Show Job Controls
Bid Cobra

MONTGOMERY FM 149 (0720-02-085)

Items: 84

County: MONTGOMERY
Length: N/A
Highway: FM 149
District: HOUSTON
Control Number: 0720-02-085
DBE Goal: N/A
Project: STP 2017(635)
Guaranty: N/A
Time: 113 WORKING DAYS
Engineer's Estimate: $3,527,502.95
Date: 02/03/2017 (9 years ago)
Contract Number: N/A
Type: BS REPR, OCST, 1.5" OL & ADD SHDLR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$3,527,502.95
$2,864,063.57
Over/Under Est: -18.81% -$663,439.38
Over/Under Est: -2.76% -$97,301.50
Amt Left: 19.77% $566,137.88

Bid Items & Bid Tabulations

84 Total 0 of 84
MONTGOMERY  |  FM 149  |  HOUSTON  |  0720-02-085  |  02/03/2017  |  $3,527,502.95  |  STP 2017(635)  |  BS REPR, OCST, 1.5" OL & ADD SHDLR  |  113 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SMITH & COMPANY
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 202.360 $1,500.000 $300.000 $300.000
SUBGRADE WIDENING (ORD COMP)
STA 193.360 $815.000 $567.000 $500.000
BACKFILL (TY B)
STA 202.360 $130.000 $222.000 $280.000
BLOCK SODDING
SY 38,708.000 $3.000 $3.000 $3.200
STRAW OR HAY MULCH
SY 38,708.000 $0.250 $0.180 $0.200
DRILL SEED (TEMP)(WARM OR COOL)
SY 38,708.000 $0.100 $0.090 $0.100
FERTILIZER
AC 16.000 $650.000 $765.000 $850.000
VEGETATIVE WATERING
MG 1,920.000 $15.000 $10.000 $15.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 8,433.000 $65.000 $70.000 $89.000
ASPH (MULTI OPTION)
GAL 33,789.000 $2.250 $2.350 $3.600
AGGR(TY-PB GR-4 SAC-B)
CY 858.000 $100.000 $90.000 $124.000
D-GR HMA TY-D SAC-A PG70-22
TON 6,976.000 $75.000 $70.000 $85.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 2,708.000 $65.000 $67.000 $75.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 2,258.000 $2.000 $3.000 $12.000
CEM STABIL BKFL
CY 253.000 $125.000 $100.000 $124.000
CL C CONC (COLLAR)
EA 17.000 $1,250.000 $1,275.000 $1,700.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 110.000 $450.000 $100.000 $122.000
RIPRAP (MOW STRIP)(4 IN)
CY 206.000 $665.000 $615.000 $675.000
RC PIPE (CL III)(18 IN)
LF 535.000 $60.000 $49.000 $58.000
RC PIPE (CL III)(24 IN)
LF 8.000 $100.000 $150.000 $168.000
RC PIPE (CL III)(30 IN)
LF 4.000 $160.000 $200.000 $224.000
RC PIPE (CL III)(42 IN)
LF 28.000 $140.000 $255.000 $280.000
RC PIPE (CL III)(48 IN)
LF 24.000 $225.000 $357.000 $400.000
HEADWALL (CH - PW - 0) (DIA= 18 IN)
EA 2.000 $3,750.000 $3,075.000 $3,600.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $4,200.000 $3,675.000 $4,000.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $4,100.000 $4,900.000 $5,400.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 6.000 $8,200.000 $9,180.000 $10,600.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 2.000 $12,000.000 $14,280.000 $15,700.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 56.000 $1,125.000 $825.000 $1,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,125.000 $925.000 $1,100.000
CLEAN EXIST CULVERTS
EA 13.000 $2,090.000 $1,275.000 $1,700.000
REMOV STR (HEADWALL)
EA 13.000 $1,500.000 $1,530.000 $1,700.000
REMOV STR (PIPE)
LF 430.000 $25.000 $20.000 $33.600
MOBILIZATION
LS 1.000 $341,182.000 $138,000.000 $235,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $1,100.000 $2,000.000 $5,700.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 2,314.000 $25.000 $25.500 $28.000
ROCK FILTER DAMS (REMOVE)
LF 2,314.000 $10.000 $9.000 $10.000
CONSTRUCTION PERIMETER FENCE
