REMOVING CONC (PAV)
|
SY
|
25.000
|
$12.000
|
$12.000
|
$15.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
100.000
|
$1.500
|
$1.500
|
$3.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
100.000
|
$15.000
|
$15.000
|
$10.000
|
|
|
REMOVING CONC (COPING)
|
LF
|
250.000
|
$50.000
|
$16.000
|
$50.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
100.000
|
$50.000
|
$25.000
|
$20.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
100.000
|
$4.000
|
$4.000
|
$5.000
|
|
|
BACKFILL (TY A OR B)
|
CY
|
50.000
|
$100.000
|
$100.000
|
$75.000
|
|
|
BACKFILLING PAVEMENT EDGES
|
CY
|
50.000
|
$100.000
|
$100.000
|
$75.000
|
|
|
BLADING
|
LF
|
100,000.000
|
$1.710
|
$0.420
|
$1.400
|
|
|
BLOCK SODDING
|
SY
|
2,000.000
|
$3.000
|
$3.000
|
$6.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
3,000.000
|
$45.000
|
$40.000
|
$76.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(9")
|
SY
|
100.000
|
$115.000
|
$95.000
|
$160.000
|
|
|
FULL - DEPTH REPAIR CRCP (8"-14")
|
SY
|
1,000.000
|
$285.000
|
$325.000
|
$360.000
|
|
|
FULL-DEPTH REPAIR CRCP (13"-15")
|
SY
|
1,000.000
|
$230.000
|
$350.000
|
$410.000
|
|
|
STRUCT EXCAV
|
CY
|
1,000.000
|
$25.000
|
$25.000
|
$15.000
|
|
|
CEM STABIL BKFL
|
CY
|
25.000
|
$136.800
|
$300.000
|
$100.000
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
25.000
|
$36.000
|
$36.000
|
$30.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
25.000
|
$36.000
|
$36.000
|
$40.000
|
|
|
CL C CONC (COPING)
|
CY
|
5.000
|
$2,500.000
|
$6,500.000
|
$1,000.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
100.000
|
$99.000
|
$250.000
|
$150.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
100.000
|
$125.000
|
$300.000
|
$250.000
|
|
|
CONC STR REPR(RAPID VERT AND OVERHEAD)
|
SF
|
100.000
|
$75.000
|
$500.000
|
$90.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
250.000
|
$72.000
|
$300.000
|
$75.000
|
|
|
CONC STR REPR(REMOV AND REPL WINGWALL)
|
CY
|
25.000
|
$200.000
|
$300.000
|
$200.000
|
|
|
RIPRAP CONC (8 IN)
|
CY
|
25.000
|
$800.000
|
$575.000
|
$550.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
25.000
|
$460.000
|
$460.000
|
$450.000
|
|
|
CLEANING AND SEALING JOINTS (CL 7)
|
LF
|
10,000.000
|
$30.000
|
$18.000
|
$26.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
250.000
|
$228.000
|
$228.000
|
$120.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
100.000
|
$55.000
|
$55.000
|
$50.000
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
4.000
|
$3,000.000
|
$8,500.000
|
$3,000.000
|
|
|
INLET (STG II)(TY C)
|
EA
|
4.000
|
$1,500.000
|
$1,600.000
|
$1,500.000
|
|
|
GRATE & FRAME
|
EA
|
1.000
|
$900.000
|
$900.000
|
$1,000.000
|
|
|
FRAME & COVER
|
EA
|
1.000
|
$475.000
|
$475.000
|
$1,000.000
|
|
|
RING & COVER
|
EA
|
1.000
|
$700.000
|
$700.000
|
$700.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
1.000
|
$415.000
|
$415.000
|
$750.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$315.000
|
$315.000
|
$1,000.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
104.000
|
$75.000
|
$1,000.000
|
$50.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
52.000
|
$75.000
|
$500.000
|
$100.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 2)
|
LF
|
100.000
|
$4.000
|
$24.000
|
$25.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
100.000
|
$4.000
|
$4.000
|
$5.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 2)
|
LF
|
5,000.000
|
$2.000
|
$2.000
|
$3.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 4)
|
LF
|
100.000
|
$2.000
|
$2.000
|
$5.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
100.000
|
$10.000
|
$10.000
|
$20.000
|
|
|
PORT CTB (MOVE) (SAFETY SH) (TY 2)
|
LF
|
5,000.000
|
$2.000
|
$2.000
|
$3.000
|
|
|
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
|
LF
|
500.000
|
$12.000
|
$12.000
|
$10.000
|
|
|
PORT CTB (DES SOURCE)(SAFETY SH)
|
LF
|
100.000
|
$18.000
|
$18.000
|
$25.000
|
|
|
PORT CTB (MOVE)(SAFETY SH)
|
LF
|
100.000
|
$2.000
|
$2.000
|
$10.000
|
|
|
PORT CTB (STKPL)(SAFETY SH)
|
LF
|
100.000
|
$20.000
|
$20.000
|
$25.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
100.000
|
$59.000
|
$59.000
|
$60.000
|
|
|
PERM CTB (SGL SLOPE) (TY 2) (42 )
|
LF
|
100.000
|
$59.000
|
$59.000
|
$60.000
|
|
|
PERM CTB (F-SHAPE) (TY 1)
|
LF
|
100.000
|
$59.000
|
