PREPARING ROW
|
AC
|
8.070
|
$82,000.000
|
$6,100.000
|
$6,950.000
|
$29,000.000
|
$10,000.000
|
$7,500.000
|
$6,950.000
|
$10,000.000
|
$8,500.000
|
$35,000.000
|
|
|
PREPARING ROW
|
STA
|
110.000
|
$26,000.000
|
$1,100.000
|
$9,000.000
|
$14,000.000
|
$2,000.000
|
$9,250.000
|
$2,850.000
|
$4,315.000
|
$18,130.060
|
$2,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
248.000
|
$5.750
|
$10.000
|
$7.890
|
$5.000
|
$4.500
|
$9.000
|
$10.000
|
$10.900
|
$20.410
|
$8.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
401.000
|
$8.600
|
$10.000
|
$5.310
|
$6.000
|
$3.000
|
$4.000
|
$12.000
|
$6.300
|
$11.590
|
$6.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
262.000
|
$3.550
|
$10.000
|
$2.240
|
$5.000
|
$2.000
|
$0.950
|
$3.000
|
$3.200
|
$12.500
|
$10.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
82.000
|
$10.000
|
$10.000
|
$4.020
|
$10.000
|
$7.000
|
$7.000
|
$12.000
|
$11.700
|
$10.000
|
$8.000
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
51,524.000
|
$5.000
|
$4.000
|
$1.840
|
$2.500
|
$1.000
|
$0.950
|
$4.040
|
$4.300
|
$4.170
|
$4.750
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
5,392.000
|
$3.250
|
$2.750
|
$3.120
|
$2.250
|
$1.000
|
$1.500
|
$4.040
|
$4.200
|
$4.800
|
$7.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
56,217.000
|
$11.000
|
$9.500
|
$5.540
|
$6.750
|
$8.000
|
$3.000
|
$4.500
|
$12.300
|
$7.050
|
$9.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
22,200.000
|
$7.000
|
$6.500
|
$5.020
|
$7.500
|
$7.500
|
$6.800
|
$12.000
|
$9.300
|
$5.730
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
4,610.000
|
$6.000
|
$6.500
|
$2.040
|
$8.000
|
$20.000
|
$2.400
|
$4.000
|
$7.900
|
$3.470
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
28,626.000
|
$7.500
|
$2.250
|
$13.110
|
$8.000
|
$4.000
|
$5.850
|
$8.400
|
$8.800
|
$8.000
|
$58.000
|
|
|
EMB(FNL)(DC)(TYC)(CSBE)(RWALL FND IMPR)
|
CY
|
915.000
|
$70.000
|
$40.000
|
$40.870
|
$34.500
|
$43.000
|
$50.000
|
$52.000
|
$35.100
|
$37.470
|
$44.000
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
8,191.000
|
$35.000
|
$15.000
|
$37.130
|
$34.500
|
$36.000
|
$5.000
|
$45.000
|
$36.500
|
$38.210
|
$44.000
|
|
|
EMB(FNL)(DC)(TYC SPL)CLAY LINER
|
CY
|
10,713.000
|
$50.000
|
$17.750
|
$6.010
|
$9.800
|
$15.000
|
$19.000
|
$20.000
|
$11.400
|
$10.000
|
$17.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
7,140.000
|
$1.000
|
$0.650
|
$0.890
|
$0.950
|
$2.000
|
$0.750
|
$1.900
|
$1.500
|
$0.890
|
$0.950
|
|
|
BLOCK SODDING
|
SY
|
64,688.000
|
$3.000
|
$3.000
|
$3.190
|
$3.000
|
$3.600
|
$3.350
|
$3.000
|
$3.800
|
$3.190
|
$3.000
|
|
|
STRAW OR HAY MULCH
|
SY
|
7,140.000
|
$0.250
|
$0.140
|
$0.550
|
$0.600
|
$0.180
|
$0.400
|
$0.140
|
$0.300
|
$0.550
|
$0.180
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
72,142.000
|
$0.200
|
$0.130
|
$0.070
|
$0.100
|
$0.080
|
$0.130
|
$0.130
|
$0.270
|
$0.070
|
$0.080
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)
|
SY
|
10,456.000
|
$0.600
|
$0.310
|
$0.320
|
$0.350
|
$0.360
|
$0.510
|
$0.310
|
$0.600
|
$0.320
|
$0.350
|
|
|
BROADCAST SEED (PERM)(SPECIAL MIX)
|
SY
|
7,140.000
|
$0.250
|
$0.140
|
$0.370
|
$0.400
|
$0.300
|
$0.540
|
$0.140
|
$0.500
|
$0.370
|
$0.300
|
|
|
FERTILIZER
|
AC
|
13.000
|
$700.000
|
$700.000
|
$721.500
|
$850.000
|
$1,000.000
|
$650.000
|
$700.000
|
$1,152.700
|
$721.500
|
$950.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,559.500
|
$17.000
|
$23.500
|
$20.000
|
$25.000
|
$20.000
|
$27.000
|
$25.000
|
$29.800
|
$33.630
|
$9.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
42,854.000
|
$1.900
|
$2.200
|
$2.880
|
$3.250
|
$1.650
|
$2.500
|
$3.000
|
$2.700
|
$3.990
|
$3.500
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
578.600
|
$170.000
|
$165.000
|
$175.800
|
$172.000
|
$160.000
|
$160.000
|
$200.000
|
$162.800
|
$148.910
|
$150.000
|
|
|
CEMENT
|
TON
|
578.600
|
$150.000
|
$140.000
|
$128.460
|
$145.000
|
$134.000
|
$115.000
|
$155.000
|
$184.800
|
$131.480
|
$130.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
42,854.000
|
$1.300
|
$2.200
|
$1.470
|
$8.500
|
$1.400
|
$2.600
|
$1.890
|
$2.900
|
$2.830
|
$1.600
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
86,997.000
|
$6.000
|
$8.750
|
$9.000
|
$7.250
|
$13.500
|
$11.850
|
$12.000
|
$14.900
|
$9.220
|
$6.900
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
885.000
|
$80.000
|
$69.300
|
$91.710
|
$95.000
|
$89.000
|
$72.000
|
$69.690
|
$85.100
|
$70.160
|
$75.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
4,783.000
|
$70.000
|
$65.100
|
$80.850
|
$82.500
|
$90.000
|
$69.000
|
$65.470
|
$115.500
|
$65.910
|
$75.000
|
|
|
SALV HAUL & STKPL RCL APH PV (6")
|
SY
|
51,524.000
|
$4.000
|
$3.500
|
$1.840
|
$4.500
|
$1.200
|
$0.950
|
$2.680
|
$2.200
|
$2.760
|
$2.500
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG70-22
|
TON
|
256.000
|
$140.000
|
$105.000
|
$160.500
|
$120.000
|
$150.000
|
$108.000
|
$105.600
|
$115.500
|
$107.370
|
$100.000
|
|
|
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
|
TON
|
7.000
|
$70.000
|
$790.000
