Job Info for 2706-01-008

County: MONTAGUE Highway: FM 2634 Date: 06/05/2019 (5 years ago) Engineer's Estimate: $3,903,626 Control Number: 2706-01-008
Project: STP 1902(037)HES District: WICHITA FALLS Time: 180 WORKING DAYS Type: SAFETY TRT FXD OBJ, ADDL SURF WIDTH, RUMBLE STRIPS

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,903,626.00
EUROVIA ATLANTIC COAST LLC   $4,677,007.22 1
19.81% | $773,381.22
JAGOE-PUBLIC COMPANY   $5,124,362.80 2
31.27% | $1,220,736.80
9.56% | $447,355.58
A. L. HELMCAMP, INC.   $5,388,468.91 3
38.04% | $1,484,842.91
15.21% | $711,461.69
5.15% | $264,106.11

Bid Items

Items: 109, 0 filtered
MONTAGUE FM 2634  |  WICHITA FALLS  |  2706-01-008  |  06/05/2019  |  $3,903,626  |  STP 1902(037)HES  |  SAFETY TRT FXD OBJ, ADDL SURF WIDTH, RUMBLE STRIPS  |  180 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate EUROVIA ATLANTIC COAST LLC JAGOE-PUBLIC COMPANY A. L. HELMCAMP, INC.
100 6002 PREPARING ROW STA 23.000 $2,500.000 $1,100.000 $2,900.000 $1,600.000
110 6001 EXCAVATION (ROADWAY) CY 2,234.000 $11.000 $21.000 $16.000 $75.000
110 6002 EXCAVATION (CHANNEL) CY 100.000 $17.000 $85.000 $27.000 $8.000
132 6001 EMBANKMENT (FINAL)(ORD COMP)(TY A) CY 9,190.000 $10.000 $23.000 $22.000 $24.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 40,746.000 $0.120 $0.080 $0.090 $0.110
164 6011 BROADCAST SEED (TEMP) (COOL) SY 40,746.000 $0.120 $0.080 $0.090 $0.110
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 81,491.000 $0.120 $0.120 $0.130 $0.130
168 6001 VEGETATIVE WATERING MG 689.000 $14.000 $28.000 $11.600 $10.000
169 6003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 3,373.000 $2.000 $1.150 $1.250 $2.500
275 6001 CEMENT TON 492.000 $145.000 $155.000 $169.040 $165.000
275 6011 CEMENT TREAT(EXIST MATL)(8") SY 45,241.000 $3.000 $4.500 $4.000 $4.500
314 6009 EMULS ASPH (EROSN CONT)(MULTI) GAL 6,512.000 $3.000 $4.500 $3.670 $3.750
341 6008 D-GR HMA TY-B PG64-22 TON 9,043.000 $60.000 $75.750 $79.000 $87.000
341 6062 D-GR HMA TY-D PG64-22(LEVEL-UP) TON 2,794.000 $70.000 $95.000 $82.000 $114.000
344 6126 SUPERPAVE MIXTURES SP-D PG70-28 TON 12,965.000 $80.000 $91.000 $95.000 $97.000
351 6001 FLEXIBLE PAVEMENT STRUCTURE REPAIR(5") SY 1,626.000 $40.000 $37.000 $28.000 $41.500
400 6005 CEM STABIL BKFL CY 87.700 $75.000 $195.000 $239.860 $157.000
400 6006 CUT & RESTORING PAV SY 57.000 $100.000 $55.000 $59.970 $180.000
402 6001 TRENCH EXCAVATION PROTECTION LF 31.000 $5.000 $11.000 $27.260 $21.000
403 6001 TEMPORARY SPL SHORING SF 2,821.000 $20.000 $40.500 $59.970 $42.000
420 6009 CL A CONC (COLLAR) EA 16.000 $500.000 $765.000 $545.140 $1,312.000
420 6074 CL C CONC (MISC) CY 1.000 $550.000 $2,000.000 $1,308.330 $845.000
432 6003 RIPRAP (CONC)(6 IN) CY 3.300 $460.000 $850.000 $517.880 $790.000
432 6030 RIPRAP (STONE COMMON)(GROUT)(12 IN) CY 305.700 $200.000 $220.000 $272.570 $125.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 26.100 $450.000 $650.000 $545.140 $580.000
460 6002 CMP (GAL STL 18 IN) LF 1,037.000 $60.000 $50.000 $43.610 $53.000
460 6003 CMP (GAL STL 24 IN) LF 310.000 $80.000 $55.000 $54.510 $93.000
460 6004 CMP (GAL STL 30 IN) LF 4.000 $85.000 $110.000 $76.320 $105.000
460 6005 CMP (GAL STL 36 IN) LF 12.000 $80.000 $145.000 $92.670 $210.000
460 6006 CMP (GAL STL 42 IN) LF 8.000 $100.000 $170.000 $109.030 $315.000
460 6007 CMP (GAL STL 48 IN) LF 8.000 $110.000 $220.000 $163.540 $420.000
462 6045 CONC BOX CULV (3 FT X 2 FT)(EXTEND) LF 16.000 $450.000 $410.000 $408.850 $395.000
