Show Job Controls
Bid Cobra

MONTGOMERY SH 242 (3538-01-035)

Items: 156

County: MONTGOMERY
Length: N/A
Highway: SH 242
District: HOUSTON
Control Number: 3538-01-035
DBE Goal: N/A
Project: STP 2019(952)
Guaranty: N/A
Time: 602 WORKING DAYS
Engineer's Estimate: $40,937,492.70
Date: 05/08/2019 (7 years ago)
Contract Number: N/A
Type: WIDEN FROM 2 TO 4 LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (9)
E
Engineer's Estimate
$40,937,492.70
Over/Under Est: -10.12% -$4,143,862.52
Over/Under Est: -3.9% -$1,596,934.90
Amt Left: 6.92% $2,546,927.62
$42,692,675.12
Over/Under Est: 4.29% $1,755,182.42
Amt Left: 16.03% $5,899,044.94
Delta: -8.52% -$3,352,117.32
Over/Under Est: 4.58% $1,875,311.56
Amt Left: 16.36% $6,019,174.08
Delta: -0.28% -$120,129.14
Over/Under Est: 9.82% $4,019,925.61
Amt Left: 22.19% $8,163,788.13
Delta: -5.01% -$2,144,614.05
$45,315,818.80
Over/Under Est: 10.7% $4,378,326.10
Amt Left: 23.16% $8,522,188.62
Delta: -0.80% -$358,400.49
Over/Under Est: 14.83% $6,070,321.86
Amt Left: 27.76% $10,214,184.38
Delta: -3.73% -$1,691,995.76
Over/Under Est: 17.02% $6,968,329.84
Amt Left: 30.2% $11,112,192.36
Delta: -1.91% -$898,007.98
$51,829,748.20
Over/Under Est: 26.61% $10,892,255.50
Amt Left: 40.87% $15,036,118.02
Delta: -8.19% -$3,923,925.66
Subcontractor Percentage Amount
A&J REBAR LLC 9.56% $3,715,916.30
THIRD COAST SERVICES LLC 6.34% $2,464,321.06
ROADWAY SPECIALTIES, INC. 1.94% $754,066.70
ROADWAY CONSTRUCTION, INC. 1.72% $668,553.98
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 1.20% $466,433.01
PROFESSIONAL TRAFFIC CONTROL LLC 0.51% $198,234.03
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.20% $77,738.83
SCOTT DERR PAINTING CO, LLC 0.05% $19,434.71
PINNACLE GRINDING AND GROOVING LLC 0.03% $11,660.83
Total: 21.55% $8,376,359.45

Bid Items & Bid Tabulations

156 Total 0 of 156
MONTGOMERY  |  SH 242  |  HOUSTON  |  3538-01-035  |  05/08/2019  |  $40,937,492.70  |  STP 2019(952)  |  WIDEN FROM 2 TO 4 LANES  |  602 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
JAMES CONSTRUCTION GROUP, L.L.C.
J.D. ABRAMS, L.P.
HARPER BROTHERS CONSTRUCTION LLC
BALFOUR BEATTY INFRASTRUCTURE, INC.
