MIDLAND SL 250 (1188-02-100)

Items: 187

County: MIDLAND
Length: N/A
Highway: SL 250
District: ODESSA
Control Number: 1188-02-100
DBE Goal: N/A
Project: C 1188-2-100
Guaranty: N/A
Time: 295 WORKING DAYS
Engineer's Estimate: $22,306,271.29
Date: 04/07/2021 (5 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (8)
E
Engineer's Estimate
$22,306,271.29
Over/Under Est: -18.21% -$4,061,093.30
$20,065,709.15
Over/Under Est: -10.04% -$2,240,562.14
Amt Left: 9.98% $1,820,531.16
$20,632,503.69
Over/Under Est: -7.5% -$1,673,767.60
Amt Left: 13.08% $2,387,325.70
Delta: -2.82% -$566,794.54
Over/Under Est: -5.95% -$1,327,416.42
Amt Left: 14.98% $2,733,676.88
Delta: -1.68% -$346,351.18
Over/Under Est: -3.57% -$795,885.62
Amt Left: 17.9% $3,265,207.68
Delta: -2.53% -$531,530.80
$21,913,748.50
Over/Under Est: -1.76% -$392,522.79
Amt Left: 20.11% $3,668,570.51
Delta: -1.88% -$403,362.83
Over/Under Est: -1.65% -$368,703.29
Amt Left: 20.24% $3,692,390.01
Delta: -0.11% -$23,819.50
$24,191,930.94
Over/Under Est: 8.45% $1,885,659.65
Amt Left: 32.59% $5,946,752.95
Delta: -10.28% -$2,254,362.94

Bid Items & Bid Tabulations

187 Total 0 of 187
MIDLAND  |  SL 250  |  ODESSA  |  1188-02-100  |  04/07/2021  |  $22,306,271.29  |  C 1188-2-100  |  HWY IMPRV  |  295 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
REECE ALBERT, INC.
FNF CONSTRUCTION, INC.
RAGLE CONSTRUCTION, INC.
JAMES CONSTRUCTION GROUP, LLC
CK NEWBERRY, LLC
STERLING DELAWARE HOLDING COMPANY, INC.
SEMA CONSTRUCTION, INC.
REMOVING CONC (PAV)
SY 16,129.000 $85.000 $5.250 $10.650 $17.000 $7.250 $7.420 $6.000 $2.250 $14.000
REMOVING CONC (RIPRAP)
SY 1,153.000 $25.000 $9.000 $14.200 $12.000 $6.500 $9.990 $11.000 $13.500 $7.500
REMOVING CONC (MEDIANS)
SY 339.000 $50.000 $9.000 $29.500 $11.000 $14.000 $8.120 $19.000 $17.600 $11.000
REMOVING CONC (SIDEWALKS)
SY 399.000 $10.000 $9.000 $20.900 $13.000 $12.000 $10.880 $16.000 $10.250 $7.150
REMOVING CONC (CURB AND GUTTER)
LF 16,957.000 $6.000 $2.500 $3.300 $3.500 $4.750 $2.270 $6.000 $1.450 $3.700
REMOVING CONC (CTB)
LF 338.000 $10.000 $6.300 $56.250 $15.500 $30.000 $30.230 $19.000 $22.600 $6.500
REMOVING CONC (WHEELCHAIR RAMP)
SY 36.000 $20.000 $26.250 $75.650 $19.000 $22.000 $44.090 $45.000 $32.550 $23.500
REMOVING CONC (FLUME)
SY 832.000 $15.000 $8.000 $15.350 $16.000 $9.000 $8.990 $15.000 $9.800 $11.500
REMOVING STAB BASE AND ASPH PAV(8")
SY 48,274.000 $5.250 $3.150 $3.600 $4.000 $3.000 $3.880 $5.000 $4.200 $5.000
REMOVING STAB BASE AND ASPH PAV(7"-10")
SY 51,181.000 $2.000 $3.800 $3.800 $4.500 $3.500 $4.040 $5.150 $4.350 $5.250
OBLITERATING ABANDONED ROAD
SY 19,907.000 $7.000 $2.000 $2.300 $3.000 $5.500 $5.230 $1.500 $1.110 $5.250
EXCAVATION (ROADWAY)
CY 46,963.000 $9.000 $10.250 $8.050 $13.000 $15.000 $12.420 $11.000 $2.410 $14.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 37,851.000 $18.000 $15.700 $7.500 $6.000 $1.500 $8.490 $7.500 $6.580 $24.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 7,812.000 $12.000 $24.190 $56.000 $28.000 $1.000 $0.020 $35.000 $60.000 $46.000
BLADING
HR 50.000 $215.000 $300.000 $130.500 $148.000 $140.000 $103.730 $125.000 $151.900 $165.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 238,624.000 $0.150 $0.120 $0.130 $0.110 $0.100 $0.100 $0.100 $0.100 $1.100
