PREPARING ROW
|
STA
|
168.000
|
$2,000.000
|
$21,900.000
|
$10,769.560
|
$5,000.000
|
$1,000.000
|
$18,500.000
|
$26,057.740
|
$24,876.290
|
$10,000.000
|
$6,474.550
|
|
|
REMOVING CONC (PAV)
|
SY
|
5,727.000
|
$10.000
|
$10.000
|
$7.420
|
$4.000
|
$10.000
|
$10.000
|
$10.200
|
$8.240
|
$3.900
|
$6.460
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,860.000
|
$15.000
|
$5.000
|
$5.350
|
$2.500
|
$8.500
|
$10.000
|
$3.200
|
$11.520
|
$4.200
|
$6.800
|
|
|
REMOVE STAB BASE AND ASPH PAV (6"-20")
|
SY
|
2,707.000
|
$3.000
|
$7.000
|
$9.000
|
$6.000
|
$5.000
|
$8.340
|
$6.100
|
$5.810
|
$2.600
|
$4.650
|
|
|
REMOV STAB BASE & ASPH PAV (4"-14")
|
SY
|
42,854.000
|
$2.000
|
$6.000
|
$3.670
|
$5.000
|
$6.500
|
$4.220
|
$5.100
|
$3.170
|
$3.500
|
$2.320
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
19,779.000
|
$8.000
|
$14.000
|
$1.660
|
$3.800
|
$10.000
|
$9.000
|
$5.500
|
$4.520
|
$7.100
|
$10.280
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
153,230.000
|
$10.000
|
$9.000
|
$11.050
|
$8.150
|
$9.750
|
$12.500
|
$13.370
|
$10.820
|
$12.300
|
$18.320
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
26,582.000
|
$20.000
|
$30.000
|
$38.300
|
$27.500
|
$40.000
|
$45.000
|
$36.220
|
$42.250
|
$45.000
|
$18.620
|
|
|
BLOCK SODDING
|
SY
|
132,302.000
|
$3.000
|
$3.000
|
$2.840
|
$2.900
|
$2.840
|
$2.980
|
$2.840
|
$2.840
|
$4.400
|
$2.040
|
|
|
FERTILIZER
|
AC
|
27.000
|
$750.000
|
$650.000
|
$678.950
|
$686.000
|
$678.950
|
$711.600
|
$678.950
|
$678.950
|
$770.000
|
$469.550
|
|
|
VEGETATIVE WATERING
|
MG
|
3,280.000
|
$10.000
|
$20.000
|
$21.970
|
$29.000
|
$25.510
|
$15.000
|
$21.970
|
$15.530
|
$26.100
|
$9.020
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
46,074.000
|
$3.000
|
$2.000
|
$0.500
|
$4.500
|
$2.200
|
$2.500
|
$2.830
|
$3.010
|
$2.300
|
$2.500
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
622.000
|
$150.000
|
$180.000
|
$125.000
|
$200.000
|
$206.510
|
$150.000
|
$175.000
|
$175.000
|
$194.700
|
$208.920
|
|
|
CEMENT
|
TON
|
622.000
|
$150.000
|
$180.000
|
$155.000
|
$99.000
|
$132.500
|
$125.000
|
$124.500
|
$200.000
|
$157.300
|
$156.580
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
46,074.000
|
$5.000
|
$2.000
|
$1.500
|
$1.780
|
$2.200
|
$2.500
|
$3.050
|
$5.000
|
$3.200
|
$1.630
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
92,148.000
|
$8.000
|
$4.000
|
$10.170
|
$14.000
|
$12.500
|
$7.500
|
$9.870
|
$15.760
|
$11.100
|
$11.950
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
1,191.000
|
$100.000
|
$75.000
|
$122.620
|
$93.000
|
$102.250
|
$131.040
|
$87.000
|
$89.750
|
$121.000
|
$101.160
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
5,068.000
|
$100.000
|
$65.000
|
$103.430
|
$92.000
|
$99.600
|
$101.940
|
$86.000
|
$98.510
|
$99.000
|
$100.000
|
|
|
SALV,HAUL& STKPL RCL APH PV(VAR DEPTH)
|
SY
|
36,183.000
|
$2.500
|
$3.000
|
$0.460
|
$1.700
|
$1.100
|
$2.210
|
$1.650
|
$4.650
|
$1.600
|
$2.320
|
|
|
D-GR HMA(SQ) TY-C SAC-A PG70-22
|
TON
|
298.000
|
$100.000
|
$110.000
|
$122.620
|
$140.000
|
$143.350
|
$121.070
|
$130.000
|
$186.070
|
$110.000
|
$151.160
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
84,929.000
|
$60.000
|
$35.000
|
$61.890
|
$62.000
