REMOVING CONC (PAV)
|
SY
|
1,141.000
|
$12.000
|
$40.000
|
$5.370
|
$25.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
528.000
|
$15.000
|
$20.000
|
$18.530
|
$25.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
686.000
|
$16.000
|
$20.000
|
$19.310
|
$25.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (19")
|
SY
|
31,794.000
|
$7.000
|
$15.000
|
$12.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
17,510.000
|
$9.000
|
$14.000
|
$15.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
2,885.000
|
$17.000
|
$22.000
|
$25.000
|
$50.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
67,358.000
|
$2.000
|
$3.750
|
$2.000
|
$2.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
6,268.000
|
$0.240
|
$0.110
|
$0.230
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
18,406.000
|
$0.500
|
$0.190
|
$0.150
|
$0.120
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
18,406.000
|
$0.500
|
$0.110
|
$0.150
|
$0.120
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
67,358.000
|
$0.750
|
$0.080
|
$0.610
|
$0.650
|
|
|
VEGETATIVE WATERING
|
MG
|
1,228.700
|
$10.000
|
$2.000
|
$15.950
|
$15.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
650.000
|
$1.750
|
$1.200
|
$2.890
|
$3.000
|
|
|
FL BS(RDWY DEL)(TY D GR 1-2)(FNAL POS)
|
CY
|
8,582.000
|
$50.000
|
$92.000
|
$91.270
|
$65.000
|
|
|
CEMENT
|
TON
|
1,222.000
|
$175.000
|
$240.000
|
$180.000
|
$200.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
51,487.000
|
$1.650
|
$3.000
|
$7.000
|
$4.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
54,307.000
|
$2.750
|
$3.000
|
$7.500
|
$4.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
10,167.000
|
$8.000
|
$4.500
|
$5.320
|
$8.000
|
|
|
FOG SEAL (CSS-1)
|
GAL
|
2,706.000
|
$3.500
|
$6.500
|
$4.000
|
$8.000
|
|
|
ASPH (TIER I)
|
GAL
|
8,873.000
|
$5.000
|
$4.750
|
$1.820
|
$8.000
|
|
|
AGGR (TY-B GR-4)
|
CY
|
274.000
|
$116.500
|
$200.000
|
$200.000
|
$500.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(18")
|
SY
|
1,607.000
|
$85.000
|
$210.000
|
$210.000
|
$200.000
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (4"-5")
|
SY
|
8,608.000
|
$28.000
|
$48.000
|
$210.000
|
$100.000
|
|
|
PLAN & TEXT ASPH CONC PAV(4" TO 6")
|
SY
|
2,368.000
|
$5.000
|
$9.000
|
$4.850
|
$7.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
22,948.000
|
$2.100
|
$3.250
|
$2.120
|
$3.000
|
|
|
PLANE ASPH CONC PAV (3" TO 6")
|
SY
|
1,599.000
|
$2.750
|
$8.000
|
$6.220
|
$6.000
|
|
|
PLANE ASPH CONC PAV (3"- 5")
|
SY
|
2,701.000
|
$2.500
|
$7.500
|
$3.430
|
$6.000
|
|
|
PLANE ASPH CONC PAV (4" TO 7")
|
SY
|
1,388.000
|
$5.000
|
$10.000
|
$5.970
|
$10.000
|
|
|
PLANE ASPH CONC PAV (3" TO 7")
|
SY
|
2,048.000
|
$2.750
|
$6.750
|
$5.360
|
$10.000
|
|
|
PLANE ASPH CONC PAV (3" TO 13")
|
SY
|
1,350.000
|
$12.000
|
$10.250
|
$6.910
|
$25.000
|
|
|
PLANE ASPH CONC PAV (5" TO 10")
|
SY
|
1,259.000
|
$10.000
|
$11.000
|
$7.280
|
$25.000
|
|
|
CONC PVMT (JOINTED - CPCD) (8")
|
SY
|
47,918.000
|
$50.000
|
$76.000
|
$93.000
|
$120.000
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
SY
|
10,865.000
|
$241.000
|
$220.000
|
$291.450
|
$225.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
63.000
|
$231.500
|
$225.000
|
$309.400
|
$400.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
174.600
|
$205.000
|
$195.000
|
$143.080
|
$170.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
80.000
|
$205.000
|
$195.000
|
$216.490
|
$220.000
|
|
|
CL K CONC (APPROACH SLAB)
|
CY
|
61.000
|
$570.000
|
$1,050.000
|
$950.000
|
$3,000.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
502.000
|
$500.000
|
$500.000
|
$600.000
|
$600.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
31.000
|
$125.000
|
$300.000
|
$124.600
|
$300.000
|
|
|
BEDDING MATERIAL (6 IN)
|
CY
|
17.000
|
$100.000
|
$275.000
|
$99.960
|
$300.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
109.000
|
$485.000
|
$575.000
|
$378.560
|
$600.000
|
|
|
RAIL (TY SSTR)
|
LF
|
660.000
|
$41.000
|
$97.000
|
$120.000
|
$125.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
78.000
|
$250.000
|
$360.000
|
$222.850
|
$700.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
573.000
|
$55.000
|
$78.000
|
$95.000
|
$80.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
16.000
|
$100.000
|
$190.000
|
$100.000
|
$125.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
1.000
|
$5,000.000
|
$6,500.000
|
$5,558.750
|
$5,000.000
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
2.000
|
$6,300.000
|
$7,000.000
|
$6,450.780
|
$6,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
|
EA
|
2.000
|
$5,975.000
|
$7,600.000
|
$5,603.110
|
$7,000.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$7,000.000
|
$8,200.000
|
$5,824.910
|
$8,000.000
|
|
|
INLET (COMPL) (DROP) (SPL)
|
EA
|
1.000
|
$8,700.000
|
$7,500.000
|
$7,727.780
|
$6,000.000
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
1.000
|
$15,000.000
