REMOVING CONC (RIPRAP)
|
SY
|
97.000
|
$32.000
|
$82.120
|
$20.790
|
$15.000
|
$118.780
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
1,660.000
|
$6.600
|
$7.530
|
$5.480
|
$7.000
|
$26.680
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
13.000
|
$35.000
|
$125.390
|
$38.310
|
$20.000
|
$668.570
|
|
|
REMOVING STAB BASE & ASPH PAV (5" - 6")
|
SY
|
114,699.000
|
$3.400
|
$4.240
|
$3.430
|
$5.750
|
$7.600
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
17.000
|
$1,600.000
|
$1,924.680
|
$1,113.790
|
$5,000.000
|
$3,319.840
|
|
|
BLADING
|
HR
|
20.000
|
$420.000
|
$150.900
|
$391.770
|
$500.000
|
$217.720
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$175.000
|
$103.340
|
$90.920
|
$150.000
|
$118.120
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
114,699.000
|
$1.150
|
$0.690
|
$0.850
|
$1.500
|
$8.190
|
|
|
PRIME COAT (AE-P)
|
GAL
|
22,950.000
|
$3.400
|
$4.700
|
$4.820
|
$5.000
|
$4.980
|
|
|
SUPERPAVE MIXTURES SP- B SAC-B PG70-22
|
TON
|
25,940.000
|
$85.000
|
$98.000
|
$118.970
|
$130.000
|
$173.370
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
6,195.000
|
$76.000
|
$96.200
|
$108.860
|
$90.000
|
$199.820
|
|
|
TOM (ASPHALT) PG 70-22
|
TON
|
504.000
|
$625.000
|
$675.000
|
$775.600
|
$800.000
|
$233.260
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
12.000
|
$275.000
|
$412.500
|
$384.180
|
$468.750
|
$536.530
|
|
|
CL K CONC (MISC)
|
CY
|
127.000
|
$875.000
|
$1,097.800
|
$2,458.780
|
$730.000
|
$916.430
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2.000
|
$2,000.000
|
$1,650.000
|
$1,536.740
|
$1,875.000
|
$1,749.800
|
|
|
JOINT SEALANT
|
LF
|
1,299.000
|
$17.000
|
$48.400
|
$43.730
|
$56.380
|
$148.860
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$298,896.960
|
$199,991.150
|
$413,547.000
|
$950,000.000
|
$1,000,356.040
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$15,000.000
|
$10,000.000
|
$12,370.760
|
$117,999.000
|
$10,881.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,550.000
|
$9.000
|
$5.140
|
$5.580
|
$20.000
|
$15.680
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,550.000
|
$3.000
|
$1.480
|
$0.530
|
$5.000
|
$3.420
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
60.000
|
$75.000
|
$82.500
|
$179.290
|
$218.750
|
$119.060
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
1,533.000
|
$30.000
|
$64.900
|
$33.200
|
$30.000
|
$40.120
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
22.000
|
$70.000
|
$146.060
|
$74.690
|
$32.500
|
$78.990
|
|
|
CURB RAMPS (TY 1)
|
SY
|
13.000
|
$145.000
|
$240.900
|
$236.750
|
$372.500
|
$617.010
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
4.000
|
$1,600.000
|
$1,650.000
|
$1,536.740
|
$1,875.000
|
$1,849.590
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,400.000
|
$1,540.000
|
$1,434.290
|
$1,750.000
|
$1,779.180
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
126.000
|
$5.500
|
$4.400
|
$4.100
|
$5.000
|
$6.370
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$450.000
|
$440.000
|
$409.800
|
$500.000
|
$579.180
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,700.000
|
$3,410.000
|
$3,175.920
|
$3,875.000
|
$3,819.180
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$450.000
|
$440.000
|
$409.800
|
$500.000
|
$579.180
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$2,150.000
|
$4,950.000
|
$4,610.210
|
$5,625.000
|
$5,859.180
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
282.000
|
$15.000
|
$11.000
|
$10.240
|
$12.500
|
$22.300
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
302.000
|
$2.000
|
$2.200
|
$2.050
|
$2.500
|
$6.660
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
604.000
|
$2.500
|
$2.480
|
$2.310
|
$2.810
|
$6.330
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$1,500.000
|
$1,650.000
|
$1,536.740
|
$1,875.000
|
$1,254.360
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
258.000
|
$26.000
|
$27.500
|
$87.080
|
$75.000
|
$30.770
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
89.000
|
$650.000
|
$418.000
|
$845.210
|
$1,150.000
|
$1,012.290
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
145.000
|
$575.000
|
$489.500
|
$922.040
|
$1,212.500
|
$1,100.520
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
14.000
|
$1,000.000
|
$594.000
|
$1,024.490
|
$1,350.000
|
$1,228.340
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
9.000
|
$1,100.000
|
$682.000
|
$1,075.720
|
$1,500.000
|
$1,282.040
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$1,200.000
|
$715.000
|
$1,162.800
|
$1,562.500
|
$1,381.840
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$1,300.000
|
$847.000
|
$1,357.450
|
$1,750.000
|
$1,609.840
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
261.000
|
$82.000
|
$49.500
|
$102.450
|
$100.000
|
$142.800
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
7,939.000
|
$1.090
|
$1.380
|
$1.280
|
$1.560