462 6048 CONC BOX CULV (4 FT X 3 FT)(EXTEND) LF 16.000 $350.000 $550.000 $545.140 $420.000
462 6050 CONC BOX CULV (5 FT X 2 FT)(EXTEND) LF 34.500 $500.000 $480.000 $545.140 $450.000
462 6053 CONC BOX CULV (5 FT X 5 FT)(EXTEND) LF 16.000 $400.000 $685.000 $735.940 $580.000
462 6055 CONC BOX CULV (6 FT X 4 FT)(EXTEND) LF 15.100 $525.000 $725.000 $735.940 $600.000
462 6056 CONC BOX CULV (6 FT X 5 FT)(EXTEND) LF 13.000 $600.000 $750.000 $806.810 $630.000
462 6059 CONC BOX CULV (7 FT X 4 FT)(EXTEND) LF 34.800 $550.000 $735.000 $806.810 $660.000
462 6060 CONC BOX CULV (7 FT X 5 FT)(EXTEND) LF 9.200 $730.000 $930.000 $872.220 $735.000
462 6062 CONC BOX CULV (7 FT X 7 FT)(EXTEND) LF 11.000 $800.000 $1,000.000 $1,003.060 $900.000
462 6064 CONC BOX CULV (8 FT X 5 FT)(EXTEND) LF 8.000 $800.000 $1,075.000 $937.640 $950.000
464 6005 RC PIPE (CL III)(24 IN) LF 158.000 $65.000 $88.000 $98.130 $125.000
464 6009 RC PIPE (CL III)(42 IN) LF 44.000 $140.000 $200.000 $228.960 $370.000
466 6101 HEADWALL (CH - PW - 0) (DIA= 36 IN) EA 2.000 $4,600.000 $7,000.000 $8,177.090 $7,900.000
466 6103 HEADWALL (CH - PW - 0) (DIA= 48 IN) EA 2.000 $7,800.000 $11,400.000 $13,628.490 $10,500.000
466 6130 HEADWALL (CH - PW - S) (DIA= 24 IN) EA 1.000 $4,800.000 $5,250.000 $8,177.090 $3,675.000
466 6132 HEADWALL (CH - PW - S) (DIA= 30 IN) EA 1.000 $6,500.000 $6,125.000 $11,175.360 $4,725.000
466 6135 HEADWALL (CH - PW - S) (DIA= 42 IN) EA 2.000 $6,800.000 $12,000.000 $19,897.590 $8,925.000
466 6171 WINGWALL (PW - 1) (HW=10 FT) EA 2.000 $25,000.000 $21,825.000 $38,159.760 $28,350.000
466 6178 WINGWALL (PW - 1) (HW=3 FT) EA 2.000 $5,100.000 $3,275.000 $5,015.280 $3,675.000
466 6179 WINGWALL (PW - 1) (HW=4 FT) EA 4.000 $8,700.000 $4,900.000 $8,177.090 $6,300.000
466 6180 WINGWALL (PW - 1) (HW=5 FT) EA 4.000 $11,000.000 $8,500.000 $14,173.620 $8,400.000
466 6181 WINGWALL (PW - 1) (HW=6 FT) EA 1.000 $13,000.000 $8,850.000 $14,718.760 $10,500.000
466 6182 WINGWALL (PW - 1) (HW=7 FT) EA 3.000 $15,000.000 $14,750.000 $25,076.410 $17,325.000
466 6183 WINGWALL (PW - 1) (HW=8 FT) EA 4.000 $16,000.000 $15,500.000 $27,256.970 $18,900.000
466 6184 WINGWALL (PW - 1) (HW=9 FT) EA 2.000 $22,000.000 $20,200.000 $39,250.040 $27,300.000
466 6217 HEADWALL (CH - PW - S)(DIA= 30 IN)(MOD) EA 1.000 $6,600.000 $8,750.000 $13,083.340 $6,300.000
467 6348 SET (TY II) (18 IN) (CMP) (6: 1) (P) EA 66.000 $800.000 $985.000 $1,035.760 $790.000
467 6375 SET (TY II) (24 IN) (CMP) (3: 1) (C) EA 3.000 $1,200.000 $1,000.000 $1,090.280 $840.000
467 6377 SET (TY II) (24 IN) (CMP) (4: 1) (C) EA 2.000 $1,200.000 $1,050.000 $1,144.800 $895.000
467 6379 SET (TY II) (24 IN) (CMP) (6: 1) (C) EA 1.000 $1,300.000 $1,250.000 $1,308.330 $998.000
467 6380 SET (TY II) (24 IN) (CMP) (6: 1) (P) EA 16.000 $1,100.000 $1,250.000 $1,308.330 $998.000
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 4.000 $1,200.000 $975.000 $1,090.280 $950.000
467 6394 SET (TY II) (24 IN) (RCP) (6: 1) (C) EA 1.000 $1,100.000 $1,150.000 $1,308.330 $1,000.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 2.000 $1,200.000 $1,150.000 $1,308.340 $998.000
467 6457 SET (TY II) (42 IN) (CMP) (4: 1) (C) EA 2.000 $2,000.000 $3,820.000 $4,906.260 $4,725.000
480 6001 CLEAN EXIST CULVERTS EA 19.000 $900.000 $1,330.000 $1,962.500 $2,100.000
496 6004 REMOV STR (SET) EA 18.000 $300.000 $165.000 $545.140 $473.000
496 6007 REMOV STR (PIPE) LF 1,204.500 $10.000 $13.000 $10.900 $26.000