PROOF ROLLING
HR 50.000 $120.000 $125.000 $75.800 $110.000 $115.000 $71.810 $40.000 $86.080 $150.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 36,250.000 $9.750 $5.700 $6.000 $8.000 $5.600 $8.000 $6.500 $8.610 $5.600
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 95,715.000 $1.160 $0.750 $0.750 $1.000 $1.250 $1.250 $1.000 $1.770 $2.250
PRIME COAT (AE-P)
GAL 22,786.000 $4.500 $3.740 $4.300 $4.500 $4.000 $4.450 $4.000 $3.000 $3.250
FOG SEAL (CSS-1H)
GAL 22,660.000 $3.400 $3.280 $2.200 $4.000 $4.000 $3.650 $3.500 $3.000 $3.250
ASPH (AC-20-5TR)
GAL 42,438.000 $3.000 $2.900 $3.650 $3.500 $3.000 $3.350 $3.250 $3.500 $3.750
AGGR(TY-PB GR-4 SAC-B)
CY 1,164.000 $105.000 $69.000 $115.250 $140.000 $95.000 $170.000 $115.000 $140.000 $146.000
STONE-MTRX-ASPH SMAR-F SAC-A
TON 10,556.000 $117.000 $128.000 $162.000 $130.000 $120.000 $164.500 $150.000 $180.000 $183.000
CONC PVMT (JOINTED - CPCD) (10")
SY 19,725.000 $103.000 $82.450 $103.150 $84.000 $75.000 $80.850 $110.000 $104.000 $86.500
CEM STABIL BKFL
CY 10.900 $155.000 $147.000 $152.500 $194.000 $105.000 $89.580 $150.000 $333.000 $175.000
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 1.000 $17,000.000 $20,000.000 $49,340.000 $23,000.000 $13,000.000 $42,000.000 $19,000.000 $17,595.000 $76,000.000
DRILL SHAFT (36 IN)
LF 198.000 $250.000 $459.900 $407.000 $406.000 $150.000 $398.380 $215.000 $316.490 $205.000
DRILL SHAFT (48 IN)
LF 40.000 $400.000 $719.250 $802.000 $405.000 $250.000 $444.250 $275.000 $685.000 $540.000
DRILL SHAFT (72 IN)
LF 76.000 $350.000 $1,517.250 $1,188.000 $1,100.000 $725.000 $1,001.270 $700.000 $944.130 $795.000
DRILL SHAFT (SIGN MTS) (12 IN)
LF 32.000 $117.000 $131.250 $146.000 $128.000 $100.000 $115.000 $275.000 $127.800 $145.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 163.000 $210.000 $157.500 $175.000 $192.000 $150.000 $180.210 $375.000 $188.750 $225.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 344.000 $265.000 $241.500 $269.000 $230.000 $180.000 $227.150 $190.000 $230.000 $275.000
CL C CONC (ABUT)
CY 25.200 $980.000 $1,365.000 $1,868.000 $1,700.000 $1,100.000 $1,100.000 $1,200.000 $1,200.000 $1,200.000
CL C CONC (CAP)
CY 145.300 $1,000.000 $1,575.000 $1,210.000 $2,000.000 $1,100.000 $1,000.000 $1,400.000 $1,300.000 $2,000.000
CL C CONC (COLUMN)
CY 77.400 $960.000 $1,470.000 $1,510.000 $1,400.000 $950.000 $1,200.000 $1,325.000 $1,100.000 $2,000.000
REINF CONC SLAB (HPC)
SF 12,480.000 $19.000 $25.360 $34.050 $30.000 $21.500 $29.000 $20.000 $29.000 $21.000
APPROACH SLAB
CY 29.800 $545.000 $787.500 $962.150 $1,200.000 $1,200.000 $800.000 $725.000 $525.000 $675.000
RETAINING WALL (MSE)
SF 19,376.000 $45.000 $39.380 $36.500 $43.000 $52.000 $62.000 $52.000 $50.000 $38.000
PRESTR CONC GIRDER (TX54)
LF 1,864.800 $180.000 $213.150 $192.750 $232.000 $140.000 $190.000 $175.000 $178.000 $168.000
RIPRAP (CONC)(4 IN)
CY 66.250 $515.000 $630.000 $601.500 $1,028.000 $500.000 $545.260 $610.000 $467.000 $440.000
RIPRAP (CONC)(CL B)
CY 15.050 $900.000 $630.000 $1,010.000 $1,800.000 $530.000 $944.060 $675.000 $661.000 $525.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 20.000 $450.000 $630.000 $762.000 $1,500.000 $530.000 $475.930 $725.000 $545.000 $540.000
RIPRAP (CONC)(FLUME)
