PREPARING ROW
|
STA
|
369.000
|
$4,000.000
|
$3,900.000
|
$2,300.000
|
$6,926.000
|
$3,000.000
|
$6,000.000
|
$5,500.000
|
|
|
REMOV CONC (PAV)
|
SY
|
3,334.000
|
$200.000
|
$8.000
|
$13.000
|
$25.440
|
$17.000
|
$8.000
|
$12.000
|
|
|
RMV (5"-9") TRT/UNTRT BASE & ASPH PAV
|
SY
|
401.000
|
$20.000
|
$9.000
|
$20.000
|
$25.440
|
$12.850
|
$4.000
|
$15.000
|
|
|
RMV (12"-16") TRT/UNTRT BASE & ASPH PAV
|
SY
|
11,500.000
|
$12.500
|
$9.000
|
$15.000
|
$20.250
|
$6.000
|
$7.000
|
$20.000
|
|
|
RMV (15") TRT/UNTRT BASE & ASPH PAV
|
SY
|
2,007.000
|
$13.000
|
$9.000
|
$20.000
|
$26.020
|
$6.900
|
$8.000
|
$20.000
|
|
|
RMV (6"-12") TRT/UNTRT BASE & ASPH PAV
|
SY
|
4,254.000
|
$12.000
|
$9.000
|
$12.000
|
$19.060
|
$5.450
|
$8.700
|
$20.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
188,030.000
|
$10.000
|
$8.500
|
$8.500
|
$11.000
|
$7.100
|
$9.000
|
$11.000
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
114,847.000
|
$10.000
|
$3.000
|
$6.000
|
$8.500
|
$10.050
|
$11.000
|
$15.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
77.000
|
$25.000
|
$3.000
|
$100.000
|
$75.190
|
$42.000
|
$50.000
|
$30.000
|
|
|
EMBANK (VEH)(OC)(TY B)
|
CY
|
50.000
|
$20.000
|
$3.000
|
$150.000
|
$85.590
|
$63.000
|
$40.000
|
$30.000
|
|
|
BACKFILL (TY B)
|
STA
|
369.000
|
$200.000
|
$200.000
|
$220.000
|
$449.820
|
$310.000
|
$250.000
|
$600.000
|
|
|
BLADING
|
STA
|
369.000
|
$60.000
|
$100.000
|
$100.000
|
$272.480
|
$160.000
|
$185.000
|
$300.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
38.000
|
$150.000
|
$25.000
|
$53.000
|
$292.780
|
$150.000
|
$58.000
|
$150.000
|
|
|
SPEC EXCAV WORK (ORIGINAL)
|
CY
|
3,487.000
|
$100.000
|
$10.000
|
$26.000
|
$12.900
|
$14.000
|
$8.000
|
$20.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
457,983.000
|
$3.000
|
$0.250
|
$0.850
|
$2.350
|
$1.750
|
$1.500
|
$1.250
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
3,374.000
|
$2.000
|
$2.000
|
$3.500
|
$4.810
|
$1.350
|
$3.600
|
$6.000
|
|
|
BLOCK SODDING
|
SY
|
4,314.000
|
$6.000
|
$5.000
|
$5.300
|
$5.770
|
$5.400
|
$6.150
|
$6.000
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
457,983.000
|
$0.150
|
$0.250
|
$0.110
|
$0.090
|
$0.110
|
$0.100
|
$0.120
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
457,983.000
|
$0.150
|
$0.250
|
$0.110
|
$0.090
|
$0.110
|
$0.100
|
$0.120
|
|
|
BROADCAST SEED (TEMP_WARM_COOL)
|
SY
|
51.000
|
$0.200
|
$0.250
|
$1.100
|
$5.360
|
$1.080
|
$5.750
|
$2.000
|
|
|
BROADCAST SEED (OPT1)
|
SY
|
34.000
|
$2.500
|
$2.000
|
$1.100
|
$10.710
|
$1.080
|
$11.500
|
$2.000
|
|
|
BOND FBR MTRX SEED (TEMP)(WARM)
|
SY
|
482,274.000
|
$1.000
|
$0.500
|
$0.500
|
$0.490
|
$0.520
|
$0.500
|
$0.520
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(CLAY)
|
SY
|
5,052.000
|
$1.000
|
$1.000
|
$0.550
|
$0.600
|
$0.560
|
$0.630
|
$0.560
|
|
|
VEGETATIVE WATERING
|
TGL
|
37,259.720
|
$10.000
|
$5.000
|
$3.000
|
$16.540
|
$8.640
|
$10.000
|
$6.000
|
|
|
SOIL RET BLKT(SL_MOD_SAND_SHORT_ROLL)
|
SY
|
16,500.000
|
$2.000
|
$2.000
|
$0.650
|
$0.740
|
$0.650
|
$0.790
|
$1.000
|
|
|
WILDFLOWER SEEDING (MIX 2)
|
AC
|
95.000
|
$1,100.000
|
$2,000.000
|
$420.000
|
$678.770
|
$430.000
|
$725.000
|
$450.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
86,805.000
|
$50.000
|
$60.000
|
$61.000
|
$70.000
|
$82.000
|
$80.000
|
$80.000
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
1,752.000
|
$200.000
|
$350.000
|
$330.000
|
$360.000
|
$392.000
|
$334.000
|
$400.000
|
|
|
LIME TRT (EXIST MATL)(12")
|
SY
|
70,083.000
|
$6.500
|
$5.000
|
$4.000
|
$5.000
|
$4.000
|
$3.000
|
$4.500
|
|
|
CEMENT
|
TON
|
3,774.000
|
$250.000
|
$230.000
|
$230.000
|
$262.710
|
$275.000
|
$258.000
|
$235.000
|
|
|
CEMENT TRT (EXIST MATL)(12")
|
SY
|
70,083.000
|
$4.000
|
$2.500
|
$4.000
|
$4.000
|
$3.200
|
$2.600
|
$3.000
|
|
|
CEMENT TRT (EXIST MATL & NEW BASE)(12")
|
SY
|
1,354.000
|
$5.000
|
$2.500
|
$12.000
|
$8.110
|
$4.750
|
$3.800
|
$3.000
|
|
|
CEMENT TRT (NEW BASE)(12")
|
SY
|
137,162.000
|
$5.000
|
$2.500
|
$4.500
|
$3.750
|
$4.000
|
$1.500
|
$3.000
|
|
|
CEMENT TRT (NEW BASE)(14")
|
SY
|
4,528.000
|
$6.000
|
$2.500
|
$4.800
|
$7.550
|
$4.250
|
$1.950
|
$3.000
|
|
|
CEMENT TRT (SUBGRADE)(12")
|
SY
|
4,602.000
|
$8.000
|
$2.500
|
$4.800
|
$6.380
|
$4.200
|
$1.950
|
$3.000
