PREPARING ROW
|
STA
|
81.500
|
$6,000.000
|
$6,700.000
|
$9,000.000
|
$2,000.000
|
$1,900.000
|
$797.120
|
$5,000.000
|
$5,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,541.000
|
$8.800
|
$6.900
|
$15.000
|
$8.000
|
$6.640
|
$12.500
|
$10.000
|
$5.500
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,370.000
|
$10.310
|
$9.070
|
$20.000
|
$10.000
|
$6.950
|
$11.920
|
$7.000
|
$7.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
74.000
|
$4.690
|
$6.940
|
$4.610
|
$8.000
|
$4.890
|
$1.950
|
$10.000
|
$4.000
|
|
|
REMOVE CONC (GUTTER)
|
LF
|
257.000
|
$10.930
|
$4.280
|
$30.000
|
$8.000
|
$3.670
|
$1.950
|
$12.000
|
$3.000
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
184.000
|
$17.670
|
$29.080
|
$60.580
|
$10.000
|
$42.810
|
$12.840
|
$15.000
|
$6.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-22")
|
SY
|
30,979.000
|
$6.630
|
$6.550
|
$4.000
|
$8.000
|
$7.380
|
$3.640
|
$11.000
|
$4.000
|
|
|
REMOVING STAB BASE & ASPH PAV(12"-27")
|
SY
|
11,751.000
|
$8.790
|
$9.940
|
$6.000
|
$10.000
|
$10.180
|
$5.110
|
$14.000
|
$8.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
58,925.000
|
$12.650
|
$10.050
|
$1.000
|
$9.000
|
$10.000
|
$15.180
|
$9.000
|
$16.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
8,473.000
|
$11.690
|
$11.000
|
$12.000
|
$10.000
|
$15.000
|
$17.110
|
$20.000
|
$40.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
35,231.000
|
$9.000
|
$10.000
|
$10.000
|
$6.000
|
$17.500
|
$20.780
|
$20.000
|
$20.000
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
4,014.000
|
$40.000
|
$43.310
|
$43.000
|
$46.000
|
$100.000
|
$51.000
|
$55.000
|
$55.000
|
|
|
BLOCK SODDING
|
SY
|
50,837.000
|
$3.260
|
$2.740
|
$2.740
|
$5.250
|
$3.000
|
$4.000
|
$2.740
|
$2.750
|
|
|
STRAW OR HAY MULCH
|
SY
|
25,419.000
|
$0.200
|
$0.250
|
$0.250
|
$1.000
|
$0.270
|
$0.190
|
$0.250
|
$0.250
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
25,419.000
|
$0.120
|
$0.070
|
$0.070
|
$1.000
|
$0.080
|
$0.160
|
$0.070
|
$0.070
|
|
|
FERTILIZER
|
AC
|
15.760
|
$710.290
|
$611.890
|
$611.890
|
$1,100.000
|
$650.000
|
$900.000
|
$610.000
|
$612.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,890.700
|
$15.000
|
$42.000
|
$20.890
|
$46.000
|
$16.000
|
$12.000
|
$41.000
|
$15.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
35,436.000
|
$2.050
|
$2.110
|
$3.040
|
$4.900
|
$2.640
|
$5.000
|
$3.750
|
$5.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
478.000
|
$181.230
|
$197.780
|
$180.000
|
$208.000
|
$195.000
|
$187.000
|
$180.000
|
$225.000
|
|
|
CEMENT
|
TON
|
478.000
|
$150.000
|
$163.940
|
$149.500
|
$135.000
|
$170.000
|
$174.050
|
$158.000
|
$175.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
35,436.000
|
$2.490
|
$1.730
|
$2.280
|
$4.900
|
$2.850
|
$4.730
|
$2.250
|
$4.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
70,871.000
|
$7.000
|
$10.430
|
$15.710
|
$8.800
|
$9.000
|
$17.500
|
$15.000
|
$18.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
3,898.000
|
$90.000
|
$89.370
|
$84.500
|
$117.000
|
$95.000
|
$87.040
|
$87.000
|
$83.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
67,299.000
|
$53.100
|
$59.770
|
$67.320
|
$56.000
|
$70.750
|
$60.620
|
$50.000
|
$69.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
11,672.000
|
$86.000
|
$123.980
|
$103.550
|
$85.000
|
$110.000
|
$135.000
|
$120.000
|
$104.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,622.000
|
$42.000
|
$39.230
|
$50.000
|
$55.000
|
$46.230
|
$37.930
|
$30.000
|
$40.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
92.000
|
$105.000
|
$114.290
|
$170.150
|
$73.000
|
$100.000
|
$174.760
|
$120.000
|
$150.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
2,748.000
|
$1.630
|
$1.080
|
$1.830
|
$1.000
|
$1.000
|
$2.130
|
$1.000
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
8,765.000
|
$25.000
|
$0.010
|
$1.000
|
$57.000
|
$16.810
|
