REMOVING CONC (CURB)
|
LF
|
1,200.000
|
$7.500
|
$2.000
|
$1.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
100.000
|
$20.000
|
$16.000
|
$10.000
|
|
|
BACKFILLING PAVEMENT EDGES
|
CY
|
50.000
|
$40.000
|
$75.000
|
$125.000
|
|
|
BLADING
|
HR
|
150.000
|
$265.000
|
$120.000
|
$115.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
75.000
|
$73.000
|
$150.000
|
$90.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
50.000
|
$51.000
|
$75.000
|
$65.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
50.000
|
$55.000
|
$80.000
|
$75.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
50.000
|
$70.000
|
$89.000
|
$85.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
50.000
|
$70.000
|
$105.000
|
$90.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
|
SY
|
70.000
|
$40.000
|
$105.000
|
$95.000
|
|
|
FULL - DEPTH REPAIR CRCP (8"-14")
|
SY
|
500.000
|
$350.000
|
$275.000
|
$220.000
|
|
|
FULL-DEPTH REPAIR CRCP (13"-15")
|
SY
|
500.000
|
$294.000
|
$300.000
|
$230.000
|
|
|
STRUCT EXCAV
|
CY
|
25.000
|
$25.000
|
$14.000
|
$20.000
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
50.000
|
$95.000
|
$35.000
|
$75.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
50.000
|
$145.000
|
$35.000
|
$90.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
200.000
|
$75.000
|
$99.000
|
$80.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
650.000
|
$200.000
|
$110.000
|
$95.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
1,400.000
|
$70.000
|
$45.000
|
$50.000
|
|
|
CONC STR REPR(RAPID VERT AND OVERHEAD)
|
SF
|
400.000
|
$200.000
|
$50.000
|
$80.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
375.000
|
$56.000
|
$45.000
|
$80.000
|
|
|
CONC STR REPR(REMOV AND REPL WINGWALL)
|
CY
|
100.000
|
$175.000
|
$75.000
|
$100.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
100.000
|
$350.000
|
$300.000
|
$385.000
|
|
|
CLEANING AND SEALING JOINTS (CL 7)
|
LF
|
2,500.000
|
$43.750
|
$28.000
|
$35.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
450.000
|
$300.000
|
$190.000
|
$190.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
5.000
|
$65.000
|
$55.000
|
$85.000
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
2.000
|
$4,200.000
|
$2,700.000
|
$3,000.000
|
|
|
INLET (STG II)(TY C)
|
EA
|
2.000
|
$1,200.000
|
$1,600.000
|
$1,200.000
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$400.000
|
$300.000
|
$500.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
52.000
|
$442.000
|
$60.000
|
$300.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
52.000
|
$1,209.090
|
$60.000
|
$400.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 2)
|
LF
|
500.000
|
$35.000
|
$20.000
|
$4.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
750.000
|
$1.000
|
$4.000
|
$1.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 2)
|
LF
|
750.000
|
$10.430
|
$2.000
|
$1.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 4)
|
LF
|
750.000
|
$8.000
|
$2.000
|
$1.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
900.000
|
$12.360
|
$15.000
|
$1.000
|
|
|
PORT CTB (MOVE) (SAFETY SH) (TY 2)
|
LF
|
500.000
|
$1.250
|
$2.000
|
$30.000
|
|
|
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
|
LF
|
500.000
|
$30.000
|
$12.000
|
$15.000
|
|
|
PORT CTB (DES SOURCE)(SAFETY SH)
|
LF
|
100.000
|
$35.000
|
$18.000
|
$15.000
|
|
|
PORT CTB (MOVE)(SAFETY SH)
|
LF
|
100.000
|
$55.000
|
$2.000
|
$40.000
|
|
|
PORT CTB (STKPL)(SAFETY SH)
|
LF
|
100.000
|
$37.000
|
$10.000
|
$15.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
300.000
|
$45.000
|
$56.000
|
$35.000
|
|
|
PERM CTB (SGL SLOPE) (TY 2) (42 )
|
LF
|
300.000
|
$30.000
|
$56.000
|
$35.000
|
|
|
CONC CURB (TY I)
|
LF
|
300.000
|
$30.000
|
$2.000
|
$1.000
|
|
|
CONC CURB (TY II)
|
LF
|
2,200.000
|
$19.000
|
$2.000
|
$1.000
|
|
|
CONC CURB (MONO) (TY I)
|
LF
|
100.000
|
$45.000
|
$2.000
|
$1.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
100.000
|
$7.000
|
$2.000
|
$1.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
100.000
|
$35.000