|
$11,000.000
|
$18,340.250
|
$6,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$8,000.000
|
$10,000.000
|
$7,970.000
|
$15,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,440.000
|
$1,050.000
|
$1,366.620
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,400.000
|
$1,275.000
|
$907.890
|
$1,500.000
|
|
|
SET (TY II) (30 IN) (CMP) (4: 1) (C)
|
EA
|
1.000
|
$2,450.000
|
$1,600.000
|
$2,148.900
|
$2,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,200.000
|
$675.000
|
$1,744.400
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
37.000
|
$16.000
|
$36.000
|
$6.280
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,652,000.000
|
$2,735,000.000
|
$3,890,000.000
|
$3,700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
32.000
|
$4,000.000
|
$7,000.000
|
$41,000.000
|
$20,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,075.000
|
$30.000
|
$32.000
|
$44.920
|
$35.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
110.000
|
$31.610
|
$38.000
|
$51.820
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,185.000
|
$11.850
|
$11.000
|
$18.630
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,813.000
|
$2.900
|
$3.050
|
$4.780
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,813.000
|
$1.000
|
$0.900
|
$1.170
|
$0.300
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
420.000
|
$5.850
|
$6.600
|
$8.020
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
420.000
|
$1.190
|
$3.300
|
$1.760
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
7,241.000
|
$61.500
|
$130.000
|
$109.930
|
$200.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,480.000
|
$85.000
|
$95.000
|
$55.000
|
$100.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$85.000
|
$95.000
|
$55.000
|
$100.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
7,780.000
|
$10.000
|
$10.000
|
$15.000
|
$10.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
560.000
|
$10.000
|
$12.000
|
$15.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,480.000
|
$8.000
|
$8.000
|
$18.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$8.000
|
$8.000
|
$18.000
|
$10.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
5,160.000
|
$70.000
|
$96.000
|
$60.000
|
$100.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
47,370.000
|
$10.000
|
$8.000
|
$15.000
|
$10.000
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
5,160.000
|
$10.000
|
$5.000
|
$18.000
|
$10.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
272.000
|
$67.000
|
$140.000
|
$120.000
|
$200.000
|
|
|
CONC CURB (TY I)
|
LF
|
926.000
|
$25.000
|
$24.000
|
$18.690
|
$30.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
685.000
|
$20.000
|
$48.000
|
$35.000
|
$75.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
145,398.000
|
$0.250
|
$0.200
|
$0.140
|
$0.400
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,500.000
|
$23.000
|
$28.350
|
$22.750
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$2,900.000
|
$1,925.000
|
$1,331.190
|
$2,000.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,300.000
|
$1,550.000
|
$1,100.000
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
425.000
|
$2.550
|
$2.500
|
$1.490
|
$2.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$260.000
|
$165.000
|
$174.420
|
$200.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$175.000
|
$165.000
|
$122.220
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,665.000
|
$3,600.000
|
$2,152.480
|
$3,600.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
22.000
|
$1,000.000
|
$1,650.000
|
$1,100.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$873.000
|
$550.000
|
$1,048.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$22,000.000
|
$30,000.000
|
$21,500.000
|
$30,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
3.000
|
$18,000.000
|
$10,300.000
|
$12,875.000
|
$10,000.000
|
|
|
PIPE UNDERDRAINS (TY 9) (6")
|
LF
|
7,050.000
|
$38.000
|
$42.000
|
$71.180
|
$90.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$3,000.000
|
$1,550.000
|
$1,290.000
|
$2,500.000
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
6.000
|
$4,700.000
|
$6,200.000
|
$4,263.000
|
$6,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
4,829.000
|
$8.500
|
$8.800
|
$11.030
|
$9.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
937.000
|
$21.000
|
$27.500
|
$22.400
|
$27.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
388.000
|
$2.000
|
$2.300
|
$1.640
|
$2.500
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
775.000
|
$2.250
|
$2.500
|
$1.820
|
$2.500
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
5,378.000
|
$2.000
|
$2.750
|
$1.630
|
$3.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
11,759.000
|
$2.250
|
$2.750
|
$1.780
|
$3.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
14.000
|
$950.000
|
$770.000
|
$967.500
|
$800.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
3.000
|
$710.000
|
$1,150.000