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
14,575.000
|
$3.000
|
$12.000
|
$4.500
|
$4.430
|
$4.350
|
$4.120
|
$6.000
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
1,517.000
|
$3.500
|
$12.000
|
$6.000
|
$4.990
|
$5.100
|
$4.300
|
$6.000
|
|
|
ASPH (RC-250)
|
TON
|
164.000
|
$1,100.000
|
$925.000
|
$1,300.000
|
$1,485.000
|
$1,350.000
|
$1,285.000
|
$900.000
|
|
|
ASPH (AC-15P OR CRS-2P)
|
TON
|
908.000
|
$900.000
|
$925.000
|
$1,200.000
|
$1,100.000
|
$1,175.000
|
$1,040.000
|
$415.000
|
|
|
AGGR (TY E OR L, GR-5)
|
CY
|
1,007.000
|
$185.000
|
$138.000
|
$230.000
|
$221.500
|
$210.000
|
$167.000
|
$185.000
|
|
|
AGGR (TY E OR L, PE OR PL GR 4)
|
CY
|
3,683.000
|
$185.000
|
$154.000
|
$230.000
|
$202.000
|
$210.000
|
$172.000
|
$175.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
14,220.000
|
$150.000
|
$148.000
|
$153.000
|
$142.000
|
$146.000
|
$155.000
|
$155.000
|
|
|
SP MIXES SP-B PG70-22
|
TON
|
28,518.000
|
$150.000
|
$152.000
|
$154.000
|
$144.000
|
$144.000
|
$146.000
|
$160.000
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
57,206.000
|
$150.000
|
$157.000
|
$156.000
|
$144.000
|
$144.000
|
$150.000
|
$162.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
56,836.000
|
$150.000
|
$162.000
|
$163.000
|
$155.000
|
$150.000
|
$162.000
|
$165.000
|
|
|
SP MIXES SP-D PG70-22
|
TON
|
17,331.000
|
$150.000
|
$159.000
|
$159.000
|
$155.000
|
$145.000
|
$158.000
|
$162.000
|
|
|
PLANE ASPH CONC PAV(0" TO 6")
|
SY
|
3,845.000
|
$8.000
|
$3.000
|
$5.000
|
$7.040
|
$6.600
|
$3.900
|
$11.000
|
|
|
PLANE ASPH CONC PAV(0" TO 8")
|
SY
|
68,800.000
|
$5.000
|
$3.000
|
$5.500
|
$6.500
|
$3.850
|
$4.200
|
$12.000
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
150,715.000
|
$2.000
|
$1.000
|
$2.000
|
$2.550
|
$2.500
|
$2.050
|
$3.500
|
|
|
PLANE ASPH CONC PAV(10")
|
SY
|
45,446.000
|
$10.000
|
$5.000
|
$9.000
|
$15.100
|
$4.950
|
$8.250
|
$15.000
|
|
|
CUT & RESTORING PAV
|
SY
|
17.000
|
$200.000
|
$180.000
|
$150.000
|
$145.230
|
$315.000
|
$157.000
|
$500.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
1,209.000
|
$150.000
|
$180.000
|
$160.000
|
$158.620
|
$110.000
|
$96.000
|
$95.000
|
|
|
CEM STABIL BKFL
|
CY
|
2,056.000
|
$225.000
|
$120.000
|
$270.000
|
$256.790
|
$285.000
|
$206.000
|
$250.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
23,018.000
|
$50.000
|
$32.000
|
$40.000
|
$5.000
|
$50.000
|
$37.000
|
$30.000
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
4.000
|
$23,500.000
|
$30,000.000
|
$28,000.000
|
$27,500.000
|
$30,000.000
|
$31,000.000
|
$30,000.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
200.000
|
$175.000
|
$290.000
|
$120.000
|
$175.000
|
$195.000
|
$175.000
|
$225.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,000.000
|
$275.000
|
$310.000
|
$300.000
|
$300.000
|
$305.000
|
$310.000
|
$325.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
642.000
|
$345.000
|
$515.000
|
$430.000
|
$400.000
|
$410.000
|
$400.000
|
$425.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
64.000
|
$300.000
|
$300.000
|
$280.000
|
$276.040
|
$305.000
|
$295.000
|
$300.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
88.000
|
$750.000
|
$800.000
|
$860.000
|
$839.450
|
$925.000
|
$896.000
|
$900.000
|
|
|
CL A CONC (MISC)
|
CY
|
45.000
|
$900.000
|
$750.000
|
$1,300.000
|
$824.000
|
$690.000
|
$590.000
|
$2,500.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
5.000
|
$1,900.000
|
$686.620
|
$650.000
|
$618.000
|
$1,640.000
|
$1,600.000
|
$1,500.000
|
|
|
CL C CONC (ABUT)
|
CY
|
141.200
|
$1,350.000
|
$1,500.000
|
$1,300.000
|
$900.000
|
$984.000
|
$1,000.000
|
$1,100.000
|
|
|
CL C CONC (CAP)
|
CY
|
99.600
|
$1,500.000
|
$1,300.000
|
$1,400.000
|
$995.000
|
$1,215.000
|
$1,100.000
|
$1,100.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
38.800
|
$1,350.000
|
$1,200.000
|
$1,400.000
|
$975.000
|
$1,225.000
|
$1,015.000
|
$1,100.000
|
|
|
CL E CONC (SEAL SLAB)
|
CY
|
113.000
|
$650.000
|
$300.000
|
$560.000
|
$500.000
|
$375.000
|
$530.000
|
$400.000
|
|
|
REINF CONC SLAB
|
SF
|
31,390.000
|
$20.000
|
$26.000
|
$32.000
|
$21.000
|
$27.000
|
$30.000
|
$27.000
|
|
|
APPROACH SLAB
|
CY
|
134.800
|
$750.000
|
$800.000
|
$700.000
|
$750.000
|
$635.000
|
$820.000
|
$800.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
