|
|
PREPARING ROW
|
AC
|
14.600
|
$25,000.000
|
$4,500.000
|
$8,000.000
|
$30,000.000
|
$18,649.700
|
|
|
PREPARING ROW
|
STA
|
233.000
|
$4,000.000
|
$4,184.000
|
$11,455.830
|
$11,500.000
|
$5,032.400
|
|
|
REMOVING CONC (PAV)
|
SY
|
20,426.000
|
$50.000
|
$29.000
|
$7.630
|
$37.000
|
$41.300
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
18.000
|
$10.000
|
$7.600
|
$17.030
|
$25.000
|
$9.800
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
38.000
|
$34.000
|
$10.300
|
$47.150
|
$25.000
|
$11.900
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
451.000
|
$43.000
|
$5.250
|
$17.080
|
$10.000
|
$10.800
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
3,702.000
|
$28.000
|
$8.000
|
$13.520
|
$10.000
|
$11.900
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
767.000
|
$16.000
|
$6.500
|
$15.410
|
$10.000
|
$11.900
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
26,058.000
|
$10.000
|
$9.000
|
$14.850
|
$25.000
|
$16.400
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
73,930.000
|
$10.000
|
$7.500
|
$15.520
|
$25.000
|
$15.900
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
15,125.000
|
$17.000
|
$12.430
|
$7.680
|
$5.000
|
$11.500
|
|
|
BLOCK SODDING
|
SY
|
310,239.000
|
$4.000
|
$4.250
|
$4.250
|
$4.000
|
$4.100
|
|
|
BROADCAST SEED (PERM) (URBAN) (CLAY)
|
SY
|
400,788.000
|
$0.500
|
$0.030
|
$0.300
|
$0.300
|
$0.200
|
|
|
FERTILIZER
|
AC
|
147.100
|
$650.000
|
$655.000
|
$575.000
|
$600.000
|
$660.000
|
|
|
VEGETATIVE WATERING
|
MG
|
17,629.000
|
$25.000
|
$10.000
|
$30.000
|
$17.000
|
$35.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
72,082.000
|
$5.500
|
$3.000
|
$0.070
|
$1.000
|
$8.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
977.000
|
$350.000
|
$340.000
|
$1.120
|
$10.000
|
$315.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
72,082.000
|
$17.000
|
$23.000
|
$34.000
|
$1.000
|
$19.800
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
4,133.000
|
$140.000
|
$110.000
|
$125.110
|
$100.000
|
$129.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
34,229.000
|
$100.000
|
$115.000
|
$110.120
|
$85.000
|
$111.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
1,000.000
|
$150.000
|
$165.000
|
$230.880
|
$250.000
|
$155.000
|
|
|
CEM STABIL BKFL
|
CY
|
3,921.000
|
$90.000
|
$68.000
|
$53.440
|
$50.000
|
$84.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
1,099.000
|
$200.000
|
$195.000
|
$198.000
|
$200.000
|
$184.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
1,716.000
|
$100.000
|
$70.000
|
$51.170
|
$50.000
|
$84.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
3,803.000
|
$10.000
|
$40.000
|
$1.120
|
$2.000
|
$0.100
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
74.000
|
$181.100
|
$190.000
|
$190.000
|
$200.000
|
$171.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
166.000
|
$243.560
|
$285.000
|
$285.000
|
$290.000
|
$290.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
728.000
|
$333.230
|
$400.000
|
$400.000
|
$410.000
|
$601.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
808.000
|
$575.000
|
$455.000
|
$385.100
|
$400.000
|
$501.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
395.000
|
$420.000
|
$480.000
|
$390.630
|
$450.000
|
$513.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
842.000
|
$620.000
|
$455.000
|
$368.860
|
$700.000
|
$533.000
|
|
|
RIPRAP CONC (8 IN)
|
CY
|
6.000
|
$52.000
|
$980.000
|
$775.910
|
$1,300.000
|
$656.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
2.000
|
$575.000
|
$990.000
|
$1,799.450
|
$1,000.000
|
$1,740.000
|
|
|
RIPRAP (CONC) (CL B) (6")
|
CY
|
112.000
|
$650.000
|
$500.000
|
$548.380
|
$1,100.000
|