|
$14.000
|
$10.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
100.000
|
$34.700
|
$14.000
|
$10.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
2,000.000
|
$10.850
|
$10.000
|
$20.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
50.000
|
$70.000
|
$42.000
|
$150.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
600.000
|
$25.500
|
$17.000
|
$14.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
600.000
|
$27.000
|
$18.000
|
$19.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
16.000
|
$1.000
|
$100.000
|
$70.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,533.330
|
$2,000.000
|
$450.000
|
|
|
SHORT RADIUS
|
LF
|
100.000
|
$40.000
|
$23.000
|
$15.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
150.000
|
$2.000
|
$2.000
|
$1.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,800.000
|
$2,400.000
|
$2,000.000
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
10.000
|
$850.000
|
$400.000
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$200.000
|
$260.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
2.000
|
$1,566.670
|
$3,000.000
|
$1,600.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$2,000.000
|
$1,100.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$2,308.330
|
$1,200.000
|
$1,250.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,280.000
|
$600.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$7,924.000
|
$20,000.000
|
$15,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
1,500.000
|
$14.500
|
$15.000
|
$15.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
750.000
|
$28.680
|
$15.000
|
$15.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
750.000
|
$20.500
|
$15.000
|
$15.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
750.000
|
$20.500
|
$15.000
|
$25.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
500.000
|
$30.000
|
$15.000
|
$18.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
500.000
|
$40.000
|
$40.000
|
$30.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
50.000
|
$595.000
|
$300.000
|
$300.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
15.000
|
$500.000
|
$400.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
15.000
|
$600.000
|
$500.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
|
EA
|
7.000
|
$450.000
|
$500.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
25.000
|
$700.000
|
$340.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
25.000
|
$400.000
|
$400.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
|
EA
|
10.000
|
$400.000
|
$225.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
9.000
|
$400.000
|
$185.000
|
$300.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-EXAL)
|
EA
|
7.000
|
$400.000
|
$185.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
25.000
|
$440.000
|
$220.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-EXAL)
|
EA
|
7.000
|
$400.000
|
$185.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
15.000
|
$440.000
|
$265.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(P)
|
EA
|
25.000
|
$400.000
|
$220.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
10.000
|
$800.000
|
$220.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
10.000
|
$700.000
|
$300.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
1.000
|
$1,100.000
|
$350.000
|
$1,300.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
5.000
|
$490.000
|
$400.000
|
$500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
5.000
|
$850.000
|
$400.000
|
$450.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,250.000
|
$4.900
|
$2.750
|
$3.000
|
|
|
REMOVE LRSA
|
EA
|
5.000
|
$550.000
|
$300.000
|
$2,500.000
|
|
|
REMOVE LRSA (FOUNDATION ONLY)(24 IN)
|
EA
|
3.000
|
$530.000
|
$150.000
|
$250.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
2,200.000
|
$6.500
|
$3.000
|
$4.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
1,500.000
|
$3.500
|
$3.000
|
$4.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
325.000
|
$39.500
|
$14.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