$14.040
|
$1.000
|
$104.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
7,173.000
|
$10.000
|
$0.010
|
$50.000
|
$95.000
|
$56.030
|
$43.170
|
$72.000
|
$116.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
144.000
|
$93.970
|
$60.310
|
$94.370
|
$315.000
|
$118.520
|
$65.870
|
$650.000
|
$65.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
1,012.000
|
$211.100
|
$154.840
|
$177.410
|
$230.000
|
$369.740
|
$176.020
|
$850.000
|
$215.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
86.000
|
$262.000
|
$225.000
|
$239.880
|
$266.060
|
$254.290
|
$267.240
|
$244.000
|
$225.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
44.000
|
$375.000
|
$320.000
|
$344.640
|
$382.250
|
$361.650
|
$354.520
|
$326.000
|
$320.000
|
|
|
CL C CONC (ABUT)
|
CY
|
117.000
|
$900.000
|
$700.280
|
$783.220
|
$595.430
|
$1,695.250
|
$871.660
|
$1,000.000
|
$1,385.000
|
|
|
REINF CONC SLAB
|
SF
|
10,750.000
|
$13.880
|
$17.570
|
$20.000
|
$21.000
|
$18.250
|
$14.650
|
$22.000
|
$24.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
1,870.000
|
$9.500
|
$9.560
|
$9.000
|
$8.500
|
$23.530
|
$47.100
|
$12.000
|
$13.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
1,554.000
|
$110.000
|
$170.070
|
$183.980
|
$250.000
|
$240.900
|
$206.370
|
$210.000
|
$233.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
181.000
|
$420.000
|
$350.810
|
$373.160
|
$400.000
|
$398.970
|
$475.700
|
$570.000
|
$400.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
249.600
|
$135.000
|
$159.610
|
$141.760
|
$140.000
|
$191.830
|
$190.720
|
$150.000
|
$175.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
4,120.000
|
$154.500
|
$190.000
|
$144.720
|
$145.000
|
$192.030
|
$204.240
|
$135.000
|
$185.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
12.000
|
$517.320
|
$628.340
|
$478.210
|
$465.090
|
$734.610
|
$701.910
|
$725.000
|
$650.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
336.000
|
$12.000
|
$19.140
|
$7.000
|
$24.000
|
$16.570
|
$16.460
|
$22.000
|
$17.000
|
|
|
RAIL (TY C223)
|
LF
|
312.000
|
$125.000
|
$100.330
|
$185.200
|
$192.000
|
$132.870
|
$110.320
|
$155.000
|
$170.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
148.000
|
$102.000
|
$110.660
|
$102.040
|
$97.000
|
$94.860
|
$108.390
|
$55.000
|
$130.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
388.000
|
$195.000
|
$255.400
|
$239.780
|
$260.000
|
$242.690
|
$292.680
|
$250.000
|
$250.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
155.000
|
$235.000
|
$248.620
|
$289.780
|
$290.000
|
$272.360
|
$319.960
|
$275.000
|
$280.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
146.000
|
$350.000
|
$369.410
|
$389.780
|
$590.000
|
$498.250
|
$441.510
|
$750.000
|
$400.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
244.000
|
$486.000
|
$513.300
|
$489.780
|
$740.000
|
$571.710
|
$540.950
|
$950.000
|
$460.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
559.000
|
$65.100
|
$65.040
|
$78.120
|
$80.000
|
$64.210
|
$59.510
|
$65.000
|
$60.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,104.000
|
$71.500
|
$73.070
|
$83.160
|
$90.000
|
$76.370
|
$64.600
|
$92.000
|
$72.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
325.000
|
$84.000
|
$122.180
|
$95.000
|
$110.000
|
$98.740
|
$84.940
|
$100.000
|
$95.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
2.000
|
$6,770.000
|
$6,700.370
|
$11,695.980
|
$7,700.000
|
$11,098.150
|
$6,889.520
|
$6,500.000
|
$8,000.000
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
5.000
|
$5,100.000
|
$3,688.370
|
$4,284.140
|
$3,300.000
|
$5,170.400
|
$5,085.610
|
$6,500.000
|
$6,000.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
3.000
|
$6,749.000
|
$3,901.510
|
$5,652.760
|
$2,900.000
|
$4,950.720
|
$5,274.010
|
$4,500.000
|
$6,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$18,250.000
|
$44,112.680
|
$26,047.940
|
$21,600.000
|
$60,175.900