CY 52.000 $510.000 $630.000 $615.000 $780.000 $475.000 $513.820 $575.000 $435.000 $575.000
RIPRAP (MOW STRIP)(4 IN)
CY 188.000 $475.000 $696.180 $615.000 $780.000 $475.000 $546.880 $575.000 $537.000 $430.000
RAIL (TY SSTR)
LF 2,332.000 $55.000 $81.900 $61.600 $71.000 $50.000 $58.030 $60.000 $54.000 $96.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 104.000 $110.000 $157.500 $157.050 $216.000 $135.000 $119.790 $150.000 $161.000 $135.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 240.000 $670.000 $522.900 $357.000 $670.000 $700.000 $556.970 $350.000 $484.000 $350.000
RC PIPE (CL III)(18 IN)
LF 153.000 $80.000 $65.100 $83.000 $92.000 $60.000 $65.510 $80.000 $121.000 $76.000
RC PIPE (CL III)(24 IN)
LF 1,066.000 $80.000 $94.500 $77.000 $102.000 $70.000 $76.710 $77.000 $86.000 $82.000
MANH (COMPL)(PRM)(48IN)
EA 4.000 $4,500.000 $3,984.750 $7,360.000 $8,700.000 $4,500.000 $4,957.980 $12,500.000 $6,360.000 $5,200.000
INLET (COMPL)(TY MSE2)
EA 2.000 $5,500.000 $4,488.750 $8,600.000 $5,300.000 $5,400.000 $5,868.100 $14,000.000 $7,850.000 $5,000.000
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
EA 8.000 $4,350.000 $3,596.250 $5,180.000 $5,600.000 $4,500.000 $4,112.190 $11,500.000 $6,700.000 $4,200.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $12,500.000 $14,805.000 $18,530.000 $26,000.000 $14,250.000 $15,116.010 $35,000.000 $20,650.000 $19,000.000
SET (TY II) (18 IN) (CMP) (4: 1) (C)
EA 2.000 $1,500.000 $1,569.750 $1,667.000 $2,400.000 $1,270.000 $1,330.840 $2,000.000 $2,225.000 $1,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,500.000 $2,047.500 $1,883.000 $3,200.000 $1,350.000 $1,519.700 $2,100.000 $2,425.000 $1,200.000
ADJUSTING MANHOLES
EA 7.000 $1,350.000 $1,995.000 $3,000.000 $1,800.000 $1,100.000 $1,261.890 $1,750.000 $1,400.000 $2,000.000
ADJUSTING INLETS
EA 1.000 $1,805.000 $2,257.500 $4,537.000 $1,800.000 $1,100.000 $2,491.700 $3,500.000 $2,275.000 $2,300.000
CLEAN EXIST CULVERTS
EA 1.000 $2,000.000 $3,675.000 $11,895.000 $4,100.000 $3,700.000 $10,000.000 $3,000.000 $13,000.000 $1,200.000
PIPE (PVC) (SCH 40) (18 IN)
LF 31.000 $155.000 $236.250 $55.100 $51.000 $70.000 $112.870 $100.000 $121.000 $100.000
REMOV STR (INLET)
EA 3.000 $600.000 $1,338.750 $2,165.000 $2,300.000 $500.000 $680.160 $1,400.000 $925.000 $400.000
REMOV STR (SET)
EA 1.000 $550.000 $834.750 $164.550 $2,300.000 $500.000 $816.180 $1,100.000 $235.000 $700.000
REMOV STR (HEADWALL)
EA 2.000 $1,250.000 $2,362.500 $1,000.000 $4,500.000 $1,450.000 $2,700.470 $2,100.000 $2,060.000 $1,200.000
REMOV STR (PIPE)
LF 449.000 $14.000 $21.000 $17.700 $88.000 $15.000 $32.860 $10.000 $16.900 $17.500
MOBILIZATION
LS 1.000 $1,000,000.000 $670,000.000 $973,358.000 $2,000,000.000 $2,000,000.000 $2,150,600.000 $1,700,000.000 $2,161,740.000 $2,410,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $10,000.000 $11,000.000 $9,455.000 $36,000.000 $126,500.000 $23,000.000 $32,200.000 $23,400.000 $27,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 92.000 $58.000 $30.000 $69.350 $100.000 $116.880 $116.880 $75.000 $116.880 $72.000
ROCK FILTER DAMS (REMOVE)