|
$301.690
|
$120.000
|
$165.000
|
$850.000
|
$828.930
|
$210.000
|
$859.570
|
$150.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
80,363.000
|
$45.000
|
$55.000
|
$58.090
|
$50.000
|
$57.000
|
$59.300
|
$54.750
|
$58.500
|
$54.960
|
$55.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
3,189.000
|
$90.000
|
$100.000
|
$95.360
|
$91.000
|
$110.000
|
$96.000
|
$85.000
|
$100.000
|
$78.460
|
$85.000
|
|
|
STRUCT EXCAV
|
CY
|
2,428.000
|
$9.000
|
$11.500
|
$11.350
|
$8.000
|
$20.000
|
$15.000
|
$16.000
|
$7.500
|
$5.570
|
$10.000
|
|
|
CEM STABIL BKFL
|
CY
|
8,617.500
|
$40.000
|
$40.000
|
$34.740
|
$32.000
|
$43.000
|
$47.000
|
$48.000
|
$41.000
|
$37.910
|
$38.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
1,136.000
|
$45.000
|
$40.000
|
$34.740
|
$38.000
|
$43.000
|
$42.000
|
$48.000
|
$47.100
|
$37.910
|
$38.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
12,730.000
|
$1.900
|
$0.500
|
$1.260
|
$1.000
|
$3.500
|
$2.150
|
$1.000
|
$0.100
|
$1.020
|
$1.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,500.000
|
$8.000
|
$5.000
|
$5.000
|
$7.000
|
$22.000
|
$4.000
|
$5.500
|
$18.200
|
$14.000
|
$25.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
2,328.000
|
$75.000
|
$75.000
|
$69.160
|
$92.000
|
$93.000
|
$89.000
|
$68.000
|
$79.700
|
$83.890
|
$84.300
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
88.000
|
$258.000
|
$310.360
|
$215.000
|
$300.000
|
$320.000
|
$320.000
|
$310.360
|
$325.900
|
$310.360
|
$310.360
|
|
|
DRILL SHAFT (TRF SIG POLE) (42 IN)
|
LF
|
18.000
|
$330.000
|
$356.190
|
$245.000
|
$330.000
|
$360.000
|
$365.000
|
$356.190
|
$374.000
|
$356.190
|
$356.190
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
66.000
|
$370.000
|
$382.060
|
$360.000
|
$405.000
|
$390.000
|
$395.000
|
$382.060
|
$401.200
|
$382.060
|
$382.060
|
|
|
CL C CONC (ABUT)
|
CY
|
48.400
|
$800.000
|
$1,200.000
|
$919.060
|
$850.000
|
$1,100.000
|
$950.000
|
$1,245.000
|
$791.100
|
$1,144.180
|
$818.000
|
|
|
CL C CONC (BENT)
|
CY
|
42.600
|
$850.000
|
$1,200.000
|
$1,167.710
|
$870.000
|
$1,100.000
|
$1,650.000
|
$1,300.000
|
$1,272.700
|
$1,423.940
|
$915.000
|
|
|
CL C CONC (RETAINING WALL)
|
CY
|
42.600
|
$1,000.000
|
$850.000
|
$864.090
|
$800.000
|
$1,300.000
|
$800.000
|
$1,300.000
|
$603.700
|
$900.730
|
$1,322.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
10,834.000
|
$12.000
|
$14.000
|
$10.370
|
$14.000
|
$14.000
|
$11.700
|
$15.500
|
$10.300
|
$13.760
|
$15.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
917.000
|
$8.500
|
$15.000
|
$10.760
|
$8.000
|
$12.000
|
$11.750
|
$10.500
|
$10.700
|
$16.710
|
$10.600
|
|
|
APPROACH SLAB
|
CY
|
282.600
|
$500.000
|
$300.000
|
$416.000
|
$350.000
|
$475.000
|
$395.000
|
$500.000
|
$503.700
|
$384.150
|
$354.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
18,023.000
|
$42.000
|
$43.000
|
$30.270
|
$36.700
|
$50.000
|
$56.000
|
$50.000
|
$35.900
|
$44.390
|
$37.250
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
557.680
|
$120.000
|
$145.000
|
$124.920
|
$155.000
|
$137.000
|
$136.000
|
$150.000
|
$144.700
|
$135.660
|
$135.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
1,673.040
|
$130.000
|
$145.000
|
$124.250
|
$155.000
|
$137.000
|
$130.000
|
$160.000
|
$144.600
|
$137.100
|
$135.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
338.000
|
$400.000
|
$475.000
|
$305.300
|
$350.000
|
$375.000
|
$300.000
|
$580.000
|
$411.200
|
$346.340
|
$400.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
487.480
|
$450.000
|
$500.000
|
$264.620
|
$305.000
|
$350.000
|
$500.000
|
$500.000
|
$398.100
|
$343.950
|
$400.000
|
|
|
RIPRAP (STONE TY R)(DRY)(18 IN)
|
CY
|
601.840
|
$140.000
|
$135.000
|
$95.160
|
$135.000
|
$170.000
|
$115.000
|
$151.000
|
$121.500
|
$186.630
|
$110.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
1,543.200
|
$195.000
|
$135.000
|
$88.940
|
$195.000
|
$100.000
|
$115.000
|
$185.000
|
$122.400
|
$188.100
|
$110.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
94.300
|
$550.000
|
$325.000
|
$549.440
|
$305.000
|
$400.000
|
$370.000
|
$593.000
|
$385.500
|
$432.570
|
$475.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
194.000
|
$6.500
|
$18.500
|
$9.330
|
$10.750
|
$13.000
|
$20.000
|
$18.000
|
$16.600
|
$14.130
|
$12.500
|
|
|
RAIL (TY T402)
|
LF
|
1,934.000
|
$105.000
|
$130.000
|
$105.000
|
$85.000
|
$135.000
|
$135.000
|
$115.000
|
$108.200
|
$94.550
|
$100.000
|
|
|
RAIL (TY C402)
|
LF
|
777.000
|
$154.000
|
$160.000
|
$105.000
|
$130.000
|
$145.000
|
$150.000
|
$130.000
|
$118.200
|
$108.850
|
$114.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
33.000
|
$85.000
|
$200.000
|
$204.910
|
$78.000
|
$125.000
|
$235.000
|
$310.000
|
$140.600
|
$200.000
|
$77.500
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
177.000
|
$100.000
|
$95.000
|
$58.860
|
$90.000
|
$87.000
|
$75.000
|
$84.000
|
$56.700
|
$74.030
|
$75.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
163.000
|
$230.000
|
$280.000
|
$220.920
|
$235.000
|
$290.000
|
$280.000
|
$304.000
|
$203.500
|
$266.430
