Job Info for 0917-12-086

County: MILAM Highway: CR Date: 06/01/2023 (1 year ago) Engineer's Estimate: $958,319 Control Number: 0917-12-086
Project: BR 2021(240) District: BRYAN Time: 121 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $958,319.17
KNIFE RIVER CORPORATION - SOUTH   $774,755.25 1
-19.15% | -$183,563.92
A GREATER AUSTIN DEVELOPMENT COMPANY, LTD.   $918,417.50 2
-4.16% | -$39,901.67
18.54% | $143,662.25
SEFBO PIPELINE BRIDGE, INCORPORATED   $973,601.95 3
1.59% | $15,282.78
25.67% | $198,846.70
6.01% | $55,184.45
TEXAS MATERIALS GROUP, INC.   $994,933.00 4
3.82% | $36,613.83
28.42% | $220,177.75
2.19% | $21,331.05
HODGES AND SON CONSTRUCTION COMPANY, INC.   $1,075,442.50 5
12.22% | $117,123.33
38.81% | $300,687.25
8.09% | $80,509.50
R CONSTRUCTION CIVIL, LLC   $1,313,530.10 6
37.07% | $355,210.93
69.54% | $538,774.85
22.14% | $238,087.60
Subcontractor Percentage Amount
WYLIE DRILLING & DRAINAGE, INC. 5.99% $46,407.84
ROADWAY SPECIALTIES, INC. 3.18% $24,637.22
CEN-TREE SOLUTIONS LLC 2.25% $17,431.99
CEN TEX HYDROSEED, INC. 1.76% $13,635.69
MURRAY CONSTRUCTION 0.72% $5,578.24
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.64% $4,958.43
Total: 14.54% $112,649.41

Bid Items

Items: 35, 0 filtered
MILAM CR  |  BRYAN  |  0917-12-086  |  06/01/2023  |  $958,319  |  BR 2021(240)  |  BRIDGE REPL  |  121 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate KNIFE RIVER CORPORATION - SOUTH A GREATER AUSTIN DEVELOPMENT COMPANY, LTD. SEFBO PIPELINE BRIDGE, INCORPORATED TEXAS MATERIALS GROUP, INC. HODGES AND SON CONSTRUCTION COMPANY, INC. R CONSTRUCTION CIVIL, LLC
100 6002 PREPARING ROW STA 4.500 $7,709.520 $5,400.000 $10,000.000 $11,834.450 $21,000.000 $15,000.000 $8,500.000
100 6004 PREPARING ROW(TREE)(12" TO 24" DIA) EA 20.000 $700.000 $800.000 $125.000 $507.000 $500.000 $3,200.000 $1,550.000
110 6001 EXCAVATION (ROADWAY) CY 259.000 $32.660 $55.000 $51.550 $12.970 $50.000 $40.000 $150.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 44.000 $110.320 $55.000 $74.000 $164.180 $110.000 $80.000 $100.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 1,200.000 $5.250 $1.750 $8.300 $2.500 $6.000 $4.000 $8.000
164 6023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 1,200.000 $1.450 $1.500 $5.000 $0.380 $1.250 $4.000 $5.000
164 6029 CELL FBR MLCH SEED(TEMP)(WARM) SY 510.000 $2.030 $1.250 $4.450 $0.750 $1.250 $1.000 $3.000
164 6031 CELL FBR MLCH SEED(TEMP)(COOL) SY 510.000 $2.330 $1.250 $4.450 $0.750 $1.250 $1.000 $3.000
168 6001 VEGETATIVE WATERING MG 158.000 $87.720 $20.000 $46.000 $13.670 $24.000 $1.000 $70.000
247 6061 FL BS (CMP IN PLC)(TYA GR1-2) (6") SY 1,200.000 $19.180 $18.000 $31.000 $43.330 $25.000 $40.000 $33.000
400 6005 CEM STABIL BKFL CY 27.000 $259.760 $360.000 $380.000 $346.840 $300.000 $300.000 $109.000
416 6002 DRILL SHAFT (24 IN) LF 387.000 $252.520 $200.000 $232.550 $494.620 $300.000 $180.000 $345.000
420 6013 CL C CONC (ABUT) CY 21.000 $1,664.020 $1,850.000 $1,760.000 $2,126.920 $2,200.000 $2,000.000 $2,915.000
420 6029 CL C CONC (CAP) CY 13.800 $1,947.400 $2,200.000 $2,290.000 $2,786.880 $3,000.000 $2,500.000 $2,707.000
420 6037 CL C CONC (COLUMN) CY 16.800 $2,119.490 $1,000.000 $2,095.000 $1,226.280 $1,600.000 $2,500.000 $3,010.000
422 6007 REINF CONC SLAB (SLAB BEAM) SF 2,860.000 $31.460 $27.000 $32.750 $22.490 $37.000 $30.000 $22.000
425 6012 PRESTR CONC SLAB BEAM (5SB15) LF 542.500 $297.950 $300.000 $245.000 $264.770 $280.000 $435.000 $284.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 454.000 $232.340 $138.000 $220.000 $124.760 $200.000 $200.000 $350.000
450 6006 RAIL (TY T223) LF 244.000 $172.790 $155.000 $236.000 $180.240 $190.000 $200.000 $250.000
454 6004 ARMOR JOINT (SEALED) LF 46.000 $185.610 $185.000 $210.000 $255.040 $170.000 $200.000 $164.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 1.000 $47,467.390 $29,000.000 $42,400.000 $63,600.000 $35,000.000 $25,000.000 $200,000.000
500 6001 MOBILIZATION LS 1.000 $87,749.020 $77,000.000 $91,800.000 $96,000.000 $90,000.000 $90,000.000 $130,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $12,163.990 $1,500.000 $2,600.000 $1,003.450 $3,500.000 $8,000.000 $5,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 120.000 $42.070 $45.000 $41.800 $37.500 $40.000 $1.000 $41.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 120.000 $35.960 $17.000 $9.350 $8.000 $15.000 $1.000 $2.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 711.000 $4.700 $9.000 $3.850 $6.720 $4.500 $1.000 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 711.000 $1.660 $1.750 $1.100 $1.010 $1.500 $1.000 $1.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 187.500 $50.000 $48.000 $44.300 $107.260 $40.000 $50.000 $31.000
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 4.000 $339.190 $1,500.000 $1,398.000 $882.000 $1,300.000 $2,000.000 $1,599.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $168.420 $3,500.000 $3,212.000 $2,436.000 $3,000.000 $3,500.000 $3,639.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 4.000 $793.060 $1,000.000 $715.000 $669.600 $800.000 $1,200.000 $815.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 1.000 $928.110 $1,100.000 $1,100.000 $1,209.600 $900.000 $1,500.000 $873.000
644 6071 RELOCATE SM RD SN SUP&AM TY TWT EA 2.000 $572.890 $575.000 $550.000 $360.000 $750.000 $500.000 $582.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 6.000 $37.300 $20.000 $16.500 $68.000 $15.000 $50.000 $41.000
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 16.000 $15.830 $20.000 $16.500 $90.750 $15.000 $50.000 $41.000
Totals: $958,319.17 $774,755.25 $918,417.50 $973,601.97 $994,933.00 $1,075,442.50 $1,313,530.10