PREPARING ROW
|
STA
|
390.000
|
$500.000
|
$669.690
|
$375.000
|
$2,200.000
|
$2,000.000
|
$3,500.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
1,040.000
|
$20.000
|
$18.900
|
$19.000
|
$15.000
|
$15.000
|
$20.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
354.000
|
$280.000
|
$294.230
|
$124.000
|
$200.000
|
$295.000
|
$180.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
13,148.000
|
$15.000
|
$11.050
|
$12.000
|
$14.000
|
$14.000
|
$15.000
|
|
|
BACKFILL (TY B)
|
STA
|
35.000
|
$150.000
|
$131.180
|
$110.000
|
$240.000
|
$150.000
|
$250.000
|
|
|
BLADING
|
STA
|
354.000
|
$150.000
|
$100.000
|
$89.000
|
$155.000
|
$100.000
|
$200.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
264.000
|
$150.000
|
$84.000
|
$84.000
|
$200.000
|
$100.000
|
$160.000
|
|
|
BLOCK SODDING
|
SY
|
3,091.000
|
$4.000
|
$4.950
|
$5.250
|
$5.500
|
$3.500
|
$4.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
297,069.000
|
$0.500
|
$0.300
|
$0.300
|
$0.320
|
$0.400
|
$0.330
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
148,535.000
|
$0.300
|
$0.270
|
$0.300
|
$0.320
|
$0.150
|
$0.320
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
148,535.000
|
$0.300
|
$0.260
|
$0.300
|
$0.320
|
$0.150
|
$0.320
|
|
|
VEGETATIVE WATERING
|
MG
|
11,948.800
|
$15.000
|
$0.010
|
$3.000
|
$15.000
|
$0.010
|
$1.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
1,027.000
|
$10.000
|
$0.010
|
$10.000
|
$15.000
|
$0.010
|
$1.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
50,056.000
|
$38.000
|
$37.270
|
$35.500
|
$40.000
|
$39.500
|
$45.000
|
|
|
CEMENT
|
TON
|
2,211.000
|
$165.000
|
$150.000
|
$152.000
|
$160.000
|
$175.000
|
$160.000
|
|
|
CEM TRT(MX EXST MTL & NEW BS)(14")
|
SY
|
102,764.000
|
$2.000
|
$4.370
|
$2.550
|
$2.500
|
$3.000
|
$3.800
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
89,121.000
|
$2.000
|
$0.010
|
$2.820
|
$2.000
|
$3.500
|
$1.000
|
|
|
FOG SEAL (SS-1 OR CSS-1)
|
GAL
|
4,113.000
|
$4.500
|
$3.160
|
$4.000
|
$3.500
|
$3.500
|
$3.000
|
|
|
ASPH (RC-250)
|
TON
|
91.000
|
$750.000
|
$724.340
|
$807.000
|
$900.000
|
$1,000.000
|
$1,150.000
|
|
|
AGGR (TY PE OR PL GR 4)
|
CY
|
150.000
|
$135.000
|
$139.730
|
$161.000
|
$120.000
|
$175.000
|
$140.000
|
|
|
AGGR (TY-PE, E, L OR PL GR 3)
|
CY
|
859.000
|
$115.000
|
$122.850
|
$122.000
|
$120.000
|
$175.000
|
$140.000
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
737.000
|
$130.000
|
$104.860
|
$120.000
|
$100.000
|
$100.000
|
$140.000
|
|
|
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
|
CY
|
793.000
|
$130.000
|
$122.850
|
$126.000
|
$120.000
|
$175.000
|
$140.000
|
|
|
ASPH (AC-15P, AC-10-2TR, OR CRS-2P)
|
TON
|
413.000
|
$700.000
|
$604.750
|
$670.000
|
$700.000
|
$900.000
|
$690.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22 NON-MOW STRIP
|
SY
|
1,231.000
|
$65.000
|
$48.450
|
$77.000
|
$65.000
|
$40.000
|
$50.000
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
93.000
|
$120.000
|
$0.010
|
$0.010
|
$140.000
|
$250.000
|
$140.000
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
1,221.000
|
$120.000
|
$147.000
|
$137.000
|
$140.000
|
$250.000
|
$140.000
|
|
|
TACK COAT
|
GAL
|
1,946.000
|
$2.000
|
$1.050
|
$3.700
|
$3.000
|
$3.000
|
$3.500
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
11.000
|
$150.000
|
$132.300
|
$132.000
|
$240.000
|
$100.000
|
$130.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,294.000
|
$25.000
|
$42.000
|
$42.000
|
$30.000
|
$39.000
|
$40.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
1.000
|
$1,000.000
|
$1,050.000
|
$1,050.000
|
$1,125.000
|
$600.000
|
$1,100.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
5.000
|
$450.000
|
$577.500
|
$580.000
|
$700.000
|
$1,000.000
|
$580.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
92.000
|
$200.000
|
$198.450
|
$200.000
|
$175.000
|