$527.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
82.000
|
$600.000
|
$550.000
|
$634.960
|
$1,000.000
|
$550.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
152.000
|
$80.000
|
$100.000
|
$105.540
|
$120.000
|
$85.100
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
144.000
|
$200.000
|
$270.000
|
$319.370
|
$500.000
|
$268.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
375.000
|
$400.000
|
$290.000
|
$335.080
|
$600.000
|
$287.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
686.000
|
$850.000
|
$750.000
|
$789.950
|
$1,200.000
|
$750.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
533.000
|
$90.000
|
$72.000
|
$87.830
|
$150.000
|
$81.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
5,062.000
|
$134.000
|
$80.000
|
$95.000
|
$175.000
|
$89.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
840.000
|
$177.000
|
$100.000
|
$114.420
|
$200.000
|
$121.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
94.000
|
$250.000
|
$150.000
|
$153.420
|
$300.000
|
$162.000
|
|
|
INLET (COMPL)(PSL)(RC)(5FTX6FT)
|
EA
|
2.000
|
$8,000.000
|
$8,400.000
|
$10,254.830
|
$12,000.000
|
$10,344.000
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
1.000
|
$9,000.000
|
$8,800.000
|
$8,927.990
|
$10,000.000
|
$10,407.000
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
10.000
|
$5,500.000
|
$6,100.000
|
$6,319.620
|
$9,000.000
|
$6,600.000
|
|
|
INLET (COMPL)(TY A)
|
EA
|
2.000
|
$8,500.000
|
$4,800.000
|
$4,169.260
|
$7,000.000
|
$6,942.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
17.000
|
$4,500.000
|
$10,844.060
|
$6,844.290
|
$12,000.000
|
$8,700.000
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
3.000
|
$6,000.000
|
$6,700.000
|
$5,878.030
|
$8,000.000
|
$7,263.600
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
2.000
|
$32,000.000
|
$18,800.000
|
$37,080.220
|
$40,000.000
|
$51,000.000
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
61.000
|
$1,900.000
|
$1,150.000
|
$1,454.420
|
$1,400.000
|
$2,600.000
|
|
|
MANH (COMPL)(RISER ONLY)
|
EA
|
1.000
|
$3,000.000
|
$4,100.000
|
$3,292.010
|
$5,000.000
|
$10,094.300
|
|
|
INLET (COMPL)(TY C)(SPL)
|
EA
|
242.000
|
$3,500.000
|
$7,000.000
|
$7,174.510
|
$5,000.000
|
$9,900.000
|
|
|
INLET (STAGE II)(TY AD) (SPECIAL)
|
EA
|
1.000
|
$4,000.000
|
$3,100.000
|
$4,446.560
|
$5,000.000
|
$10,094.300
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
1.000
|
$7,000.000
|
$6,500.000
|
$7,208.830
|
$14,000.000
|
$8,510.700
|
|
|
WINGWALL (SW - 0) (HW=5 FT)
|
EA
|
1.000
|
$10,000.000
|
$10,700.000
|
$11,709.480
|
$18,000.000
|
$16,641.700
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$8,000.000
|
$10,000.000
|
$13,074.900
|
$15,000.000
|
$9,924.800
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,331.000
|
$1,750.000
|
$1,761.620
|
$2,100.000
|
$1,978.900
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$3,000.000
|
$2,000.000
|
$1,884.500
|
$7,500.000
|
$2,141.700
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
29.000
|
$2,185.000
|
$2,300.000
|
$2,269.880
|
$2,600.000
|
$2,677.200
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
17.000
|
$3,837.000
|
$4,280.000
|
$3,676.700
|
$5,000.000
|
$4,971.400
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$6,000.000
|
$6,600.000
|
$4,195.220
|
$6,000.000
|
$5,700.600
|
|
|
JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)
|
LF
|
121.000
|
$1,000.000
|
$170.000
|
$1,329.610
|
$1,700.000
|
$1,380.000
|
|
|
JACK BOR TUN BOX CULV (4 FT X 2 FT)
|
LF
|
150.000
|
$1,500.000
|
$775.000
|
$1,638.200
|
$3,000.000
|
$1,590.000
|
|
|
ADJUSTING INLETS
|
EA
|
1.000
|
$3,500.000
|
$1,160.000
|
$3,320.870
|
$800.000
|