|
$67,400.000
|
$35,000.000
|
$50,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$30,000.000
|
$24,467.860
|
$63,801.000
|
$17,800.000
|
$47,819.990
|
$47,600.000
|
$25,000.000
|
$40,000.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$29,000.000
|
$44,033.490
|
$45,033.060
|
$23,600.000
|
$62,253.800
|
$55,950.600
|
$25,000.000
|
$55,000.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
1.000
|
$40,000.000
|
$49,176.080
|
$52,206.000
|
$25,200.000
|
$72,788.500
|
$68,207.030
|
$25,000.000
|
$65,000.000
|
|
|
HEADWALL (CH-PW-0)(SPL)
|
EA
|
1.000
|
$33,075.000
|
$7,563.240
|
$11,000.000
|
$4,200.000
|
$11,497.900
|
$30,100.000
|
$10,000.000
|
$15,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(6:1) (P)
|
EA
|
13.000
|
$7,300.000
|
$8,323.860
|
$7,371.210
|
$7,100.000
|
$5,115.080
|
$7,200.000
|
$7,250.000
|
$9,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
21.000
|
$1,100.000
|
$1,111.380
|
$1,180.310
|
$750.000
|
$1,691.410
|
$610.750
|
$1,500.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
43.000
|
$1,578.000
|
$1,359.940
|
$1,419.310
|
$1,000.000
|
$1,919.660
|
$847.120
|
$1,700.000
|
$1,600.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$2,586.000
|
$1,640.200
|
$1,601.760
|
$1,300.000
|
$2,960.510
|
$1,397.390
|
$1,950.000
|
$1,900.000
|
|
|
REMOV STR (INLET)
|
EA
|
6.000
|
$400.000
|
$469.250
|
$335.140
|
$350.000
|
$618.520
|
$1,200.000
|
$750.000
|
$400.000
|
|
|
REMOV STR (SET)
|
EA
|
69.000
|
$445.000
|
$274.480
|
$421.820
|
$350.000
|
$618.520
|
$1,100.000
|
$750.000
|
$300.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
8.000
|
$2,520.000
|
$3,403.690
|
$2,578.980
|
$500.000
|
$1,689.790
|
$3,600.000
|
$1,000.000
|
$100.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$1,930.000
|
$2,451.810
|
$1,584.580
|
$500.000
|
$2,054.310
|
$5,400.000
|
$1,250.000
|
$100.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,975.000
|
$18.400
|
$25.770
|
$19.880
|
$2.500
|
$20.290
|
$37.000
|
$30.000
|
$15.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$30,000.000
|
$50,000.000
|
$75,000.000
|
$60,000.000
|
$42,806.960
|
$80,000.000
|
$56,025.000
|
$63,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,292,059.240
|
$1,618,000.000
|
$1,600,000.000
|
$1,500,000.000
|
$1,460,000.000
|
$1,600,000.000
|
$1,782,570.000
|
$1,738,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$6,500.000
|
$5,039.740
|
$500.000
|
$4,800.000
|
$1,000.000
|
$1,272.890
|
$5,000.000
|
$2,100.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
760.000
|
$37.000
|
$27.810
|
$27.810
|
$38.000
|
$27.000
|
$36.400
|
$25.000
|
$37.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
760.000
|
$9.500
|
$8.940
|
$8.940
|
$6.000
|
$6.270
|
$8.170
|
$17.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
534.000
|
$26.500
|
$26.050
|
$26.050
|
$34.000
|
$24.000
|
$24.740
|
$5.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
534.000
|
$8.450
|
$5.600
|
$5.600
|
$8.000
|
$6.270
|
$6.920
|
$5.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,255.000
|
$2.380
|
$4.290
|
$4.290
|
$3.000
|
$2.600
|
$3.670
|
$4.290
|
$5.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,255.000
|
$0.660
|
$0.410
|
$0.410
|
$0.600
|
$0.940
|
$2.490
|
$0.410
|
$0.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
180.000
|
$3.180
|
$3.490
|
$3.490
|
$10.000
|
$3.120
|
$4.800
|
$3.490
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
180.000
|
$1.000
|
$0.410
|
$0.410
|
$2.000
|
$0.980
|
$1.000
|
$0.410
|
$0.100
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,888.000
|
$63.000
|
$88.810
|
$75.000
|
$100.000
|
$75.000
|
$78.980
|
$60.000
|
$100.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
940.000
|
$35.000
|
$59.560
|
$37.020
|
$66.000
|
$76.000
|
$62.040
|
$75.000
|
$70.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
5,280.000
|
$8.500
|
$9.890
|