$69.000
|
$60.000
|
|
|
CONC CURB (TY I)
|
LF
|
100.000
|
$6.000
|
$6.000
|
$20.000
|
|
|
CONC CURB (TY II)
|
LF
|
1,000.000
|
$6.000
|
$6.000
|
$15.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
100.000
|
$7.000
|
$7.000
|
$50.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
100.000
|
$14.000
|
$14.000
|
$20.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
100.000
|
$14.000
|
$14.000
|
$20.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
100.000
|
$9.000
|
$9.000
|
$20.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
250.000
|
$65.000
|
$60.000
|
$50.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
100.000
|
$18.000
|
$15.000
|
$26.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
100.000
|
$20.000
|
$15.000
|
$31.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$1.000
|
$1.000
|
$10.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$2,200.000
|
$2,200.000
|
$1,600.000
|
|
|
SHORT RADIUS
|
LF
|
250.000
|
$23.000
|
$23.000
|
$20.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$1,240.000
|
$1,600.000
|
$1,400.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
100.000
|
$17.000
|
$15.000
|
$25.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL ADJUSTMENT
|
EA
|
10.000
|
$92.000
|
$600.000
|
$200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
100.000
|
$2.000
|
$1.000
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,875.000
|
$3,200.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
5.000
|
$400.000
|
$250.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$250.000
|
$1.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
2.000
|
$2,900.000
|
$2,900.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,200.000
|
$1,200.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
1.000
|
$900.000
|
$500.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$10,000.000
|
$5,000.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
2.000
|
$23,000.000
|
$13,000.000
|
$17,820.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$24,000.000
|
$14,000.000
|
$21,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
|
EA
|
2.000
|
$18,000.000
|
$18,000.000
|
$22,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
2.000
|
$35,000.000
|
$22,000.000
|
$30,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
750.000
|
$20.000
|
$20.000
|
$25.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
250.000
|
$15.000
|
$15.000
|
$25.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
250.000
|
$15.000
|
$15.000
|
$25.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
250.000
|
$20.000
|
$20.000
|
$25.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
250.000
|
$20.000
|
$20.000
|
$25.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
250.000
|
$20.000
|
$20.000
|
$25.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
25.000
|
$297.000
|
$185.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
25.000
|
$423.000
|
$285.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$423.000
|
$255.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
|
EA
|
2.000
|
$533.000
|
$555.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
25.000
|
$501.000
|
$185.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
2.000
|
$406.000
|
$235.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
|
EA
|
2.000
|
$546.000
|
$250.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
2.000
|
$426.000
|
$230.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-EXAL)
|
EA
|
2.000
|
$423.000
|
$575.000
|
$1,250.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$454.000
|
$335.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-EXAL)
|
EA
|
2.000
|
$650.000
|
$540.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$473.000
|
$275.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(P)
|
EA
|
2.000
|
$648.000
|
$170.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
2.000
|
$400.000
|
$265.000
|
$1,250.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
2.000
|
$550.000
|
$275.000
|
$1,350.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
2.000
|
$530.000
|
$525.000
|
$2,450.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
25.000
|
$150.000
|
$250.000
|
$300.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$275.000
|