WEBBER, LLC
ZACHRY CONSTRUCTION CORPORATION
SER CONSTRUCTION PARTNERS, LLC
COPASA INC
PREPARING ROW
STA 168.000 $2,000.000 $21,900.000 $10,769.560 $5,000.000 $1,000.000 $18,500.000 $26,057.740 $24,876.290 $10,000.000 $6,474.550
REMOVING CONC (PAV)
SY 5,727.000 $10.000 $10.000 $7.420 $4.000 $10.000 $10.000 $10.200 $8.240 $3.900 $6.460
REMOVING CONC (RIPRAP)
SY 1,860.000 $15.000 $5.000 $5.350 $2.500 $8.500 $10.000 $3.200 $11.520 $4.200 $6.800
REMOVE STAB BASE AND ASPH PAV (6"-20")
SY 2,707.000 $3.000 $7.000 $9.000 $6.000 $5.000 $8.340 $6.100 $5.810 $2.600 $4.650
REMOV STAB BASE & ASPH PAV (4"-14")
SY 42,854.000 $2.000 $6.000 $3.670 $5.000 $6.500 $4.220 $5.100 $3.170 $3.500 $2.320
EXCAVATION (ROADWAY)
CY 19,779.000 $8.000 $14.000 $1.660 $3.800 $10.000 $9.000 $5.500 $4.520 $7.100 $10.280
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 153,230.000 $10.000 $9.000 $11.050 $8.150 $9.750 $12.500 $13.370 $10.820 $12.300 $18.320
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 26,582.000 $20.000 $30.000 $38.300 $27.500 $40.000 $45.000 $36.220 $42.250 $45.000 $18.620
BLOCK SODDING
SY 132,302.000 $3.000 $3.000 $2.840 $2.900 $2.840 $2.980 $2.840 $2.840 $4.400 $2.040
FERTILIZER
AC 27.000 $750.000 $650.000 $678.950 $686.000 $678.950 $711.600 $678.950 $678.950 $770.000 $469.550
VEGETATIVE WATERING
MG 3,280.000 $10.000 $20.000 $21.970 $29.000 $25.510 $15.000 $21.970 $15.530 $26.100 $9.020
LIME TRT (EXST MATL) (6")
SY 46,074.000 $3.000 $2.000 $0.500 $4.500 $2.200 $2.500 $2.830 $3.010 $2.300 $2.500
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 622.000 $150.000 $180.000 $125.000 $200.000 $206.510 $150.000 $175.000 $175.000 $194.700 $208.920
CEMENT
TON 622.000 $150.000 $180.000 $155.000 $99.000 $132.500 $125.000 $124.500 $200.000 $157.300 $156.580
CEMENT TREAT (EXIST MATL) (6")
SY 46,074.000 $5.000 $2.000 $1.500 $1.780 $2.200 $2.500 $3.050 $5.000 $3.200 $1.630
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 92,148.000 $8.000 $4.000 $10.170 $14.000 $12.500 $7.500 $9.870 $15.760 $11.100 $11.950
ASPHALT STAB BASE (GR 2)(PG 64)
TON 1,191.000 $100.000 $75.000 $122.620 $93.000 $102.250 $131.040 $87.000 $89.750 $121.000 $101.160
ASPHALT STAB BASE (GR 4)(PG 64)
TON 5,068.000 $100.000 $65.000 $103.430 $92.000 $99.600 $101.940 $86.000 $98.510 $99.000 $100.000
SALV,HAUL& STKPL RCL APH PV(VAR DEPTH)
SY 36,183.000 $2.500 $3.000 $0.460 $1.700 $1.100 $2.210 $1.650 $4.650 $1.600 $2.320
D-GR HMA(SQ) TY-C SAC-A PG70-22
TON 298.000 $100.000 $110.000 $122.620 $140.000 $143.350 $121.070 $130.000 $186.070 $110.000 $151.160
CONC PVMT (CONT REINF - CRCP) (11")
SY 84,929.000 $60.000 $35.000 $61.890 $62.000 $60.000 $48.000 $59.100 $62.540 $62.000 $66.350
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 5,488.000 $100.000 $90.000 $103.720 $100.000 $125.000 $115.000 $84.240 $96.140 $95.000 $89.390
STRUCT EXCAV
CY 3,986.000 $7.000 $7.000 $0.020 $5.000 $1.000 $0.010 $1.000 $3.030 $8.200 $20.600
CEM STABIL BKFL