|
$60.000
|
$48.000
|
$59.100
|
$62.540
|
$62.000
|
$66.350
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
5,488.000
|
$100.000
|
$90.000
|
$103.720
|
$100.000
|
$125.000
|
$115.000
|
$84.240
|
$96.140
|
$95.000
|
$89.390
|
|
|
STRUCT EXCAV
|
CY
|
3,986.000
|
$7.000
|
$7.000
|
$0.020
|
$5.000
|
$1.000
|
$0.010
|
$1.000
|
$3.030
|
$8.200
|
$20.600
|
|
|
CEM STABIL BKFL
|
CY
|
2,079.000
|
$50.000
|
$37.200
|
$38.100
|
$48.000
|
$40.000
|
$48.000
|
$42.350
|
$38.210
|
$44.400
|
$58.310
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
3,175.000
|
$2.000
|
$1.250
|
$1.070
|
$2.500
|
$1.000
|
$2.000
|
$1.080
|
$1.850
|
$0.200
|
$2.170
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
334.000
|
$70.000
|
$100.000
|
$191.780
|
$245.000
|
$60.000
|
$192.000
|
$190.230
|
$165.580
|
$53.300
|
$101.490
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
1,518.000
|
$120.000
|
$125.000
|
$128.440
|
$186.000
|
$150.000
|
$148.000
|
$136.420
|
$137.660
|
$139.300
|
$177.640
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
852.000
|
$150.000
|
$150.000
|
$168.270
|
$237.000
|
$230.000
|
$192.000
|
$173.970
|
$168.620
|
$203.700
|
$233.970
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
14,131.000
|
$200.000
|
$210.000
|
$175.070
|
$239.000
|
$250.000
|
$189.000
|
$173.960
|
$182.580
|
$259.700
|
$421.170
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
5,307.000
|
$320.000
|
$277.000
|
$302.470
|
$421.000
|
$400.000
|
$335.000
|
$304.350
|
$308.400
|
$456.600
|
$615.450
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
120.000
|
$250.000
|
$215.000
|
$215.000
|
$237.000
|
$215.000
|
$225.340
|
$130.550
|
$230.140
|
$236.500
|
$491.220
|
|
|
CL C CONC (ABUT)
|
CY
|
254.300
|
$1,300.000
|
$700.000
|
$597.110
|
$550.000
|
$885.000
|
$800.000
|
$920.520
|
$1,100.000
|
$896.600
|
$1,107.570
|
|
|
CL C CONC (CAP)
|
CY
|
1,556.900
|
$1,750.000
|
$800.000
|
$770.760
|
$820.000
|
$900.000
|
$1,000.000
|
$1,000.000
|
$1,100.000
|
$1,043.800
|
$1,019.520
|
|
|
CL C CONC (COLUMN)
|
CY
|
959.200
|
$800.000
|
$800.000
|
$443.010
|
$1,000.000
|
$975.000
|
$950.000
|
$1,000.000
|
$1,100.000
|
$932.100
|
$848.350
|
|
|
REINF CONC SLAB
|
SF
|
332,403.000
|
$13.000
|
$10.000
|
$12.870
|
$14.400
|
$14.500
|
$15.750
|
$15.630
|
$15.000
|
$18.200
|
$13.310
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
45,522.500
|
$125.000
|
$95.000
|
$126.160
|
$135.000
|
$128.250
|
$134.000
|
$122.780
|
$125.090
|
$139.000
|
$167.040
|
|
|
CONCRETE PAINT FINISH
|
SF
|
77,798.000
|
$0.250
|
$0.250
|
$0.270
|
$0.420
|
$0.350
|
$0.280
|
$0.350
|
$0.270
|
$0.300
|
$0.510
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
61.000
|
$400.000
|
$450.000
|
$410.650
|
$715.000
|
$475.000
|
$480.000
|
$429.630
|
$560.000
|
$682.400
|
$347.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
694.000
|
$500.000
|
$450.000
|
$270.950
|
$343.000
|
$370.000
|
$480.000
|
$369.000
|
$400.000
|
$394.100
|
$359.290
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
4.200
|
$500.000
|
$450.000
|
$747.230
|
$1,100.000
|
$497.000
|
$480.000
|
$551.600
|
$2,000.000
|
$481.100
|
$861.900
|
|
|
RIPRAP (STONE TY R)(DRY)(6 IN)
|
CY
|
52.000
|
$100.000
|
$135.000
|
$124.550