$716.600
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
2.000
|
$2,665.000
|
$1,160.000
|
$1,354.090
|
$2,000.000
|
$1,504.100
|
|
|
REMOV STR (INLET)
|
EA
|
7.000
|
$1,306.000
|
$430.000
|
$686.780
|
$1,000.000
|
$588.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
2.000
|
$700.000
|
$520.000
|
$892.000
|
$1,500.000
|
$934.500
|
|
|
REMOV STR (SET)
|
EA
|
55.000
|
$861.000
|
$330.000
|
$450.610
|
$500.000
|
$588.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,767.000
|
$47.000
|
$15.000
|
$22.280
|
$10.000
|
$19.500
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
183.000
|
$177.000
|
$19.000
|
$98.440
|
$70.000
|
$107.100
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,902,980.880
|
$2,606,802.080
|
$3,100,000.000
|
$3,200,000.000
|
$3,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
26.000
|
$9,000.000
|
$22,000.000
|
$25,000.000
|
$50,000.000
|
$6,700.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
935.000
|
$100.000
|
$43.000
|
$35.000
|
$35.000
|
$44.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
CY
|
935.000
|
$20.000
|
$14.000
|
$15.000
|
$15.000
|
$14.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
2,444.000
|
$34.000
|
$41.000
|
$40.000
|
$40.000
|
$41.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
2,444.000
|
$13.000
|
$11.500
|
$15.000
|
$15.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
25,142.000
|
$8.000
|
$3.750
|
$3.500
|
$3.500
|
$3.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
25,142.000
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
$1.050
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
21,900.000
|
$13.000
|
$8.000
|
$6.500
|
$6.500
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
21,900.000
|
$4.000
|
$1.000
|
$1.000
|
$1.000
|
$1.050
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
16,000.000
|
$28.000
|
$9.900
|
$9.670
|
$20.000
|
$14.100
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
880.000
|
$31.000
|
$9.900
|
$12.760
|
$25.000
|
$14.100
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
39,580.000
|
$10.000
|
$5.100
|
$3.730
|
$9.000
|
$14.500
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,280.000
|
$14.000
|
$5.100
|
$4.230
|
$9.000
|
$9.900
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
16,480.000
|
$15.000
|
$8.120
|
$8.780
|
$10.000
|
$13.300
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
920.000
|
$15.000
|
$8.120
|
$11.600
|
$10.000
|
$13.300
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
322.000
|
$115.000
|
$122.440
|
$100.540
|
$100.000
|
$100.800
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
87,415.000
|
$35.000
|
$21.500
|
$33.000
|
$20.000
|
$37.400
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,576.000
|
$71.000
|
$78.000
|
$67.050
|
$80.000
|
$95.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
404.000
|
$97.000
|
$80.000
|
$84.330
|
$70.000
|
$65.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
25.000
|
$68.250
|
$88.000
|
$116.800
|
$80.000
|
$75.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
10.000
|
$3,000.000
|
$3,250.000
|
$4,137.200
|
$2,200.000
|
$4,351.700
|
|
|
CURB RAMPS (TY 6)
|
EA
|
1.000
|
$3,500.000
|
$3,250.000
|
$3,592.810
|
$4,000.000
|
$3,706.400
|
|
|
CURB RAMPS (TY 7)
|
EA
|
34.000
|
$2,000.000
|
$2,380.000
|
$2,471.460
|
$2,000.000
|
$2,274.300
|
|
|
CURB RAMPS (TY 10)
|
EA
|
2.000
|
$2,000.000
|
$2,380.000
|
$2,471.470
|
$1,800.000
|
$2,276.800
|
|
|
CURB RAMPS (TY 20)
|
EA
|
10.000
|
$5,500.000
|
$2,700.000
|
$2,714.300
|
$3,800.000
|
$1,751.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
3.000
|
$3,252.000
|
$2,700.000
|
$2,471.460
|
$4,000.000
|
