Show Job Controls
Bid Cobra

MOORE US 287 (0066-04-079)

Items: 44

County: MOORE
Length: N/A
Highway: US 287
District: AMARILLO
Control Number: 0066-04-079
DBE Goal: N/A
Project: F 2021(699)
Guaranty: N/A
Time: 137 WORKING DAYS
Engineer's Estimate: $4,081,800.35
Date: 07/02/2021 (4 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (6)
E
Engineer's Estimate
$4,081,800.35
$4,229,617.35
Over/Under Est: 3.62% $147,817.00
Over/Under Est: 15.38% $627,609.39
Amt Left: 11.34% $479,792.39
$4,921,445.65
Over/Under Est: 20.57% $839,645.30
Amt Left: 16.36% $691,828.30
Delta: -4.50% -$212,035.91
$5,179,539.05
Over/Under Est: 26.89% $1,097,738.70
Amt Left: 22.46% $949,921.70
Delta: -5.24% -$258,093.40
Over/Under Est: 31.23% $1,274,729.58
Amt Left: 26.64% $1,126,912.58
Delta: -3.42% -$176,990.88
$5,535,714.07
Over/Under Est: 35.62% $1,453,913.72
Amt Left: 30.88% $1,306,096.72
Delta: -3.35% -$179,184.14
Subcontractor Percentage Amount
TEXAS GUARDRAIL CONTRACTORS LLC 9.91% $419,155.08
LYNCO CONSTRUCTION 5.07% $214,441.60
MARCOM'S MOWING SERVICE, LLC 3.01% $127,311.48
LONE STAR EROSION CONTROL 2.34% $98,973.05
NELSON INDUSTRIAL SERVICES, INC. 1.27% $53,716.14
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.49% $20,725.13
DUSTROL, INC. 0.26% $10,997.01
Total: 22.35% $945,319.49