|
$267.000
|
$210.000
|
$150.000
|
$100.000
|
$213.360
|
$231.700
|
$215.120
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
204.000
|
$450.000
|
$450.000
|
$583.660
|
$726.000
|
$470.000
|
$480.000
|
$458.540
|
$560.000
|
$372.300
|
$384.160
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
4,099.000
|
$15.000
|
$5.000
|
$9.600
|
$8.700
|
$12.500
|
$8.220
|
$8.810
|
$8.350
|
$14.600
|
$23.760
|
|
|
RAIL (TY T223)
|
LF
|
5,671.000
|
$120.000
|
$40.000
|
$33.770
|
$108.000
|
$110.000
|
$96.000
|
$85.000
|
$86.000
|
$81.600
|
$102.670
|
|
|
RAIL (TY C223)
|
LF
|
6,399.000
|
$120.000
|
$70.000
|
$54.620
|
$152.000
|
$125.000
|
$121.000
|
$100.000
|
$106.790
|
$107.700
|
$117.730
|
|
|
RAIL (TY PR11)
|
LF
|
6,410.000
|
$100.000
|
$75.000
|
$62.060
|
$74.000
|
$68.870
|
$61.000
|
$68.870
|
$68.870
|
$74.900
|
$93.020
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
1,377.000
|
$70.000
|
$100.000
|
$66.950
|
$83.000
|
$100.000
|
$70.000
|
$79.910
|
$97.680
|
$65.900
|
$75.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
73.000
|
$450.000
|
$272.750
|
$241.490
|
$323.000
|
$425.000
|
$350.000
|
$247.220
|
$315.070
|
$359.400
|
$322.500
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
137.000
|
$650.000
|
$291.500
|
$279.200
|
$313.000
|
$400.000
|
$400.000
|
$254.480
|
$274.680
|
$338.400
|
$388.590
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
258.000
|
$750.000
|
$372.850
|
$335.800
|
$416.000
|
$500.000
|
$500.000
|
$326.770
|
$317.880
|
$411.100
|
$552.690
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
370.000
|
$60.000
|
$71.400
|
$95.310
|
$92.000
|
$75.000
|
$80.000
|
$41.920
|
$68.850
|
$75.000
|
$55.350
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,913.000
|
$70.000
|
$64.750
|
$62.480
|
$56.000
|
$60.000
|
$90.000
|
$46.250
|
$60.630
|
$63.100
|
$56.160
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
202.000
|
$90.000
|
$94.950
|
$106.070
|
$212.000
|
$75.000
|
$105.000
|
$74.080
|
$88.900
|
$95.200
|
$79.360
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
361.000
|
$130.000
|
$116.950
|
$114.040
|
$133.000
|
$175.000
|
$160.000
|
$87.940
|
$113.900
|
$149.200
|
$164.830
|
|
|
INLET (COMPL)(TY S)
|
EA
|
1.000
|
$3,000.000
|
$9,210.000
|
$6,839.000
|
$13,250.000
|
$8,800.000
|
$3,500.000
|
$7,234.730
|
$6,897.850
|
$6,865.300
|
$3,823.840
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$3,000.000
|
$3,068.000
|
$3,323.430
|
$3,665.000
|
$3,800.000
|
$3,000.000
|
$2,864.570
|
$3,090.030
|
$3,423.800
|
$3,823.840
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
3.000
|
$4,000.000
|
$6,043.000
|
$6,550.080
|
$5,300.000
|
$7,175.000
|
$6,500.000
|
$4,608.730
|
$4,955.840
|
$8,903.400
|
$8,102.910
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
4.000
|
$3,500.000
|
$6,607.000
|
$5,138.990
|
$6,500.000
|
$6,550.000
|
$3,400.000
|
$5,135.770
|
$5,437.360
|
$5,682.300
|
$5,444.030
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
7.000
|
$5,000.000
|
$3,254.000
|
$3,001.230
|
$3,200.000
|
$3,550.000
|
$2,400.000
|
$3,098.050
|
$3,432.360
|
$2,865.700
|
$6,612.320
|
|
|
HEADWALL (CH - FW - 0) (DIA= 42 IN)
|
EA
|
1.000
|
$6,500.000
|
$9,345.000
|
$10,044.330
|
$6,150.000