1,325.000
|
$6.500
|
$2.200
|
$4.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
1,250.000
|
$3.250
|
$3.950
|
$4.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
50.000
|
$40.000
|
$10.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
325.000
|
$24.850
|
$12.000
|
$15.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,000.000
|
$0.400
|
$0.380
|
$0.525
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
2,000.000
|
$0.350
|
$0.440
|
$0.600
|
|
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
|
LF
|
150.000
|
$1.290
|
$0.900
|
$1.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,000.000
|
$0.550
|
$0.900
|
$1.200
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
150.000
|
$2.150
|
$1.000
|
$1.350
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
12,500.000
|
$1.850
|
$1.000
|
$1.350
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
6,300.000
|
$4.250
|
$1.100
|
$1.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
150.000
|
$80.000
|
$82.000
|
$112.500
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
50.000
|
$84.200
|
$104.000
|
$142.500
|
|
REFL PAV MRK TY I(W)(TPL ARRW)(100MIL)
|
EA
|
5.000
|
$100.000
|
$136.000
|
$187.500
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
22.000
|
$100.000
|
$142.000
|
$195.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
150.000
|
$98.000
|
$163.000
|
$225.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
9.000
|
$450.000
|
$270.000
|
$375.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
9.000
|
$450.000
|
$270.000
|
$375.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
5.000
|
$316.000
|
$325.000
|
$450.000
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
2.000
|
$100.000
|
$190.000
|
$262.500
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
50.000
|
$40.000
|
$27.000
|
$37.500
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
300.000
|
$0.750
|
$0.900
|
$1.200
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
300.000
|
$1.250
|
$1.000
|
$2.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
300.000
|
$3.250
|
$1.100
|
$4.000
|
|
REFL PAV MRK TY I (Y)(ISLAND)(100MIL)
|
SF
|
15.000
|
$3.000
|
$490.000
|
$675.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
2,500.000
|
$1.000
|
$1.100
|
$1.500
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
2,000.000
|
$0.550
|
$0.750
|
$0.975
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,000.000
|
$0.010
|
$0.020
|
$0.030
|
|
|
PAVEMENT SEALER 6"
|
LF
|
7,000.000
|
$0.010
|
$0.040
|
$0.060
|
|
|
PAVEMENT SEALER 8"
|
LF
|
2,450.000
|
$0.020
|
$0.070
|
$0.090
|
|
|
PAVEMENT SEALER 12"
|
LF
|
14,950.000
|
$0.080
|
$0.110
|
$0.150
|
|
|
PAVEMENT SEALER 24"
|
LF
|
6,300.000
|
$0.750
|
$0.140
|
$0.180
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
150.000
|
$5.000
|
$5.450
|
$7.500
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
150.000
|
$5.000
|
$8.700
|
$12.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
50.000
|
$10.000
|
$11.000
|
$15.000
|
|
|
PAVEMENT SEALER (TPL ARROW)
|
EA
|
5.000
|
$52.000
|
$13.000
|
$18.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
22.000
|
$6.730
|
$16.000
|
$22.500
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
9.000
|
$50.000
|
$20.000
|
$27.000
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
9.000
|
$50.000
|
$20.000
|
$27.000
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
2.000
|
$37.000
|
$22.000
|
$30.000
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
5.000
|
$30.000
|
$23.000
|
$33.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
50.000
|
$5.000
|
$2.150
|
$3.000
|
|
|
PAVEMENT SEALER (ISLAND)
|
SF
|
15.000
|
$1.000
|
$16.000
|
$22.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
2,500.000
|
$0.400
|
$1.100
|
$1.500
|
|
PREFAB PAV MRK TY C (MULTI) (SHIELD)
|
EA
|
2.000
|
$1,750.000
|
$1,300.000
|
$1,800.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
550.000
|
$2.500
|
$3.250
|
$4.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
