Show Job Controls
Bid Cobra

MONTGOMERY IH0045 (6326-33-001)

Items: 52

County: MONTGOMERY
Length: N/A
Highway: IH0045
District: HOUSTON
Control Number: 6326-33-001
DBE Goal: N/A
Project: RMC - 632633001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $296,605.00
Date: 03/06/2018 (8 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$296,605.00
$328,303.00
Over/Under Est: 10.69% $31,698.00
Over/Under Est: 11.18% $33,160.00
Amt Left: 0.45% $1,462.00
Over/Under Est: 21.97% $65,175.00
Amt Left: 10.2% $33,477.00
Delta: -9.71% -$32,015.00

Bid Items & Bid Tabulations

52 Total 0 of 52
MONTGOMERY  |  IH0045  |  HOUSTON  |  6326-33-001  |  03/06/2018  |  $296,605.00  |  RMC - 632633001  |  GUARDRAIL REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
ROY JORGENSEN ASSOCIATES, INC.
T&L CLEANING SERVICES LLC
REMOVING CONCRETE(MOW STRIP)
LF 100.000 $15.000 $10.000 $15.000 $100.000
BACKFILLING PAVEMENT EDGES
CY 25.000 $35.000 $80.000 $100.000 $20.000
STRUCT EXCAV
CY 25.000 $35.000 $25.000 $35.000 $30.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 15.000 $125.000 $200.000 $300.000 $100.000
RIPRAP (MOW STRIP)(4 IN)
CY 100.000 $300.000 $425.000 $400.000 $450.000
MOBILIZATION (CALLOUT)
EA 26.000 $500.000 $250.000 $250.000 $300.000
MOBILIZATION (EMERGENCY)
EA 1.000 $750.000 $1,000.000 $750.000 $300.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 150.000 $30.000 $68.000 $25.000 $65.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 150.000 $30.000 $10.000 $25.000 $20.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 150.000 $10.000 $5.000 $5.000 $30.000
PERM CTB (F-SHAPE) (TY 1)
LF 150.000 $75.000 $50.000 $10.000 $60.000
MTL W-BEAM GD FEN (TIM POST)
LF 150.000 $25.000 $24.000 $25.000 $20.000
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $25.000 $26.000 $38.000 $27.000
TERMINAL ANCHOR SECTION
EA 2.000 $40.000 $1.000 $250.000 $100.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,000.000 $2,400.000 $2,500.000 $1,500.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 100.000 $8.000 $5.000 $10.000 $4.000
SHORT RADIUS
LF 150.000 $40.000 $40.000 $35.000 $20.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $2.000 $1.000 $2.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $20.000 $1.000 $50.000 $100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,900.000 $2,800.000 $2,800.000 $3,000.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 1.000 $500.000 $750.000 $500.000 $1,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $175.000 $200.000 $250.000 $100.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,500.000 $1,900.000 $1,000.000 $1,000.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,300.000 $400.000 $1,000.000 $1,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 500.000 $10.000 $10.000 $30.000 $30.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 150.000 $10.000 $10.000 $30.000 $30.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,000.000 $12.000 $16.000 $17.000 $15.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 75.000 $15.000 $10.000 $25.000 $30.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 15.000 $15.000 $25.000 $26.000 $30.000
RAISE RAIL ELEMENT
LF 100.000 $6.000 $5.000 $10.000 $4.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 200.000 $35.000 $40.000 $35.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 200.000 $40.000 $44.000 $45.000 $50.000
REALIGN POSTS
EA 25.000 $15.000 $7.000 $10.000 $15.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 2,000.000 $20.000 $20.000 $20.000 $21.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 300.000 $40.000 $45.000 $65.000 $100.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $6.000 $1.000 $75.000 $1.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 5.000 $2,900.000 $2,900.000 $3,000.000 $3,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 40.000 $900.000 $980.000 $900.000 $900.000
REM & RESET SGT IMPACT HEAD
EA 40.000 $100.000 $120.000 $100.000 $200.000
REPLACE SGT CABLE ASSEMBLY
EA 40.000 $95.000 $118.000 $90.000 $50.000
REPLACE SGT CABLE ANCHOR
EA 40.000 $75.000 $95.000 $90.000 $50.000
REPLACE SGT STRUT
EA 40.000 $80.000 $90.000 $75.000 $50.000
REPLACE SGT OBJECT MARKER
EA 40.000 $25.000 $25.000 $25.000 $30.000
REM & REPLACE BLOCKOUTS (FURNISHED)
EA 100.000 $10.000 $5.000 $5.000 $10.000
REPAIR (REACT)
EA 1.000 $1,000.000 $1,200.000 $1,500.000 $2,500.000
REPAIR REACT (N) (MISC HARDWARE)
EA 1.000 $1,000.000 $1,200.000 $1,000.000 $1,000.000
REPAIR REACT (N) (FRONT SECTION)
EA 1.000 $1,000.000 $200.000 $1,000.000 $1,000.000
REPAIR REACT (N) (CYLINDERS)
EA 1.000 $2,800.000 $3,100.000 $3,000.000 $1,000.000
REPAIR (QUAD) (N) (BAY)
EA 1.000 $1,500.000 $1,500.000 $850.000 $1,000.000
REPAIR (QUAD) (W) (BAY)
EA 1.000 $1,600.000 $3,000.000 $850.000 $2,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 1.000 $21,000.000 $28,000.000 $18,000.000 $22,000.000
REPAIR (SMTC) (N)
EA 1.000 $1,100.000 $2,000.000 $5,000.000 $3,000.000
Totals: $296,605.000 $328,303.000 $329,765.000 $361,780.000