|
$230.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
267.000
|
$210.000
|
$310.000
|
$252.600
|
$270.000
|
$330.000
|
$335.000
|
$349.000
|
$252.900
|
$334.060
|
$270.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
239.000
|
$250.000
|
$375.000
|
$314.920
|
$340.000
|
$390.000
|
$405.000
|
$421.000
|
$309.200
|
$394.520
|
$325.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
98.000
|
$65.000
|
$55.000
|
$67.770
|
$36.000
|
$73.000
|
$69.000
|
$77.000
|
$51.400
|
$51.240
|
$50.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8,301.000
|
$60.000
|
$85.000
|
$92.250
|
$48.000
|
$60.000
|
$70.000
|
$76.000
|
$59.300
|
$61.480
|
$60.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
2,094.000
|
$61.000
|
$80.000
|
$76.180
|
$65.000
|
$76.000
|
$82.000
|
$84.000
|
$71.600
|
$79.930
|
$70.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,928.300
|
$85.000
|
$120.000
|
$95.540
|
$95.000
|
$107.000
|
$110.000
|
$113.000
|
$86.600
|
$106.570
|
$90.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
509.000
|
$100.000
|
$135.000
|
$128.150
|
$135.000
|
$150.000
|
$150.000
|
$155.000
|
$119.600
|
$135.260
|
$115.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
1,240.000
|
$120.000
|
$155.000
|
$131.850
|
$162.000
|
$170.000
|
$170.000
|
$180.000
|
$144.000
|
$155.760
|
$130.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
10.000
|
$2,600.000
|
$2,290.000
|
$2,093.470
|
$1,970.000
|
$2,200.000
|
$2,700.000
|
$2,150.000
|
$1,426.400
|
$1,501.220
|
$2,300.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
3.000
|
$4,000.000
|
$3,190.000
|
$2,792.980
|
$2,450.000
|
$3,800.000
|
$3,300.000
|
$3,200.000
|
$2,140.400
|
$2,401.950
|
$3,300.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX5FT)
|
EA
|
1.000
|
$7,000.000
|
$2,660.000
|
$2,202.000
|
$2,700.000
|
$2,800.000
|
$3,300.000
|
$2,500.000
|
$1,538.300
|
$1,674.400
|
$2,700.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
1.000
|
$5,000.000
|
$3,530.000
|
$2,875.200
|
$3,150.000
|
$3,900.000
|
$3,100.000
|
$3,750.000
|
$2,710.100
|
$2,561.810
|
$3,700.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX6FT)
|
EA
|
3.000
|
$5,000.000
|
$5,000.000
|
$3,435.580
|
$3,400.000
|
$4,400.000
|
$4,100.000
|
$4,050.000
|
$3,281.300
|
$3,279.110
|
$4,200.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
1.000
|
$5,000.000
|
$6,320.000
|
$3,710.140
|
$3,850.000
|
$5,000.000
|
$4,400.000
|
$4,015.000
|
$3,939.600
|
$3,689.000
|
$4,700.000
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
4.000
|
$3,200.000
|
$3,000.000
|
$2,893.320
|
$2,850.000
|
$3,200.000
|
$3,100.000
|
$3,475.000
|
$2,459.400
|
$2,561.810
|
$3,000.000
|
|
|
INLET (COMPL)(TY A)
|
EA
|
4.000
|
$2,100.000
|
$2,710.000
|
$2,600.430
|
$2,150.000
|
$2,800.000
|
$2,700.000
|
$2,270.000
|
$2,160.400
|
$2,049.450
|
$2,700.000
|
|
|
INLET (COMPL)(TY AZ)
|
EA
|
10.000
|
$4,000.000
|
$4,000.000
|
$3,404.890
|
$3,450.000
|
$4,200.000
|
$4,100.000
|
$4,896.000
|
$2,981.500
|
$3,074.170
|
$3,900.000
|
|
|
INLET (COMPL)(CURB)(TY C1)
|
EA
|
95.000
|
$3,700.000
|
$4,250.000
|
$3,317.550
|
$2,900.000
|
$4,800.000
|
$3,900.000
|
$4,500.000
|
$2,892.200
|
$3,005.510
|
$4,000.000
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
1.000
|
$25,000.000
|
$11,075.000
|
$12,850.950
|
$17,750.000
|
$15,000.000
|
$10,500.000
|
$12,500.000
|
$6,080.000
|
$6,522.360
|
$10,500.000
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
120.000
|
$1,000.000
|
$690.000
|
$1,005.960
|
$700.000
|
$1,000.000
|
$850.000
|
$1,040.000
|
$698.300
|
$646.600
|
$900.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$5,000.000
|
$7,650.000
|
$3,118.800
|
$9,100.000
|
$7,800.000
|
$15,000.000
|
$11,080.000
|
$1,266.100
|
$9,624.120
|
$7,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$5,000.000
|
$7,500.000
|
$3,118.800
|
$3,250.000
|
$6,500.000
|
$8,100.000
|
$5,842.000
|
$844.100
|
$3,836.400
|
$5,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$6,000.000
|
$7,650.000
|
$3,118.800
|
$8,750.000
|
$6,700.000
|
$8,300.000
|
$6,076.620
|
$9,013.100
|
$4,875.980
|
$7,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
1.000
|
$9,000.000
|
$7,645.000
|
$6,157.620
|
$10,750.000
|
$7,700.000
|
$7,800.000
|
$10,710.000
|
$5,890.800
|
$4,192.610
|
$8,500.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$13,000.000
|
$11,565.000
|
$9,128.230
|
$12,500.000
|
$16,000.000
|
$13,800.000
|
$17,400.000
|
$11,759.100
|
$10,348.220
|
$19,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
4.000
|
$14,500.000
|
$12,375.000
|
$13,501.120
|
$13,750.000
|
$11,700.000
|
$16,500.000
|
$13,430.000
|
$9,036.900
|
$8,915.200
|
$20,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$22,000.000
|
$25,770.000
|
$22,058.300
|
$15,500.000
|
$25,000.000
|
$27,500.000
|
$23,650.000
|
$10,340.600
|
$18,143.920
|
$20,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$750.000
|
$1,120.000
|
$1,524.840
|
$750.000
|
$900.000
|
$715.000
|
$910.000
|
$683.600
|
$819.780
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