575.000
|
$2.750
|
$3.250
|
$4.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
875.000
|
$2.850
|
$3.250
|
$4.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,275.000
|
$2.950
|
$3.250
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,000.000
|
$0.300
|
$0.110
|
$0.150
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
7,000.000
|
$0.250
|
$0.160
|
$0.225
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
2,450.000
|
$0.400
|
$0.280
|
$0.375
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
14,950.000
|
$0.600
|
$0.350
|
$0.450
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
6,300.000
|
$1.400
|
$0.650
|
$0.900
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
150.000
|
$32.000
|
$11.000
|
$15.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
50.000
|
$39.000
|
$13.000
|
$18.000
|
|
|
ELIM EXT PAV MRK & MRKS (TPL ARROW)
|
EA
|
5.000
|
$44.000
|
$16.000
|
$22.500
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
150.000
|
$30.000
|
$22.000
|
$30.000
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
9.000
|
$150.000
|
$27.000
|
$37.500
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
9.000
|
$150.000
|
$27.000
|
$37.500
|
|
|
ELIM EXT PAV MRK & MRKS (ISLAND)
|
SF
|
15.000
|
$2.200
|
$38.000
|
$52.500
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
5.000
|
$103.000
|
$44.000
|
$60.000
|
|
|
ELIM EXT PAV MRK & MRKS (SYMBOL)
|
EA
|
2.000
|
$64.000
|
$49.000
|
$67.500
|
|
|
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
|
EA
|
50.000
|
$30.000
|
$20.000
|
$27.000
|
|
|
ELIM EXT PAV MRK & MRKS (SHEILD)
|
EA
|
2.000
|
$200.000
|
$38.000
|
$52.500
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
55.000
|
$29.000
|
$22.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,000.000
|
$0.010
|
$0.010
|
$0.015
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
7,000.000
|
$0.020
|
$0.020
|
$0.030
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,450.000
|
$0.040
|
$0.050
|
$0.075
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
14,950.000
|
$0.080
|
$0.090
|
$0.120
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
6,300.000
|
$0.250
|
$0.110
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
150.000
|
$5.650
|
$1.100
|
$1.500
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
50.000
|
$8.450
|
$1.100
|
$1.500
|
|
|
PAV SURF PREP FOR MRK (TPL ARROW)
|
EA
|
5.000
|
$6.900
|
$1.300
|
$1.800
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
22.000
|
$4.360
|
$1.350
|
$1.875
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
150.000
|
$8.000
|
$1.650
|
$2.250
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
9.000
|
$25.000
|
$2.200
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
9.000
|
$25.000
|
$2.200
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (ISLAND)
|
SF
|
15.000
|
$15.000
|
$3.250
|
$4.500
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
5.000
|
$43.000
|
$3.250
|
$4.500
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
2.000
|
$1.360
|
$3.250
|
$4.500
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
50.000
|
$9.900
|
$2.180
|
$3.000
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
2.000
|
$250.000
|
$5.450
|
$7.500
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
50.000
|
$90.000
|
$90.000
|
$125.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
3,198.000
|
$33.330
|
$45.000
|
$43.000
|
|
|
SPOT MOWING
|
AC
|
50.000
|
$24.500
|
$44.000
|
$45.000
|
|
|
LITTER REMOVAL
|
AC
|
13,382.000
|
$9.470
|
$14.000
|
$17.250
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
100.000
|
$8.630
|
$30.000
|
$20.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
26.000
|
$3,000.000
|
$7,200.000
|
$4,750.000
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
CYC
|
12.000
|
$382.000
|
$5,800.000
|
$4,250.000
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
CYC
|
26.000
|
$200.000
|
$4,800.000
|
$3,750.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
25.000
|
$36.870
|
$200.000
|