$10.700
|
$11.000
|
$22.000
|
$8.780
|
$30.000
|
$25.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
600.000
|
$18.050
|
$9.890
|
$23.220
|
$11.000
|
$22.000
|
$8.780
|
$30.000
|
$24.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
7,720.000
|
$5.000
|
$7.380
|
$3.550
|
$7.300
|
$9.000
|
$8.780
|
$6.000
|
$5.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
740.000
|
$4.400
|
$5.810
|
$5.420
|
$7.300
|
$9.000
|
$8.780
|
$8.000
|
$6.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
5,280.000
|
$5.900
|
$9.520
|
$6.660
|
$11.000
|
$14.000
|
$8.780
|
$7.000
|
$5.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
600.000
|
$6.900
|
$9.740
|
$7.780
|
$11.000
|
$14.000
|
$8.780
|
$7.000
|
$5.000
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
294.000
|
$53.600
|
$42.310
|
$52.120
|
$49.000
|
$66.660
|
$70.000
|
$40.000
|
$60.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
3,062.000
|
$6.000
|
$2.700
|
$5.630
|
$8.000
|
$4.340
|
$3.740
|
$5.000
|
$3.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,738.790
|
$66.000
|
$64.720
|
$80.000
|
$57.000
|
$95.000
|
$63.280
|
$75.000
|
$55.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
8,747.000
|
$50.280
|
$40.170
|
$51.580
|
$39.000
|
$53.430
|
$50.430
|
$85.000
|
$40.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
16.000
|
$1,826.000
|
$1,810.390
|
$1,920.610
|
$1,000.000
|
$2,099.230
|
$1,381.180
|
$1,800.000
|
$1,900.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
1.000
|
$2,600.000
|
$3,166.320
|
$2,633.610
|
$1,000.000
|
$3,200.000
|
$1,410.250
|
$1,800.000
|
$4,000.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,606.000
|
$19.950
|
$23.000
|
$19.540
|
$24.560
|
$32.900
|
$23.000
|
$23.000
|
$23.250
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,780.000
|
$1,900.000
|
$1,723.260
|
$2,021.930
|
$2,207.620
|
$1,755.000
|
$1,900.000
|
$1,800.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,220.000
|
$1,215.000
|
$1,265.900
|
$1,386.400
|
$1,559.400
|
$1,084.000
|
$1,215.000
|
$1,225.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,957.000
|
$2.650
|
$2.000
|
$2.610
|
$2.360
|
$1.900
|
$2.000
|
$2.000
|
$1.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$312.000
|
$150.000
|
$290.040
|
$323.870
|
$244.610
|
$213.000
|
$150.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,550.000
|
$2,750.000
|
$2,445.600
|
$3,216.460
|
$3,852.630
|
$2,800.000
|
$2,750.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
13.000
|
$312.000
|
$150.000
|
$286.990
|
$323.860
|
$250.730
|
$213.000
|
$150.000
|
$275.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
6.000
|
$172.000
|
$260.000
|
$275.000
|
$230.000
|
$244.610
|
$258.780
|
$890.560
|
$260.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
2.000
|
$157.000
|
$310.000
|
$273.960
|
$230.000
|
$305.760
|
$265.430
|
$805.800
|
$310.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
375.000
|
$10.000
|
$9.000
|
$9.570
|
$10.610
|
$10.170
|
$9.000
|
$8.780
|
$9.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
410.000
|
$21.000
|
$12.000
|
$13.450
|
$14.920
|
$13.560
|
$17.250
|
$16.850
|
$12.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
30.000
|
$10.200
|
$15.000
|
$19.070
|
$21.150
|
$16.950
|
$13.400
|
$13.000
|
$15.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
190.000
|
$26.000
|
$15.000
|
$19.550
|
$21.680
|
$16.950
|
$22.500
|
$21.930
|
$15.000
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
25.000
|
$14.000
|
$20.000
|
$23.630
|
$26.210
|
$22.600
|
$23.000
|
$22.280
|
$20.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
780.000
|
$1.200
|
$2.400
|
$1.650
|
$1.830
|
$2.710
|
$1.400
|
$1.440
|
$2.400
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
225.000
|
$1.550
|
$3.500
|
$2.950
|
$3.270
|
$3.960
|
$2.700
|
$2.620
|
$3.500
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
440.000