$261.890
|
$500.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
25.000
|
$4.000
|
$4.000
|
$8.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$350.000
|
$350.000
|
$500.000
|
|
|
REMOVE LRSA (FOUNDATION ONLY)(24 IN)
|
EA
|
1.000
|
$150.000
|
$150.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
500.000
|
$3.000
|
$4.000
|
$5.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
500.000
|
$3.000
|
$4.000
|
$5.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
500.000
|
$4.000
|
$4.000
|
$4.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
1,500.000
|
$4.000
|
$4.000
|
$5.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
100.000
|
$4.000
|
$2.450
|
$5.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
100.000
|
$14.000
|
$8.250
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
|
EA
|
500.000
|
$13.000
|
$8.250
|
$30.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
500.000
|
$0.700
|
$1.510
|
$1.700
|
|
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
|
LF
|
100.000
|
$1.000
|
$1.010
|
$1.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,000.000
|
$0.650
|
$1.010
|
$1.100
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
6,000.000
|
$1.850
|
$3.280
|
$3.350
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,000.000
|
$4.150
|
$6.560
|
$6.600
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
28.000
|
$570.000
|
$504.520
|
$520.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
28.000
|
$835.000
|
$585.240
|
$600.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
150.000
|
$0.750
|
$0.860
|
$0.950
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,500.000
|
$2.700
|
$2.520
|
$2.600
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
500.000
|
$3.750
|
$5.050
|
$5.200
|
|
REFL PAV MRK TY I (Y)(ISLAND)(100MIL)
|
SF
|
100.000
|
$5.000
|
$3.030
|
$3.200
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
500.000
|
$0.450
|
$0.610
|
$0.650
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
50.000
|
$18.500
|
$20.180
|
$23.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
50.000
|
$19.500
|
$20.180
|
$23.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
50.000
|
$16.000
|
$30.270
|
$32.000
|
|
|
PAVEMENT SEALER (TPL ARROW)
|
EA
|
2.000
|
$14.800
|
$3.030
|
$32.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
20.000
|
$16.100
|
$30.270
|
$32.000
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
28.000
|
$128.000
|
$100.900
|
$115.000
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
28.000
|
$165.000
|
$100.900
|
$115.000
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
2.000
|
$30.000
|
$25.230
|
$27.000
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
2.000
|
$73.500
|
$100.900
|
$110.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
2.000
|
$6.000
|
$10.090
|
$12.000
|
|
|
PAVEMENT SEALER (ISLAND)
|
SF
|
100.000
|
$1.000
|
$1.010
|
$1.050
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
31,680.000
|
$0.400
|
$0.660
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
31,680.000
|
$0.400
|
$0.660
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
50.000
|
$198.000
|
$216.940
|
$220.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
50.000
|
$332.000
|
$353.160
|
$360.000
|
|
PREFAB PAV MRK TY C (W) (TPL ARROW)
|
EA
|
2.000
|
$415.000
|
$469.200
|
$475.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
20.000
|
$367.000
|
$388.480
|
$395.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
50.000
|
$243.000
|
$252.260
|
$260.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
2.000
|
$567.000
|
$605.420
|
$620.000
|
|
PREFAB PAV MRK TY C (W) (SYMBOL)
|
EA
|
2.000
|
$303.000
|
$302.710
|
$310.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
2.000
|
$30.000
|
$35.320
|
$36.500
|
|
PREFAB PAV MRK TY C (MULTI) (SHIELD)
|
EA
|
2.000
|
$1,800.000
|
$2,018.070
|
$2,100.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
3,000.000
|
$3.000
|
$3.030
|
$3.200
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,500.000
|
$3.000
|
$3.030
|
$3.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
250.000
|
$3.000
|
$3.030
|
$3.200
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
35,000.000
|
$3.000
|
$3.280
|
$3.750
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
