Job Info for 0911-08-049

County: NACOGDOCHES Highway: CR Date: 06/02/2023 (1 year ago) Engineer's Estimate: $2,524,212 Control Number: 0911-08-049
Project: BR 2022(570) District: LUFKIN Time: 567 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,524,212.00
CROSS PLUS CONSTRUCTION, LLC   $2,547,392.10 1
0.92% | $23,180.10
EAST TEXAS BRIDGE, INC.   $3,277,374.50 2
29.84% | $753,162.50
28.66% | $729,982.40
DREWERY CONSTRUCTION COMPANY, INCORPORATED   $3,507,784.04 3
38.97% | $983,572.04
37.7% | $960,391.94
7.03% | $230,409.54

Bid Items

Items: 42, 0 filtered
NACOGDOCHES CR  |  LUFKIN  |  0911-08-049  |  06/02/2023  |  $2,524,212  |  BR 2022(570)  |  BRIDGE REPL  |  567 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate CROSS PLUS CONSTRUCTION, LLC EAST TEXAS BRIDGE, INC. DREWERY CONSTRUCTION COMPANY, INCORPORATED
100 6002 PREPARING ROW STA 14.900 $4,000.000 $1,100.000 $20,000.000 $5,000.000
110 6001 EXCAVATION (ROADWAY) CY 2,215.000 $19.000 $33.000 $20.000 $44.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 304.000 $25.000 $44.000 $50.000 $105.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 4,427.000 $4.000 $5.500 $4.000 $12.500
164 6009 BROADCAST SEED (TEMP) (WARM) SY 2,215.000 $0.500 $3.300 $2.000 $1.210
164 6011 BROADCAST SEED (TEMP) (COOL) SY 2,215.000 $0.500 $3.300 $2.000 $1.210
164 6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 4,427.000 $1.000 $3.300 $2.000 $2.650
168 6001 VEGETATIVE WATERING MG 177.100 $20.000 $55.000 $25.000 $5.000
247 6073 FL BS (CMP IN PLC)(TY D GR 1-2) (6") SY 3,086.000 $35.000 $11.000 $50.000 $52.000
400 6005 CEM STABIL BKFL CY 122.400 $275.000 $220.000 $400.000 $263.000
416 6002 DRILL SHAFT (24 IN) LF 1,098.000 $340.000 $275.000 $300.000 $335.000
420 6013 CL C CONC (ABUT) CY 71.600 $1,500.000 $1,650.000 $1,500.000 $2,050.000
420 6029 CL C CONC (CAP) CY 40.200 $1,900.000 $3,300.000 $1,500.000 $2,200.000
420 6037 CL C CONC (COLUMN) CY 19.600 $1,900.000 $3,300.000 $1,500.000 $2,400.000
422 6007 REINF CONC SLAB (SLAB BEAM) SF 7,540.000 $28.000 $33.000 $35.000 $37.000
425 6010 PRESTR CONC SLAB BEAM (5SB12) LF 1,425.000 $325.000 $192.500 $275.000 $425.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 1,321.200 $225.000 $165.000 $270.000 $263.000
450 6006 RAIL (TY T223) LF 184.000 $175.000 $170.500 $180.000 $158.000
450 6019 RAIL (TY T631LS) LF 492.000 $80.000 $110.000 $100.000 $65.000
454 6021 TYPE A JOINT LF 208.000 $80.000 $440.000 $50.000 $242.000
464 6005 RC PIPE (CL III)(24 IN) LF 82.000 $135.000 $330.000 $125.000 $100.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 1.000 $2,000.000 $3,850.000 $1,500.000 $2,050.000
496 6007 REMOV STR (PIPE) LF 20.000 $20.000 $11.000 $20.000 $20.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 4.000 $20,000.000 $22,000.000 $25,000.000 $45,000.000
496 6043 REMOV STR (SMALL FENCE) LF 343.000 $5.000 $1.100 $10.000 $12.050
500 6001 MOBILIZATION LS 1.000 $227,000.000 $330,000.000 $300,000.000 $600,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 48.000 $3,000.000 $2,200.000 $10,000.000 $2,400.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 160.000 $37.000 $220.000 $70.000 $45.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 160.000 $10.000 $1.100 $30.000 $14.460
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 3,157.000 $4.000 $16.500 $6.000 $3.620
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 3,157.000 $1.000 $1.100 $2.000 $1.600
530 6016 DRIVEWAYS (BASE) SY 49.000 $50.000 $110.000 $50.000 $85.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 550.000 $32.000 $44.000 $30.000 $33.740
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 3.000 $1,500.000 $2,310.000 $1,500.000 $1,105.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 8.000 $1,800.000 $3,300.000 $1,800.000 $1,500.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 7.000 $4,000.000 $3,520.000 $3,500.000 $3,615.300
545 6006 CRASH CUSH ATTEN (INSTL)(L)(N)(TL2) EA 1.000 $20,500.000 $44,000.000 $35,000.000 $37,000.000
552 6003 WIRE FENCE (TY C) LF 343.000 $30.000 $11.000 $20.000 $13.000
644 6076 REMOVE SM RD SN SUP&AM EA 6.000 $120.000 $110.000 $200.000 $170.000
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 4.000 $30.000 $275.000 $50.000 $16.000
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 28.000 $30.000 $33.000 $50.000 $16.000
658 6053 INSTL OM ASSM (OM-3L)(TWT)GND EA 8.000 $300.000 $88.000 $150.000 $257.000
Totals: $2,524,212.00 $2,547,392.10 $3,277,374.50 $3,507,784.04