$225.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
26.000
|
$900.000
|
$8,500.000
|
$8,500.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
26.000
|
$1,800.000
|
$6,100.000
|
$6,200.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
26.000
|
$1,800.000
|
$6,100.000
|
$5,800.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
CYC
|
26.000
|
$900.000
|
$4,000.000
|
$3,450.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
75.000
|
$175.000
|
$200.000
|
$260.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
75,000.000
|
$0.500
|
$0.550
|
$0.250
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
200.000
|
$5.000
|
$5.000
|
$10.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
10.000
|
$2,000.000
|
$1,500.000
|
$2,000.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
15.000
|
$1,200.000
|
$1,500.000
|
$1,500.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
75.000
|
$85.000
|
$100.000
|
$100.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
30.000
|
$98.000
|
$200.000
|
$125.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
20.000
|
$150.000
|
$300.000
|
$300.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
10.000
|
$200.000
|
$300.000
|
$325.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
10.000
|
$400.000
|
$300.000
|
$350.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
5.000
|
$500.000
|
$300.000
|
$400.000
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
5.000
|
$500.000
|
$300.000
|
$500.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
500.000
|
$60.780
|
$75.000
|
$62.000
|
|
|
PUMP STATION WELL CLEANING
|
EA
|
8.000
|
$1,685.710
|
$1,900.000
|
$1,750.000
|
|
|
BASKET AND INLET PIPE CLEANING
|
EA
|
8.000
|
$410.000
|
$550.000
|
$525.000
|
|
|
DOWNSPOUT CLEANING
|
EA
|
8.000
|
$200.000
|
$330.000
|
$330.000
|
|
|
SUMP CLEANING
|
EA
|
5.000
|
$228.500
|
$550.000
|
$540.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
850.000
|
$2.590
|
$5.500
|
$5.400
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
4,400.000
|
$3.600
|
$7.700
|
$7.400
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
4,400.000
|
$4.690
|
$8.800
|
$8.500
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
1,400.000
|
$7.560
|
$10.000
|
$9.500
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
400.000
|
$4.000
|
$12.000
|
$11.500
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
400.000
|
$8.900
|
$16.000
|
$15.500
|
|
|
STORM SEWER CLEANING (PIPE)(55"-74"DIA)
|
LF
|
30.000
|
$18.000
|
$22.000
|
$23.000
|
|
|
STORM SEWER CLEANING (PIPE)(75"-96"DIA)
|
LF
|
10.000
|
$37.690
|
$33.000
|
$33.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (<6 SF)
|
LF
|
250.000
|
$8.000
|
$14.000
|
$14.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
|
LF
|
700.000
|
$15.700
|
$15.000
|
$15.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
|
LF
|
300.000
|
$19.600
|
$18.000
|
$17.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
250.000
|
$18.000
|
$20.000
|
$19.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
|
LF
|
300.000
|
$21.670
|
$22.000
|
$21.000
|
|
|
STORM SEWER CLEAN (BOX CULV) (>96 SF)
|
LF
|
10.000
|
$75.380
|
$18.000
|
$33.000
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
50.000
|
$7.500
|
$12.000
|
$12.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
7,500.000
|
$16.000
|
$13.000
|
$13.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
150.000
|
$9.720
|
$5.000
|
$50.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
800.000
|
$33.000
|
$5.000
|
$30.000
|
|
|
RAISE RAIL ELEMENT
|
LF
|
750.000
|
$5.500
|
$10.000
|
$9.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
135.000
|
$43.000
|
$30.000
|
$45.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
500.000
|
$46.000
|
$38.000
|
$45.000
|
|
|
REALIGN POSTS
|
EA
|
75.000
|
$11.000
|
$6.000
|
$5.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
7,500.000
|
$15.900
|
$14.500
|
$15.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
750.000
|
$43.600
|
$34.000
|
$75.000
|
|
|