$2,758.900
|
|
|
CURB RAMPS (TY 22)
|
EA
|
4.000
|
$5,000.000
|
$3,790.000
|
$2,560.430
|
$5,000.000
|
$2,625.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,463.000
|
$33.000
|
$25.000
|
$21.500
|
$25.000
|
$26.900
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$400.000
|
$1,900.000
|
$2,000.000
|
$2,000.000
|
$2,163.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
6.000
|
$1,658.000
|
$1,220.000
|
$1,550.000
|
$1,500.000
|
$1,527.800
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
876.000
|
$5.570
|
$3.150
|
$2.000
|
$5.000
|
$5.300
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
6.000
|
$300.000
|
$209.000
|
$300.000
|
$630.000
|
$660.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$3,403.000
|
$3,160.000
|
$2,850.000
|
$3,500.000
|
$3,626.700
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$358.500
|
$550.000
|
$150.000
|
$700.000
|
$724.500
|
|
|
IN RD IL (TY SA) 20T-8 (250W EQ) LED
|
EA
|
3.000
|
$4,151.000
|
$3,885.000
|
$3,885.000
|
$4,000.000
|
$3,956.400
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
5.000
|
$4,342.000
|
$5,285.000
|
$5,285.000
|
$5,300.000
|
$5,565.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
3,385.000
|
$10.720
|
$10.350
|
$10.350
|
$11.000
|
$14.500
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,120.000
|
$15.370
|
$12.850
|
$12.850
|
$13.000
|
$22.600
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
4,295.000
|
$15.230
|
$18.000
|
$18.000
|
$18.500
|
$27.500
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
3,455.000
|
$18.890
|
$22.000
|
$22.000
|
$23.000
|
$28.400
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
835.000
|
$20.440
|
$28.000
|
$28.000
|
$29.000
|
$35.400
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
1,810.000
|
$27.070
|
$32.000
|
$32.000
|
$33.000
|
$41.300
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
3,500.000
|
$0.950
|
$1.300
|
$1.300
|
$1.400
|
$1.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
10,390.000
|
$1.220
|
$1.650
|
$1.650
|
$1.700
|
$1.900
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,830.000
|
$3.000
|
$1.800
|
$1.800
|
$1.900
|
$2.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
1,090.000
|
$2.700
|
$2.750
|
$2.750
|
$2.900
|
$3.100
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
9,400.000
|
$2.120
|
$3.100
|
$3.100
|
$3.300
|
$3.900
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
90.000
|
$992.010
|
$1,250.000
|
$1,250.000
|
$1,300.000
|
$1,179.200
|
|
|
REMOVE GROUND BOX
|
EA
|
99.000
|
$374.150
|
$100.000
|
$100.000
|
$100.000
|
$231.000
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
|
EA
|
1.000
|
$7,153.000
|
$6,630.000
|
$6,630.000
|
$7,200.000
|
$11,639.300
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
|
EA
|
13.000
|
$7,141.640
|
$6,500.000
|
$6,500.000
|
$7,000.000
|
$8,641.500
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
156.000
|
$30.750
|
$22.500
|
$23.000
|
$25.000
|
$32.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
143.000
|
$565.000
|
$632.000
|
$435.000
|
$750.000
|
$652.400
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
15.000
|
$710.000
|
$705.000
|
$565.000
|
$850.000
|
$420.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
16.000
|
$710.000
|
$752.000
|
$505.000
|
$850.000
|
$735.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
6.000
|
$810.000
|
$872.000
|
$710.000
|
$1,000.000
|
$945.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
96.000
|
$825.000
|
$935.000
|
$625.000
|
$950.000
|
$1,155.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$990.000
|
$1,185.000
|
$840.000
|
$1,300.000
|
$2,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