176,900.000
|
$0.550
|
$0.200
|
$0.250
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
24,350.000
|
$0.700
|
$0.500
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
21,000.000
|
$1.600
|
$1.010
|
$1.250
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
4,700.000
|
$3.200
|
$2.020
|
$2.200
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
50.000
|
$59.000
|
$60.540
|
$62.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
50.000
|
$59.000
|
$60.540
|
$62.000
|
|
|
ELIM EXT PAV MRK & MRKS (TPL ARROW)
|
EA
|
2.000
|
$59.000
|
$60.540
|
$62.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
50.000
|
$59.000
|
$60.540
|
$62.000
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
28.000
|
$80.000
|
$100.900
|
$110.000
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
28.000
|
$80.000
|
$100.900
|
$110.000
|
|
|
ELIM EXT PAV MRK & MRKS (ISLAND)
|
SF
|
100.000
|
$2.100
|
$3.530
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
2.000
|
$123.000
|
$201.810
|
$210.000
|
|
|
ELIM EXT PAV MRK & MRKS (SYMBOL)
|
EA
|
2.000
|
$80.000
|
$100.900
|
$110.000
|
|
|
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
|
EA
|
2.000
|
$48.000
|
$20.180
|
$22.000
|
|
|
ELIM EXT PAV MRK & MRKS (SHEILD)
|
EA
|
2.000
|
$530.000
|
$100.900
|
$110.000
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
20.000
|
$80.000
|
$75.680
|
$80.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
176,900.000
|
$0.080
|
$0.010
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
24,350.000
|
$0.100
|
$0.010
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
21,000.000
|
$0.500
|
$0.040
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
5,000.000
|
$1.000
|
$0.060
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
50.000
|
$24.000
|
$5.050
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
50.000
|
$24.000
|
$5.050
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (TPL ARROW)
|
EA
|
2.000
|
$24.000
|
$5.050
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
20.000
|
$24.000
|
$5.050
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
50.000
|
$24.000
|
$5.050
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
28.000
|
$48.000
|
$10.090
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
28.000
|
$48.000
|
$10.090
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (ISLAND)
|
SF
|
100.000
|
$4.250
|
$1.010
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
2.000
|
$48.000
|
$10.090
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
2.000
|
$48.000
|
$10.090
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
2.000
|
$9.600
|
$10.090
|
$15.000
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
2.000
|
$24.000
|
$10.090
|
$15.000
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
2,000.000
|
$100.000
|
$10.000
|
$90.000
|
|
|
POTHOLE REPAIR (SAW - CUT)
|
SY
|
8,000.000
|
$80.000
|
$3.300
|
$58.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
2,000.000
|
$3.500
|
$3.000
|
$5.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
6,396.000
|
$40.000
|
$48.000
|
$48.000
|
|
|
SPOT MOWING
|
AC
|
100.000
|
$40.000
|
$48.000
|
$48.000
|
|
|
LITTER REMOVAL
|
AC
|
26,764.000
|
$15.000
|
$16.500
|
$12.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
3,000.000
|
$30.000
|
$15.000
|
$20.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
52.000
|
$3,000.000
|
$3,415.000
|
$3,300.000
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
CYC
|
52.000
|
$3,000.000
|
$3,415.000
|
$3,300.000
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
CYC
|
52.000
|
$3,000.000
|
$3,415.000
|
$3,300.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
3,000.000
|
$230.000
|
$10.000
|
$100.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
52.000
|
$7,000.000
|
$10,564.930
|
$11,000.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
52.000
|
$7,000.000
|
$10,564.930
|
$11,000.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
52.000
|
$6,500.000
|
$10,564.930
|
$11,000.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
CYC
|
52.000
|
$6,500.000
|
$10,564.930
|
$11,000.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
400.000
|
$250.000
|
$300.000
|
$300.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
150,000.000
|
$0.800
|