4,368.240
|
$215.000
|
$266.750
|
$250.000
|
$230.000
|
$275.000
|
$240.000
|
$280.000
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
18.000
|
$330.000
|
$300.000
|
$275.000
|
$25.750
|
$125.000
|
$105.000
|
$150.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
33.000
|
$500.000
|
$550.000
|
$700.000
|
$695.250
|
$640.000
|
$618.000
|
$700.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
21.000
|
$525.000
|
$550.000
|
$820.000
|
$772.500
|
$650.000
|
$670.000
|
$700.000
|
|
|
RIPRAP (CONC)(CL A)
|
CY
|
39.000
|
$850.000
|
$550.000
|
$700.000
|
$690.100
|
$670.000
|
$628.000
|
$800.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(24 IN)
|
CY
|
807.000
|
$200.000
|
$130.040
|
$240.000
|
$242.050
|
$195.000
|
$230.000
|
$225.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
6,668.000
|
$175.000
|
$120.810
|
$149.000
|
$195.700
|
$195.000
|
$185.000
|
$225.000
|
|
|
RAIL (TY SSTR)
|
LF
|
802.000
|
$82.000
|
$112.470
|
$142.000
|
$106.090
|
$120.000
|
$82.500
|
$125.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
171.000
|
$235.000
|
$170.000
|
$250.000
|
$211.150
|
$215.000
|
$355.000
|
$200.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
32.000
|
$880.000
|
$430.000
|
$450.000
|
$437.750
|
$390.000
|
$440.000
|
$400.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
86.000
|
$990.000
|
$440.000
|
$520.000
|
$515.000
|
$425.000
|
$405.000
|
$500.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
52.000
|
$1,050.000
|
$650.000
|
$640.000
|
$623.150
|
$520.000
|
$540.000
|
$550.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
24.000
|
$875.000
|
$720.000
|
$840.000
|
$827.090
|
$670.000
|
$850.000
|
$650.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
148.000
|
$1,450.000
|
$1,850.000
|
$1,200.000
|
$1,197.890
|
$1,115.000
|
$1,200.000
|
$1,000.000
|
|
|
CONC BOX CULV (9 FT X 8 FT)(EXTEND)
|
LF
|
108.000
|
$1,350.000
|
$1,300.000
|
$1,500.000
|
$1,431.700
|
$1,165.000
|
$1,475.000
|
$1,300.000
|
|
|
CONC BOX CULV (9 FT X 9 FT)(EXTEND)
|
LF
|
184.000
|
$1,400.000
|
$1,200.000
|
$1,900.000
|
$1,829.280
|
$1,200.000
|
$1,430.000
|
$1,500.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
96.000
|
$2,050.000
|
$2,300.000
|
$2,200.000
|
$2,101.200
|
$1,250.000
|
$3,460.000
|
$2,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3,382.000
|
$75.000
|
$80.000
|
$71.000
|
$70.040
|
$55.000
|
$52.000
|
$70.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
993.000
|
$115.000
|
$100.000
|
$98.000
|
$96.820
|
$75.000
|
$69.000
|
$90.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
290.000
|
$200.000
|
$130.000
|
$184.000
|
$181.280
|
$100.000
|
$110.000
|
$115.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
85.000
|
$185.000
|
$180.000
|
$220.000
|
$206.000
|
$130.000
|
$165.000
|
$155.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
1.000
|
$12,500.000
|
$9,000.000
|
$7,400.000
|
$7,210.000
|
$7,000.000
|
$6,336.000
|
$9,000.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 30 IN)
|
EA
|
2.000
|
$8,000.000
|
$8,000.000
|
$5,800.000
|
$5,665.000
|
$10,500.000
|
$9,585.000
|
$6,000.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 48 IN)
|
EA
|
1.000
|
$10,000.000
|
$9,000.000
|
$6,800.000
|
$6,695.000
|
$13,100.000
|
$17,360.000
|
$13,000.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 54 IN)
|
EA
|
1.000
|
$11,000.000
|
$10,000.000
|
$10,000.000
|
$9,785.000
|
$14,500.000
|
$19,000.000
|
$18,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$8,300.000
|
$9,000.000
|
$9,000.000
|
$8,755.000
|
$10,500.000
|
$10,000.000
|
$8,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 33 IN)
|
EA
|
2.000
|
$8,500.000
|
$10,000.000
|
$9,300.000
|
$9,064.000
|
$10,900.000
|
$10,500.000
|
$9,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
1.000
|
$14,000.000
|
$9,000.000
|
$10,000.000
|
$9,888.000
|
$12,675.000
|
$14,400.000
|
$15,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$13,500.000
|
$10,000.000
|
$12,000.000
|
$11,509.220
|
$16,500.000
|
$18,200.000
|
$18,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 54 IN)
|
EA
|
2.000
|
$16,500.000
|
$12,000.000
|
$17,000.000
|
$16,480.000
|
$17,700.000
|
$19,150.000
|
$24,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 60 IN)