3.000
|
$1,500.000
|
$1,285.000
|
$1,655.980
|
$950.000
|
$1,200.000
|
$865.000
|
$1,051.000
|
$816.900
|
$1,045.220
|
$1,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
53.000
|
$1,300.000
|
$1,250.000
|
$1,822.980
|
$950.000
|
$1,300.000
|
$1,150.000
|
$1,091.940
|
$988.100
|
$1,255.280
|
$1,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$1,800.000
|
$1,750.000
|
$3,010.300
|
$1,150.000
|
$1,600.000
|
$1,300.000
|
$1,437.000
|
$1,137.200
|
$1,440.760
|
$1,700.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
9.000
|
$2,300.000
|
$3,110.000
|
$3,010.290
|
$2,300.000
|
$2,000.000
|
$2,000.000
|
$1,906.000
|
$1,730.400
|
$2,638.660
|
$2,200.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$3,145.000
|
$3,489.410
|
$2,400.000
|
$2,800.000
|
$2,700.000
|
$2,435.000
|
$2,111.600
|
$2,751.380
|
$2,600.000
|
|
|
JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)
|
LF
|
276.000
|
$750.000
|
$160.000
|
$288.580
|
$135.000
|
$340.000
|
$900.000
|
$691.000
|
$175.200
|
$310.120
|
$200.000
|
|
|
JACK BOR OR TUN PIPE(30 IN)(RC)(CL III)
|
LF
|
20.000
|
$775.000
|
$475.000
|
$1,157.660
|
$285.000
|
$720.000
|
$900.000
|
$1,185.000
|
$383.300
|
$307.420
|
$345.000
|
|
|
JACK BOR OR TUN PIPE(36 IN)(RC)(CL III)
|
LF
|
120.000
|
$800.000
|
$840.000
|
$938.040
|
$830.000
|
$1,000.000
|
$910.000
|
$695.000
|
$524.700
|
$666.070
|
$925.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
1.000
|
$900.000
|
$1,194.000
|
$783.550
|
$1,100.000
|
$500.000
|
$1,500.000
|
$1,320.000
|
$651.000
|
$896.630
|
$800.000
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
19.000
|
$1,200.000
|
$1,350.000
|
$783.930
|
$1,350.000
|
$1,300.000
|
$1,500.000
|
$1,320.000
|
$668.000
|
$922.250
|
$800.000
|
|
|
REMOV STR (INLET)
|
EA
|
23.000
|
$450.000
|
$590.000
|
$507.420
|
$750.000
|
$400.000
|
$590.000
|
$830.000
|
$409.500
|
$461.130
|
$750.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$650.000
|
$620.000
|
$844.860
|
$1,250.000
|
$400.000
|
$1,400.000
|
$967.000
|
$485.600
|
$1,127.190
|
$750.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
9.000
|
$1,400.000
|
$2,400.000
|
$1,586.660
|
$2,500.000
|
$1,100.000
|
$1,600.000
|
$1,620.000
|
$1,185.500
|
$1,024.720
|
$1,250.000
|
|
|
REMOV STR (PIPE)
|
LF
|
2,869.000
|
$33.000
|
$40.000
|
$15.610
|
$10.000
|
$8.000
|
$12.500
|
$18.000
|
$19.000
|
$20.490
|
$12.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
863.000
|
$46.000
|
$40.000
|
$52.090
|
$15.000
|
$30.000
|
$42.000
|
$55.000
|
$29.600
|
$174.200
|
$60.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,000,000.000
|
$1,750,000.000
|
$1,800,000.000
|
$1,405,000.000
|
$1,500,000.000
|
$1,000,000.000
|
$1,676,000.000
|
$1,900,000.000
|
$2,000,000.000
|
$1,650,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
30.000
|
$8,000.000
|
$3,925.000
|
$8,553.920
|
$1,450.000
|
$3,000.000
|
$5,500.000
|
$1,430.000
|
$4,725.000
|
$10,000.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
510.000
|
$30.000
|
$28.100
|
$34.980
|
$20.000
|
$29.000
|
$40.000
|
$34.980
|
$19.300
|
$28.100
|
$28.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
510.000
|
$11.000
|
$7.700
|
$12.380
|
$5.000
|
$9.000
|
$8.500
|
$12.380
|
$5.100
|
$7.700
|
$9.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
177.000
|
$30.000
|
$29.510
|
$30.430
|
$28.000
|
$17.000
|
$39.000
|
$30.430
|
$21.400
|
$29.510
|
$17.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
177.000
|
$9.000
|
$9.500
|
$8.510
|
$5.000
|
$7.000
|
$10.500
|
$8.510
|
$2.800
|
$9.500
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,144.000
|
$2.500
|
$2.800
|
$5.300
|
$3.200
|
$2.500
|
$5.000
|
$5.300
|
$2.000
|
$2.800
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,144.000
|
$0.800
|
$0.560
|
$1.310
|
$0.750
|
$0.800
|
$0.650
|
$1.310
|
$0.700
|
$0.560
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,384.000
|
$5.000
|
$3.390
|
$3.660
|
$4.250
|
$3.100
|
$4.500
|
$3.660
|
$1.800
|
$3.390
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
988.000
|
$5.250
|
$5.700
|
$4.920
|
$6.250
|
$5.000
|
$7.500
|
$4.920
|
$2.100
|
$5.700
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,372.000
|
$1.000
|
$0.810
|
$1.310
|
$1.000
|
$1.000
|
$0.900
|
$1.310
|
$0.900
|
$0.810
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
6,321.000
|
$60.000
|
$72.500
|
$69.830
|
$55.000
|
$60.000
|
$95.000
|
$65.000
|
$66.100
|
$65.030
|
$55.550
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
1,140.000
|
$35.000
|
$65.000
|
$68.030
|
$60.000
|
$18.000
|
$50.000
|
$12.000
|
$18.000
|
$14.520
|
$73.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
600.000
|
$7.500
|
$12.500
|
$10.580
|
$60.000
|
$17.000
|
$11.000
|
$18.000
|
$7.500
|
$15.380
|
$15.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
13,000.000
|
$6.000
|
$8.500
|
$6.930
|
$13.250
|
$10.000
|
$7.300
|
$8.000
|
$7.500
|
$5.920
|
$13.150
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
330.000
|
$5.000
|
$10.500
|
$5.380
|
$7.000
|
$6.500
|
$9.500
|
$5.700
|
$4.600
|
$12.610
|