$200.000
|
$200.000
|
|
|
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
|
LF
|
33.000
|
$1,015.000
|
$1,524.600
|
$1,500.000
|
$950.000
|
$1,200.000
|
$1,500.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
16.000
|
$1,060.000
|
$1,871.100
|
$1,900.000
|
$1,200.000
|
$1,400.000
|
$1,800.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,610.000
|
$45.000
|
$42.000
|
$42.000
|
$42.000
|
$35.000
|
$43.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
102.000
|
$65.000
|
$65.100
|
$65.000
|
$65.000
|
$50.000
|
$65.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$8,000.000
|
$6,668.550
|
$7,000.000
|
$1,800.000
|
$14,000.000
|
$6,700.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
2.000
|
$26,000.000
|
$31,719.450
|
$32,000.000
|
$23,000.000
|
$30,000.000
|
$32,000.000
|
|
|
WINGWALL (PW - 2) (HW=12 FT)
|
EA
|
2.000
|
$38,750.000
|
$44,593.500
|
$45,000.000
|
$32,000.000
|
$35,000.000
|
$44,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$450.000
|
$577.500
|
$600.000
|
$600.000
|
$750.000
|
$580.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
168.000
|
$600.000
|
$630.000
|
$630.000
|
$600.000
|
$700.000
|
$640.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
19.000
|
$950.000
|
$1,026.900
|
$1,000.000
|
$1,000.000
|
$900.000
|
$1,100.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
12.000
|
$500.000
|
$1,050.000
|
$1,050.000
|
$3,000.000
|
$1,000.000
|
$1,100.000
|
|
|
REMOV STR (PIPE)
|
EA
|
35.000
|
$250.000
|
$189.000
|
$200.000
|
$662.000
|
$500.000
|
$200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$632,000.000
|
$310,650.000
|
$550,000.000
|
$700,000.000
|
$700,000.000
|
$700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
21.000
|
$2,500.000
|
$1,551.250
|
$2,000.000
|
$2,265.000
|
$3,000.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,670.000
|
$30.000
|
$29.400
|
$34.000
|
$35.000
|
$40.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,670.000
|
$8.000
|
$9.450
|
$8.400
|
$8.500
|
$15.000
|
$9.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
250.000
|
$20.000
|
$25.200
|
$34.000
|
$34.000
|
$30.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
250.000
|
$10.000
|
$10.500
|
$8.400
|
$8.500
|
$15.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,465.000
|
$3.000
|
$3.000
|
$3.000
|
$3.150
|
$2.750
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,465.000
|
$1.000
|
$0.790
|
$1.050
|
$1.100
|
$1.000
|
$0.800
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
45.000
|
$5.000
|
$5.250
|
$10.500
|
$11.000
|
$16.000
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
45.000
|
$1.000
|
$1.050
|
$5.250
|
$5.500
|
$15.000
|
$1.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,040.000
|
$90.000
|
$101.850
|
$102.000
|
$115.000
|
$75.000
|
$100.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,294.000
|
$40.000
|
$34.000
|
$41.000
|
$34.000
|
$34.000
|
$37.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
7,806.000
|
$25.000
|
$34.000
|
$30.000
|
$34.000
|
$35.000
|
$33.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
2,419.000
|
$40.000
|
$34.000
|
$40.000
|
$34.000
|
$35.000
|
$23.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,075.000
|
$25.000
|
$18.110
|
$21.000
|
$25.000
|
$20.000
|
$18.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
225.000
|
$66.000
|
$59.850
|
$64.000
|
$67.100
|
$100.000
|
$60.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,275.000
|
$2.750
|
$2.100
|
$2.700
|
$2.750
|
$3.500
|
$2.200
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,575.000
|
$2,415.000
|
$2,600.000
|
$2,695.000
|
$2,500.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$275.000
|
$157.500
|
$265.000
|
$27.500
|
$250.000
|
$160.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$440.000
|
$262.500
|
$385.000
|
$401.500
|
