|
|
REMOVING CONC (CTB)
|
LF
|
120.000
|
$16.000
|
$90.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
320.000
|
$50.000
|
$25.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
336.000
|
$2.000
|
$2.200
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
336.000
|
$2.000
|
$2.200
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
672.000
|
$1.000
|
$3.300
|
|
|
VEGETATIVE WATERING
|
MG
|
26.800
|
$100.000
|
$40.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
670.000
|
$5.000
|
$3.300
|
|
|
FOG SEAL (CMS-1P)
|
GAL
|
26,238.000
|
$4.000
|
$4.160
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
600.000
|
$150.000
|
$235.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
7,500.000
|
$7.500
|
$6.140
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$524,700.000
|
$250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$4,500.000
|
$2,600.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,434.000
|
$3.200
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,434.000
|
$1.000
|
$0.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,075.000
|
$25.000
|
$26.350
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,700.000
|
$1,650.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
125.000
|
$100.000
|
$98.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
950.000
|
$2.100
|
$3.250
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$280.000
|
$275.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$270.000
|
$2,750.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$3,200.000
|
$3,100.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$350.000
|
$275.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
15.000
|
$35.000
|
$38.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
1.000
|
$95.000
|
$115.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
43,757.000
|
$1.500
|
$1.250
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
65,635.000
|
$1.500
|
$1.250
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
870.000
|
$1.000
|
$1.380
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
|
LF
|
174,072.000
|
$0.800
|
$1.090
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
43,830.000
|
$0.720
|
$0.660
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
179,803.000
|
$0.660
|
$0.660
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
38,860.000
|
$0.720
|
$0.660
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
19,942.000
|
$0.660
|
$0.660
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
140.000
|
$15.000
|
$13.250
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
24.000
|
$225.000
|
$245.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$290.000
|
$302.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
2,238.000
|
$4.000
|
$5.450
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,540.000
|
$4.000
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
70,787.000
|
$0.300
|
$0.100
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
140.000
|
$3.500
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
93.000
|
$60.000
|
$30.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
5.000
|
$75.000
|
$40.000
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
825.000
|
$180.000
|
$229.000
|
|
|
SP MIXES SP-D SAC-A PG70-22
|
TON
|
206.000
|
$250.000
|
$255.000
|
|
|
TACK COAT
|
GAL
|
225.000
|
$4.500
|
$5.150
|
|
|
SP MIXES SP-D PG64-22 (EXEMPT)
|
TON
|
148.000
|
$300.000
|
$232.000
|
|
|
TOM-C PG76-22 SAC-A
|
TON
|
26,931.000
|
$180.000
|
$196.000
|
|
|
BONDING COURSE
|
GAL
|
32,026.000
|
$5.000
|
$5.150
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$10,100.000
|
$4,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
54.000
|
$200.000
|
$75.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
65.000
|
$100.000
|
$50.000
|
|
Totals: |
$6,767,820.500
|
$6,975,521.460
|