|
$547.500
|
$1,200.000
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)TP(O)
|
EA
|
1.000
|
$3,775.000
|
$8,500.000
|
$5,653.500
|
$9,000.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
832.750
|
$30.000
|
$16.500
|
$21.180
|
$30.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
17.000
|
$575.000
|
$800.000
|
$700.420
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
15.000
|
$750.000
|
$940.000
|
$832.270
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$900.000
|
$1,060.000
|
$929.930
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
$813.250
|
$1,300.000
|
$1,121.550
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
6.000
|
$1,500.000
|
$1,340.000
|
$1,883.190
|
$1,400.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
21.000
|
$382.000
|
$490.000
|
$458.100
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
78.000
|
$79.000
|
$105.000
|
$219.000
|
$120.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
3,622.000
|
$6.250
|
$13.000
|
$5.850
|
$6.000
|
|
|
REMOVE LRSA
|
EA
|
8.000
|
$1,200.000
|
$2,750.000
|
$1,095.000
|
$1,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
6.000
|
$20.000
|
$16.500
|
$38.990
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
21.000
|
$37.000
|
$36.000
|
$20.920
|
$36.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
282.000
|
$30.000
|
$36.000
|
$29.330
|
$36.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
62.000
|
$88.000
|
$110.000
|
$93.760
|
$110.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
149.000
|
$88.000
|
$110.000
|
$66.230
|
$110.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
38,670.000
|
$1.250
|
$2.750
|
$1.000
|
$2.700
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
8,020.000
|
$2.000
|
$3.300
|
$2.000
|
$3.300
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
21,238.000
|
$1.250
|
$2.750
|
$1.000
|
$2.700
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
13,812.000
|
$1.020
|
$0.950
|
$1.200
|
$0.940
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,231.000
|
$3.250
|
$3.850
|
$3.750
|
$4.000
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
13,812.000
|
$0.370
|
$0.380
|
$0.550
|
$0.380
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
2,231.000
|
$1.510
|
$2.200
|
$1.850
|
$2.200
|
|
REFL PAV MRK TY II (W) (ENTR GORE)
|
EA
|
2.000
|
$510.000
|
$550.000
|
$400.000
|
$550.000
|
|
REFL PAV MRK TY II (W) (EXIT GORE)
|
EA
|
9.000
|
$400.000
|
$1,100.000
|
$685.000
|
$1,200.000
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
1,321.000
|
$5.000
|
$7.700
|
$6.350
|
$8.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
27.000
|
$11.770
|
$16.500
|
$13.650
|
$20.000
|
|
PREFAB PAV MRK TY C (W) (EXIT GORE)
|
EA
|
6.000
|
$2,750.000
|
$4,400.000
|
$4,800.000
|
$4,500.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
12.000
|
$35.330
|
$82.500
|
$100.000
|
$80.000
|
|
REFL PAV MRKR TY I-R
|
EA
|
84.000
|
$8.000
|
$6.600
|
$10.000
|
$7.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,099.000
|
$3.150
|
$4.000
|
$4.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,245.000
|
$0.700
|
$1.100
|
$0.450
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
14,689.000
|
$0.600
|
$1.100
|
$0.180
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
2,655.000
|
$0.500
|
$0.220
|
$0.180
|
$0.220
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
4,976.000
|
$1.500
|
$1.100
|
$1.000
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
4.000
|
$25.000
|
$82.500
|
$27.000
|
$80.000
|
|
|
D-GR HMA TY-F PG64-22
|
TON
|
3,730.000
|
$110.000
|
$127.000
|
$95.000
|
$150.000
|
|
|
TACK COAT
|
GAL
|
5,064.000
|
$3.700
|
$4.000
|
$3.100
|
$4.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
3,715.000
|
$112.000
|
$134.000
|
$120.000
|
$150.000
|
|
|
SP MIXES SP-D PG76-22
|
TON
|
20,176.000
|
$110.000
|
$134.000
|
$115.690
|
$150.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
571.000
|
$115.000
|
$138.000
|
$110.000
|
$250.000
|
|
|
TACK COAT
|
GAL
|
34,951.000
|
$3.800
|
$3.500
|
$3.780
|
$4.000
|
|
|
PERMEABLE CONCRETE EDGE DRAIN
|
LF
|
156,768.000
|
$80.000
|
$78.000
|
$62.420
|
$90.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
15.000
|
$9,000.000
|
$18,000.000
|
$8,352.940
|
$30,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
9,590.000
|
$3.000
|
$5.500
|
$6.000
|
$5.500
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
179,818.000
|
$0.550
|
$0.770
|
$0.510
|
$0.770
|
|
|
REFL PAV MRK AWT (W) 6" (DOT) (100MIL)
|
LF
|
1,579.000
|
$1.000
|
$1.100
|
$1.000
|
$1.100
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
19,153.000
|
$0.600
|
$0.770
|
$0.510
|
$0.770
|
|
|
TMA (STATIONARY)
|
DAY
|
346.000
|
$175.000
|
$200.000
|
$200.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
13.000
|
$150.000
|
$200.000
|
$475.000
|
$300.000
|
|
Totals: |
$29,353,130.560
|
$33,388,167.525
|
$35,626,956.798
|
$41,561,561.070
|