LF 92.000 $20.000 $15.000 $34.600 $11.000 $24.510 $24.510 $10.000 $24.510 $9.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 333.000 $25.000 $13.500 $35.400 $37.000 $32.010 $32.010 $25.000 $32.010 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 333.000 $10.000 $5.000 $8.000 $9.000 $8.820 $8.820 $8.000 $8.820 $7.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,828.000 $5.500 $6.000 $3.800 $8.000 $6.630 $6.630 $5.250 $6.630 $6.800
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,828.000 $1.750 $1.500 $0.400 $1.000 $0.520 $0.520 $1.000 $0.520 $1.150
CONSTRUCTING DETOURS
SY 11,745.000 $55.000 $28.000 $33.150 $38.000 $35.000 $37.500 $39.000 $35.820 $42.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 15,800.000 $45.000 $73.500 $69.000 $23.000 $55.000 $54.000 $42.000 $45.000 $68.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 460.000 $67.500 $68.250 $52.800 $26.000 $50.000 $70.000 $54.000 $45.000 $65.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 30,020.000 $5.000 $5.250 $5.600 $5.000 $6.250 $4.700 $4.500 $8.000 $5.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 1,560.000 $12.000 $5.250 $5.600 $9.000 $6.250 $5.530 $22.000 $8.000 $8.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 15,800.000 $7.000 $10.500 $6.200 $7.000 $7.750 $8.180 $4.250 $29.000 $9.200
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 460.000 $10.000 $10.500 $7.100 $10.000 $7.750 $14.130 $24.000 $29.000 $10.900
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 15,330.000 $90.000 $18.380 $48.700 $13.000 $55.000 $56.000 $49.000 $50.000 $58.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 23,070.000 $15.000 $13.000 $5.600 $2.000 $6.250 $5.280 $12.000 $3.500 $5.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 15,330.000 $5.100 $15.750 $5.250 $1.000 $7.750 $9.540 $7.000 $6.500 $9.150
PERM CTB (SGL SLOPE) (TY 2) (42 )
LF 543.000 $125.000 $220.500 $121.000 $140.000 $110.000 $112.220 $115.000 $77.000 $236.000
PERM CTB (F-SHAPE) (TY 1)
LF 400.000 $75.000 $234.150 $116.600 $135.000 $85.000 $108.030 $110.000 $63.000 $256.000
REMOVE AND RELAY PAVERS
SY 75.000 $220.000 $99.000 $103.950 $164.000 $105.000 $106.170 $35.000 $81.750 $80.000
CONC CURB (TY II)
LF 354.000 $18.000 $26.250 $29.950 $25.000 $12.000 $8.840 $27.000 $35.070 $27.000
CONC CURB (MONO) (TY II)
LF 664.000 $10.000 $26.250 $25.100 $25.000 $6.500 $8.840 $25.000 $16.990 $4.500
CONC CURB & GUTTER (TY II)
LF 20,043.000 $40.000 $25.200 $20.000 $33.000 $18.000 $16.210 $21.000 $21.660 $20.000
DRIVEWAYS (CONC)
SY 856.000 $75.000 $96.600 $121.450 $122.000 $75.000 $92.850 $140.000 $95.830 $92.000
TURNOUTS (CONC)
SY 2,034.000 $70.000 $96.600 $114.600 $96.000 $65.000 $88.490 $100.000 $90.750 $74.000
CONC SIDEWALKS (4")
SY 314.000 $78.000 $82.950 $94.550 $91.000 $50.000 $75.410 $62.000 $67.000 $54.000
CURB RAMPS (TY 22)
EA 12.000 $4,350.000 $2,310.000 $2,445.000 $3,800.000 $2,500.000 $2,239.180 $2,300.000 $2,450.000 $1,700.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 14,456.000 $0.250 $0.200 $0.580 $0.250 $0.350 $0.350 $0.500 $0.650 $0.700
CONC MEDIAN
SY 292.000 $80.000 $94.500 $117.900 $72.000 $65.000 $77.040 $160.000 $46.000 $100.000
MTL W-BEAM GD FEN (STEEL POST)
LF 3,046.000 $27.500 $34.130 $31.630 $36.000 $23.310 $28.750 $27.000 $23.310 $25.000
MTL THRIE-BEAM GD FEN (STEEL POST)
LF 50.000 $729.150 $131.250 $77.000 $89.000 $143.980 $70.000 $50.000 $143.980 $160.000
MTL BEAM GD FEN TRANS (T101)