$5.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
7,780.000
|
$4.000
|
$2.500
|
$2.030
|
$6.500
|
$7.000
|
$1.800
|
$1.900
|
$3.500
|
$1.840
|
$4.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
860.000
|
$4.500
|
$2.500
|
$6.020
|
$6.500
|
$8.000
|
$8.500
|
$5.100
|
$3.500
|
$1.880
|
$5.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
13,000.000
|
$5.250
|
$8.250
|
$6.740
|
$12.500
|
$10.000
|
$5.500
|
$7.750
|
$7.500
|
$5.920
|
$13.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
1,140.000
|
$5.500
|
$8.250
|
$6.740
|
$10.000
|
$10.000
|
$7.000
|
$12.000
|
$7.500
|
$6.230
|
$13.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
600.000
|
$8.500
|
$6.500
|
$10.280
|
$12.500
|
$16.000
|
$6.500
|
$12.400
|
$7.500
|
$6.000
|
$10.000
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
650.000
|
$50.000
|
$70.000
|
$31.990
|
$30.000
|
$48.000
|
$85.000
|
$78.000
|
$179.000
|
$27.060
|
$66.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
17,756.000
|
$4.000
|
$5.250
|
$2.240
|
$4.250
|
$3.000
|
$3.800
|
$3.000
|
$3.000
|
$2.920
|
$3.500
|
|
|
CONC CURB (DOWEL)
|
LF
|
258.000
|
$6.500
|
$10.750
|
$377.970
|
$5.000
|
$8.000
|
$13.000
|
$3.500
|
$10.100
|
$9.900
|
$14.000
|
|
|
CONC CURB (SLOTTED)
|
LF
|
164.000
|
$10.000
|
$25.000
|
$2.640
|
$7.000
|
$23.000
|
$10.000
|
$8.610
|
$9.300
|
$12.000
|
$5.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
3,661.300
|
$61.000
|
$85.000
|
$43.860
|
$65.000
|
$66.000
|
$64.000
|
$60.000
|
$55.400
|
$70.610
|
$65.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
5,957.000
|
$55.000
|
$60.000
|
$29.290
|
$58.000
|
$50.000
|
$36.000
|
$35.000
|
$49.400
|
$42.460
|
$50.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
6.000
|
$2,100.000
|
$1,950.000
|
$1,800.610
|
$1,300.000
|
$1,600.000
|
$1,800.000
|
$3,020.000
|
$736.200
|
$1,150.000
|
$1,100.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
5.000
|
$2,100.000
|
$3,250.000
|
$1,800.590
|
$1,500.000
|
$2,100.000
|
$1,800.000
|
$3,020.000
|
$2,255.200
|
$1,150.000
|
$1,100.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
237.000
|
$21.000
|
$25.500
|
$25.500
|
$25.000
|
$18.000
|
$27.000
|
$25.500
|
$27.300
|
$17.000
|
$20.750
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
3.000
|
$1,300.000
|
$850.000
|
$850.000
|
$1,050.000
|
$850.000
|
$895.000
|
$850.000
|
$1,050.000
|
$850.000
|
$710.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,300.000
|
$1,180.000
|
$1,180.000
|
$1,300.000
|
$1,000.000
|
$1,240.000
|
$1,180.000
|
$1,417.500
|
$1,000.000
|
$910.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,650.000
|
$3.600
|
$2.000
|
$2.000
|
$4.000
|
$2.000
|
$2.100
|
$2.000
|
$4.200
|
$2.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
7.000
|
$230.000
|
$250.000
|
$250.000
|
$200.000
|
$80.000
|
$275.000
|
$250.000
|
$105.000
|
$75.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,400.000
|
$2,260.000
|
$2,260.000
|
$2,200.000
|
$2,400.000
|
$2,750.000
|
$2,260.000
|
$2,472.800
|
$2,200.000
|
$2,425.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
9.000
|
$255.000
|
$250.000
|
$250.000
|
$200.000
|
$210.000
|
$275.000
|
$250.000
|
$262.500
|
$200.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
1.000
|
$11,000.000
|
$9,075.000
|
$9,075.000
|
$9,500.000
|
$10,000.000
|
$11,000.000
|
$9,075.000
|
$19,950.000
|
$9,100.000
|
$9,050.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,100.000
|
$400.000
|
$750.000
|
$1,500.000
|
$500.000
|
$825.000
|
$750.000
|
$1,050.000
|
$900.000
|
$1,250.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
2,553.000
|
$30.000
|
$17.200
|
$17.180
|
$12.000
|
$15.000
|
$28.000
|
$16.490
|
$31.500
|
$15.000
|
$20.000
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
2.000
|
$1,400.000
|
$1,100.000
|
$1,098.000
|
$1,650.000
|
$1,400.000
|
$1,500.000
|
$1,403.100
|
$2,625.000
|
$1,500.000
|
$2,000.000
|
|
|
CHAIN LINK FENCE GATE (INSTALL)(6'X16')
|
EA
|
1.000
|
$1,400.000
|
$1,150.000
|
$1,149.000
|
$1,800.000
|
$2,000.000
|
$2,250.000
|
$1,903.550
|
$2,940.000
|
$2,000.000
|
$1,250.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
14.000
|
$200.000
|
$200.000
|
$200.000
|
$400.000
|
$210.000
|
$220.000
|
$200.000
|
$89.300
|
$250.000
|
$500.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
1.000
|
$190.000
|
$235.000
|
$235.000
|
$200.000
|
$240.000
|
$260.000
|
$235.000
|
$136.500
|
$300.000
|
$500.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
3.000
|
$450.000
|
$355.000
|
$355.000
|
$225.000
|
$370.000
|
$375.000
|
$355.000
|
$215.300
|
$500.000
|
$500.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
1,380.000
|
$7.000
|
$5.250
|
$10.950
|
$8.250
|
$5.300
|
$5.300
|
$5.250
|
$5.500
|
$5.250
|
$5.250
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
200.000
|
$13.000
|
$6.300
|
$16.850
|
$11.000
|
$6.400
|
$6.350
|
$6.300
|
$6.600
|
$6.300
|
$6.300
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
35.000
|
$19.000
|
$7.530
|
$25.000
|
$13.200
|
$7.600
|
$7.600
|
$7.530
|
$7.900
|
$7.530
|
$7.530
|
|
|
CONDT (RM) (3")