|
$1.800
|
$3.900
|
$3.250
|
$3.600
|
$4.410
|
$3.100
|
$3.000
|
$3.900
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
1,415.000
|
$2.000
|
$2.900
|
$1.980
|
$2.200
|
$3.280
|
$2.100
|
$2.050
|
$2.900
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
10.000
|
$920.000
|
$700.000
|
$870.000
|
$964.940
|
$791.120
|
$1,000.000
|
$973.000
|
$700.000
|
|
|
REMOVE GROUND BOX
|
EA
|
6.000
|
$277.000
|
$200.000
|
$50.000
|
$55.460
|
$226.030
|
$175.000
|
$170.000
|
$200.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$4,150.780
|
$4,500.000
|
$6,085.000
|
$6,749.020
|
$5,085.740
|
$8,975.000
|
$8,703.000
|
$4,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
32.000
|
$2,520.000
|
$18.000
|
$32.000
|
$38.820
|
$20.340
|
$35.000
|
$35.000
|
$18.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
54.000
|
$475.000
|
$395.000
|
$456.030
|
$496.790
|
$454.510
|
$462.000
|
$395.000
|
$395.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$490.000
|
$635.000
|
$478.700
|
$802.450
|
$720.330
|
$746.000
|
$635.000
|
$635.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
7.000
|
$700.000
|
$795.000
|
$737.810
|
$908.700
|
$896.620
|
$845.000
|
$795.000
|
$795.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$910.000
|
$870.000
|
$885.700
|
$1,954.610
|
$967.340
|
$1,818.000
|
$870.000
|
$870.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$340.000
|
$375.000
|
$252.330
|
$524.650
|
$401.080
|
$488.000
|
$375.000
|
$375.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$70.000
|
$65.000
|
$85.690
|
$83.180
|
$42.650
|
$77.000
|
$65.000
|
$65.000
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
4.000
|
$65.000
|
$45.000
|
$38.750
|
$38.820
|
$51.310
|
$36.000
|
$45.000
|
$45.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
6.000
|
$19.000
|
$25.000
|
$16.120
|
$83.190
|
$26.250
|
$12.000
|
$25.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
40.000
|
$18.000
|
$28.000
|
$18.540
|
$83.180
|
$29.400
|
$25.000
|
$28.000
|
$28.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
4.000
|
$70.000
|
$50.000
|
$69.000
|
$88.730
|
$52.500
|
$47.000
|
$50.000
|
$50.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
47,954.000
|
$0.680
|
$0.680
|
$0.890
|
$0.750
|
$0.860
|
$0.700
|
$0.890
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
9,100.000
|
$0.690
|
$1.750
|
$0.890
|
$1.940
|
$0.860
|
$1.800
|
$0.890
|
$1.750
|
|
|
WK ZN PAV MRK REMOV (Y)4"(DOT)
|
LF
|
9,100.000
|
$0.510
|
$0.400
|
$3.000
|
$0.440
|
$0.860
|
$0.410
|
$3.000
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
38,154.000
|
$0.680
|
$0.680
|
$0.890
|
$0.750
|
$0.860
|
$0.700
|
$0.890
|
$0.700
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
80.000
|
$1.000
|
$1.250
|
$3.000
|
$1.390
|
$2.260
|
$1.300
|
$3.000
|
$1.250
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
27.000
|
$225.000
|
$240.000
|
$150.000
|
$266.190
|
$239.590
|
$247.000
|
$150.000
|
$240.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
11.000
|
$275.000
|
$250.000
|
$205.000
|
$277.280
|
$293.840
|
$257.000
|
$205.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W)(BIKE ARROW)
|
EA
|
18.000
|
$125.000
|
$155.000
|
$60.000
|
$171.910
|
$322.100
|
$160.000
|
$60.000
|
$155.000
|
|
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
|
EA
|
18.000
|
$125.000
|
$155.000
|
$160.000
|
$171.910
|
$322.100
|
$160.000
|
$160.000
|
$155.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
338.000
|
$4.000
|
$4.500
|
$4.500
|
$4.990
|
$4.660
|
$4.650
|
$4.500
|
$4.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
564.000
|
$4.100
|
$4.500
|
$4.500
|
$4.990
|
$4.660
|
$4.650
|
$4.500
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
2,180.000
|
$0.470
|
$0.440
|
$0.250
|
$0.490
|
$0.450
|
$0.450
|
$0.250
|
$0.450
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,425.000
|
$0.430
|
$0.600
|
$0.500
|