CY 2,079.000 $50.000 $37.200 $38.100 $48.000 $40.000 $48.000 $42.350 $38.210 $44.400 $58.310
TRENCH EXCAVATION PROTECTION
LF 3,175.000 $2.000 $1.250 $1.070 $2.500 $1.000 $2.000 $1.080 $1.850 $0.200 $2.170
DRILL SHAFT (18 IN)
LF 334.000 $70.000 $100.000 $191.780 $245.000 $60.000 $192.000 $190.230 $165.580 $53.300 $101.490
DRILL SHAFT (30 IN)
LF 1,518.000 $120.000 $125.000 $128.440 $186.000 $150.000 $148.000 $136.420 $137.660 $139.300 $177.640
DRILL SHAFT (36 IN)
LF 852.000 $150.000 $150.000 $168.270 $237.000 $230.000 $192.000 $173.970 $168.620 $203.700 $233.970
DRILL SHAFT (42 IN)
LF 14,131.000 $200.000 $210.000 $175.070 $239.000 $250.000 $189.000 $173.960 $182.580 $259.700 $421.170
DRILL SHAFT (54 IN)
LF 5,307.000 $320.000 $277.000 $302.470 $421.000 $400.000 $335.000 $304.350 $308.400 $456.600 $615.450
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 120.000 $250.000 $215.000 $215.000 $237.000 $215.000 $225.340 $130.550 $230.140 $236.500 $491.220
CL C CONC (ABUT)
CY 254.300 $1,300.000 $700.000 $597.110 $550.000 $885.000 $800.000 $920.520 $1,100.000 $896.600 $1,107.570
CL C CONC (CAP)
CY 1,556.900 $1,750.000 $800.000 $770.760 $820.000 $900.000 $1,000.000 $1,000.000 $1,100.000 $1,043.800 $1,019.520
CL C CONC (COLUMN)
CY 959.200 $800.000 $800.000 $443.010 $1,000.000 $975.000 $950.000 $1,000.000 $1,100.000 $932.100 $848.350
REINF CONC SLAB
SF 332,403.000 $13.000 $10.000 $12.870 $14.400 $14.500 $15.750 $15.630 $15.000 $18.200 $13.310
PRESTR CONC GIRDER (TX46)
LF 45,522.500 $125.000 $95.000 $126.160 $135.000 $128.250 $134.000 $122.780 $125.090 $139.000 $167.040
CONCRETE PAINT FINISH
SF 77,798.000 $0.250 $0.250 $0.270 $0.420 $0.350 $0.280 $0.350 $0.270 $0.300 $0.510
RIPRAP (CONC)(5 IN)
CY 61.000 $400.000 $450.000 $410.650 $715.000 $475.000 $480.000 $429.630 $560.000 $682.400 $347.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 694.000 $500.000 $450.000 $270.950 $343.000 $370.000 $480.000 $369.000 $400.000 $394.100 $359.290
RIPRAP (CONC) (CL B) (4")
CY 4.200 $500.000 $450.000 $747.230 $1,100.000 $497.000 $480.000 $551.600 $2,000.000 $481.100 $861.900
RIPRAP (STONE TY R)(DRY)(6 IN)
CY 52.000 $100.000 $135.000 $124.550 $267.000 $210.000 $150.000 $100.000 $213.360 $231.700 $215.120
RIPRAP (MOW STRIP)(4 IN)
CY 204.000 $450.000 $450.000 $583.660 $726.000 $470.000 $480.000 $458.540 $560.000 $372.300 $384.160
STR STEEL (MISC NON - BRIDGE)
LB 4,099.000 $15.000 $5.000 $9.600 $8.700 $12.500 $8.220 $8.810 $8.350 $14.600 $23.760
RAIL (TY T223)
LF 5,671.000 $120.000 $40.000 $33.770 $108.000 $110.000 $96.000 $85.000 $86.000 $81.600 $102.670
RAIL (TY C223)
LF 6,399.000 $120.000 $70.000 $54.620 $152.000 $125.000 $121.000 $100.000 $106.790 $107.700 $117.730
RAIL (TY PR11)
LF 6,410.000 $100.000 $75.000 $62.060 $74.000 $68.870 $61.000 $68.870 $68.870 $74.900 $93.020
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 1,377.000 $70.000 $100.000 $66.950 $83.000 $100.000 $70.000 $79.910 $97.680 $65.900 $75.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 73.000 $450.000 $272.750 $241.490 $323.000 $425.000 $350.000 $247.220 $315.070 $359.400 $322.500
