Show Job Controls
Bid Cobra

NACOGDOCHES SH0007 (6429-92-001)

Items: 36

County: NACOGDOCHES
Length: N/A
Highway: SH0007
District: LUFKIN
Control Number: 6429-92-001
DBE Goal: N/A
Project: RMC - 642992001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $256,822.90
Date: 03/15/2023 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$256,822.90
$214,075.00
Over/Under Est: -16.64% -$42,747.90
Over/Under Est: -12.98% -$33,332.90
Amt Left: 4.4% $9,415.00
Over/Under Est: -10.96% -$28,147.90
Amt Left: 6.82% $14,600.00
Delta: -2.32% -$5,185.00

Bid Items & Bid Tabulations

36 Total 0 of 36
NACOGDOCHES  |  SH0007  |  LUFKIN  |  6429-92-001  |  03/15/2023  |  $256,822.90  |  RMC - 642992001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACE CONTRACTORS, INC.
JCW CONSTRUCTION, LLC
GARRET SHIELDS INFRASTRUCTURE
REMOVING CONC (CURB)
LF 125.000 $15.000 $5.000 $20.000 $15.000
RAIL (TY T631)
LF 75.000 $100.000 $100.000 $70.000 $100.000
RAIL (TY T631LS)
LF 20.000 $150.000 $70.000 $70.000 $150.000
MOBILIZATION (CALLOUT)
EA 12.000 $1,500.000 $1,250.000 $250.000 $2,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,100.000 $40.000 $35.000 $40.000 $50.000
MTL W-BEAM GD FEN (STEEL POST)
LF 10.000 $30.000 $40.000 $50.000 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,000.000 $1,750.000 $3,000.000 $2,000.000
MTL BEAM GD FEN TRANS (T101)
EA 8.000 $1,500.000 $1,200.000 $900.000 $500.000
SHORT RADIUS
LF 50.000 $35.000 $50.000 $50.000 $100.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $1,000.000 $400.000 $250.000 $50.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,000.000 $1,000.000 $1,300.000 $100.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 75.000 $30.000 $50.000 $150.000 $40.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 3.000 $1,700.000 $750.000 $250.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 2,000.000 $3.750 $3.000 $0.250 $5.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 40.000 $50.000 $50.000 $1.000 $10.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 10.000 $250.000 $40.000 $250.000 $100.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 10.000 $1,200.000 $1.000 $3,000.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $3,000.000 $3,000.000 $2,500.000 $500.000
CRASH CUSHION ATTEN (INSTALL) (TRACC)
EA 1.000 $31,821.000 $20,000.000 $15,000.000 $1,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 10.000 $6.520 $25.000 $30.000 $10.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 10.000 $5.000 $25.000 $30.000 $10.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 10.000 $4.530 $25.000 $30.000 $10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 10.000 $41.050 $25.000 $30.000 $10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $21.380 $25.000 $30.000 $10.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 10.000 $29.210 $25.000 $30.000 $10.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 75.000 $70.000 $60.000 $50.000 $100.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 15.000 $70.000 $100.000 $50.000 $90.000
REALIGN POSTS
EA 30.000 $30.000 $40.000 $50.000 $100.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 15.000 $25.000 $1.000 $40.000 $50.000
REMOVE & REPLACE BLOCKOUT
EA 5.000 $30.000 $50.000 $40.000 $200.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 15.000 $100.000 $125.000 $100.000 $50.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 8.000 $5,000.000 $5,000.000 $4,000.000 $5,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,200.000 $1,000.000 $500.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 8.000 $350.000 $200.000 $200.000 $500.000
REPLACE SGT OBJECT MARKER
EA 5.000 $65.000 $30.000 $800.000 $10.000
TMA (STATIONARY)
DAY 12.000 $400.000 $750.000 $500.000 $1,000.000
Totals: $256,822.900 $214,075.000 $223,490.000 $228,675.000