|
$9,120.000
|
$5,500.000
|
$11,203.000
|
$8,624.400
|
$14,940.000
|
$8,459.650
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
1.000
|
$9,000.000
|
$18,288.000
|
$6,244.560
|
$15,900.000
|
$17,150.000
|
$20,000.000
|
$27,420.030
|
$18,111.390
|
$15,040.900
|
$11,512.110
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
1.000
|
$5,500.000
|
$4,596.000
|
$5,711.050
|
$4,875.000
|
$6,200.000
|
$4,500.000
|
$4,601.350
|
$2,422.200
|
$6,546.300
|
$6,279.330
|
|
|
SET (TY I)(S= 5 FT)(HW= 2 FT)(4:1) (C)
|
EA
|
2.000
|
$5,500.000
|
$3,077.000
|
$5,337.860
|
$5,290.000
|
$6,275.000
|
$4,900.000
|
$4,531.670
|
$1,697.130
|
$6,546.300
|
$8,023.590
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$1,000.000
|
$787.000
|
$919.060
|
$1,100.000
|
$920.000
|
$900.000
|
$1,227.050
|
$737.570
|
$876.600
|
$962.310
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$1,500.000
|
$1,110.000
|
$1,084.270
|
$1,350.000
|
$1,210.000
|
$1,050.000
|
$1,374.650
|
$867.570
|
$1,157.700
|
$1,633.460
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
6.000
|
$1,500.000
|
$1,110.000
|
$1,084.440
|
$1,215.000
|
$1,235.000
|
$1,050.000
|
$1,374.660
|
$743.570
|
$1,133.300
|
$1,940.890
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (P)
|
EA
|
8.000
|
$1,500.000
|
$2,206.000
|
$1,889.350
|
$2,280.000
|
$2,450.000
|
$1,700.000
|
$2,100.350
|
$1,265.070
|
$2,232.900
|
$2,847.240
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
1.000
|
$500.000
|
$1,148.000
|
$743.960
|
$1,600.000
|
$1,650.000
|
$900.000
|
$1,577.760
|
$1,771.890
|
$574.800
|
$1,482.620
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$2,000.000
|
$11,285.000
|
$1,250.000
|
$3,500.000
|
$4,000.000
|
$2,000.000
|
$3,000.000
|
$4,768.660
|
$3,148.800
|
$1,635.780
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$500.000
|
$448.000
|
$670.390
|
$972.000
|
$425.000
|
$550.000
|
$839.250
|
$605.190
|
$288.500
|
$936.500
|
|
|
REMOV STR (SET)
|
EA
|
16.000
|
$400.000
|
$228.000
|
$562.960
|
$474.000
|
$375.000
|
$600.000
|
$468.210
|
$625.190
|
$288.500
|
$586.940
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$2,000.000
|
$828.000
|
$1,636.640
|
$3,765.000
|
$2,500.000
|
$900.000
|
$2,006.260
|
$645.190
|
$593.500
|
$2,233.900
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,500.000
|
$828.000
|
$1,636.650
|
$3,635.000
|
$3,000.000
|
$900.000
|
$2,006.290
|
$2,786.460
|
$593.500
|
$2,265.320
|
|
|
REMOV STR (PIPE)
|
LF
|
165.000
|
$15.000
|
$41.050
|
$19.680
|
$25.500
|
$45.000
|
$12.000
|
$29.760
|
$53.050
|
$24.500
|
$51.040
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,000,000.000
|
$3,907,787.000
|
$3,900,000.000
|
$3,600,000.000
|
$4,000,000.000
|
$4,200,000.000
|
$4,500,000.000
|
$4,750,000.000
|
$4,500,000.000
|
$4,633,078.310
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
28.000
|
$1,000.000
|
$5,000.000
|
$2,521.410
|
$15,600.000
|
$6,000.000
|
$8,000.000
|
$14,631.240
|
$18,395.560
|
$6,435.000
|
$16,738.240
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
280.000
|
$30.000
|
$29.000
|
$25.270
|
$25.000
|
$25.270
|
$36.000
|
$25.270
|
$22.900
|
$33.300
|
$59.110
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
280.000
|
$10.000
|