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 137.000 $650.000 $291.500 $279.200 $313.000 $400.000 $400.000 $254.480 $274.680 $338.400 $388.590
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 258.000 $750.000 $372.850 $335.800 $416.000 $500.000 $500.000 $326.770 $317.880 $411.100 $552.690
RC PIPE (CL III)(18 IN)
LF 370.000 $60.000 $71.400 $95.310 $92.000 $75.000 $80.000 $41.920 $68.850 $75.000 $55.350
RC PIPE (CL III)(24 IN)
LF 1,913.000 $70.000 $64.750 $62.480 $56.000 $60.000 $90.000 $46.250 $60.630 $63.100 $56.160
RC PIPE (CL III)(30 IN)
LF 202.000 $90.000 $94.950 $106.070 $212.000 $75.000 $105.000 $74.080 $88.900 $95.200 $79.360
RC PIPE (CL III)(42 IN)
LF 361.000 $130.000 $116.950 $114.040 $133.000 $175.000 $160.000 $87.940 $113.900 $149.200 $164.830
INLET (COMPL)(TY S)
EA 1.000 $3,000.000 $9,210.000 $6,839.000 $13,250.000 $8,800.000 $3,500.000 $7,234.730 $6,897.850 $6,865.300 $3,823.840
MANH (COMPL)(PRM)(48IN)
EA 1.000 $3,000.000 $3,068.000 $3,323.430 $3,665.000 $3,800.000 $3,000.000 $2,864.570 $3,090.030 $3,423.800 $3,823.840
MANH (COMPL)(PRM)(72IN)
EA 3.000 $4,000.000 $6,043.000 $6,550.080 $5,300.000 $7,175.000 $6,500.000 $4,608.730 $4,955.840 $8,903.400 $8,102.910
INLET (COMPL)(TY AAD)
EA 4.000 $3,500.000 $6,607.000 $5,138.990 $6,500.000 $6,550.000 $3,400.000 $5,135.770 $5,437.360 $5,682.300 $5,444.030
INLET (COMPL)(TY AD)
EA 7.000 $5,000.000 $3,254.000 $3,001.230 $3,200.000 $3,550.000 $2,400.000 $3,098.050 $3,432.360 $2,865.700 $6,612.320
HEADWALL (CH - FW - 0) (DIA= 42 IN)
EA 1.000 $6,500.000 $9,345.000 $10,044.330 $6,150.000 $9,120.000 $5,500.000 $11,203.000 $8,624.400 $14,940.000 $8,459.650
WINGWALL (FW - S) (HW=4 FT)
EA 1.000 $9,000.000 $18,288.000 $6,244.560 $15,900.000 $17,150.000 $20,000.000 $27,420.030 $18,111.390 $15,040.900 $11,512.110
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 1.000 $5,500.000 $4,596.000 $5,711.050 $4,875.000 $6,200.000 $4,500.000 $4,601.350 $2,422.200 $6,546.300 $6,279.330
SET (TY I)(S= 5 FT)(HW= 2 FT)(4:1) (C)
EA 2.000 $5,500.000 $3,077.000 $5,337.860 $5,290.000 $6,275.000 $4,900.000 $4,531.670 $1,697.130 $6,546.300 $8,023.590
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 8.000 $1,000.000 $787.000 $919.060 $1,100.000 $920.000 $900.000 $1,227.050 $737.570 $876.600 $962.310
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 5.000 $1,500.000 $1,110.000 $1,084.270 $1,350.000 $1,210.000 $1,050.000 $1,374.650 $867.570 $1,157.700 $1,633.460
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 6.000 $1,500.000 $1,110.000 $1,084.440 $1,215.000 $1,235.000 $1,050.000 $1,374.660 $743.570 $1,133.300 $1,940.890
SET (TY II) (30 IN) (RCP) (4: 1) (P)
EA 8.000 $1,500.000 $2,206.000 $1,889.350 $2,280.000 $2,450.000 $1,700.000 $2,100.350 $1,265.070 $2,232.900 $2,847.240
ADJUSTING INLET (CAP)