$0.750
|
$0.700
|
|
|
MAKE READY: DRAIN SLOTS, BARRIER SLOTS
|
LS
|
1.000
|
$35,000.000
|
$33,000.000
|
$25,000.000
|
|
|
GRAFFITI REMOVAL (BLAST CLEANING)
|
SF
|
100.000
|
$2.000
|
$2.250
|
$2.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
20,000.000
|
$10.000
|
$2.250
|
$8.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
50.000
|
$1,100.000
|
$1,055.000
|
$1,500.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
10.000
|
$1,500.000
|
$1,435.000
|
$1,500.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
100.000
|
$125.000
|
$175.000
|
$150.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
10.000
|
$225.000
|
$285.000
|
$180.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
10.000
|
$280.000
|
$285.000
|
$180.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
10.000
|
$300.000
|
$290.000
|
$200.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
10.000
|
$300.000
|
$530.000
|
$220.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
10.000
|
$400.000
|
$1,590.000
|
$200.000
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
10.000
|
$400.000
|
$3,700.000
|
$200.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
20,000.000
|
$4.500
|
$2.000
|
$4.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
500.000
|
$75.000
|
$72.000
|
$75.000
|
|
|
PUMP STATION WELL CLEANING
|
EA
|
16.000
|
$1,900.000
|
$1,770.000
|
$1,750.000
|
|
|
BASKET AND INLET PIPE CLEANING
|
EA
|
16.000
|
$560.000
|
$520.000
|
$520.000
|
|
|
DOWNSPOUT CLEANING
|
EA
|
16.000
|
$335.000
|
$312.000
|
$320.000
|
|
|
SUMP CLEANING
|
EA
|
10.000
|
$560.000
|
$520.000
|
$520.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
7,500.000
|
$4.500
|
$6.250
|
$4.100
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
10,000.000
|
$6.600
|
$7.500
|
$6.150
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
5,000.000
|
$7.700
|
$8.800
|
$7.200
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
2,500.000
|
$8.800
|
$10.000
|
$8.250
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
7,500.000
|
$10.500
|
$12.500
|
$10.500
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
2,500.000
|
$13.950
|
$13.500
|
$14.000
|
|
|
STORM SEWER CLEANING (PIPE)(55"-74"DIA)
|
LF
|
100.000
|
$21.500
|
$20.800
|
$22.000
|
|
|
STORM SEWER CLEANING (PIPE)(75"-96"DIA)
|
LF
|
100.000
|
$32.000
|
$31.250
|
$33.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (<6 SF)
|
LF
|
100.000
|
$11.250
|
$11.450
|
$10.500
|
|
|
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
|
LF
|
100.000
|
$13.400
|
$13.000
|
$12.500
|
|
|
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
|
LF
|
500.000
|
$15.400
|
$14.500
|
$15.500
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
2,500.000
|
$18.700
|
$17.650
|
$18.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
|
LF
|
100.000
|
$21.000
|
$20.800
|
$22.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (>96 SF)
|
LF
|
100.000
|
$32.000
|
$31.250
|
$32.000
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
2,500.000
|
$10.000
|
$9.350
|
$10.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
6,000.000
|
$15.000
|
$19.750
|
$18.500
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
100.000
|
$6.000
|
$27.000
|
$22.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
100.000
|
$6.000
|
$42.000
|
$22.000
|
|
|
RAISE RAIL ELEMENT
|
LF
|
25.000
|
$12.000
|
$11.500
|
$2.500
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
75.000
|
$33.000
|
$81.000
|
$52.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
500.000
|
$41.000
|
$45.000
|
$70.000
|
|
|
REALIGN POSTS
|
EA
|
50.000
|
$7.000
|
$20.000
|
$6.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
5,000.000
|
$20.000
|
$29.000
|
$29.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
750.000
|
$38.000
|
$38.000
|
$58.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
15.000
|
$2,800.000
|
$4,200.000
|
$3,500.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
200.000
|
$875.000
|
$1,140.000
|
$1,000.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
100.000
|
$100.000
|
$115.000
|
$150.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
200.000
|
$100.000
|
$120.000
|
$80.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
200.000
|
$85.000
|
$90.000
|
$80.000
|
|
|