EA 6.000 $1,200.000 $1,470.000 $1,595.000 $1,500.000 $1,203.930 $1,450.000 $1,900.000 $1,203.930 $1,300.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,500.000 $1,548.750 $1,413.500 $1,320.000 $1,062.460 $1,285.000 $1,900.000 $1,062.460 $1,150.000
REMOVE METAL BEAM GUARD FENCE
LF 3,478.000 $3.250 $3.150 $1.930 $2.000 $1.820 $1.750 $2.500 $1.820 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $150.000 $315.000 $181.500 $168.000 $147.880 $165.000 $400.000 $147.880 $165.000
RM MTL BM GD FEN TRANS (T101)
EA 2.000 $280.000 $315.000 $192.500 $178.000 $147.880 $175.000 $300.000 $147.880 $165.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,400.000 $3,412.500 $3,272.500 $3,100.000 $2,569.500 $2,975.000 $2,800.000 $2,569.500 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $370.000 $315.000 $192.500 $180.000 $147.880 $175.000 $200.000 $147.880 $165.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 9.000 $1,400.000 $2,100.000 $870.000 $750.000 $157.880 $157.580 $1,250.000 $157.580 $175.000
CRASH CUSH ATTEN (REMOVE)
EA 9.000 $950.000 $1,312.500 $870.000 $450.000 $103.030 $103.030 $950.000 $103.030 $120.000
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
EA 3.000 $29,800.000 $30,450.000 $26,045.000 $23,000.000 $22,276.130 $22,276.130 $25,000.000 $22,276.130 $23,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
EA 5.000 $7,000.000 $7,875.000 $8,270.000 $10,000.000 $7,064.130 $7,064.130 $25,000.000 $7,064.130 $7,800.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $6,800.000 $7,875.000 $8,858.000 $10,000.000 $7,086.080 $7,086.080 $25,000.000 $7,086.080 $7,800.000
REMOVE RD IL ASM (TRANS-BASE)
EA 31.000 $470.000 $420.000 $440.000 $1,000.000 $950.000 $478.850 $1,000.000 $400.000 $575.000
REPLACE LUMINAIRE W/LED (150W EQ)
EA 8.000 $639.060 $498.750 $522.500 $500.000 $450.000 $399.840 $475.000 $475.000 $475.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 95.000 $575.000 $609.000 $638.000 $510.000 $500.000 $519.330 $525.000 $580.000 $600.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 2.000 $1,800.000 $1,575.000 $1,650.000 $1,600.000 $1,550.000 $1,252.360 $1,650.000 $1,500.000 $1,500.000
IN RD IL (TY SA) 40S-8 (250W EQ) LED
EA 5.000 $3,450.000 $3,675.000 $3,850.000 $3,600.000 $3,500.000 $2,811.200 $3,700.000 $3,500.000 $3,200.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 43.000 $3,650.000 $3,675.000 $3,850.000 $3,600.000 $3,500.000 $2,940.650 $3,700.000 $3,500.000 $3,500.000
CONDT (PVC) (SCH 40) (2")
LF 12,323.000 $8.750 $8.930 $9.350 $8.000 $7.000 $11.150 $7.500 $8.500 $13.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 471.000 $27.000 $52.500 $55.000 $24.000 $23.000 $24.250 $24.500 $50.000 $29.000
CONDT (PVC) (SCH 40) (3")
LF 53.000 $21.000 $36.750 $38.500 $10.000 $9.000 $20.970 $9.500 $35.000 $25.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 155.000 $25.000 $52.500 $55.000 $24.000 $23.000 $26.440 $24.000 $50.000 $31.000
CONDT (RM) (3/4")
LF 18.000 $28.500 $26.250 $27.500 $26.000 $25.000 $26.200 $26.000 $25.000 $31.000
CONDT (RM) (2")
LF 69.000 $35.000 $42.000 $44.000 $28.000 $27.000 $35.840 $28.000 $40.000 $43.000
ELEC CONDR (NO.12) BARE
LF 32.000 $1.000 $1.050 $1.100 $1.000 $0.900 $1.230 $0.950 $1.000 $1.500
ELEC CONDR (NO.12) INSULATED