$12.000
|
$11.130
|
$8.250
|
$11.130
|
$5.000
|
$11.130
|
$7.870
|
$16.900
|
$18.860
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,120.000
|
$25.000
|
$29.000
|
$26.610
|
$29.000
|
$26.610
|
$35.000
|
$26.610
|
$26.300
|
$21.900
|
$48.210
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,120.000
|
$10.000
|
$5.000
|
$8.680
|
$8.250
|
$8.680
|
$5.000
|
$8.680
|
$7.870
|
$6.300
|
$18.300
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,948.000
|
$3.500
|
$3.000
|
$4.030
|
$3.250
|
$4.030
|
$4.500
|
$4.030
|
$2.910
|
$2.800
|
$5.580
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,948.000
|
$1.000
|
$1.000
|
$0.550
|
$0.450
|
$0.550
|
$0.250
|
$0.550
|
$0.430
|
$1.300
|
$1.320
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
10,860.000
|
$30.000
|
$30.000
|
$46.220
|
$21.000
|
$40.000
|
$75.000
|
$31.800
|
$30.090
|
$75.000
|
$32.310
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
660.000
|
$50.000
|
$30.000
|
$45.520
|
$8.200
|
$40.000
|
$80.000
|
$32.880
|
$224.140
|
$68.400
|
$50.560
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
9,080.000
|
$3.000
|
$4.000
|
$3.700
|
$3.000
|
$4.000
|
$6.000
|
$3.060
|
$2.190
|
$6.000
|
$6.270
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
260.000
|
$6.000
|
$4.000
|
$3.310
|
$4.000
|
$4.000
|
$6.000
|
$4.480
|
$33.690
|
$6.000
|
$10.090
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
10,860.000
|
$6.000
|
$4.000
|
$8.300
|
$5.150
|
$6.500
|
$7.000
|
$5.610
|
$5.150
|
$11.500
|
$7.920
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
660.000
|
$6.000
|
$4.000
|
$8.430
|
$8.400
|
$6.500
|
$7.000
|
$5.880
|
$13.600
|
$13.600
|
$6.670
|
|
|
CONC CURB (SLOTTED)
|
LF
|
1,025.000
|
$5.000
|
$10.000
|
$2.940
|
$9.700
|
$7.770
|
$8.000
|
$5.400
|
$10.870
|
$2.300
|
$22.410
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,877.000
|
$60.000
|
$70.000
|
$53.370
|
$46.000
|
$73.000
|
$80.000
|
$68.060
|
$63.540
|
$57.300
|
$58.920
|
|
|
DRIVEWAYS (CONC) (FAST TRACK)
|
SY
|
981.000
|
$75.000
|
$80.000
|
$58.420
|
$46.500
|
$82.000
|
$95.000
|
$85.000
|
$59.150
|
$65.900
|
$104.650
|
|
|
CONC SIDEWALKS (4")
|
SY
|
3,134.000
|
$60.000
|
$60.000
|
$32.010
|
$41.000
|
$68.000
|
$48.000
|
$60.000
|
$47.990
|
$54.700
|
$55.880
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,950.000
|
$20.000
|
$19.390
|
$20.000
|
$20.500
|
$19.390
|
$20.320
|
$19.390
|
$19.390
|
$22.000
|
$23.840
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
15.000
|
$2,000.000
|
$1,488.000
|
$1,680.000
|
$1,570.000
|
$1,488.000
|
$1,559.570
|
$1,488.000
|
$1,488.000
|
$1,848.000
|
$2,210.720
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,000.000
|
$1,138.000
|
$1,200.000
|
$1,200.000
|
$1,138.000
|
$1,192.730
|
$1,138.000
|
$1,138.000
|
$1,320.000
|
$2,610.270
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,024.000
|
$3.000
|
$1.500
|
$2.000
|
$1.600
|
$1.500
|
$1.570
|
$1.500
|
$1.500
|
$2.200
|
$6.810
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$2,500.000
|
$2,775.000
|
$2,545.000
|
$2,950.000
|
$2,775.000
|
$2,908.470
|
$2,775.000
|
$2,775.000
|
$2,799.500
|
$3,101.640
|
|
|
IN RD IL (TY SA) 50T-8 (400W EQ) LED
|
EA
|
12.000
|
$4,000.000
|
$3,675.000
|
$3,675.000