EA 1.000 $500.000 $1,148.000 $743.960 $1,600.000 $1,650.000 $900.000 $1,577.760 $1,771.890 $574.800 $1,482.620
CLEAN EXIST CULVERTS
EA 5.000 $2,000.000 $11,285.000 $1,250.000 $3,500.000 $4,000.000 $2,000.000 $3,000.000 $4,768.660 $3,148.800 $1,635.780
REMOV STR (INLET)
EA 1.000 $500.000 $448.000 $670.390 $972.000 $425.000 $550.000 $839.250 $605.190 $288.500 $936.500
REMOV STR (SET)
EA 16.000 $400.000 $228.000 $562.960 $474.000 $375.000 $600.000 $468.210 $625.190 $288.500 $586.940
REMOV STR (WINGWALL)
EA 2.000 $2,000.000 $828.000 $1,636.640 $3,765.000 $2,500.000 $900.000 $2,006.260 $645.190 $593.500 $2,233.900
REMOV STR (HEADWALL)
EA 1.000 $1,500.000 $828.000 $1,636.650 $3,635.000 $3,000.000 $900.000 $2,006.290 $2,786.460 $593.500 $2,265.320
REMOV STR (PIPE)
LF 165.000 $15.000 $41.050 $19.680 $25.500 $45.000 $12.000 $29.760 $53.050 $24.500 $51.040
MOBILIZATION
LS 1.000 $4,000,000.000 $3,907,787.000 $3,900,000.000 $3,600,000.000 $4,000,000.000 $4,200,000.000 $4,500,000.000 $4,750,000.000 $4,500,000.000 $4,633,078.310
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 28.000 $1,000.000 $5,000.000 $2,521.410 $15,600.000 $6,000.000 $8,000.000 $14,631.240 $18,395.560 $6,435.000 $16,738.240
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 280.000 $30.000 $29.000 $25.270 $25.000 $25.270 $36.000 $25.270 $22.900 $33.300 $59.110
ROCK FILTER DAMS (REMOVE)
LF 280.000 $10.000 $12.000 $11.130 $8.250 $11.130 $5.000 $11.130 $7.870 $16.900 $18.860
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,120.000 $25.000 $29.000 $26.610 $29.000 $26.610 $35.000 $26.610 $26.300 $21.900 $48.210
CONSTRUCTION EXITS (REMOVE)
SY 1,120.000 $10.000 $5.000 $8.680 $8.250 $8.680 $5.000 $8.680 $7.870 $6.300 $18.300
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,948.000 $3.500 $3.000 $4.030 $3.250 $4.030 $4.500 $4.030 $2.910 $2.800 $5.580
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,948.000 $1.000 $1.000 $0.550 $0.450 $0.550 $0.250 $0.550 $0.430 $1.300 $1.320
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 10,860.000 $30.000 $30.000 $46.220 $21.000 $40.000 $75.000 $31.800 $30.090 $75.000 $32.310
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 660.000 $50.000 $30.000 $45.520 $8.200 $40.000 $80.000 $32.880 $224.140 $68.400 $50.560
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 9,080.000 $3.000 $4.000 $3.700 $3.000 $4.000 $6.000 $3.060 $2.190 $6.000 $6.270
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 260.000 $6.000 $4.000 $3.310 $4.000 $4.000 $6.000 $4.480 $33.690 $6.000 $10.090
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 10,860.000 $6.000 $4.000 $8.300 $5.150 $6.500 $7.000 $5.610 $5.150 $11.500 $7.920
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 660.000 $6.000 $4.000 $8.430 $8.400 $6.500 $7.000 $5.880 $13.600 $13.600 $6.670
CONC CURB (SLOTTED)
LF 1,025.000 $5.000 $10.000 $2.940 $9.700 $7.770 $8.000 $5.400 $10.870 $2.300 $22.410
DRIVEWAYS (CONC)
SY 1,877.000 $60.000 $70.000 $53.370 $46.000 $73.000 $80.000 $68.060 $63.540 $57.300 $58.920