|
EA
|
1.000
|
$20,700.000
|
$13,000.000
|
$18,000.000
|
$17,510.000
|
$19,250.000
|
$23,000.000
|
$27,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 33 IN)
|
EA
|
1.000
|
$7,800.000
|
$10,000.000
|
$9,500.000
|
$9,270.000
|
$11,250.000
|
$11,500.000
|
$9,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
2.000
|
$14,000.000
|
$10,000.000
|
$11,000.000
|
$10,815.000
|
$13,500.000
|
$16,000.000
|
$15,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 72 IN)
|
EA
|
1.000
|
$20,500.000
|
$15,000.000
|
$23,000.000
|
$22,660.000
|
$28,500.000
|
$38,700.000
|
$40,000.000
|
|
|
WINGWALL (FW - 0) (HW=12 FT)
|
EA
|
2.000
|
$22,000.000
|
$18,000.000
|
$34,000.000
|
$32,960.000
|
$21,750.000
|
$28,200.000
|
$35,000.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
4.000
|
$10,300.000
|
$12,000.000
|
$11,000.000
|
$10,300.000
|
$18,500.000
|
$9,260.000
|
$18,000.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
3.000
|
$13,000.000
|
$14,000.000
|
$12,000.000
|
$11,330.000
|
$19,500.000
|
$12,385.000
|
$25,000.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
2.000
|
$20,500.000
|
$16,000.000
|
$17,000.000
|
$16,480.000
|
$20,500.000
|
$13,440.000
|
$27,000.000
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
2.000
|
$33,400.000
|
$28,000.000
|
$38,000.000
|
$37,080.000
|
$49,875.000
|
$24,150.000
|
$85,000.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
3.000
|
$42,500.000
|
$35,000.000
|
$44,000.000
|
$43,260.000
|
$41,250.000
|
$20,785.000
|
$60,000.000
|
|
|
WINGWALL (PW - 2) (HW=11 FT)
|
EA
|
4.000
|
$45,000.000
|
$40,000.000
|
$55,000.000
|
$53,560.000
|
$65,500.000
|
$23,940.000
|
$100,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,000.000
|
$1,500.000
|
$850.000
|
$824.000
|
$1,150.000
|
$730.000
|
$650.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
156.000
|
$1,100.000
|
$1,550.000
|
$940.000
|
$912.580
|
$740.000
|
$875.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,725.000
|
$2,000.000
|
$1,300.000
|
$1,236.000
|
$1,150.000
|
$1,120.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
7.000
|
$2,000.000
|
$2,250.000
|
$1,600.000
|
$1,545.000
|
$1,150.000
|
$1,330.000
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$2,000.000
|
$2,250.000
|
$1,600.000
|
$1,545.000
|
$1,150.000
|
$1,320.000
|
$1,400.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
10.000
|
$5,000.000
|
$3,000.000
|
$2,200.000
|
$2,060.000
|
$1,800.000
|
$2,130.000
|
$2,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$6,500.000
|
$6,500.000
|
$5,300.000
|
$5,150.000
|
$4,500.000
|
$5,285.000
|
$6,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$2,450.000
|
$1,500.000
|
$650.000
|
$618.000
|
$1,800.000
|
$3,500.000
|
$3,000.000
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$400.000
|
$2,000.000
|
$370.000
|
$362.560
|
$375.000
|
$515.000
|
$1,000.000
|
|
|
REMOV STR (SMALL)
|
EA
|
1.000
|
$70.000
|
$800.000
|
$9,000.000
|
$1,500.790
|
$2,300.000
|
$1,285.000
|
$3,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
8.000
|
$1,100.000
|
$1,000.000
|
$700.000
|
$669.500
|
$725.000
|
$475.000
|
$1,000.000
|
|
|
REMOVE STR (DRIVEWAY CULVERT)
|
EA
|
4.000
|
$1,500.000
|
$800.000
|
$460.000
|
$453.200
|
$360.000
|
$758.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$6,000,000.000
|
$5,551,223.980
|
$3,900,000.000
|
$3,250,000.000
|
$6,500,000.000
|
$6,000,000.000
|
$4,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
61.000
|
$3,500.000
|
$5,000.000
|
$9,990.000
|
$3,332.790
|
$5,400.000
|
$2,500.000
|
$10,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$12,000.000
|
$18,000.000
|
$25,000.000
|
$18,000.000
|
$6,600.000
|
$30,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
582.000
|
$150.000
|
$200.000
|
$200.000
|
$200.000
|
$100.000
|
$200.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
370.000
|
$150.000
|
$200.000
|
$100.000
|
$200.000
|
$100.000
|
$250.000
|
$200.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
10,715.000
|
$40.000
|
$30.000
|
$47.000
|
$32.960
|
$48.000
|
$35.200
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
10,715.000
|
$10.000
|
$4.000
|
$7.200
|
$10.300
|
$7.500
|
$11.000
|
$7.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
888.000
|
$35.000
|
$20.000
|
$39.000
|
$30.000