|
$3,858.000
|
$3,675.000
|
$3,851.750
|
$3,699.290
|
$3,675.000
|
$4,042.500
|
$4,501.650
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
17,220.000
|
$8.000
|
$11.000
|
$11.000
|
$11.550
|
$11.000
|
$11.530
|
$7.540
|
$11.000
|
$12.100
|
$15.100
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
1,428.000
|
$8.000
|
$6.050
|
$6.050
|
$6.350
|
$6.050
|
$6.340
|
$5.450
|
$6.050
|
$6.700
|
$9.820
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,120.000
|
$10.000
|
$10.250
|
$10.250
|
$10.700
|
$10.250
|
$10.740
|
$11.560
|
$10.250
|
$11.300
|
$18.970
|
|
|
CONDT (PVC) (SCH 80) (2") (CONC ENCSE)
|
LF
|
11,790.000
|
$20.000
|
$5.150
|
$5.150
|
$5.410
|
$5.150
|
$5.400
|
$6.480
|
$5.150
|
$5.700
|
$14.380
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
5,860.000
|
$15.000
|
$31.000
|
$31.000
|
$32.550
|
$31.000
|
$32.490
|
$36.520
|
$31.000
|
$34.100
|
$32.850
|
|
|
CONDT (RM) (3")
|
LF
|
11,435.000
|
$35.000
|
$45.250
|
$45.250
|
$47.520
|
$45.250
|
$47.430
|
$41.320
|
$45.250
|
$49.800
|
$52.520
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
22,300.000
|
$0.700
|
$0.990
|
$0.990
|
$1.040
|
$0.990
|
$1.040
|
$0.410
|
$0.990
|
$1.100
|
$1.470
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,539.000
|
$1.000
|
$1.250
|
$1.250
|
$1.310
|
$1.250
|
$1.310
|
$0.750
|
$1.250
|
$1.400
|
$1.480
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
5,078.000
|
$1.000
|
$1.350
|
$1.350
|
$1.410
|
$1.350
|
$1.410
|
$0.850
|
$1.350
|
$1.500
|
$1.980
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
12.000
|
$1,500.000
|
$895.000
|
$895.000
|
$939.750
|
$895.000
|
$938.050
|
$759.340
|
$895.000
|
$984.500
|
$1,238.010
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
|
EA
|
6.000
|
$6,000.000
|
$5,450.000
|
$5,450.000
|
$5,722.000
|
$5,450.000
|
$5,920.510
|
$6,533.410
|
$5,450.000
|
$5,995.000
|
$7,838.700
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$450.000
|
$460.580
|
$351.000
|
$472.000
|
$460.580
|
$471.640
|
$460.580
|
$443.090
|
$386.100
|
$523.270
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
45.000
|
$550.000
|
$578.910
|
$530.000
|
$472.000
|
$578.910
|
$471.640
|
$578.910
|
$456.530
|
$583.000
|
$523.270
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
3.000
|
$450.000
|
$461.250
|
$323.000
|
$525.000
|
$461.250
|
$524.050
|
$461.250
|
$446.220
|
$355.300
|
$581.410
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
5.000
|
$500.000
|
$498.250
|
$396.000
|
$682.500
|
$498.250
|
$681.260
|
$498.250
|
$492.470
|
$435.600
|
$755.840
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
27.000
|
$100.000
|
$75.000
|
$68.000
|
$68.250
|
$75.000
|
$68.130
|
$75.000
|
$95.000
|
$71.500
|
$75.580
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
160.000
|
$20.000
|
$11.000
|
$18.000
|
$5.250
|
$11.000
|
$5.240
|
$11.000
|
$26.260
|
$19.800
|
$5.810
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
154.000
|
$25.000
|
$11.000
|
$18.000
|
$5.250
|
$11.000
|
$5.240
|
$11.000
|
$20.030
|
$19.800
|
$5.810
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
15.000
|
$80.000
|
$45.330
|
$46.000
|
$94.500
|
$45.330
|
$94.330
|
$45.330
|
$39.950
|
$50.600
|
$104.650