|
LF
|
220.000
|
$29.000
|
$52.000
|
$25.000
|
$25.000
|
$53.000
|
$52.500
|
$52.000
|
$54.600
|
$52.000
|
$52.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,865.000
|
$1.250
|
$1.370
|
$1.700
|
$1.250
|
$1.400
|
$1.400
|
$1.370
|
$1.400
|
$1.370
|
$1.370
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
55.000
|
$1.500
|
$1.690
|
$1.950
|
$1.650
|
$1.700
|
$1.700
|
$1.690
|
$1.800
|
$1.690
|
$1.690
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
110.000
|
$1.600
|
$1.790
|
$1.950
|
$1.950
|
$1.800
|
$1.800
|
$1.790
|
$1.900
|
$1.790
|
$1.790
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
940.000
|
$2.000
|
$2.000
|
$2.100
|
$2.150
|
$2.000
|
$2.100
|
$2.000
|
$2.100
|
$2.000
|
$2.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
13.000
|
$800.000
|
$986.130
|
$755.000
|
$750.000
|
$1,000.000
|
$990.000
|
$986.130
|
$1,035.400
|
$986.130
|
$986.130
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
|
EA
|
3.000
|
$5,000.000
|
$3,785.340
|
$4,715.000
|
$4,200.000
|
$3,800.000
|
$3,800.000
|
$3,785.340
|
$3,974.600
|
$3,785.340
|
$3,785.340
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
17.000
|
$450.000
|
$305.000
|
$305.000
|
$320.000
|
$310.000
|
$310.000
|
$305.000
|
$320.300
|
$305.000
|
$533.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
30.000
|
$520.000
|
$440.000
|
$440.000
|
$300.000
|
$450.000
|
$450.000
|
$440.000
|
$462.000
|
$440.000
|
$604.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
2.000
|
$510.000
|
$505.000
|
$505.000
|
$350.000
|
$510.000
|
$510.000
|
$505.000
|
$530.300
|
$505.000
|
$753.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$705.000
|
$535.000
|
$535.000
|
$300.000
|
$550.000
|
$550.000
|
$535.000
|
$561.800
|
$535.000
|
$805.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$885.000
|
$600.000
|
$600.000
|
$310.000
|
$620.000
|
$620.000
|
$600.000
|
$630.000
|
$600.000
|
$944.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
5.000
|
$795.000
|
$700.000
|
$700.000
|
$300.000
|
$720.000
|
$725.000
|
$700.000
|
$735.000
|
$700.000
|
$963.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
2.000
|
$1,290.000
|
$1,195.000
|
$1,195.000
|
$300.000
|
$1,200.000
|
$1,220.000
|
$1,195.000
|
$1,254.800
|
$1,195.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
4.000
|
$2,565.000
|
$1,465.000
|
$1,465.000
|
$1,420.000
|
$1,500.000
|
$1,500.000
|
$1,465.000
|
$1,538.300
|
$1,465.000
|
$2,799.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
32.000
|
$20.000
|
$20.000
|
$20.000
|
$50.000
|
$20.000
|
$21.000
|
$20.000
|
$29.400
|
$10.000
|
$25.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
13.000
|
$60.000
|
$48.000
|
$48.000
|
$80.000
|
$50.000
|
$50.000
|
$48.000
|
$68.300
|
$50.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
8.000
|
$18.000
|
$32.000
|
$32.000
|
$40.000
|
$30.000
|
$33.000
|
$32.000
|
$47.300
|
$20.000
|
$30.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
1,234.000
|
$0.250
|
$0.180
|
$0.180
|
$0.200
|
$0.180
|
$0.190
|
$0.100
|
$0.200
|
$0.180
|
$0.110
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
3,480.000
|
$0.150
|
$0.180
|
$0.180
|
$0.200
|
$0.180
|
$0.190
|
$0.100
|
$0.200
|
$0.180
|
$0.110
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
48,851.000
|
$0.600
|
$0.420
|
$0.420
|
$0.470
|
$0.430
|
$0.450
|
$0.440
|
$0.400
|
$0.420
|
$0.440
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
15.000
|
$150.000
|
$125.000
|
$125.000
|
$135.000
|
$130.000
|
$130.000
|
$250.000
|
$131.300
|
$125.000
|
$250.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
15.000
|
$170.000
|
$180.000
|
$180.000
|
$185.000
|
$190.000
|
$190.000
|
$300.000
|
$189.000
|
$180.000
|
$300.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
67,055.000
|
$0.600
|
$0.420
|
$0.420
|
$0.480
|
$0.430
|
$0.450
|
$0.440
|
$0.400
|
$0.420
|
$0.440
|
|
|
WK ZN PAV MRK REMOV (Y)24"(SLD)
|
LF
|
1,761.000
|
$3.000
|
$3.000
|
$3.000
|
$3.100
|
$3.200
|
$3.200
|
$2.000
|
$3.200
|
$3.000
|
$2.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
20.000
|
$202.000
|
$230.000
|
$230.000
|
$250.000
|
$240.000
|
$235.000
|
$250.000
|
$241.500
|
$230.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
6.000
|
$335.000
|
$350.000
|
$350.000
|
$360.000
|
$360.000
|
$360.000
|
$350.000
|
$367.500
|
$350.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
17.000
|
$265.000
|
$450.000
|
$450.000
|
$465.000
|
$460.000
|
$460.000
|
$350.000
|
$472.500
|
$450.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
6.000
|
$545.000
|
$500.000
|
$500.000
|
$525.000
|
$510.000
|
$510.000
|
$600.000
|
$525.000
|
$500.000
|
$600.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
415.000
|
$3.300
|
$3.500
|
$3.500
|
$3.750
|
$3.600
|
$3.600
|
$2.200
|
$3.700
|
$3.500
|
$2.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
930.000
|
$3.000
|
$3.500
|
$3.500
|
$3.750
|
$3.600
|
$3.600
|
$2.200
|
$3.700
|
$3.500
|
$2.200
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
36,371.000
|
$0.300
|
$0.200
|
$0.200
|
$0.210
|