|
$41.000
|
$58.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
888.000
|
$10.000
|
$6.000
|
$10.000
|
$5.000
|
$10.000
|
$11.000
|
$10.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
4,412.000
|
$5.500
|
$7.000
|
$5.000
|
$4.120
|
$4.850
|
$4.400
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
32,722.000
|
$4.000
|
$5.000
|
$3.800
|
$3.240
|
$3.950
|
$3.450
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
32,722.000
|
$1.000
|
$1.000
|
$0.300
|
$0.520
|
$0.220
|
$0.550
|
$0.200
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
340.000
|
$70.000
|
$110.000
|
$100.000
|
$95.180
|
$83.000
|
$10.000
|
$100.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$90.000
|
$110.000
|
$100.000
|
$91.470
|
$83.000
|
$14.000
|
$100.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
300.000
|
$35.000
|
$20.000
|
$60.000
|
$7.870
|
$17.000
|
$11.000
|
$25.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$35.000
|
$20.000
|
$60.000
|
$7.460
|
$21.000
|
$14.000
|
$25.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
340.000
|
$10.000
|
$15.000
|
$65.000
|
$16.530
|
$15.000
|
$6.500
|
$20.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$40.000
|
$15.000
|
$65.000
|
$21.950
|
$21.000
|
$14.000
|
$20.000
|
|
|
PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
2,640.000
|
$27.500
|
$75.000
|
$90.000
|
$102.470
|
$65.000
|
$12.000
|
$100.000
|
|
|
PTB (MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
420.000
|
$10.000
|
$12.000
|
$50.000
|
$8.220
|
$15.000
|
$9.000
|
$25.000
|
|
|
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
2,640.000
|
$19.500
|
$20.000
|
$55.000
|
$16.990
|
$11.000
|
$12.000
|
$10.000
|
|
|
CONC CURB (TY II)
|
LF
|
48.000
|
$70.000
|
$17.000
|
$85.000
|
$82.400
|
$52.000
|
$70.000
|
$30.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,949.000
|
$85.000
|
$60.000
|
$100.000
|
$99.740
|
$90.000
|
$69.000
|
$95.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
9,061.000
|
$65.000
|
$60.000
|
$60.000
|
$54.000
|
$66.000
|
$62.000
|
$70.000
|
|
|
TURNOUTS (ACP)
|
SY
|
16.000
|
$80.000
|
$60.000
|
$80.000
|
$160.000
|
$190.000
|
$70.000
|
$200.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
73,645.000
|
$0.200
|
$0.200
|
$0.250
|
$0.200
|
$0.350
|
$0.300
|
$0.400
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,762.500
|
$30.000
|
$26.000
|
$25.000
|
$24.200
|
$25.000
|
$26.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,500.000
|
$1,500.000
|
$1,700.000
|
$1,622.250
|
$1,700.000
|
$1,735.000
|
$1,700.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,600.000
|
$3.000
|
$2.000
|
$2.200
|
$2.060
|
$2.150
|
$2.200
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$1,500.000
|
$3,100.000
|
$3,300.000
|
$3,090.000
|
$3,200.000
|
$3,300.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
14.000
|
$250.000
|
$250.000
|
$260.000
|
$206.000
|
$215.000
|
$220.000
|
$220.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$2,500.000
|
$4,000.000
|
$1,200.000
|
$3,090.000
|
$3,240.000
|
$3,300.000
|
$3,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
20.000
|
$500.000
|
$1,000.000
|
$900.000
|
$1,030.000
|
$1,080.000
|
$1,100.000
|
$1,100.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
10.000
|
$15,000.000
|
$26,000.000
|
$23,000.000
|
$25,621.250
|
$26,830.000
|
$27,400.000
|
$27,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
10.000
|
$15,000.000
|
$26,000.000
|
$23,000.000
|
$24,951.750
|
$26,000.000
|
$26,700.000
|
$27,000.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
2,687.000
|
$27.500
|
$20.000
|
$8.500
|
$25.750
|
$26.000
|
$24.750
|
$25.000
|
|
|
GATE (TY 1)
|
EA
|
15.000
|
$1,350.000
|
$2,000.000
|
$1,800.000
|
$2,060.000
|
$1,180.000
|
$1,650.000
|
$2,000.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
9,534.000
|
$40.000
|
$20.000
|
$37.000
|
$36.050
|
$48.000
|
$36.000
|
$50.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
9.000
|
$750.000
|
$350.000
|
$740.000
|
$744.690
|
$880.000
|
$795.000
|
$800.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
50.000
|
$280.000
|
$250.000
|
$250.000
|
$276.040
|
$280.000
|
$295.000
|
$260.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
7.000
|
$300.000
|
$300.000
|
$275.000
|
$322.390
|
$410.000
|
$345.000