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
36.000
|
$25.000
|
$14.750
|
$28.000
|
$5.000
|
$14.750
|
$4.980
|
$14.750
|
$79.950
|
$30.800
|
$5.520
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
|
EA
|
17.000
|
$25.000
|
$14.750
|
$28.000
|
$5.000
|
$14.750
|
$4.980
|
$14.750
|
$79.950
|
$30.800
|
$5.520
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
838.000
|
$0.600
|
$0.850
|
$0.650
|
$1.020
|
$1.250
|
$0.890
|
$0.850
|
$0.850
|
$0.800
|
$1.480
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
36,901.000
|
$0.500
|
$0.790
|
$0.600
|
$0.950
|
$1.100
|
$0.830
|
$0.790
|
$0.790
|
$0.600
|
$1.110
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
12.000
|
$150.000
|
$175.000
|
$150.000
|
$210.000
|
$225.000
|
$183.420
|
$175.000
|
$175.000
|
$123.200
|
$320.080
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
12.000
|
$150.000
|
$185.000
|
$150.000
|
$222.000
|
$225.000
|
$183.420
|
$185.000
|
$185.000
|
$127.600
|
$404.730
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
36,854.000
|
$0.500
|
$0.790
|
$0.600
|
$0.950
|
$1.100
|
$0.830
|
$0.790
|
$0.790
|
$0.600
|
$1.110
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
23.000
|
$250.000
|
$225.000
|
$300.000
|
$236.000
|
$400.000
|
$235.820
|
$225.000
|
$225.000
|
$275.000
|
$363.340
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$400.000
|
$450.000
|
$350.000
|
$472.000
|
$425.000
|
$471.650
|
$450.000
|
$450.000
|
$310.200
|
$580.290
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
24.000
|
$250.000
|
$275.000
|
$350.000
|
$288.000
|
$325.000
|
$288.230
|
$275.000
|
$275.000
|
$256.300
|
$482.370
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
708.000
|
$5.000
|
$5.000
|
$3.950
|
$5.250
|
$5.000
|
$5.240
|
$5.000
|
$5.000
|
$4.400
|
$5.300
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
84,733.000
|
$0.500
|
$0.400
|
$0.500
|
$0.420
|
$0.650
|
$0.420
|
$0.400
|
$0.400
|
$0.300
|
$1.180
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
4,808.000
|
$0.700
|
$0.600
|
$0.700
|
$0.630
|
$1.120
|
$0.630
|
$0.600
|
$0.600
|
$0.500
|
$1.700
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
250.000
|
$2.500
|
$3.000
|
$2.100
|
$3.150
|
$4.000
|
$3.140
|
$3.000
|
$3.000
|
$2.300
|
$4.670
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
23.000
|
$70.000
|
$45.000
|
$25.000
|
$47.250
|
$75.000
|
$47.160
|
$45.000
|
$45.000
|
$35.200
|
$124.670
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
2.000
|
$80.000
|
$62.000
|
$25.000
|
$65.100
|
$75.000
|
$64.980
|
$62.000
|
$62.000
|
$61.600
|
$223.090
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
24.000
|
$80.000
|
$45.000
|
$25.000
|
$47.250
|
$75.000
|
$47.160
|
$45.000
|
$45.000
|
$46.200
|
$119.690
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
84,733.000
|
$0.100
|
$0.050
|
$0.060
|
$0.050
|
$0.200
|
$0.050
|
$0.050
|
$0.050
|
$0.100
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
4,808.000
|
$0.100
|
$0.080
|
$0.080
|
$0.080
|
$0.450
|
$0.080
|
$0.080
|
$0.080
|
$0.100
|
$0.380
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
217.000
|
$1.000
|
$0.240
|
$0.250
|
$0.250
|
$2.000
|
$0.250
|
$0.240
|
$0.240
|
$0.900
|
$1.270
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