$0.200
|
$0.210
|
$0.120
|
$0.200
|
$0.200
|
$0.120
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,310.000
|
$0.550
|
$0.300
|
$0.500
|
$0.250
|
$0.300
|
$0.320
|
$0.200
|
$0.400
|
$0.300
|
$0.200
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
1,155.000
|
$0.800
|
$0.800
|
$1.000
|
$0.250
|
$0.800
|
$0.830
|
$1.000
|
$0.600
|
$0.800
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
318.000
|
$1.550
|
$2.000
|
$3.000
|
$0.250
|
$2.000
|
$2.100
|
$2.500
|
$1.300
|
$2.000
|
$2.500
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
5.000
|
$35.000
|
$10.000
|
$25.000
|
$20.000
|
$10.000
|
$10.500
|
$35.000
|
$31.500
|
$10.000
|
$35.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
4.000
|
$47.000
|
$12.000
|
$30.000
|
$20.000
|
$12.000
|
$12.500
|
$45.000
|
$31.500
|
$12.000
|
$45.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
5.000
|
$42.000
|
$12.000
|
$25.000
|
$20.000
|
$12.000
|
$12.500
|
$45.000
|
$31.500
|
$12.000
|
$45.000
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
2.000
|
$112.000
|
$15.000
|
$30.000
|
$25.000
|
$16.000
|
$15.500
|
$150.000
|
$31.500
|
$15.000
|
$150.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
120,620.000
|
$0.050
|
$0.020
|
$0.020
|
$0.030
|
$0.020
|
$0.020
|
$0.010
|
$0.020
|
$0.020
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
46,424.000
|
$0.150
|
$0.040
|
$0.040
|
$0.050
|
$0.040
|
$0.040
|
$0.010
|
$0.040
|
$0.040
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
4,084.000
|
$0.100
|
$0.080
|
$0.080
|
$0.100
|
$0.080
|
$0.090
|
$0.020
|
$0.100
|
$0.080
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,169.000
|
$0.300
|
$0.100
|
$0.100
|
$0.150
|
$0.100
|
$0.110
|
$0.030
|
$0.100
|
$0.100
|
$0.030
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,642.000
|
$0.150
|
$0.200
|
$0.200
|
$0.250
|
$0.200
|
$0.210
|
$0.040
|
$0.200
|
$0.200
|
$0.040
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
35.000
|
$5.250
|
$10.000
|
$10.000
|
$35.000
|
$10.000
|
$10.500
|
$5.000
|
$10.500
|
$10.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
8.000
|
$15.000
|
$12.000
|
$12.000
|
$45.000
|
$12.000
|
$12.500
|
$5.000
|
$12.600
|
$12.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
32.000
|
$7.500
|
$12.000
|
$12.000
|
$45.000
|
$12.000
|
$12.500
|
$8.000
|
$12.600
|
$12.000
|
$8.000
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
6.000
|
$7.000
|
$15.000
|
$15.000
|
$85.000
|
$16.000
|
$15.500
|
$10.000
|
$15.800
|
$15.000
|
$10.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
3.000
|
$34,000.000
|
$27,857.360
|
$23,750.000
|
$29,050.000
|
$29,000.000
|
$28,000.000
|
$27,857.360
|
$29,250.200
|
$27,857.360
|
$28,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$2,800.000
|
$6,579.380
|
$4,315.000
|
$4,350.000
|
$6,800.000
|
$6,600.000
|
$6,579.380
|
$6,908.300
|
$6,579.380
|
$6,600.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
5.000
|
$30,125.000
|
$12,480.970
|
$16,895.000
|
$27,200.000
|
$13,000.000
|
$12,500.000
|
$12,480.970
|
$13,105.000
|
$12,480.970
|
$12,500.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
22.000
|
$200.000
|
$152.620
|
$215.000
|
$205.000
|
$160.000
|
$153.000
|
$152.620
|
$160.300
|
$152.620
|
$153.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
6.000
|
$200.000
|
$152.620
|
$215.000
|
$205.000
|
$160.000
|
$153.000
|
$152.620
|
$160.300
|
$152.620
|
$153.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
22.000
|
$200.000
|
$152.620
|
$215.000
|
$205.000
|
$160.000
|
$153.000
|
$152.620
|
$160.300
|
$152.620
|
$153.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
4.000
|
$200.000
|
$152.620
|
$215.000
|
$205.000
|
$160.000
|
$153.000
|
$152.620
|
$160.300
|
$152.620
|
$153.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
22.000
|
$200.000
|
$152.620
|
$215.000
|
$205.000
|
$160.000
|
$153.000
|
$152.620
|
$160.300
|
$152.620
|
$153.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
6.000
|
$200.000
|
$152.620
|
$215.000
|
$245.000
|
$160.000
|
$153.000
|
$152.620
|
$160.300
|
$152.620
|
$153.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
14.000
|
$350.000
|
$384.180
|
$480.000
|
$440.000
|
$390.000
|
$385.000
|
$384.180
|
$403.400
|
$384.180
|
$385.000
|
|
|
BACK PLATE (12")(3 SEC)(VENTED)ALUM
|
EA
|
20.000
|
$120.000
|
$81.230
|
$150.000
|
$135.000
|
$85.000
|
$81.500
|
$81.230
|
$85.300
|
$81.230
|
$81.230
|
|
|
BACK PLATE (12")(4 SEC)(VENTED)ALUM
|
EA
|
6.000
|
$155.000
|
$104.220
|
$170.000
|
$155.000
|
$110.000
|
$105.000
|
$104.220
|
$109.400
|
$104.220
|
$105.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
1,495.000
|
$1.350
|
$1.300
|
$1.250
|
$1.150
|
$1.300
|
$1.350
|
$1.300
|
$1.400
|
$1.300
|
$1.300
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
1,550.000
|
$1.700
|
$1.640
|
$1.500
|
$1.750
|
$1.700
|
$1.650
|
$1.640
|
$1.700
|
$1.640
|
$1.640
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
2,540.000
|
$2.000
|
$2.200
|
$1.900
|
$2.300
|
$2.300
|
$2.250
|
$2.200
|
$2.300
|
$2.200
|
$2.200
|
|
|
TRF SIG CBL (TY A)(12 AWG)(10 CONDR)