16.000
|
$1,075.000
|
$1,185.000
|
$1,045.000
|
$1,600.000
|
$1,680.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$164.000
|
$89.000
|
$100.000
|
$135.000
|
$157.500
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
7.000
|
$88.000
|
$67.000
|
$65.000
|
$65.000
|
$73.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
38.000
|
$55.000
|
$34.000
|
$35.000
|
$75.000
|
$33.600
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
|
EA
|
35.000
|
$39.000
|
$34.000
|
$35.000
|
$65.000
|
$33.600
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
|
EA
|
9.000
|
$86.000
|
$85.000
|
$125.000
|
$190.000
|
$105.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
34,233.000
|
$1.850
|
$2.000
|
$1.600
|
$2.000
|
$1.700
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
104,359.000
|
$0.820
|
$1.200
|
$1.550
|
$1.300
|
$1.800
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
72.000
|
$165.000
|
$195.000
|
$210.000
|
$210.000
|
$199.500
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
48.000
|
$200.000
|
$210.000
|
$210.000
|
$220.000
|
$283.500
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
86,125.000
|
$0.820
|
$1.200
|
$1.550
|
$1.300
|
$1.700
|
|
|
WK ZN PAV MRK REMOV (Y)8"(SLD)
|
LF
|
9,725.000
|
$2.500
|
$2.400
|
$2.200
|
$2.500
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (Y)24"(SLD)
|
LF
|
1,812.000
|
$8.000
|
$10.500
|
$8.000
|
$11.000
|
$7.400
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
623.000
|
$2.050
|
$1.850
|
$3.000
|
$1.900
|
$3.200
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
23,233.000
|
$2.050
|
$1.800
|
$3.000
|
$1.900
|
$2.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
256.000
|
$224.000
|
$306.000
|
$265.000
|
$310.000
|
$283.500
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
16.000
|
$362.000
|
$436.000
|
$450.000
|
$450.000
|
$420.000
|
|
PREFAB PAV MRK TY C (W) (TPL ARROW)
|
EA
|
1.000
|
$750.000
|
$507.000
|
$600.000
|
$530.000
|
$551.300
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
5.000
|
$363.000
|
$452.000
|
$500.000
|
$475.000
|
$420.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
260.000
|
$280.000
|
$377.000
|
$320.000
|
$390.000
|
$336.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
22.000
|
$38.000
|
$44.500
|
$40.000
|
$46.000
|
$168.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
228.000
|
$6.000
|
$6.000
|
$7.000
|
$6.500
|
$7.600
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,823.000
|
$5.500
|
$6.000
|
$6.000
|
$6.500
|
$6.800
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
58,920.000
|
$0.040
|
$0.060
|
$0.050
|
$0.070
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
38,707.000
|
$0.060
|
$0.080
|
$0.100
|
$0.090
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
30,094.000
|
$0.120
|
$0.120
|
$0.250
|
$0.130
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
6,547.000
|
$2.000
|
$0.240
|
$0.500
|
$0.250
|
$0.900
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
256.000
|
$6.500
|
$5.000
|
$10.000
|
$5.250
|
$17.300
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
16.000
|
$8.500
|
$5.000
|
$10.000
|
$5.500
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (TPL ARROW)
|
EA
|
1.000
|
$40.000
|
$5.000
|
$10.000
|
$5.500
|
$18.900
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
5.000
|
$9.000
|
$5.000
|
$10.000
|
$5.500
|
$12.600
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
260.000
|
$7.500
|
$5.000
|
$10.000
|
$5.500
|
$24.200
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
22.000
|
$3.500
|
$5.000
|
$10.000
|
$5.500
|
$6.800
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
13.000
|