$0.670
|
$0.890
|
$0.620
|
$0.500
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
2,270.000
|
$0.840
|
$1.100
|
$1.000
|
$1.220
|
$1.410
|
$1.130
|
$1.000
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
100.000
|
$1.500
|
$2.200
|
$2.000
|
$2.440
|
$2.830
|
$2.250
|
$2.000
|
$2.200
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
7.000
|
$30.000
|
$30.000
|
$25.000
|
$33.270
|
$71.200
|
$31.000
|
$25.000
|
$30.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
5.000
|
$40.000
|
$35.000
|
$35.000
|
$38.820
|
$73.460
|
$36.000
|
$35.000
|
$35.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
44,860.000
|
$0.150
|
$0.050
|
$0.010
|
$0.060
|
$0.020
|
$0.050
|
$0.010
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,840.000
|
$0.100
|
$0.100
|
$0.020
|
$0.110
|
$0.020
|
$0.100
|
$0.020
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,435.000
|
$0.130
|
$0.150
|
$0.030
|
$0.170
|
$0.070
|
$0.160
|
$0.030
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,265.000
|
$0.240
|
$0.200
|
$0.060
|
$0.220
|
$0.100
|
$0.210
|
$0.060
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
27.000
|
$12.000
|
$15.000
|
$3.000
|
$16.640
|
$6.120
|
$15.250
|
$3.000
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
11.000
|
$11.000
|
$15.000
|
$5.000
|
$16.640
|
$5.650
|
$15.250
|
$5.000
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (BIKE ARROW)
|
EA
|
18.000
|
$5.000
|
$5.000
|
$3.000
|
$5.550
|
$5.650
|
$5.150
|
$3.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (BIKE SYMBOL)
|
EA
|
18.000
|
$5.000
|
$5.000
|
$5.000
|
$5.550
|
$5.650
|
$5.150
|
$10.000
|
$5.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
2.000
|
$30,654.000
|
$29,000.000
|
$28,224.500
|
$31,304.450
|
$32,774.780
|
$29,850.000
|
$28,922.000
|
$29,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
2.000
|
$3,200.000
|
$3,600.000
|
$3,000.000
|
$3,327.370
|
$4,068.590
|
$1,750.000
|
$1,702.000
|
$3,600.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$33,000.000
|
$23,000.000
|
$30,132.500
|
$33,420.660
|
$25,993.790
|
$24,260.000
|
$23,513.000
|
$23,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
8.000
|
$190.000
|
$170.000
|
$224.000
|
$248.440
|
$192.130
|
$175.000
|
$170.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
2.000
|
$190.000
|
$170.000
|
$224.000
|
$248.450
|
$192.130
|
$175.000
|
$170.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
18.000
|
$195.000
|
$170.000
|
$224.000
|
$248.440
|
$192.130
|
$175.000
|
$170.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
2.000
|
$195.000
|
$170.000
|
$224.000
|
$248.450
|
$192.130
|
$175.000
|
$170.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
12.000
|
$190.000
|
$170.000
|
$224.000
|
$248.440
|
$192.130
|
$175.000
|
$170.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$195.000
|
$170.000
|
$224.000
|
$248.440
|
$192.130
|
$175.000
|
$170.000
|
$170.000
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
14.000
|
$433.000
|
$87.000
|
$79.000
|
$87.620
|
$98.320
|
$51.000
|
$50.000
|
$87.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
8.000
|
$95.000
|
$87.000
|
$119.000
|
$131.990
|
$98.320
|
$154.000
|
$150.000
|
$87.000
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
2.000
|
$135.000
|
$100.000
|
$149.000
|
$165.260
|
$113.020
|
$174.000
|
$169.000
|
$100.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
780.000
|
$1.150
|
$2.000
|
$1.520
|
$1.690
|
$2.260
|
$1.700
|
$1.660
|
$2.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
815.000
|
$1.500
|
$2.900
|
$1.940
|
$2.150
|
$3.280
|
$2.100
|
$2.050
|
$2.900
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
2,770.000
|
$2.100
|
$3.300
|
$2.410
|
$2.670
|
$3.730
|
$2.550
|
$2.500
|
$3.300
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$550.000
|
$700.000
|
$2.500
|
$277.280
|
$791.120
|
$263.000
|
$255.000
|