|
LF
|
605.000
|
$2.000
|
$3.300
|
$2.450
|
$2.800
|
$3.400
|
$3.400
|
$3.300
|
$3.500
|
$3.300
|
$3.300
|
|
|
INS TRF SIG PL AM (S)1 ARM(28')
|
EA
|
1.000
|
$5,000.000
|
$4,984.360
|
$5,500.000
|
$5,000.000
|
$5,000.000
|
$5,000.000
|
$4,984.360
|
$5,233.600
|
$4,984.360
|
$5,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM
|
EA
|
2.000
|
$5,620.000
|
$5,942.930
|
$7,375.000
|
$6,000.000
|
$6,000.000
|
$6,000.000
|
$5,942.930
|
$6,240.100
|
$5,942.930
|
$5,950.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
1.000
|
$7,000.000
|
$6,084.100
|
$6,325.000
|
$6,000.000
|
$6,200.000
|
$6,100.000
|
$6,084.100
|
$6,388.300
|
$6,084.100
|
$6,100.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')
|
EA
|
1.000
|
$7,000.000
|
$6,897.470
|
$6,825.000
|
$7,000.000
|
$7,000.000
|
$6,900.000
|
$6,897.470
|
$7,242.300
|
$6,897.470
|
$6,900.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
1.000
|
$8,000.000
|
$8,422.060
|
$8,875.000
|
$8,900.000
|
$9,000.000
|
$8,500.000
|
$8,422.060
|
$8,843.200
|
$8,422.060
|
$8,450.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')
|
EA
|
1.000
|
$14,500.000
|
$17,087.600
|
$17,115.000
|
$17,000.000
|
$18,000.000
|
$17,100.000
|
$17,087.600
|
$17,942.000
|
$17,087.600
|
$17,100.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM
|
EA
|
1.000
|
$15,500.000
|
$18,973.830
|
$19,175.000
|
$18,500.000
|
$19,000.000
|
$19,000.000
|
$18,973.830
|
$19,922.500
|
$18,973.830
|
$18,975.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')
|
EA
|
1.000
|
$14,000.000
|
$17,703.340
|
$16,555.000
|
$17,500.000
|
$20,000.000
|
$17,800.000
|
$17,703.340
|
$18,588.500
|
$17,703.340
|
$17,750.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(44-20')LUM
|
EA
|
1.000
|
$7,745.000
|
$10,460.900
|
$11,580.000
|
$11,000.000
|
$11,000.000
|
$10,500.000
|
$10,460.900
|
$10,983.900
|
$10,460.900
|
$10,500.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
6.000
|
$1,750.000
|
$1,723.100
|
$1,815.000
|
$2,200.000
|
$1,800.000
|
$1,750.000
|
$1,723.100
|
$1,809.300
|
$1,723.100
|
$1,725.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
14.000
|
$800.000
|
$650.380
|
$655.000
|
$650.000
|
$700.000
|
$655.000
|
$650.380
|
$682.900
|
$650.380
|
$651.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
3.000
|
$3,100.000
|
$2,838.970
|
$3,035.000
|
$4,000.000
|
$2,900.000
|
$2,840.000
|
$2,838.970
|
$2,980.900
|
$2,838.970
|
$2,850.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$2,000.000
|
$2,650.000
|
$1,155.810
|
$1,500.000
|
$1,000.000
|
$3,200.000
|
$5,500.000
|
$367.500
|
$4,000.000
|
$1,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
2,100.000
|
$22.000
|
$2.500
|
$15.230
|
$40.000
|
$50.000
|
$14.500
|
$44.570
|
$21.000
|
$31.140
|
$75.000
|
|
|
VIVDS TEMPORARY
|
EA
|
19.000
|
$12,000.000
|
$164.870
|
$1,500.000
|
$1,000.000
|
$170.000
|
$165.000
|
$164.870
|
$173.100
|
$164.870
|
$164.870
|
|
|
RADAR PRESENCE DETECTOR
|
EA
|
10.000
|
$7,100.000
|
$6,973.390
|
$6,915.000
|
$7,000.000
|
$7,000.000
|
$7,000.000
|
$6,973.390
|
$7,322.100
|
$6,973.390
|
$6,975.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
3,695.000
|
$0.650
|
$0.500
|
$0.500
|
$0.550
|
$0.530
|
$0.510
|
$0.350
|
$0.500
|
$0.500
|
$0.350
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
5,890.000
|
$0.650
|
$0.500
|
$0.500
|
$0.550
|
$0.530
|
$0.510
|
$0.350
|
$0.500
|
$0.500
|
$0.350
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
4,084.000
|
$1.000
|
$0.800
|
$0.800
|
$0.900
|
$0.850
|
$0.850
|
$0.750
|
$0.800
|
$0.800
|
$0.750
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
1,169.000
|
$3.750
|
$1.500
|
$1.500
|
$1.750
|
$1.500
|
$1.600
|
$2.800
|
$1.600
|
$1.500
|
$3.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
881.000
|
$6.500
|
$3.000
|
$3.000
|
$3.500
|
$3.100
|
$3.100
|
$5.000
|
$3.200
|
$3.000
|
$6.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
31,888.000
|
$0.650
|
$0.500
|
$0.500
|
$0.600
|
$0.530
|
$0.520
|
$0.350
|
$0.500
|
$0.500
|
$0.350
|
|
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
|
LF
|
3,800.000
|
$0.650
|
$0.500
|
$0.500
|
$0.650
|
$0.530
|
$0.520
|
$0.350
|
$0.500
|
$0.500
|
$0.350
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
5,890.000
|
$0.650
|
$0.900
|
$0.900
|
$1.000
|
$0.900
|
$0.950
|
$0.500
|
$0.900
|
$0.900
|
$0.500
|
|
|
RADAR ADVANCED DETECTION DEVICE
|
EA
|
6.000
|
$8,000.000
|
$7,088.640
|
$7,035.000
|
$7,500.000
|
$7,200.000
|
$7,100.000
|
$7,088.640
|
$7,443.100
|
$7,088.640
|
$7,100.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
3.000
|
$6,500.000
|
$5,671.880
|
$7,415.000
|
$8,300.000
|
$5,800.000
|
$5,700.000
|
$5,671.880
|
$5,955.500
|
$5,671.880
|
$5,675.000
|
|
|
GPS COMMUNICATIONS UNIT
|
EA
|
3.000
|
$800.000
|
$499.890
|
$950.000
|
$850.000
|
$500.000
|
$500.000
|
$500.000
|
$524.900
|
$499.890
|
$500.000
|
|
Totals: |
$21,958,755.150
|
$18,657,275.420
|
$18,846,723.538
|
$18,907,826.580
|
$19,074,056.930
|
$19,088,834.210
|
$19,518,401.990
|
$19,759,052.018
|
$20,397,621.471
|
$20,401,124.380
|