LF 24.000 $40.000 $60.000 $60.000 $63.000 $90.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 10,500.000 $25.500 $22.000 $22.000 $23.100 $30.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2.000 $2,000.000 $1,700.000 $1,950.000 $1,785.000 $3,500.000
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 2.000 $1,375.000 $925.000 $925.000 $971.250 $1,500.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 28.000 $1,400.000 $1,050.000 $1,050.000 $1,102.500 $1,750.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 10,500.000 $2.320 $2.250 $2.250 $2.360 $3.500
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 9.000 $210.000 $130.000 $130.000 $136.500 $300.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 39.000 $2,880.000 $2,725.000 $2,725.000 $2,861.250 $3,500.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 39.000 $272.500 $225.000 $225.000 $236.250 $350.000
636 6001 ALUMINUM SIGNS (TY A) SF 11.000 $30.000 $30.000 $135.000 $31.500 $50.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 206.000 $625.000 $650.000 $940.000 $682.500 $1,000.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 91.000 $700.000 $750.000 $985.000 $787.500 $1,200.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 2.000 $1,150.000 $1,180.000 $1,700.000 $1,239.000 $1,800.000
644 6036 IN SM RD SN SUP&AM TYS80(1)SA(U-BM) EA 4.000 $1,150.000 $1,300.000 $1,950.000 $1,365.000 $2,000.000
644 6064 IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) EA 19.000 $1,870.500 $3,000.000 $4,885.000 $3,281.250 $4,500.000
644 6076 REMOVE SM RD SN SUP&AM EA 303.000 $115.500 $100.000 $100.000 $105.000 $150.000
644 6077 REMOVE BRDG MNT CLEARANCE SIGN ASSM EA 19.000 $301.090 $300.000 $350.000 $525.000 $1,500.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 59.000 $20.750 $17.000 $17.000 $17.850 $26.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 12.000 $29.000 $17.500 $17.500 $18.380 $27.000
658 6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 48.000 $18.000 $17.000 $17.000 $17.850 $27.000
658 6100 INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) EA 15.000 $146.500 $35.000 $39.000 $84.000 $55.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 9,308.000 $1.210 $2.190 $1.500 $1.000 $2.000
662 6110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 5,241.000 $1.600 $2.190 $1.500 $1.000 $2.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 285.000 $7.500 $4.850 $6.000 $10.500 $9.240
666 6081 REFL PAV MRK TY I(W)(ENTR GORE)(100MIL) EA 10.000 $807.500 $325.000 $500.000 $682.500 $770.000
666 6084 REFL PAV MRK TY I(W)(EXIT GORE)(100MIL) EA 10.000 $1,189.000 $325.000 $1,250.000 $945.000 $1,925.000
666 6102 REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA 3.000 $60.000 $20.000 $100.000 $78.750 $154.000
666 6138 REFL PAV MRK TY I (Y)8"(SLD)(100MIL) LF 5,252.000 $1.000 $0.850 $0.850 $1.000 $1.310
666 6147 REFL PAV MRK TY I (Y)24"(SLD)(100MIL) LF 1,851.000 $5.750 $4.800 $5.000 $9.450 $7.700
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 14,630.000 $0.550 $0.420 $0.500 $0.420 $0.770
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 39,819.000 $0.360 $0.420 $0.450 $0.410 $0.690
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 1,187.000 $0.360 $0.420 $0.500 $0.420 $0.770
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 33,179.000 $0.370 $0.420 $0.450 $0.410 $0.690
666 6342 REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF 46,481.000 $0.600 $0.510 $0.700 $0.670 $1.080
666 6345 REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL) LF 47,548.000 $0.600 $0.510 $0.700 $0.670 $1.080
672 6009 REFL PAV MRKR TY II-A-A EA 993.000 $5.000 $4.500 $3.300 $4.460 $5.000
672 6010 REFL PAV MRKR TY II-C-R EA 732.000 $5.000 $4.500 $3.300 $4.460 $5.000
730 6107 FULL - WIDTH MOWING CYC 2.000 $4,500.000 $3,000.000 $5,000.000 $1,000.000 $9,500.000
764 6001 DRAIN INLET CLEANING EA 7.000 $300.000 $500.000 $2,500.000 $200.000 $1,500.000
3077 6013 SP MIXES SP-C SAC-B PG64-22 TON 5,674.000 $90.000 $129.750 $134.250 $128.000 $188.000
3077 6075 TACK COAT GAL 5,674.000 $2.750 $1.800 $1.800 $4.000 $4.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $8,000.000 $15,000.000 $14,500.000 $10,000.000 $25,000.000
6185 6002 TMA (STATIONARY) DAY 40.000 $150.000 $150.000 $250.000 $400.000 $250.000
6185 6003 TMA (MOBILE OPERATION) HR 160.000 $68.500 $75.000 $115.000 $35.000 $50.000
Totals: $7,146,296.84 $6,333,011.92 $6,448,455.75 $7,224,804.31 $8,902,357.95