|
$370.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
8.000
|
$4,700.000
|
$4,500.000
|
$4,400.000
|
$4,289.950
|
$4,750.000
|
$4,580.000
|
$4,500.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
970.000
|
$18.000
|
$20.000
|
$10.000
|
$9.010
|
$10.000
|
$9.650
|
$9.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
480.000
|
$30.000
|
$24.000
|
$20.000
|
$19.570
|
$21.500
|
$21.000
|
$22.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
240.000
|
$20.000
|
$26.000
|
$19.000
|
$18.030
|
$19.950
|
$19.250
|
$20.000
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
120.000
|
$29.000
|
$50.000
|
$25.000
|
$23.690
|
$26.000
|
$25.300
|
$26.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
470.000
|
$40.000
|
$60.000
|
$32.000
|
$30.900
|
$24.000
|
$33.000
|
$33.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,450.000
|
$3.500
|
$2.000
|
$2.700
|
$2.580
|
$2.850
|
$2.750
|
$2.700
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,900.000
|
$4.000
|
$2.000
|
$2.900
|
$2.830
|
$3.140
|
$3.000
|
$3.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
790.000
|
$2.000
|
$3.000
|
$3.200
|
$3.090
|
$3.420
|
$3.300
|
$3.300
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
35.000
|
$3.000
|
$6.000
|
$4.300
|
$4.120
|
$4.560
|
$4.400
|
$4.400
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
70.000
|
$3.500
|
$7.000
|
$4.500
|
$4.380
|
$4.850
|
$4.700
|
$4.400
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
1,250.000
|
$2.900
|
$3.000
|
$3.700
|
$3.610
|
$3.990
|
$3.850
|
$4.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
7.000
|
$1,500.000
|
$1,300.000
|
$1,250.000
|
$1,215.400
|
$1,345.000
|
$1,300.000
|
$1,300.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
5.000
|
$1,800.000
|
$1,500.000
|
$1,500.000
|
$1,457.450
|
$1,610.000
|
$1,560.000
|
$1,600.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$10,000.000
|
$8,500.000
|
$8,400.000
|
$8,214.250
|
$9,090.000
|
$8,775.000
|
$8,500.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$8,750.000
|
$8,500.000
|
$7,900.000
|
$7,673.500
|
$8,500.000
|
$8,200.000
|
$8,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$830.000
|
$750.000
|
$900.000
|
$1,158.750
|
$1,320.000
|
$975.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,040.000
|
$700.000
|
$900.000
|
$1,596.500
|
$1,800.000
|
$1,455.000
|
$1,700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
1.000
|
$1,300.000
|
$2,000.000
|
$1,100.000
|
$1,802.500
|
$2,050.000
|
$1,450.000
|
$1,900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,200.000
|
$900.000
|
$1,100.000
|
$1,596.500
|
$1,820.000
|
$1,330.000
|
$1,700.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
73.000
|
$530.000
|
$400.000
|
$520.000
|
$927.000
|
$1,050.000
|
$520.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
5.000
|
$550.000
|
$500.000
|
$520.000
|
$978.500
|
$1,115.000
|
$595.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
92.000
|
$125.000
|
$76.000
|
$110.000
|
$154.500
|
$175.000
|
$142.350
|
$165.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
6.000
|
$25.000
|
$15.000
|
$26.000
|
$20.600
|
$41.000
|
$22.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
20.000
|
$40.000
|
$20.000
|
$33.000
|
$25.750
|
$41.000
|
$27.500
|
$45.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRFHH(BI)
|
EA
|
54.000
|
$240.000
|
$160.000
|
$310.000
|
$103.000
|
$440.000
|
$540.000
|
$400.000
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)Y
|
EA
|
5.000
|
$12.000
|
$45.000
|
$22.000
|
$54.590
|
$35.000
|
$58.000
|
$35.000
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)R
|
EA
|
11.000
|
$19.000
|
$45.000
|
$22.000
|
$54.590
|
$35.000
|
$58.000
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
1,275.000
|
$0.500
|
$0.380
|
$1.000
|
$1.030
|
$1.080
|
$1.100
|
$1.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
|
LF
|
62.000
|
$0.600
|
$0.380
|
$1.000
|
$1.030
|
$1.080
|
$1.100
|
$1.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
42,146.000
|
$0.350
|
$0.380
|
$1.000
|
$1.030
|
$1.080
|
$1.100
|
$1.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
653.000
|
$0.550
|
$0.460
|
$1.000
|
$1.030
|
$1.080
|
$1.100
|
$1.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
143.000
|
$3.600
|
$5.720
|
