Job Info for 0262-07-041

County: MILAM Highway: FM 1915 Date: 06/04/2019 (5 years ago) Engineer's Estimate: $7,683,326 Control Number: 0262-07-041
Project: C 262-7-41 District: BRYAN Time: 256 WORKING DAYS Type: REHABILITATION OF EXISTING ROAD

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $7,683,325.92
BIG CREEK CONSTRUCTION, LTD.   $8,638,532.48 1
12.43% | $955,206.56
KNIFE RIVER CORPORATION - SOUTH   $9,725,948.75 2
26.59% | $2,042,622.83
12.59% | $1,087,416.27

Bid Items

Items: 118, 0 filtered
MILAM FM 1915  |  BRYAN  |  0262-07-041  |  06/04/2019  |  $7,683,326  |  C 262-7-41  |  REHAB OF EXIST ROAD  |  256 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate BIG CREEK CONSTRUCTION, LTD. KNIFE RIVER CORPORATION - SOUTH
100 6002 PREPARING ROW STA 379.000 $250.000 $500.000 $274.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 38.000 $11.480 $35.000 $14.380
104 6054 REMOVING CONCRETE(MOW STRIP) LF 481.000 $6.950 $20.000 $5.850
105 6018 REMOVING STAB BASE AND ASPH PAV (7") SY 103,925.000 $4.000 $3.500 $2.890
110 6001 EXCAVATION (ROADWAY) CY 34,685.000 $7.850 $15.000 $14.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 19,265.000 $5.320 $15.000 $17.200
150 6001 BLADING STA 20.000 $116.000 $350.000 $300.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 100,310.000 $0.580 $0.750 $0.320
164 6023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 100,310.000 $0.130 $0.270 $0.300
164 6029 CELL FBR MLCH SEED(TEMP)(WARM) SY 50,160.000 $0.050 $0.250 $0.270
164 6031 CELL FBR MLCH SEED(TEMP)(COOL) SY 50,160.000 $0.050 $0.250 $0.270
168 6001 VEGETATIVE WATERING MG 1,003.000 $12.040 $10.000 $17.000
247 6303 FL BS (CMP IN PLC)(TY D GR-1-2)(9") SY 112,539.000 $13.690 $14.000 $20.640
247 6306 FL BS (CMP IN PLACE) (TY D GR 1-2)(4") SY 6,654.000 $5.070 $8.000 $6.800
260 6011 LIME TRT (EXST MATL) (12") SY 137,165.000 $3.000 $3.000 $5.350
260 6012 LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON 2,963.000 $150.000 $160.000 $145.000
276 6089 CM TRT(PT MX)(CL M)(TYD)(GR1-2)(FN POS) CY 1,309.000 $52.000 $80.000 $97.800
276 6300 CEM TRT(PLNT MX)(CL M)(TYD)(GR1-2)(12") SY 7,102.000 $45.500 $30.000 $32.000
316 6029 ASPH (RC-250) GAL 36,510.000 $3.790 $3.750 $4.550
316 6277 ASPH (SPG 73-19) GAL 90,586.000 $3.270 $3.500 $3.280
316 6403 AGGR (TY-B GR-5 OR TY-L GR-5) CY 1,082.000 $89.520 $80.000 $105.000
316 6434 AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B) CY 1,908.000 $100.000 $105.000 $137.000
344 6031 SUPERPAVE MIXTURES SP-C SAC-A PG64-22 TON 1,295.000 $79.300 $90.000 $99.000
400 6005 CEM STABIL BKFL CY 143.000 $66.000 $165.000 $104.000
400 6006 CUT & RESTORING PAV SY 143.000 $80.000 $150.000 $25.000
402 6001 TRENCH EXCAVATION PROTECTION LF 190.000 $7.680 $12.000 $24.000
420 6071 CL C CONC (COLLAR) EA 3.000 $935.000 $1,000.000 $2,890.000
432 6002 RIPRAP (CONC)(5 IN) CY 92.000 $500.000 $400.000 $635.000
432 6026 RIPRAP (STONE COMMON)(DRY)(18 IN) CY 625.000 $92.660 $125.000 $119.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 540.000 $391.830 $475.000 $637.000
462 6047 CONC BOX CULV (4 FT X 2 FT)(EXTEND) LF 18.000 $390.000 $500.000 $1,008.000
462 6055 CONC BOX CULV (6 FT X 4 FT)(EXTEND) LF 22.000 $744.000 $750.000 $1,000.000
462 6065 CONC BOX CULV (8 FT X 6 FT)(EXTEND) LF 29.000 $1,075.000 $1,000.000 $1,550.000
462 6070 CONC BOX CULV (9 FT X 7 FT)(EXTEND) LF 36.000 $1,200.000 $1,250.000 $1,378.000
462 6071 CONC BOX CULV (9 FT X 8 FT)(EXTEND) LF 11.000 $1,250.000 $1,400.000 $2,800.000