$28,143.500
|
$35,300.000
|
$35,300.000
|
$40,000.000
|
$42,474.600
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
11.000
|
$2,650.000
|
$3,000.000
|
$3,000.000
|
$10,000.000
|
$5,876.900
|
|
|
TEMP TRAF SIGNALS
|
EA
|
10.000
|
$30,420.940
|
$67,500.000
|
$67,500.000
|
$80,000.000
|
$76,606.200
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
129.000
|
$205.390
|
$240.000
|
$240.000
|
$250.000
|
$245.700
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
56.000
|
$213.010
|
$240.000
|
$240.000
|
$250.000
|
$245.700
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
155.000
|
$204.730
|
$240.000
|
$240.000
|
$250.000
|
$245.700
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
49.000
|
$219.110
|
$240.000
|
$240.000
|
$250.000
|
$245.700
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
132.000
|
$205.670
|
$240.000
|
$240.000
|
$250.000
|
$245.700
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
66.000
|
$202.780
|
$240.000
|
$240.000
|
$250.000
|
$245.700
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
84.000
|
$530.320
|
$665.000
|
$665.000
|
$650.000
|
$632.100
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
28.000
|
$81.510
|
$60.000
|
$60.000
|
$60.000
|
$120.800
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
48.000
|
$172.360
|
$175.000
|
$175.000
|
$180.000
|
$237.300
|
|
|
BACKPLATE W/REFL BRDR(5 SEC)
|
EA
|
5.000
|
$208.210
|
$200.000
|
$200.000
|
$210.000
|
$262.500
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
113.000
|
$169.220
|
$145.000
|
$145.000
|
$150.000
|
$205.800
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
15,976.000
|
$1.600
|
$2.000
|
$2.000
|
$2.000
|
$1.800
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
16,495.000
|
$1.820
|
$2.500
|
$2.500
|
$2.500
|
$2.500
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
32,135.000
|
$2.710
|
$3.500
|
$3.500
|
$3.500
|
$3.400
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
11.000
|
$9,162.000
|
$5,565.000
|
$5,565.000
|
$6,000.000
|
$6,749.700
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
11.000
|
$523.000
|
$195.000
|
$195.000
|
$215.000
|
$397.950
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM
|
EA
|
1.000
|
$9,281.000
|
$10,715.000
|
$10,715.000
|
$11,000.000
|
$10,124.100
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
1.000
|
$10,710.710
|
$11,315.000
|
$11,315.000
|
$12,000.000
|
$10,677.450
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
1.000
|
$16,647.000
|
$12,255.000
|
$12,255.000
|
$13,000.000
|
$11,513.250
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
4.000
|
$12,773.820
|
$13,100.000
|
$13,100.000
|
$14,000.000
|
$12,308.100
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')
|
EA
|
3.000
|
$25,281.670
|
$28,600.000
|
$28,600.000
|
$30,000.000
|
$27,002.850
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM
|
EA
|
4.000
|
$21,150.330
|
$31,375.000
|
$31,375.000
|
$33,000.000
|
$29,737.050
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
2.000
|
$29,518.010
|
$32,580.000
|
$32,580.000
|
$34,000.000
|
$31,168.200
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')
|
EA
|
2.000
|
$24,788.000
|
$30,650.000
|
$30,650.000
|
$32,000.000
|
$29,274.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
8.000
|
$30,174.270
|
$33,580.000
|
$33,580.000
|
$34,000.000
|
$32,028.150
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM
|
EA
|
4.000
|
$29,845.780
|
$34,365.000
|
$34,365.000
|
$35,000.000
|
$32,716.950
|
|
|
INS TRF SIG PL AM(S)2 ARM(50-44')LUM
|
EA
|
1.000
|
$34,100.000
|
$37,750.000
|
$37,750.000
|
$38,000.000
|
$36,019.200
|
|
|
INS TRF SIG PL AM(S)2 ARM(55-44')LUM
|
EA
|