$4.300
|
$4.120
|
$4.320
|
$4.400
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
40,220.000
|
$0.300
|
$0.380
|
$1.000
|
$1.030
|
$1.080
|
$1.100
|
$1.100
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
31,283.000
|
$2.000
|
$2.880
|
$0.650
|
$1.700
|
$1.300
|
$2.650
|
$1.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
20,801.000
|
$3.000
|
$2.000
|
$0.650
|
$1.770
|
$1.300
|
$2.650
|
$1.500
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(6")
|
LF
|
20,800.000
|
$2.000
|
$1.430
|
$1.000
|
$1.860
|
$1.620
|
$2.650
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
270.000
|
$1.500
|
$1.140
|
$1.300
|
$1.290
|
$1.350
|
$1.400
|
$1.400
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,397.000
|
$1.000
|
$0.970
|
$1.100
|
$1.030
|
$1.080
|
$1.100
|
$1.100
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
71,621.000
|
$1.750
|
$0.970
|
$1.000
|
$0.930
|
$0.970
|
$1.000
|
$1.100
|
|
|
PAVEMENT SLER 6"
|
LF
|
3,240.000
|
$0.750
|
$0.290
|
$1.100
|
$1.030
|
$1.080
|
$1.100
|
$1.100
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
17,931.000
|
$0.750
|
$0.700
|
$0.800
|
$0.740
|
$0.780
|
$0.800
|
$0.800
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
73,071.000
|
$0.750
|
$0.700
|
$0.800
|
$0.740
|
$0.780
|
$0.800
|
$0.800
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
16,608.000
|
$0.750
|
$0.700
|
$0.800
|
$0.740
|
$0.780
|
$0.800
|
$0.800
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
4,494.000
|
$0.750
|
$0.700
|
$0.800
|
$0.740
|
$0.780
|
$0.800
|
$0.800
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
476.000
|
$15.000
|
$13.730
|
$13.000
|
$12.620
|
$13.230
|
$13.500
|
$14.000
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
14.000
|
$250.000
|
$400.530
|
$230.000
|
$226.600
|
$235.000
|
$245.000
|
$230.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
14.000
|
$290.000
|
$400.530
|
$270.000
|
$262.650
|
$235.000
|
$280.000
|
$260.000
|
|
PREFAB PM TY C (Y)(24")(SLD)
|
LF
|
2,311.000
|
$12.500
|
$16.020
|
$12.000
|
$11.850
|
$12.400
|
$12.650
|
$13.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,332.000
|
$5.500
|
$4.290
|
$4.500
|
$4.330
|
$4.540
|
$4.600
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,019.000
|
$6.000
|
$4.290
|
$4.500
|
$4.330
|
$4.540
|
$4.650
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
3,240.000
|
$0.150
|
$0.290
|
$0.500
|
$0.520
|
$0.540
|
$0.550
|
$0.550
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$42,000.000
|
$27,500.000
|
$13,000.000
|
$12,643.250
|
$14,000.000
|
$13,500.000
|
$14,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
10.000
|
$300.000
|
$350.000
|
$310.000
|
$302.820
|
$335.000
|
$325.000
|
$320.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
4.000
|
$300.000
|
$350.000
|
$330.000
|
$314.150
|
$350.000
|
$336.000
|
$320.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
10.000
|
$300.000
|
$350.000
|
$310.000
|
$302.820
|
$335.000
|
$325.000
|
$320.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
4.000
|
$300.000
|
$350.000
|
$330.000
|
$314.150
|
$345.000
|
$336.000
|
$320.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
10.000
|
$300.000
|
$350.000
|
$310.000
|
$302.820
|
$335.000
|
$325.000
|
$320.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
8.000
|
$300.000
|
$350.000
|
$330.000
|
$314.150
|
$345.000
|
$336.000
|
$320.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
4.000
|
$280.000
|
$500.000
|
$280.000
|
$269.860
|
$300.000
|
$290.000
|
$300.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
10.000
|
$250.000
|
$350.000
|
$210.000
|
$204.970
|
$225.000
|
$220.000
|
$220.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
2,900.000
|
$3.500
|
$5.000
|
$4.300
|
$4.120
|
$4.500
|
$4.400
|
$4.400
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
2.000
|
$38,750.000
|
$38,000.000
|
$36,000.000
|
$34,891.250
|
$38,500.000
|
$37,265.000
|
$36,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
2.000
|
$42,000.000
|
$38,000.000
|
$37,000.000
|
$35,432.000
|
$39,225.000
|
$37,840.000
|
$38,000.000
|
|
|
REMOVE LUMINAIRE POLE
|
EA
|
8.000
|
$950.000
|
$1,350.000
|
$710.000
|
$695.250
|
$770.000
|
$745.000
|
$800.000
|
|
|
BONDING COURSE
|
GAL
|
53,772.000
|
$6.000
|
$4.000
|
$4.000
|
$9.130
|