DRIVEWAYS (CONC) (FAST TRACK)
SY 981.000 $75.000 $80.000 $58.420 $46.500 $82.000 $95.000 $85.000 $59.150 $65.900 $104.650
CONC SIDEWALKS (4")
SY 3,134.000 $60.000 $60.000 $32.010 $41.000 $68.000 $48.000 $60.000 $47.990 $54.700 $55.880
MTL W-BEAM GD FEN (TIM POST)
LF 2,950.000 $20.000 $19.390 $20.000 $20.500 $19.390 $20.320 $19.390 $19.390 $22.000 $23.840
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 15.000 $2,000.000 $1,488.000 $1,680.000 $1,570.000 $1,488.000 $1,559.570 $1,488.000 $1,488.000 $1,848.000 $2,210.720
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,000.000 $1,138.000 $1,200.000 $1,200.000 $1,138.000 $1,192.730 $1,138.000 $1,138.000 $1,320.000 $2,610.270
REMOVE METAL BEAM GUARD FENCE
LF 2,024.000 $3.000 $1.500 $2.000 $1.600 $1.500 $1.570 $1.500 $1.500 $2.200 $6.810
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $2,500.000 $2,775.000 $2,545.000 $2,950.000 $2,775.000 $2,908.470 $2,775.000 $2,775.000 $2,799.500 $3,101.640
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 12.000 $4,000.000 $3,675.000 $3,675.000 $3,858.000 $3,675.000 $3,851.750 $3,699.290 $3,675.000 $4,042.500 $4,501.650
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 17,220.000 $8.000 $11.000 $11.000 $11.550 $11.000 $11.530 $7.540 $11.000 $12.100 $15.100
CONDT (PVC) (SCH 80) (2")
LF 1,428.000 $8.000 $6.050 $6.050 $6.350 $6.050 $6.340 $5.450 $6.050 $6.700 $9.820
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,120.000 $10.000 $10.250 $10.250 $10.700 $10.250 $10.740 $11.560 $10.250 $11.300 $18.970
CONDT (PVC) (SCH 80) (2") (CONC ENCSE)
LF 11,790.000 $20.000 $5.150 $5.150 $5.410 $5.150 $5.400 $6.480 $5.150 $5.700 $14.380
CONDT (PVC) (SCH 80) (3") (BORE)
LF 5,860.000 $15.000 $31.000 $31.000 $32.550 $31.000 $32.490 $36.520 $31.000 $34.100 $32.850
CONDT (RM) (3")
LF 11,435.000 $35.000 $45.250 $45.250 $47.520 $45.250 $47.430 $41.320 $45.250 $49.800 $52.520
ELEC CONDR (NO.14) INSULATED
LF 22,300.000 $0.700 $0.990 $0.990 $1.040 $0.990 $1.040 $0.410 $0.990 $1.100 $1.470
ELEC CONDR (NO.8) BARE
LF 2,539.000 $1.000 $1.250 $1.250 $1.310 $1.250 $1.310 $0.750 $1.250 $1.400 $1.480
ELEC CONDR (NO.8) INSULATED
LF 5,078.000 $1.000 $1.350 $1.350 $1.410 $1.350 $1.410 $0.850 $1.350 $1.500 $1.980
GROUND BOX TY D (162922)W/APRON
EA 12.000 $1,500.000 $895.000 $895.000 $939.750 $895.000 $938.050 $759.340 $895.000 $984.500 $1,238.010
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
EA 6.000 $6,000.000 $5,450.000 $5,450.000 $5,722.000 $5,450.000 $5,920.510 $6,533.410 $5,450.000 $5,995.000 $7,838.700
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $450.000 $460.580 $351.000 $472.000 $460.580 $471.640 $460.580 $443.090 $386.100 $523.270
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 45.000 $550.000 $578.910 $530.000 $472.000 $578.910 $471.640 $578.910 $456.530 $583.000 $523.270
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 3.000 $450.000 $461.250 $323.000 $525.000 $461.250 $524.050 $461.250 $446.220 $355.300 $581.410