|
$1.060
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,382.000
|
$1.900
|
$1.940
|
$3.640
|
$2.000
|
$1.640
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,640.000
|
$0.800
|
$0.830
|
$0.770
|
$0.940
|
$0.910
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
3,600.000
|
$0.800
|
$0.830
|
$0.770
|
$0.940
|
$0.950
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
2,190.000
|
$1.500
|
$2.750
|
$2.560
|
$3.130
|
$3.780
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
8,341.000
|
$0.390
|
$0.420
|
$0.390
|
$0.480
|
$0.470
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
34,681.000
|
$0.390
|
$0.420
|
$0.390
|
$0.480
|
$0.480
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
33,361.000
|
$0.390
|
$0.420
|
$0.390
|
$0.480
|
$0.480
|
|
PREFAB PAV MRK TY B (W)(4")(SLD)
|
LF
|
538.000
|
$6.400
|
$7.150
|
$6.660
|
$8.130
|
$8.770
|
|
PREFAB PAV MRK TY B (W)(4")(BRK)CNTST
|
LF
|
1,584.000
|
$9.200
|
$9.350
|
$8.710
|
$10.630
|
$13.630
|
|
PREFAB PAV MRK TY B (W)(8")(SLD)
|
LF
|
5,266.000
|
$7.700
|
$9.350
|
$8.710
|
$10.630
|
$15.680
|
|
PREFAB PAV MRK TY B (W)(24")(SLD)
|
LF
|
1,955.000
|
$19.500
|
$26.400
|
$24.590
|
$30.000
|
$50.810
|
|
PREFAB PAV MRK TY B (W)(ARROW)
|
EA
|
32.000
|
$425.000
|
$291.500
|
$271.490
|
$331.250
|
$835.590
|
|
PREFAB PAV MRK TY B (W)(DBL ARROW)
|
EA
|
11.000
|
$425.000
|
$698.500
|
$650.550
|
$793.750
|
$1,382.700
|
|
PREFAB PAV MRK TY B (W)(UTURN ARROW)
|
EA
|
12.000
|
$1,000.000
|
$698.500
|
$650.550
|
$793.750
|
$1,969.590
|
|
PREFAB PAV MRK TY B (W)(WORD)
|
EA
|
45.000
|
$500.000
|
$660.000
|
$614.690
|
$750.000
|
$1,285.640
|
|
PREFAB PAV MRK TY B (W)(36")(YLD TRI)
|
EA
|
91.000
|
$55.000
|
$60.500
|
$56.350
|
$68.750
|
$104.800
|
|
PREFAB PAV MRK TY B (Y)(4")(SLD)
|
LF
|
6,842.000
|
$3.900
|
$7.150
|
$6.660
|
$8.130
|
$8.460
|
|
PREFAB PAV MRK TY B (Y)(12")(SLD)
|
LF
|
460.000
|
$11.000
|
$13.200
|
$12.290
|
$15.000
|
$21.260
|
|
REFL PAV MRKR TY I-A
|
EA
|
180.000
|
$3.400
|
$3.580
|
$3.330
|
$4.060
|
$5.900
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,166.000
|
$3.400
|
$3.300
|
$3.070
|
$3.750
|
$5.480
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
273.000
|
$3.400
|
$3.300
|
$3.070
|
$3.750
|
$5.530
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,534.000
|
$0.640
|
$0.390
|
$0.360
|
$0.440
|
$0.890
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
4,469.000
|
$0.810
|
$0.500
|
$0.460
|
$0.560
|
$1.650
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
460.000
|
$2.400
|
$1.100
|
$1.020
|
$1.250
|
$3.200
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,955.000
|
$2.400
|
$2.200
|
$2.050
|
$2.500
|
$5.090
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
32.000
|
$47.000
|
$38.500
|
$35.860
|
$43.750
|
$60.790
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
11.000
|
$60.000
|
$60.500
|
$56.350
|
$68.750
|
$108.070
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
41.000
|
$40.000
|
$49.500
|
$46.100
|
$56.250
|
$67.350
|
|
|
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
|
EA
|
91.000
|
$11.000
|
$11.000
|
$10.240
|
$12.500
|
$20.720
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
12.000
|
$75.000
|
$71.500
|
$66.590
|
$81.250
|
$109.590
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
7,534.000
|
$0.750
|
$0.280
|
$0.260
|
$0.310
|
$0.560
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
4,469.000
|
$1.200
|
$0.500
|
$0.460
|
$0.560
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
460.000
|
$2.250
|
$0.610
|
$0.560
|
$0.690
|
$2.370
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,955.000
|
$3.200
|
$0.880
|
$0.820
|
$1.000
|
$3.430
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
32.000
|
$35.000
|
$11.000
|
$10.240
|
$12.500
|
$54.790
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
11.000
|
$40.000
|
$11.000
|
$10.240
|
$12.500
|
$96.070
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
12.000
|
$52.000
|
$11.000
|
$10.240
|
$12.500
|
$93.060
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
41.000
|
$34.000
|
$11.000
|
$10.240
|
$12.500
|
$69.680
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
91.000
|
$14.000
|
$5.500
|
$5.120
|
$6.250
|
$21.970
|
|
|
THIN WHITETOPPING (CONC OVERLAY) 4"
|
SY
|
831.000
|
$240.000
|
$115.500
|
$105.520
|
$225.000
|
$216.330
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$20,000.000
|
$12,124.660
|
$15,803.220
|
$26,250.000
|
$15,814.260
|
|
|
TMA (STATIONARY)
|
EA
|
3.000
|
$15,000.000
|
$21,275.100
|
$65,186.070
|
$21,750.000
|
$16,508.520
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
96.000
|
$90.000
|
$72.050
|
$146.030
|
$187.500
|
$300.000
|
|
|
REP ULTRA-THIN AND THIN WHITE TOPPING
|
SY
|
2,791.000
|
$210.000
|
$401.500
|
$306.320
|
$247.500
|
$12.070
|
|
Totals: |
$5,697,387.140
|
$6,656,389.810
|
$7,589,898.210
|
$9,285,274.970
|
$10,686,398.970
|