$700.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
3.000
|
$8,500.000
|
$4,700.000
|
$6,650.000
|
$7,375.670
|
$5,311.770
|
$5,304.000
|
$5,141.000
|
$4,700.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
3.000
|
$16,900.000
|
$700.000
|
$250.000
|
$277.280
|
$791.120
|
$351.000
|
$341.000
|
$700.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')
|
EA
|
1.000
|
$6,500.000
|
$8,100.000
|
$8,345.000
|
$9,255.630
|
$9,154.340
|
$11,309.000
|
$10,961.000
|
$8,100.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
1.000
|
$7,800.000
|
$8,600.000
|
$8,772.000
|
$9,729.230
|
$9,719.420
|
$12,080.000
|
$11,717.000
|
$8,600.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
1.000
|
$8,110.000
|
$9,600.000
|
$9,938.000
|
$11,022.470
|
$10,849.580
|
$14,710.000
|
$14,258.000
|
$9,600.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
1.000
|
$8,100.000
|
$9,500.000
|
$9,820.000
|
$10,891.590
|
$10,736.570
|
$13,950.000
|
$13,517.000
|
$9,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
2.000
|
$7,500.000
|
$10,000.000
|
$11,001.000
|
$12,201.470
|
$11,301.650
|
$16,580.000
|
$16,072.000
|
$10,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM
|
EA
|
2.000
|
$15,000.000
|
$25,000.000
|
$24,407.000
|
$27,070.370
|
$28,254.120
|
$20,308.000
|
$27,437.000
|
$25,000.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
4.000
|
$1,700.000
|
$1,700.000
|
$1,465.000
|
$1,624.870
|
$1,921.280
|
$1,395.000
|
$1,352.000
|
$1,700.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
6.000
|
$665.000
|
$700.000
|
$853.000
|
$946.080
|
$791.120
|
$824.000
|
$798.000
|
$700.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
$3,350.000
|
$1,000.000
|
$1,505.000
|
$1,669.230
|
$1,130.160
|
$1,190.000
|
$1,154.000
|
$1,000.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
8.000
|
$2,230.000
|
$1,210.290
|
$2,262.510
|
$2,200.660
|
$1,000.000
|
$2,660.920
|
$1,500.000
|
$2,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
22.000
|
$1,600.000
|
$623.240
|
$1,667.290
|
$2,094.820
|
$600.000
|
$1,185.000
|
$1,500.000
|
$1,300.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
22.000
|
$1,118.180
|
$750.000
|
$1,488.890
|
$1,663.690
|
$1,100.000
|
$1,600.000
|
$1,500.000
|
$500.000
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
180.000
|
$260.000
|
$403.400
|
$246.260
|
$234.590
|
$203.430
|
$312.200
|
$550.000
|
$400.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
32.000
|
$70.000
|
$83.400
|
$50.000
|
$66.030
|
$125.000
|
$85.000
|
$500.000
|
$50.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
16,240.000
|
$1.000
|
$0.800
|
$0.450
|
$0.890
|
$0.730
|
$0.830
|
$0.450
|
$0.800
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
3,720.000
|
$1.000
|
$0.820
|
$0.480
|
$0.910
|
$0.730
|
$0.850
|
$0.480
|
$0.820
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
2,840.000
|
$1.500
|
$1.290
|
$0.750
|
$1.430
|
$1.370
|
$1.330
|
$0.750
|
$1.290
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
1,355.000
|
$4.000
|
$3.500
|
$2.500
|
$3.880
|
$3.720
|
$3.600
|
$2.500
|
$3.500
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
965.000
|
$8.000
|
$7.000
|
$4.500
|
$7.760
|
$7.440
|
$7.200
|
$4.500
|
$7.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
18,000.000
|
$0.750
|
$0.800
|
$0.450
|
$0.890
|
$0.730
|
$0.830
|
$0.450
|
$0.800
|
|
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
|
LF
|
3,180.000
|
$0.800
|
$0.800
|
$0.480
|
$0.890
|
$0.730
|
$0.830
|
$0.480
|
$0.800
|
|
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
|
LF
|
300.000
|
$8.000
|
$7.000
|
$4.500
|
$7.760
|
$7.440
|
$7.200
|
$4.500
|
$7.000
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
3,720.000
|
$0.750
|
$0.850
|
$0.450
|
$0.940
|
$0.900
|
$0.880
|
$0.450
|
$0.850
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
2.000
|
$6,250.000
|
$6,000.000
|
$7,210.000
|
$7,996.780
|