REPAIR OF TERMINAL ANCHORS POSTS
|
EA
|
5.000
|
$1.000
|
$45.000
|
$100.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
5.000
|
$49.000
|
$45.000
|
$100.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
10.000
|
$3,100.000
|
$2,400.000
|
$2,750.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
100.000
|
$820.000
|
$850.000
|
$800.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
50.000
|
$80.500
|
$100.000
|
$300.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
100.000
|
$80.340
|
$100.000
|
$100.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
100.000
|
$79.150
|
$82.000
|
$100.000
|
|
|
REPLACE SGT STRUT
|
EA
|
100.000
|
$84.500
|
$57.000
|
$70.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
100.000
|
$20.000
|
$17.000
|
$25.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)(FURN)
|
LF
|
225.000
|
$18.000
|
$25.000
|
$25.000
|
|
|
REM & REPLACE BLOCKOUTS (FURNISHED)
|
EA
|
100.000
|
$5.000
|
$6.500
|
$7.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
2.000
|
$250.000
|
$34.000
|
$100.000
|
|
|
REMOVE AND REPLACE (NARROW REACT 350)
|
EA
|
3.000
|
$16,000.000
|
$19,000.000
|
$15,000.000
|
|
|
REMOVE AND REPLACE (WIDE REACT 350)
|
EA
|
2.000
|
$25,000.000
|
$31,000.000
|
$20,000.000
|
|
|
REPAIR (TRACC)
|
EA
|
1.000
|
$2,850.000
|
$3,000.000
|
$2,500.000
|
|
|
REPAIR (WIDE TRACC)
|
EA
|
1.000
|
$4,000.000
|
$3,000.000
|
$4,500.000
|
|
|
REPAIR REACT (N) (MISC HARDWARE)
|
EA
|
2.000
|
$1,023.500
|
$900.000
|
$1,000.000
|
|
|
REPAIR REACT (N) (REAR SEC "S")
|
EA
|
2.000
|
$150.000
|
$50.000
|
$300.000
|
|
|
REPAIR REACT (N) (REAR SEC "B")
|
EA
|
2.000
|
$200.000
|
$50.000
|
$200.000
|
|
|
REPAIR REACT (N) (FRONT SECTION)
|
EA
|
2.000
|
$400.000
|
$50.000
|
$770.000
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
2.000
|
$2,533.000
|
$3,100.000
|
$3,000.000
|
|
|
REPAIR (QUAD) (N) (BAY)
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$1,000.000
|
|
|
REPAIR (QUAD) (W) (BAY)
|
EA
|
2.000
|
$1,700.000
|
$2,700.000
|
$1,700.000
|
|
|
REPAIR (REACT 350) (W)
|
EA
|
2.000
|
$13,000.000
|
$1,500.000
|
$5,000.000
|
|
|
REPAIR (GREAT SYS) (BAY)
|
EA
|
2.000
|
$1,200.000
|
$1,400.000
|
$1,350.000
|
|
|
REPAIR REACT (MISC) (HARDWARE)
|
EA
|
2.000
|
$800.000
|
$800.000
|
$800.000
|
|
|
REPAIR REACT (CYLINDERS)
|
EA
|
2.000
|
$2,300.000
|
$3,100.000
|
$2,500.000
|
|
|
REPAIR REACT (W) (MISC) (HARDWARE)
|
EA
|
2.000
|
$2,300.000
|
$1,100.000
|
$1,500.000
|
|
|
REPAIR REACT (W) (CYLINDERS)
|
EA
|
2.000
|
$2,200.000
|
$3,000.000
|
$2,200.000
|
|
|
REMOVE AND REPLACE (SMTC) (N)
|
EA
|
3.000
|
$24,815.000
|
$24,000.000
|
$15,000.000
|
|
|
REPAIR (SMTC) (N)
|
EA
|
3.000
|
$1,000.000
|
$600.000
|
$1,000.000
|
|
|
REMOVE AND REPLACE (SMTC) (W)
|
EA
|
3.000
|
$29,883.330
|
$34,000.000
|
$20,000.000
|
|
|
REPAIR (SMTC) (W)
|
EA
|
3.000
|
$1,000.000
|
$700.000
|
$1,000.000
|
|
|
REPAIR (STEEL POST W/ W-BEAM - T101)
|
LF
|
25.000
|
$62.000
|
$15.000
|
$15.000
|
|
|
REPAIR (ALUMINUM RAIL)
|
LF
|
25.000
|
$49.000
|
$95.000
|
$80.000
|
|
|
REPAIR (STEEL RAIL)
|
LF
|
25.000
|
$75.000
|
$67.000
|
$100.000
|
|
|
TYPE CAC CONCRETE
|
CY
|
20.000
|
$2,687.500
|
$2,500.000
|
$1,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$92.000
|
$80.000
|
$150.000
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
2.000
|
$124.000
|
$300.000
|
$300.000
|
|
|
REMV SMALL RDSD SIGN SUPP & ASSEM
|
EA
|
2.000
|
$57.000
|
$53.000
|
$350.000
|
|
|
STORM SEWER (TELEVISION INSPECTION)
|
LF
|
750.000
|
$8.500
|
$5.500
|
$20.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
175.000
|
$65.000
|
$55.000
|
$40.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
175.000
|
$80.000
|
$44.000
|
$80.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
175.000
|
$55.000
|
$58.000
|
$40.000
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
3.000
|
$50,000.000
|
$40,000.000
|
$50,000.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
175.000
|
$55.000
|
$60.000
|
$70.000
|
|
Totals: |
$3,698,375.020
|
$3,939,621.950
|
$3,970,805.250
|