500 6001 MOBILIZATION LS 1.000 $354,807.000 $280,000.000 $510,000.000 $540,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 9.000 $3,500.000 $20,000.000 $6,000.000 $29,100.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 335.000 $28.000 $35.000 $40.890 $32.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 335.000 $10.000 $15.000 $19.630 $3.500
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 3,748.000 $3.000 $2.200 $2.780 $2.250
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 3,748.000 $1.000 $1.000 $1.090 $0.950
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 3,040.000 $5.000 $3.900 $3.650 $6.150
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 3,040.000 $1.000 $1.000 $0.820 $1.600
530 6005 DRIVEWAYS (ACP) SY 851.000 $55.000 $31.500 $37.000 $40.000
530 6008 TURNOUTS (ACP) SY 298.000 $60.000 $37.000 $38.000 $30.000
530 6016 DRIVEWAYS (BASE) SY 4,528.000 $20.000 $17.500 $20.000 $17.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 74,471.800 $0.200 $0.140 $0.110 $0.200
533 6002 RUMBLE STRIPS (CENTERLINE) LF 37,231.400 $0.200 $0.140 $0.110 $0.220
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 250.000 $20.000 $18.750 $23.990 $20.000
540 6009 MTL BEAM GD FEN TRANS (T6) EA 4.000 $600.000 $625.000 $872.220 $660.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 300.000 $3.000 $4.000 $3.820 $4.250
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 4.000 $230.000 $250.000 $218.060 $262.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $2,400.000 $2,850.000 $2,562.160 $2,995.000
560 6007 MAILBOX INSTALL-S (WC-POST) TY 3 EA 12.000 $160.000 $195.000 $272.570 $205.000
560 6008 MAILBOX INSTALL-D (WC-POST) TY 3 EA 1.000 $180.000 $245.000 $299.830 $257.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 9.000 $1,000.000 $620.000 $572.400 $651.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 3.000 $1,000.000 $635.000 $708.680 $667.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 1.000 $1,000.000 $775.000 $844.970 $815.000
644 6037 IN SM RD SN SUP&AM TYS80(1)SA(U-WC) EA 6.000 $1,000.000 $930.000 $899.480 $975.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 52.000 $420.000 $331.000 $517.880 $350.000
644 6061 IN SM RD SN SUP&AM TYTWT(1)WS(T) EA 13.000 $420.000 $425.000 $599.650 $450.000
644 6076 REMOVE SM RD SN SUP&AM EA 80.000 $100.000 $85.000 $81.770 $90.000
658 6002 INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI) EA 12.000 $70.000 $145.000 $81.770 $150.000
658 6048 INSTL OM ASSM (OM-2Z)(FLX)GND EA 46.000 $65.000 $145.000 $81.770 $150.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 8.000 $30.000 $30.000 $27.260 $29.000
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 34,400.000 $0.200 $0.200 $0.220 $0.210
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 4,010.000 $1.000 $1.500 $1.200 $0.530
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 57.000 $5.000 $6.000 $6.540 $6.300
666 6102 REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA 12.000 $32.000 $70.000 $76.320 $73.500
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 67,555.000 $0.300 $0.400 $0.390 $0.420
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 4,360.000 $0.300 $0.400 $0.440 $0.420
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 50,823.000 $0.300 $0.400 $0.390 $0.420
672 6009 REFL PAV MRKR TY II-A-A EA 888.000 $3.000 $3.500 $3.820 $3.680
6185 6002 TMA (STATIONARY) DAY 94.000 $250.000 $900.000 $835.490 $300.000
6185 6005 TMA (MOBILE OPERATION) DAY 48.000 $500.000 $885.000 $639.040 $350.000
Totals: $3,903,626.00 $4,677,007.23 $5,124,362.85 $5,388,468.92