REPLACE SGT STRUT
|
EA
|
100.000
|
$60.000
|
$78.000
|
$70.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
200.000
|
$15.000
|
$22.000
|
$25.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)(FURN)
|
LF
|
750.000
|
$26.000
|
$78.000
|
$15.000
|
|
|
REM & REPLACE BLOCKOUTS (FURNISHED)
|
EA
|
500.000
|
$7.000
|
$9.000
|
$5.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
2.000
|
$100.000
|
$310.000
|
$10.000
|
|
|
REMOVE AND REPLACE (SMTC) (N)
|
EA
|
8.000
|
$23,000.000
|
$35,000.000
|
$18,000.000
|
|
|
REPAIR (SMTC) (N)
|
EA
|
10.000
|
$750.000
|
$1,500.000
|
$1,500.000
|
|
|
REMOVE AND REPLACE (SMTC) (W)
|
EA
|
6.000
|
$29,000.000
|
$42,000.000
|
$23,000.000
|
|
|
REPAIR (SMTC) (W)
|
EA
|
8.000
|
$750.000
|
$1,500.000
|
$2,500.000
|
|
|
REMOVE AND REPLACE (TAU II) (N)
|
EA
|
2.000
|
$19,000.000
|
$19,000.000
|
$20,000.000
|
|
|
REPAIR TAU II (N) (MISC HARDWARE)
|
EA
|
2.000
|
$1,800.000
|
$1,800.000
|
$1,500.000
|
|
|
REPAIR TAU II (N)
|
LF
|
50.000
|
$75.000
|
$75.000
|
$125.000
|
|
|
REPAIR TAU II (W)
|
LF
|
50.000
|
$75.000
|
$75.000
|
$250.000
|
|
|
REMOVE AND REPLACE TAU II (W)
|
EA
|
2.000
|
$25,000.000
|
$20,000.000
|
$34,000.000
|
|
|
REPAIR TAU II (W) (MISC HARDWARE)
|
EA
|
2.000
|
$2,000.000
|
$2,000.000
|
$1,000.000
|
|
|
REPAIR (STEEL POST W/ W-BEAM - T101)
|
LF
|
50.000
|
$19.000
|
$17.000
|
$20.000
|
|
|
REPAIR (ALUMINUM RAIL)
|
LF
|
10.000
|
$100.000
|
$100.000
|
$85.000
|
|
|
REPAIR (STEEL RAIL)
|
LF
|
10.000
|
$75.000
|
$75.000
|
$85.000
|
|
|
RAISING AND UNDERSEALING CONCRETE SLAB
|
LB
|
20,000.000
|
$5.500
|
$6.000
|
$4.000
|
|
|
TYPE CAC CONCRETE
|
CY
|
5.000
|
$650.000
|
$300.000
|
$2,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
50.000
|
$80.000
|
$95.000
|
$250.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
31,680.000
|
$0.450
|
$0.660
|
$0.700
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
31,680.000
|
$0.450
|
$0.660
|
$0.700
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
2,500.000
|
$1.000
|
$1.010
|
$1.050
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
15,000.000
|
$0.750
|
$1.010
|
$1.200
|
|
MULTIPOLYMER PAV MRK (W)(8")(DOT)
|
LF
|
100.000
|
$0.700
|
$2.020
|
$2.500
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
6,000.000
|
$1.800
|
$3.030
|
$3.200
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
2,000.000
|
$3.600
|
$6.050
|
$6.200
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
31,680.000
|
$0.500
|
$0.660
|
$0.850
|
|
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
|
LF
|
7,500.000
|
$0.400
|
$0.500
|
$0.900
|
|
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
|
LF
|
5,000.000
|
$0.650
|
$1.010
|
$1.100
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
7,500.000
|
$2.750
|
$1.510
|
$1.750
|
|
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
|
LF
|
200.000
|
$2.750
|
$4.040
|
$4.200
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
7,500.000
|
$0.450
|
$0.810
|
$1.000
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
5.000
|
$750.000
|
$750.000
|
$600.000
|
|
|
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
|
|
REPL LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
1.000
|
$2,000.000
|
$2,000.000
|
$1,000.000
|
|
|
REMV LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
1.000
|
$300.000
|
$300.000
|
$400.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
750.000
|
$300.000
|
$300.000
|
$325.000
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
1.000
|
$275.000
|
$275.000
|
$100.000
|
|
|
REMV SMALL RDSD SIGN SUPP & ASSEM
|
EA
|
1.000
|
$100.000
|
$100.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
500.000
|
$125.000
|
$500.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
750.000
|
$500.000
|
$500.000
|
$300.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
336.000
|
$75.000
|
$60.000
|
$50.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
336.000
|
$62.500
|
$50.000
|
$75.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
336.000
|
$75.000
|
$60.000
|
$50.000
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
3.000
|
$20,000.000
|
$30,000.000
|
$60,000.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
336.000
|
$75.000
|
$60.000
|
$75.000
|
|
Totals: |
$9,669,759.300
|
$9,648,786.970
|
$10,384,486.000
|