LF 405.000 $4.000 $3.000 $3.400
TEMP SEDMT CONT FENCE (INSTALL)
LF 919.000 $2.000 $3.000 $3.400
TEMP SEDMT CONT FENCE (REMOVE)
LF 919.000 $0.500 $0.750 $0.850
CONC CURB (DOWEL)(SLOTTED)
LF 90.000 $20.000 $76.500 $85.000
INTERSECTIONS (ACP)
SY 992.000 $21.000 $27.000 $22.000
DRIVEWAYS (ACP)
SY 5,158.000 $35.000 $27.000 $13.000
TURNOUTS (ACP)
SY 512.000 $35.000 $35.000 $13.000
RUMBLE STRIPS (CENTERLINE)
LF 18,495.000 $0.200 $0.240 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 2,763.000 $30.000 $18.400 $20.000
TERMINAL ANCHOR SECTION
EA 2.000 $1,000.000 $867.000 $950.000
SHORT RADIUS
LF 100.000 $50.000 $24.500 $27.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 600.000 $50.000 $18.300 $20.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $100.000 $5.000 $5.600
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 50.000 $100.000 $10.000 $11.000
GUARDRAIL END TREATMENT (INSTALL)
EA 22.000 $2,300.000 $2,167.000 $2,400.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 21.000 $260.000 $184.000 $200.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 10.000 $295.000 $210.000 $225.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $650.000 $500.000 $550.000
ALUMINUM SIGNS (TY G)
SF 14.200 $40.000 $35.000 $38.000
REFURBISH ALUMINUM SIGNS (TY G)
EA 5.000 $30.000 $362.000 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $800.000 $398.000 $435.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $400.000 $311.000 $350.000
REMOVE SM RD SN SUP&AM
EA 4.000 $150.000 $51.000 $56.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 51,472.000 $0.150 $0.130 $0.150
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 826.000 $0.300 $0.260 $0.300
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 8.000 $45.000 $30.000 $35.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 8.000 $55.000 $30.000 $35.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 15,396.000 $0.150 $0.140 $0.150
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 81,546.000 $0.150 $0.130 $0.150
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 413.000 $0.300 $0.820 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 100.000 $5.250 $4.000 $4.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $100.000 $100.000 $110.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $130.000 $122.000 $135.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 2.000 $600.000 $202.000 $225.000
PAVEMENT SEALER 24"
LF 100.000 $2.500 $0.820 $1.000
PAVEMENT SEALER (RR XING)
EA 2.000 $200.000 $21.000 $22.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 40,773.000 $0.800 $0.410 $0.500
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 7,698.000 $0.400 $0.460 $0.500
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 25,736.000 $0.300 $0.410 $0.500
REFL PAV MRKR TY I-C
EA 22.000 $3.500 $3.000 $3.500
REFL PAV MRKR TY II-A-A
EA 724.000 $3.000 $3.000 $3.500
ELIM EXT PAV MRK & MRKS (24")
LF 100.000 $2.500 $1.000 $1.100
ELIM EXT PAV MRK & MRKS (RR XING)
EA 4.000 $115.000 $36.000 $40.000
PAV SURF PREP FOR MRK (24")
LF 100.000 $0.500 $0.260 $0.280
PAV SURF PREP FOR MRK (RR XING)
EA 2.000 $200.000 $10.000 $11.000
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 4.000 $1,000.000 $1,530.000 $625.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 480.000 $50.000 $40.000 $85.000
Totals: $3,527,502.950 $2,864,063.570 $3,430,201.450