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 5.000 $500.000 $498.250 $396.000 $682.500 $498.250 $681.260 $498.250 $492.470 $435.600 $755.840
REMOVE SM RD SN SUP&AM
EA 27.000 $100.000 $75.000 $68.000 $68.250 $75.000 $68.130 $75.000 $95.000 $71.500 $75.580
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 160.000 $20.000 $11.000 $18.000 $5.250 $11.000 $5.240 $11.000 $26.260 $19.800 $5.810
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 154.000 $25.000 $11.000 $18.000 $5.250 $11.000 $5.240 $11.000 $20.030 $19.800 $5.810
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 15.000 $80.000 $45.330 $46.000 $94.500 $45.330 $94.330 $45.330 $39.950 $50.600 $104.650
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 36.000 $25.000 $14.750 $28.000 $5.000 $14.750 $4.980 $14.750 $79.950 $30.800 $5.520
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 17.000 $25.000 $14.750 $28.000 $5.000 $14.750 $4.980 $14.750 $79.950 $30.800 $5.520
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 838.000 $0.600 $0.850 $0.650 $1.020 $1.250 $0.890 $0.850 $0.850 $0.800 $1.480
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 36,901.000 $0.500 $0.790 $0.600 $0.950 $1.100 $0.830 $0.790 $0.790 $0.600 $1.110
WK ZN PAV MRK REMOV (W)(ARROW)
EA 12.000 $150.000 $175.000 $150.000 $210.000 $225.000 $183.420 $175.000 $175.000 $123.200 $320.080
WK ZN PAV MRK REMOV (W)(WORD)
EA 12.000 $150.000 $185.000 $150.000 $222.000 $225.000 $183.420 $185.000 $185.000 $127.600 $404.730
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 36,854.000 $0.500 $0.790 $0.600 $0.950 $1.100 $0.830 $0.790 $0.790 $0.600 $1.110
PREFAB PAV MRK TY C (W) (ARROW)
EA 23.000 $250.000 $225.000 $300.000 $236.000 $400.000 $235.820 $225.000 $225.000 $275.000 $363.340
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 2.000 $400.000 $450.000 $350.000 $472.000 $425.000 $471.650 $450.000 $450.000 $310.200 $580.290
PREFAB PAV MRK TY C (W) (WORD)
EA 24.000 $250.000 $275.000 $350.000 $288.000 $325.000 $288.230 $275.000 $275.000 $256.300 $482.370
REFL PAV MRKR TY II-C-R
EA 708.000 $5.000 $5.000 $3.950 $5.250 $5.000 $5.240 $5.000 $5.000 $4.400 $5.300
ELIM EXT PAV MRK & MRKS (6")
LF 84,733.000 $0.500 $0.400 $0.500 $0.420 $0.650 $0.420 $0.400 $0.400 $0.300 $1.180
ELIM EXT PAV MRK & MRKS (8")
LF 4,808.000 $0.700 $0.600 $0.700 $0.630 $1.120 $0.630 $0.600 $0.600 $0.500 $1.700
ELIM EXT PAV MRK & MRKS (24")
LF 250.000 $2.500 $3.000 $2.100 $3.150 $4.000 $3.140 $3.000 $3.000 $2.300 $4.670
ELIM EXT PAV MRK & MRKS (ARROW)
EA 23.000 $70.000 $45.000 $25.000 $47.250 $75.000 $47.160 $45.000 $45.000 $35.200 $124.670
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 2.000 $80.000 $62.000 $25.000 $65.100 $75.000 $64.980 $62.000 $62.000 $61.600 $223.090
ELIM EXT PAV MRK & MRKS (WORD)
EA 24.000 $80.000 $45.000 $25.000 $47.250 $75.000 $47.160 $45.000 $45.000 $46.200 $119.690
PAV SURF PREP FOR MRK (6")
LF 84,733.000 $0.100 $0.050 $0.060 $0.050 $0.200 $0.050 $0.050 $0.050 $0.100 $0.050