1.000
|
$35,400.000
|
$38,950.000
|
$38,950.000
|
$39,000.000
|
$37,076.550
|
|
|
INS TRF SIG PL AM(S)2 ARM(60-32')LUM
|
EA
|
2.000
|
$36,400.000
|
$38,435.000
|
$38,435.000
|
$40,000.000
|
$36,547.350
|
|
|
INS TRF SIG PL AM(S)2 ARM(60-40')LUM
|
EA
|
1.000
|
$55,924.790
|
$39,400.000
|
$39,400.000
|
$41,000.000
|
$37,503.900
|
|
|
INS TRF SIG PL AM(S)2 ARM(60-44')LUM
|
EA
|
5.000
|
$55,924.790
|
$39,760.000
|
$39,760.000
|
$41,000.000
|
$37,837.800
|
|
|
PED POLE ASSEMBLY
|
EA
|
73.000
|
$1,388.000
|
$2,375.000
|
$2,375.000
|
$2,400.000
|
$2,907.450
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
82.000
|
$745.640
|
$685.000
|
$685.000
|
$700.000
|
$743.400
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
18.000
|
$2,153.650
|
$3,325.000
|
$3,325.000
|
$3,400.000
|
$3,387.300
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$4,000.000
|
$1,973.270
|
$2,148.660
|
$3,700.000
|
$2,310.000
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
$4,000.000
|
$740.990
|
$1,249.040
|
$2,800.000
|
$525.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
120.000
|
$100.000
|
$55.000
|
$55.850
|
$150.000
|
$210.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
3,940.000
|
$1.590
|
$2.500
|
$2.500
|
$2.500
|
$2.630
|
|
|
FO SPLICE ENCLOSURE (TYPE 2)
|
EA
|
4.000
|
$1,240.680
|
$2,550.000
|
$2,550.000
|
$2,600.000
|
$1,096.200
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
42.000
|
$47.890
|
$50.000
|
$50.000
|
$50.000
|
$36.230
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
13.000
|
$1,685.000
|
$1,950.000
|
$1,950.000
|
$2,000.000
|
$231.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
24,482.000
|
$1.000
|
$1.350
|
$0.850
|
$1.400
|
$1.050
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
14,119.000
|
$0.850
|
$1.350
|
$0.850
|
$1.400
|
$1.050
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
2,635.000
|
$8.000
|
$4.000
|
$2.250
|
$4.000
|
$1.050
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
38,538.000
|
$2.000
|
$2.250
|
$1.250
|
$2.300
|
$1.370
|
|
MULTIPOLYMER PAV MRK (W)(8")(LNDP)
|
LF
|
169.000
|
$2.000
|
$5.000
|
$2.750
|
$5.000
|
$2.630
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
5,393.000
|
$4.000
|
$6.400
|
$6.500
|
$6.500
|
$3.150
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
6,547.000
|
$2.000
|
$12.800
|
$13.000
|
$13.000
|
$7.350
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
3,565.000
|
$2.500
|
$1.350
|
$0.850
|
$1.400
|
$1.050
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
845.000
|
$1.000
|
$8.000
|
$6.500
|
$8.500
|
$4.730
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
14,119.000
|
$2.500
|
$1.350
|
$1.000
|
$1.400
|
$1.050
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
13.000
|
$7,025.880
|
$6,950.000
|
$6,950.000
|
$7,000.000
|
$10,294.200
|
|
|
TMA (STATIONARY)
|
DAY
|
170.000
|
$150.000
|
$174.710
|
$234.740
|
$500.000
|
$315.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
170.000
|
$25.000
|
$55.000
|
$58.270
|
$60.000
|
$78.750
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
7.000
|
$3,176.500
|
$4,055.000
|
$4,055.000
|
$4,100.000
|
$4,308.150
|
|
|
VIVDS PROSR SYS (INSTALL ONLY)
|
EA
|
14.000
|
$670.000
|
$600.000
|
$600.000
|
$610.000
|
$735.000
|
|
|
VIVDS CAM ASSY (INSTALL ONLY)
|
EA
|
46.000
|
$275.000
|
$425.000
|
$425.000
|
$430.000
|
$230.480
|
|
|
VIVDS TEMPORARY (INSTALL ONLY)
|
EA
|
10.000
|
$730.630
|
$2,500.000
|
$2,500.000
|
$2,650.000
|
$7,799.400
|
|
|
VIVDS CABLING (INSTALL ONLY)
|
LF
|
15,010.000
|
$1.880
|
$0.950
|
$0.950
|
$0.950
|
$1.300
|
|
Totals: |
$30,834,098.210
|
$28,674,822.900
|
$32,847,818.300
|
$32,991,203.400
|
$34,780,641.790
|