464 6003 RC PIPE (CL III)(18 IN) LF 930.000 $47.700 $60.000 $47.000
464 6005 RC PIPE (CL III)(24 IN) LF 630.000 $62.000 $75.000 $57.500
464 6007 RC PIPE (CL III)(30 IN) LF 123.000 $76.380 $115.000 $90.000
464 6008 RC PIPE (CL III)(36 IN) LF 285.000 $109.000 $135.000 $115.000
464 6009 RC PIPE (CL III)(42 IN) LF 30.000 $115.000 $200.000 $161.000
464 6010 RC PIPE (CL III)(48 IN) LF 36.000 $150.000 $250.000 $188.000
464 6017 RC PIPE (CL IV)(18 IN) LF 51.000 $72.510 $85.000 $80.000
464 6021 RC PIPE (CL IV)(42 IN) LF 12.000 $265.550 $200.000 $231.000
466 6097 HEADWALL (CH - PW - 0) (DIA= 24 IN) EA 4.000 $4,750.000 $4,000.000 $13,600.000
466 6099 HEADWALL (CH - PW - 0) (DIA= 30 IN) EA 1.000 $6,600.000 $5,000.000 $14,000.000
466 6101 HEADWALL (CH - PW - 0) (DIA= 36 IN) EA 10.000 $7,800.000 $6,500.000 $14,100.000
466 6130 HEADWALL (CH - PW - S) (DIA= 24 IN) EA 2.000 $4,000.000 $4,000.000 $14,500.000
466 6135 HEADWALL (CH - PW - S) (DIA= 42 IN) EA 2.000 $8,000.000 $10,000.000 $14,700.000
466 6136 HEADWALL (CH - PW - S) (DIA= 48 IN) EA 2.000 $8,250.000 $15,000.000 $14,600.000
466 6171 WINGWALL (PW - 1) (HW=10 FT) EA 1.000 $33,000.000 $45,000.000 $30,000.000
466 6172 WINGWALL (PW - 1) (HW=11 FT) EA 2.000 $39,000.000 $65,000.000 $40,000.000
466 6173 WINGWALL (PW - 1) (HW=12 FT) EA 1.000 $45,233.800 $85,000.000 $52,900.000
466 6179 WINGWALL (PW - 1) (HW=4 FT) EA 1.000 $6,500.000 $9,000.000 $12,800.000
466 6181 WINGWALL (PW - 1) (HW=6 FT) EA 1.000 $9,500.000 $20,000.000 $18,600.000
466 6182 WINGWALL (PW - 1) (HW=7 FT) EA 1.000 $18,750.000 $27,500.000 $22,600.000
466 6183 WINGWALL (PW - 1) (HW=8 FT) EA 2.000 $21,317.000 $40,000.000 $25,200.000
466 6184 WINGWALL (PW - 1) (HW=9 FT) EA 2.000 $26,485.190 $45,000.000 $23,000.000
467 6137 SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C) EA 1.000 $4,953.250 $3,500.000 $13,700.000
467 6356 SET (TY II) (18 IN) (RCP) (3: 1) (C) EA 2.000 $770.000 $750.000 $734.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 54.000 $825.000 $900.000 $935.000
467 6388 SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 6.000 $1,031.000 $1,000.000 $810.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 20.000 $1,100.000 $1,200.000 $1,000.000
467 6417 SET (TY II) (30 IN) (RCP) (3: 1) (C) EA 4.000 $1,150.000 $1,500.000 $1,600.000
467 6423 SET (TY II) (30 IN) (RCP) (6: 1) (P) EA 6.000 $1,551.000 $2,250.000 $2,100.000
467 6448 SET (TY II) (36 IN) (RCP) (3: 1) (C) EA 4.000 $1,950.000 $2,500.000 $2,500.000
467 6461 SET (TY II) (42 IN) (RCP) (3: 1) (C) EA 6.000 $2,889.850 $3,500.000 $3,000.000
467 6480 SET (TY II) (48 IN) (RCP) (6: 1) (P) EA 2.000 $7,485.190 $6,500.000 $8,800.000
496 6006 REMOV STR (HEADWALL) EA 18.000 $972.320 $2,500.000 $3,600.000
496 6016 REMOV STR (PIPE) EA 38.000 $895.450 $500.000 $970.000
500 6001 MOBILIZATION LS 1.000 $702,606.700 $754,000.000 $525,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 17.000 $8,231.000 $2,500.000 $1,600.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 2,940.000 $28.590 $25.000 $28.570
506 6011 ROCK FILTER DAMS (REMOVE) LF 2,940.000 $9.500 $5.000 $8.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 224.000 $15.000 $25.000 $22.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 224.000 $2.500 $5.000 $11.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 9,475.000 $2.390 $3.000 $2.640