Bid Items & Bid Tabulations

44 Total 0 of 44
MOORE  |  US 287  |  AMARILLO  |  0066-04-079  |  07/02/2021  |  $4,081,800.35  |  F 2021(699)  |  HWY IMPRV  |  137 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VECTOR UTILITIES LLC
O. TREVINO CONSTRUCTION, LLC
DUININCK, INC.
HJC FARMS, INC.
SEMA CONSTRUCTION, INC.
ALTUS CONSTRUCTION LLC
REMOVING CONC (PAV)
SY 3,081.000 $30.000 $9.050 $36.000 $36.500 $12.000 $75.000 $41.990
REMOVING STAB BASE & ASPH PAV(16")
SY 1,561.000 $12.000 $8.720 $25.000 $11.500 $8.000 $17.000 $15.710
SUBGRADE WIDENING (DENS CONT)
STA 86.830 $1,000.000 $607.960 $1,150.000 $1,650.000 $675.000 $8,331.000 $1,455.470
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 1,270.300 $18.000 $36.140 $17.000 $32.000 $9.500 $45.000 $18.430
BLADING
HR 8.000 $140.000 $100.900 $175.000 $150.000 $150.000 $200.000 $613.910
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 6.430 $1,000.000 $983.580 $825.000 $605.000 $600.000 $770.000 $706.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 6.430 $700.000 $784.370 $825.000 $580.000 $600.000 $770.000 $675.300
EMULS ASPH (EROSN CONT)(MULTI)
GAL 3,119.000 $5.500 $12.450 $6.000 $3.750 $5.750 $7.100 $5.760
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 11,146.000 $95.000 $128.900 $122.750 $145.000 $190.000 $101.000 $196.800
RIPRAP (MOW STRIP)(4 IN)
CY 2,043.000 $500.000 $385.090 $385.000 $430.000 $525.000 $450.000 $411.370
REMOV STR (SET)
EA 8.000 $900.000 $520.830 $200.000 $475.000 $215.000 $750.000 $606.630
REMOV STR (PIPE)
LF 284.000 $35.000 $26.710 $15.000 $21.000 $10.750 $25.000 $14.730
MOBILIZATION
LS 1.000 $300,000.000 $148,036.600 $400,000.000 $475,000.000 $225,000.000 $536,000.000 $552,520.050
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $9,500.000 $3,735.110 $12,337.780 $18,500.000 $2,000.000 $26,000.000 $12,278.220
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,750.000 $5.000 $7.470 $5.450 $6.600 $4.000 $5.500 $4.340
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,750.000 $2.000 $1.250 $1.050 $1.600 $1.000 $1.000 $1.230
MTL W-BEAM GD FEN (STEEL POST)
LF 5,450.000 $27.000 $37.350 $33.300 $29.000 $34.250 $29.000 $26.310
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 11.000 $2,300.000 $2,346.890 $2,150.000 $2,300.000 $2,550.000 $2,000.000 $1,881.980
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $2,000.000 $1,126.760 $1,550.000 $950.000 $1,550.000 $950.000 $1,395.310
REMOVE METAL BEAM GUARD FENCE
LF 4,800.000 $6.000 $2.490 $3.300 $1.850 $2.500 $1.900 $2.670
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $450.000 $224.110 $990.000 $185.000 $300.000 $200.000 $267.360
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 11.000 $290.000 $199.210 $440.000 $160.000 $300.000 $170.000 $257.200
CABLE BARRIER SYSTEM (TL-4)
LF 39,215.000 $10.500 $12.410 $15.250 $13.500 $13.750 $13.250 $13.760
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 44.000 $2,500.000 $2,747.850 $6,000.000 $2,200.000 $4,000.000 $2,200.000 $1,900.330
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,100.000 $3,529.680 $3,450.000 $3,000.000 $3,350.000 $2,950.000 $2,644.780
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $750.000 $224.110 $385.000 $185.000 $300.000 $190.000 $281.430
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 95.000 $900.000 $996.030 $872.000 $825.000 $900.000 $900.000 $982.260
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,000.000 $1,058.290 $925.000 $860.000 $1,100.000 $925.000 $1,043.650
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 28.000 $1,000.000 $1,344.640 $1,175.000 $1,300.000 $1,275.000 $1,400.000 $1,326.050
REMOVE SM RD SN SUP&AM
EA 124.000 $150.000 $112.050 $98.000 $105.000 $100.000 $315.000 $110.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 625.000 $30.000 $19.920 $46.000 $16.000 $35.000 $16.000 $30.800
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
EA 83.000 $130.000 $136.950 $120.000 $125.000 $140.000 $112.000 $135.060
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,100.000 $0.750 $1.250 $1.100 $1.050 $1.100 $1.050 $1.230
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 8,715.000 $0.750 $1.250 $1.100 $1.050 $1.550 $1.050 $1.230
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 12,747.000 $1.000 $1.250 $1.100 $1.050 $0.850 $1.050 $1.230
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 228.000 $25.000 $49.800 $45.000 $42.000 $41.000 $43.000 $49.110
PATCHING MILLED CONCRETE RUMBLE STRIPS
LF 550.000 $5.000 $24.900 $18.000 $11.500 $13.750 $16.000 $24.560
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $21,165.620 $10,000.000 $10,500.000 $16,000.000 $15,000.000 $6,139.110
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
LF 23,960.000 $10.000 $11.450 $10.250 $9.700 $10.500 $9.600 $11.300
HPPM W/RET REQ TY I(W)4"(SLD)(100MIL)
LF 94,278.000 $0.330 $0.750 $0.530 $0.510 $0.350 $0.550 $0.590
HPPM W/RET REQ TY I(Y)4"(SLD)(100MIL)
LF 92,037.000 $0.330 $0.620 $0.530 $0.510 $0.350 $0.550 $0.590
REFURBISH RAISED REFLECT PVMT MRKRS
EA 1,389.000 $4.750 $14.630 $13.000 $12.500 $5.000 $12.500 $14.430
TMA (STATIONARY)
DAY 137.000 $350.000 $186.760 $107.000 $265.000 $150.000 $200.000 $159.620
TMA (MOBILE OPERATION)
HR 100.000 $85.000 $154.750 $55.000 $95.000 $250.000 $60.000 $55.250
Totals: $4,081,800.350 $4,229,617.377 $4,709,409.740 $4,921,445.650 $5,179,539.050 $5,356,529.930 $5,535,714.088