$4.250
|
$4.750
|
$4.000
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
4.000
|
$15,000.000
|
$4,000.000
|
$7,500.000
|
$5,150.000
|
$5,400.000
|
$5,500.000
|
$5,000.000
|
|
|
STEEL FENCE (REMOVE)
|
LF
|
2,600.000
|
$50.000
|
$1.000
|
$10.000
|
$10.500
|
$21.600
|
$8.500
|
$20.000
|
|
|
BBU SYSTEM (EXTERNAL BATTERY CABINET)
|
EA
|
1.000
|
$9,750.000
|
$9,000.000
|
$8,000.000
|
$7,750.750
|
$8,550.000
|
$8,300.000
|
$9,000.000
|
|
|
RVDS (PRESENCE DETECTION ONLY)
|
EA
|
4.000
|
$9,250.000
|
$14,000.000
|
$6,800.000
|
$6,664.100
|
$7,400.000
|
$7,120.000
|
$7,000.000
|
|
|
RVDS (ADVANCE DETECTION ONLY)
|
EA
|
2.000
|
$9,350.000
|
$12,000.000
|
$6,800.000
|
$6,664.100
|
$7,400.000
|
$7,120.000
|
$7,000.000
|
|
|
WATER MAIN PIPE (PVC)(2 IN)
|
LF
|
1,055.000
|
$30.000
|
$30.000
|
$19.000
|
$11.330
|
$18.900
|
$55.000
|
$19.000
|
|
|
WATER MAIN PIPE (PVC)(6 IN)
|
LF
|
5,380.000
|
$50.000
|
$35.000
|
$36.000
|
$27.810
|
$36.720
|
$35.000
|
$36.000
|
|
|
WATER MAIN PIPE (PVC)(8 IN)
|
LF
|
3,920.000
|
$60.000
|
$45.000
|
$40.000
|
$41.200
|
$41.040
|
$50.000
|
$40.000
|
|
|
JCK TUN BOR AUG WTR MAIN (PVC) (8 IN)
|
LF
|
300.000
|
$90.000
|
$150.000
|
$200.000
|
$58.710
|
$205.190
|
$63.000
|
$220.000
|
|
|
JCK TUN BOR AUG CASING (STL)(12 IN)
|
LF
|
450.000
|
$200.000
|
$260.000
|
$220.000
|
$185.400
|
$215.990
|
$200.000
|
$220.000
|
|
|
JCK TUN BOR AUG CASING (STL)(16 IN)
|
LF
|
150.000
|
$250.000
|
$300.000
|
$290.000
|
$221.450
|
$302.380
|
$240.000
|
$300.000
|
|
|
GATE VALVE & BOX (COMPLETE)(2 IN)
|
EA
|
4.000
|
$1,500.000
|
$1,200.000
|
$2,400.000
|
$3,818.210
|
$2,375.850
|
$4,100.000
|
$2,400.000
|
|
|
GATE VALVE & BOX (COMPLETE)(3 IN)
|
EA
|
3.000
|
$2,000.000
|
$1,600.000
|
$2,600.000
|
$4,439.300
|
$2,699.830
|
$4,750.000
|
$2,600.000
|
|
|
GATE VALVE & BOX (COMPLETE)(6 IN)
|
EA
|
6.000
|
$3,000.000
|
$2,500.000
|
$3,400.000
|
$5,432.220
|
$3,455.780
|
$5,800.000
|
$3,500.000
|
|
|
AIR RELEASE/VAC RELEASE VALVE (2IN)
|
EA
|
3.000
|
$3,000.000
|
$4,700.000
|
$10,000.000
|
$5,253.000
|
$10,583.320
|
$5,610.000
|
$12,000.000
|
|
|
WET CONNECTION (2 IN)
|
EA
|
7.000
|
$2,500.000
|
$2,000.000
|
$3,700.000
|
$3,296.000
|
$3,779.760
|
$3,520.000
|
$4,000.000
|
|
|
WET CONNECTION (3 IN)
|
EA
|
5.000
|
$2,500.000
|
$2,500.000
|
$3,800.000
|
$3,455.650
|
$3,887.750
|
$3,690.000
|
$4,000.000
|
|
|
WET CONNECTION (4 IN)
|
EA
|
3.000
|
$2,500.000
|
$2,750.000
|
$4,300.000
|
$3,914.000
|
$4,427.710
|
$4,180.000
|
$4,500.000
|
|
|
WET CONNECTION (8 IN)
|
EA
|
2.000
|
$2,500.000
|
$3,000.000
|
$6,400.000
|
$4,635.000
|
$6,479.580
|
$4,950.000
|
$7,000.000
|
|
|
WET CONNECTION (6 IN)
|
EA
|
7.000
|
$2,500.000
|
$2,700.000
|
$5,600.000
|
$3,605.000
|
$5,723.630
|
$3,850.000
|
$6,000.000
|
|
|
WATER MAIN PIPE(PVC)(4 IN)
|
LF
|
10,690.000
|
$40.000
|
$33.000
|
$27.000
|
$18.540
|
$27.000
|
$19.800
|
$27.000
|
|
|
JACK TUN BOR AUG CASING(STL)(4 IN)
|
LF
|
450.000
|
$50.000
|
$150.000
|
$79.000
|
$123.600
|
$80.990
|
$132.000
|
$85.000
|
|
|
JACK TUN BOR AUG CASING(STL)(10 IN)
|
LF
|
150.000
|
$110.000
|
$300.000
|
$200.000
|
$164.800
|
$205.190
|
$180.000
|
$220.000
|
|
|
GATE VALVE & BOX(COMPLETE)(1.5 IN)
|
EA
|
1.000
|
$1,500.000
|
$500.000
|
$1,600.000
|
$2,636.800
|
$1,619.900
|
$2,820.000
|
$1,700.000
|
|
|
GATE VALVE & BOX(COMPLETE)(4 IN)
|
EA
|
6.000
|
$2,500.000
|
$1,800.000
|
$2,800.000
|
$4,429.000
|
$2,915.810
|
$4,730.000
|
$3,000.000
|
|
|
GATE VALVE & BOX(COMPLETE)(8 IN)
|
EA
|
2.000
|
$3,500.000
|
$3,000.000
|
$4,500.000
|
$6,798.000
|
$4,643.700
|
$7,260.000
|
$5,000.000
|
|
|
TAPPING SLEEVE & VALVE(3 IN X 2 IN)
|
EA
|
2.000
|
$3,000.000
|
$5,000.000
|
$2,200.000
|
$3,605.000
|
$2,159.860
|
$3,850.000
|
$2,500.000
|
|
|
TAPPING SLEEVE & VALVE(4 IN X 1 IN)
|
EA
|
1.000
|
$3,000.000
|
$6,300.000
|
$1,200.000
|
$1,143.300
|
$1,187.920
|
$1,225.000
|
$1,500.000
|
|
|
TAPPING SLEEVE & VALVE(4 IN X 4 IN)
|
EA
|
1.000
|
$3,500.000
|
$6,400.000
|
$5,600.000
|
$7,210.000
|
$5,723.630
|
$7,700.000
|
$6,000.000
|
|
|
TAPPING SLEEVE & VALVE(6 IN X 6 IN)
|
EA
|
1.000
|
$4,000.000
|
$9,000.000
|
$6,500.000
|
$9,270.000
|
$6,695.570
|
$9,900.000
|
$7,000.000
|
|
Totals: |
$65,278,492.400
|
$61,459,150.610
|
$62,782,393.620
|
$63,974,692.979
|
$65,789,279.341
|
$66,076,545.810
|
$69,327,213.290
|