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 9,475.000 $0.520 $0.500 $1.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 3,638.000 $3.650 $4.000 $4.730
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 3,638.000 $0.850 $1.000 $1.000
530 6013 DRIVEWAYS AND TURNOUTS (CONC) SY 38.000 $75.920 $100.000 $131.000
530 6014 DRIVEWAYS AND TURNOUTS (ACP) SY 2,291.000 $26.250 $30.000 $73.000
530 6015 DRIVEWAYS AND TURNOUTS (SURF TREAT) SY 2,976.000 $10.820 $20.000 $72.500
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 6,387.500 $19.380 $25.000 $22.000
540 6008 MTL BEAM GD FEN TRANS (T101) EA 12.000 $1,312.000 $900.000 $1,263.000
540 6010 MTL W-BEAM GD FEN ADJUSTMENT LF 1,723.000 $10.500 $15.000 $11.000
540 6033 MTL BM GD FEN (LONG SPAN SYSTEM) EA 8.000 $1,133.000 $800.000 $1,200.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 2,635.000 $2.120 $3.000 $2.200
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 16.000 $218.000 $150.000 $165.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 44.000 $2,615.350 $2,600.000 $2,637.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 12.000 $244.000 $250.000 $165.000
560 6007 MAILBOX INSTALL-S (WC-POST) TY 3 EA 19.000 $265.000 $150.000 $247.250
560 6013 MAILBOX INSTALL-M (TWW-POST) TY 4 EA 1.000 $400.000 $500.000 $604.400
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 129.000 $383.030 $350.000 $494.510
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 3.000 $495.600 $450.000 $604.400
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 2.000 $550.220 $550.000 $714.290
644 6017 IN SM RD SN SUP&AM TY10BWG(2)SA(P) EA 4.000 $1,095.680 $800.000 $1,209.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 1.000 $733.240 $700.000 $934.000
644 6076 REMOVE SM RD SN SUP&AM EA 122.000 $84.830 $50.000 $71.500
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 69.000 $18.720 $20.000 $11.000
658 6048 INSTL OM ASSM (OM-2Z)(FLX)GND EA 65.000 $81.400 $60.000 $71.500
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 150,418.000 $0.110 $0.100 $0.110
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 9,104.000 $0.220 $0.200 $0.190
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 140,582.000 $0.170 $0.200 $0.190
662 6093 WK ZN PAV MRK REMOV (Y)4"(BRK) LF 609.000 $0.590 $2.000 $2.140
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 1,218.000 $0.870 $2.000 $1.370
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 3,858.000 $0.750 $1.000 $1.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 214.000 $4.720 $15.000 $14.290
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 2.000 $132.150 $365.000 $400.000
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 9,814.000 $0.310 $0.320 $0.350
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 4,320.000 $0.310 $0.650 $0.690
666 6342 REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF 67,395.000 $0.760 $0.650 $0.690
666 6344 REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL) LF 4,552.000 $0.760 $0.700 $0.760
666 6345 REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL) LF 67,971.000 $0.760 $0.650 $0.690
672 6009 REFL PAV MRKR TY II-A-A EA 969.000 $2.750 $4.000 $4.400
5001 6002 GEOGRID BASE REINFORCEMENT (TY II) SY 137,165.000 $1.390 $1.500 $0.900
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $4,982.580 $10,100.000 $1,100.000
6185 6001 TMA (STATIONARY) EA 2.000 $7,037.000 $7,500.000 $22,000.000
6185 6005 TMA (MOBILE OPERATION) DAY 16.000 $187.620 $350.000 $400.000
Totals: $7,683,325.92 $8,638,532.48 $9,725,948.75