PAV SURF PREP FOR MRK (8")
LF 4,808.000 $0.100 $0.080 $0.080 $0.080 $0.450 $0.080 $0.080 $0.080 $0.100 $0.380
PAV SURF PREP FOR MRK (24")
LF 217.000 $1.000 $0.240 $0.250 $0.250 $2.000 $0.250 $0.240 $0.240 $0.900 $1.270
PAV SURF PREP FOR MRK (ARROW)
EA 23.000 $10.000 $3.000 $10.000 $3.150 $20.000 $3.140 $3.000 $3.000 $9.900 $23.460
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $10.000 $5.000 $10.000 $5.250 $20.000 $5.240 $5.000 $5.000 $7.700 $46.180
PAV SURF PREP FOR MRK (WORD)
EA 24.000 $10.000 $5.000 $10.000 $5.250 $20.000 $5.240 $5.000 $5.000 $9.900 $28.430
FULL - WIDTH MOWING
CYC 6.000 $2,000.000 $2,500.000 $1,220.250 $2,400.000 $3,000.000 $3,700.000 $2,000.000 $1,913.980 $2,145.000 $7,732.870
LITTER REMOVAL
CYC 6.000 $1,000.000 $1,900.000 $597.760 $900.000 $2,750.000 $1,500.000 $1,135.250 $1,121.170 $1,072.500 $1,322.440
DITCH CLEANING AND RESHAPING (FOOT)
LF 4,823.000 $3.000 $1.000 $2.130 $5.000 $7.000 $1.730 $7.710 $4.000 $6.000 $3.550
WIDE FLANGE PAVEMENT TERMINALS
LF 412.000 $250.000 $200.000 $397.140 $290.000 $500.000 $500.000 $510.540 $366.530 $448.500 $17.440
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 700.000 $15.000 $10.000 $15.990 $13.000 $25.000 $125.000 $32.480 $49.490 $107.300 $104.770
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
LF 17,220.000 $12.000 $13.000 $13.000 $13.650 $13.000 $13.630 $10.960 $13.000 $14.300 $16.140
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 5,220.000 $30.000 $35.750 $35.750 $37.500 $35.750 $37.470 $41.170 $35.750 $39.300 $43.440
ITS MULTI-DUCT CND (RMC)
LF 11,595.000 $65.000 $69.500 $69.500 $73.000 $69.500 $72.840 $60.090 $69.500 $76.500 $79.380
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 33,940.000 $0.600 $0.740 $0.900 $0.780 $0.750 $0.780 $0.740 $0.740 $0.600 $1.220
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 8,930.000 $0.700 $1.250 $0.900 $0.780 $0.750 $1.310 $1.250 $1.250 $1.300 $3.660
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 4,808.000 $0.800 $1.000 $1.300 $1.050 $1.000 $1.050 $1.000 $1.000 $1.000 $0.940
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 217.000 $5.500 $8.000 $6.000 $8.400 $8.000 $8.380 $8.000 $8.000 $6.200 $9.760
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 32,933.000 $0.600 $0.740 $0.900 $0.790 $0.750 $0.780 $0.740 $0.740 $0.600 $2.440
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 8,930.000 $0.600 $0.790 $0.950 $0.790 $0.750 $0.830 $0.790 $0.790 $0.700 $0.610
TMA (STATIONARY)
DAY 30.000 $1,000.000 $495.000 $159.940 $500.000 $100.000 $750.000 $270.630 $1,630.720 $1,072.500 $14,735.110
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 56.000 $3,000.000 $2,375.000 $2,375.000 $2,500.000 $2,375.000 $2,489.230 $3,187.990 $2,375.000 $2,612.500 $4,038.790
Totals: $40,937,492.700 $36,793,630.180 $39,340,557.815 $42,692,675.120 $42,812,804.265 $44,957,418.310 $45,315,818.806 $47,007,814.565 $47,905,822.540 $51,829,748.209