$500.000
|
$450.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
69.000
|
$220.000
|
$157.500
|
$215.000
|
$225.500
|
$250.000
|
$200.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
7.000
|
$240.000
|
$162.750
|
$225.000
|
$236.500
|
$300.000
|
$310.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
$500.000
|
$420.000
|
$525.000
|
$551.100
|
$600.000
|
$470.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$600.000
|
$551.250
|
$685.000
|
$715.000
|
$750.000
|
$620.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$650.000
|
$656.250
|
$760.000
|
$797.500
|
$1,000.000
|
$790.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$800.000
|
$577.500
|
$740.000
|
$773.300
|
$750.000
|
$720.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$820.000
|
$687.750
|
$850.000
|
$891.000
|
$900.000
|
$890.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$900.000
|
$866.250
|
$1,000.000
|
$1,072.500
|
$1,100.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
55.000
|
$340.000
|
$267.750
|
$350.000
|
$368.500
|
$500.000
|
$450.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
53.000
|
$75.000
|
$99.750
|
$80.000
|
$82.500
|
$125.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
36.000
|
$80.000
|
$105.000
|
$100.000
|
$104.500
|
$150.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
19.000
|
$35.000
|
$19.950
|
$28.000
|
$29.700
|
$100.000
|
$47.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
150,895.000
|
$0.350
|
$0.110
|
$0.100
|
$0.110
|
$0.120
|
$0.110
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
163,060.000
|
$0.350
|
$0.110
|
$0.100
|
$0.110
|
$0.120
|
$0.110
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
12,230.000
|
$1.200
|
$1.000
|
$1.200
|
$1.300
|
$1.000
|
$0.600
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
100.000
|
$3.000
|
$5.250
|
$5.250
|
$5.500
|
$5.000
|
$5.700
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
7,005.000
|
$1.000
|
$0.680
|
$0.700
|
$0.720
|
$0.750
|
$0.750
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
1,968.000
|
$1.000
|
$0.530
|
$0.550
|
$0.550
|
$0.600
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
2,032.000
|
$1.000
|
$0.530
|
$0.550
|
$0.550
|
$0.600
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
9,079.000
|
$1.000
|
$0.530
|
$0.550
|
$0.550
|
$0.600
|
$0.600
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
71,531.000
|
$1.000
|
$0.680
|
$0.700
|
$0.720
|
$0.750
|
$0.750
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
2,214.000
|
$1.000
|
$1.050
|
$1.050
|
$1.100
|
$1.000
|
$1.150
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
62,102.000
|
$1.000
|
$0.680
|
$0.700
|
$0.720
|
$0.750
|
$0.800
|
|
PREFAB PAV MRK TY C (W) (8") (SLD)
|
LF
|
160.000
|
$10.000
|
$4.200
|
$4.200
|
$4.400
|
$4.000
|
$5.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
74.000
|
$15.000
|
$14.700
|
$14.700
|
$15.400
|
$15.000
|
$16.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
5.000
|
$200.000
|
$210.000
|
$210.000
|
$220.000
|
$200.000
|
$228.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
1.000
|
$250.000
|
$315.000
|
$315.000
|
$330.000
|
$300.000
|
$340.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,134.000
|
$5.000
|
$3.470
|
$3.500
|
$3.630
|
$4.000
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$5,000.000
|
$5,000.000
|
$10,000.000
|
$11,702.000
|
$6,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
600.000
|
$5.000
|
$5.250
|
$5.500
|
$5.500
|
$5.000
|
$5.700
|
|
|
TMA (STATIONARY)
|
DAY
|
330.000
|
$200.000
|
$150.000
|
$44.000
|
$265.000
|
$204.000
|
$150.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
50.000
|
$100.000
|
$0.010
|
$100.000
|
$82.500
|
$220.000
|
$80.000
|
|
Totals: |
$6,942,022.500
|
$6,199,551.448
|
$6,413,637.950
|
$7,741,773.860
|
$7,973,682.108
|
$8,565,799.820
|