$6,780.990
|
$6,475.000
|
$6,290.000
|
$6,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
32.000
|
$165.000
|
$629.980
|
$150.000
|
$166.370
|
$285.930
|
$300.000
|
$54.470
|
$100.000
|
|
|
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
|
EA
|
4.000
|
$6,900.000
|
$700.000
|
$1,162.500
|
$1,289.360
|
$791.120
|
$830.000
|
$808.000
|
$700.000
|
|
|
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
|
EA
|
2.000
|
$724.000
|
$700.000
|
$1,162.500
|
$1,289.360
|
$791.120
|
$830.000
|
$808.000
|
$700.000
|
|
|
VIVDS TEMPORARY
|
EA
|
1.000
|
$7,500.000
|
$14,000.000
|
$13,625.000
|
$15,111.800
|
$15,822.310
|
$13,800.000
|
$13,416.000
|
$14,000.000
|
|
|
INSTALLATION OF CELLULAR MODEM
|
EA
|
2.000
|
$5.000
|
$375.000
|
$1,000.000
|
$1,109.130
|
$423.810
|
$175.000
|
$170.000
|
$375.000
|
|
|
WWD CELLULAR MODEM
|
EA
|
2.000
|
$6,405.000
|
$1,500.000
|
$1,000.000
|
$1,109.130
|
$1,695.250
|
$1,219.000
|
$1,182.000
|
$1,500.000
|
|
|
WATER MAIN PIPE (PVC) (8IN) (C-900)
|
LF
|
890.000
|
$50.000
|
$63.360
|
$73.000
|
$83.000
|
$55.000
|
$84.280
|
$74.530
|
$62.000
|
|
|
WTR MAIN PIPE (PVC)(RESTRAINED JT) 8IN
|
LF
|
60.000
|
$75.000
|
$69.370
|
$100.000
|
$138.000
|
$109.690
|
$220.000
|
$95.000
|
$80.000
|
|
|
FIRE HYDRANT BRANCH (LEAD) (6IN)
|
LF
|
40.000
|
$25.000
|
$73.320
|
$44.220
|
$66.000
|
$63.660
|
$60.210
|
$130.000
|
$71.000
|
|
|
JCK TUN BOR OR AUG WTR MAIN (PVC) (8IN)
|
LF
|
90.000
|
$120.000
|
$321.510
|
$325.000
|
$280.000
|
$251.190
|
$455.540
|
$90.000
|
$475.000
|
|
|
JCK TUN BOR OR AUG CSG (STL) (16IN)
|
LF
|
210.000
|
$100.000
|
$843.360
|
$300.000
|
$550.000
|
$310.420
|
$263.010
|
$275.000
|
$475.000
|
|
|
SERVICE LINE (SHORT SIDE) (1-1/2"TO 2")
|
EA
|
3.000
|
$1,800.000
|
$2,654.240
|
$2,044.580
|
$140.000
|
$2,324.840
|
$2,235.170
|
$2,500.000
|
$1,780.000
|
|
|
TAPPING SLEEVE AND VALVE (8IN X 6IN)
|
EA
|
1.000
|
$5,400.000
|
$5,993.490
|
$1,500.000
|
$5,000.000
|
$4,389.220
|
$6,386.200
|
$7,500.000
|
$4,000.000
|
|
|
TAPPING SLEEVE AND VALVE (8IN X 8IN)
|
EA
|
1.000
|
$6,200.000
|
$7,078.490
|
$1,500.000
|
$7,200.000
|
$5,666.510
|
$8,514.940
|
$16,000.000
|
$4,900.000
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
4.000
|
$3,800.000
|
$6,060.570
|
$4,617.990
|
$7,200.000
|
$5,166.570
|
$4,257.470
|
$5,400.000
|
$5,000.000
|
|
|
REMOVING AND SALVAGING FIRE HYDRANT
|
EA
|
3.000
|
$350.000
|
$644.810
|
$375.660
|
$3,300.000
|
$359.910
|
$383.170
|
$500.000
|
$900.000
|
|
|
CUT AND PLUG WATER MAIN (8IN)
|
EA
|
3.000
|
$650.000
|
$1,717.960
|
$990.690
|
$2,700.000
|
$676.440
|
$798.280
|
$1,650.000
|
$2,900.000
|
|
|
WET CONNECTION (8IN)
|
EA
|
2.000
|
$1,800.000
|
$3,380.650
|
$3,024.290
|
$4,400.000
|
$977.950
|
$1,862.640
|
$4,650.000
|
$3,000.000
|
|
|
FIRE HYDRANT BRANCH (LEAD)(6 IN) PVC
|
EA
|
40.000
|
$25.000
|
$733.220
|
$50.000
|
$55.000
|
$63.680
|
$266.090
|
$95.000
|
$1.000
|
|
|
ABANDONING VALVES
|
EA
|
3.000
|
$550.000
|
$294.350
|
$447.300
|
$110.000
|
$359.910
|
$478.970
|
$1,800.000
|
$360.000
|
|
|
VALVE (GATE)(8")
|
EA
|
3.000
|
$1,800.000
|
$2,962.810
|
$1,500.000
|
$2,700.000
|
$1,922.380
|
$2,660.920
|
$2,800.000
|
$1.000
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
5.000
|
$10,000.000
|
$4,367.240
|
$1,000.000
|
$2,200.000
|
$1,733.350
|
$1,064.370
|
$3,000.000
|
$1.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
950.000
|
$1.000
|
$1.080
|
$3.080
|
$1.000
|
$1.000
|
$5.320
|
$1.000
|
$0.010
|
|
|
HYDROSTATIC PRESSURE TEST
|
EA
|
2.000
|
$5,500.000
|
$1,197.410
|
$4,328.410
|
$2,000.000
|
$1,775.970
|
$4,789.650
|
$1,250.000
|
$1.000
|
|
|
CARRIER PIPE (IN CASING) (PVC) (12")
|
LF
|
210.000
|
$140.000
|
$146.200
|
$111.150
|
$500.000
|
$101.530
|
$159.660
|
$100.000
|
$1.000
|
|
Totals: |
$14,647,688.540
|
$16,095,270.651
|
$16,463,192.965
|
$16,492,137.230
|
$17,894,746.688
|
$17,945,685.193
|
$18,238,234.880
|
$19,978,085.250
|