23.000
|
$10.000
|
$3.000
|
$10.000
|
$3.150
|
$20.000
|
$3.140
|
$3.000
|
$3.000
|
$9.900
|
$23.460
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$10.000
|
$5.000
|
$10.000
|
$5.250
|
$20.000
|
$5.240
|
$5.000
|
$5.000
|
$7.700
|
$46.180
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
24.000
|
$10.000
|
$5.000
|
$10.000
|
$5.250
|
$20.000
|
$5.240
|
$5.000
|
$5.000
|
$9.900
|
$28.430
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$2,000.000
|
$2,500.000
|
$1,220.250
|
$2,400.000
|
$3,000.000
|
$3,700.000
|
$2,000.000
|
$1,913.980
|
$2,145.000
|
$7,732.870
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
$1,000.000
|
$1,900.000
|
$597.760
|
$900.000
|
$2,750.000
|
$1,500.000
|
$1,135.250
|
$1,121.170
|
$1,072.500
|
$1,322.440
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
4,823.000
|
$3.000
|
$1.000
|
$2.130
|
$5.000
|
$7.000
|
$1.730
|
$7.710
|
$4.000
|
$6.000
|
$3.550
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
412.000
|
$250.000
|
$200.000
|
$397.140
|
$290.000
|
$500.000
|
$500.000
|
$510.540
|
$366.530
|
$448.500
|
$17.440
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
700.000
|
$15.000
|
$10.000
|
$15.990
|
$13.000
|
$25.000
|
$125.000
|
$32.480
|
$49.490
|
$107.300
|
$104.770
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
17,220.000
|
$12.000
|
$13.000
|
$13.000
|
$13.650
|
$13.000
|
$13.630
|
$10.960
|
$13.000
|
$14.300
|
$16.140
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
5,220.000
|
$30.000
|
$35.750
|
$35.750
|
$37.500
|
$35.750
|
$37.470
|
$41.170
|
$35.750
|
$39.300
|
$43.440
|
|
|
ITS MULTI-DUCT CND (RMC)
|
LF
|
11,595.000
|
$65.000
|
$69.500
|
$69.500
|
$73.000
|
$69.500
|
$72.840
|
$60.090
|
$69.500
|
$76.500
|
$79.380
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
33,940.000
|
$0.600
|
$0.740
|
$0.900
|
$0.780
|
$0.750
|
$0.780
|
$0.740
|
$0.740
|
$0.600
|
$1.220
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
8,930.000
|
$0.700
|
$1.250
|
$0.900
|
$0.780
|
$0.750
|
$1.310
|
$1.250
|
$1.250
|
$1.300
|
$3.660
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
4,808.000
|
$0.800
|
$1.000
|
$1.300
|
$1.050
|
$1.000
|
$1.050
|
$1.000
|
$1.000
|
$1.000
|
$0.940
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
217.000
|
$5.500
|
$8.000
|
$6.000
|
$8.400
|
$8.000
|
$8.380
|
$8.000
|
$8.000
|
$6.200
|
$9.760
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
32,933.000
|
$0.600
|
$0.740
|
$0.900
|
$0.790
|
$0.750
|
$0.780
|
$0.740
|
$0.740
|
$0.600
|
$2.440
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
8,930.000
|
$0.600
|
$0.790
|
$0.950
|
$0.790
|
$0.750
|
$0.830
|
$0.790
|
$0.790
|
$0.700
|
$0.610
|
|
|
TMA (STATIONARY)
|
DAY
|
30.000
|
$1,000.000
|
$495.000
|
$159.940
|
$500.000
|
$100.000
|
$750.000
|
$270.630
|
$1,630.720
|
$1,072.500
|
$14,735.110
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
56.000
|
$3,000.000
|
$2,375.000
|
$2,375.000
|
$2,500.000
|
$2,375.000
|
$2,489.230
|
$3,187.990
|
$2,375.000
|
$2,612.500
|
$4,038.790
|
|
Totals: |
$40,937,492.700
|
$36,793,630.180
|
$39,340,557.815
|
$42,692,675.120
|
$42,812,804.265
|
$44,957,418.310
|
$45,315,818.806
|
$47,007,814.565
|
$47,905,822.540
|
$51,829,748.209
|