LF 64.000 $1.200 $1.260 $1.320 $1.200 $1.100 $1.330 $1.150 $1.200 $1.600
ELEC CONDR (NO.8) INSULATED
LF 32,386.000 $1.500 $1.310 $1.380 $1.200 $1.150 $1.550 $1.200 $1.250 $1.800
ELEC CONDR (NO.6) BARE
LF 15,362.000 $1.500 $1.730 $1.820 $1.300 $1.250 $1.460 $1.300 $1.650 $1.700
ELEC CONDR (NO.6) INSULATED
LF 740.000 $1.750 $1.840 $1.930 $1.600 $1.500 $2.160 $1.600 $1.750 $2.500
GROUND BOX TY A (122311)W/APRON
EA 32.000 $1,000.000 $1,050.000 $1,100.000 $1,000.000 $950.000 $1,126.580 $1,000.000 $1,000.000 $1,300.000
REMOVE GROUND BOX
EA 4.000 $250.000 $262.500 $275.000 $130.000 $125.000 $485.160 $135.000 $250.000 $560.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $560.000 $525.000 $550.000 $500.000 $450.000 $872.480 $475.000 $500.000 $1,000.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 5.000 $7,000.000 $6,825.000 $7,150.000 $5,500.000 $5,400.000 $6,642.720 $5,800.000 $6,500.000 $8,000.000
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 1.000 $5,930.000 $5,250.000 $5,500.000 $6,100.000 $6,000.000 $5,437.600 $6,400.000 $5,000.000 $6,500.000
ALUMINUM SIGNS (TY A)
SF 785.000 $30.000 $29.400 $30.800 $26.000 $25.000 $35.070 $28.000 $32.290 $32.000
ALUMINUM SIGNS (TY G)
SF 1,535.500 $35.000 $29.400 $30.800 $27.000 $26.000 $30.140 $33.000 $31.560 $37.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $780.000 $787.500 $825.000 $610.000 $600.000 $760.680 $650.000 $803.570 $690.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 61.000 $910.000 $918.750 $962.500 $730.000 $715.000 $898.610 $800.000 $937.160 $860.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $3,600.000 $1,034.250 $1,083.500 $970.000 $950.000 $4,612.500 $850.000 $3,609.370 $940.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 5.000 $640.000 $971.250 $1,017.500 $630.000 $615.000 $656.860 $850.000 $683.950 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 5.000 $1,220.000 $1,086.750 $1,138.500 $820.000 $800.000 $1,150.160 $950.000 $1,151.690 $1,060.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,310.000 $1,627.500 $1,705.000 $970.000 $950.000 $1,096.960 $1,550.000 $1,164.130 $1,700.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 1.000 $2,600.000 $3,937.500 $4,125.000 $2,000.000 $1,900.000 $2,270.160 $1,700.000 $1,500.000 $1,900.000
REMOVE SM RD SN SUP&AM
EA 92.000 $100.000 $105.000 $110.000 $80.000 $70.000 $101.390 $105.000 $99.070 $120.000
INSTALL LRSS (STRUCT STEEL)
LB 8,633.600 $6.750 $6.300 $6.600 $5.000 $4.500 $6.670 $7.000 $9.070 $7.600
REMOVE LRSA
EA 10.000 $1,150.000 $1,207.500 $1,265.000 $1,200.000 $1,100.000 $1,148.060 $950.000 $1,177.750 $1,060.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 32.000 $85.000 $147.000 $154.000 $30.000 $25.000 $33.000 $100.000 $33.000 $100.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 36.000 $115.000 $147.000 $154.000 $30.000 $25.000 $33.000 $100.000 $33.000 $100.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 7,307.000 $0.250 $0.170 $0.180 $0.200 $0.200 $0.200 $0.300 $0.200 $0.220
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 26,529.000 $0.150 $0.170 $0.180 $0.200 $0.200 $0.200 $0.300 $0.200 $0.220
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 10,255.000 $0.450 $0.340 $0.360 $0.330 $0.400 $0.400 $0.600 $0.400 $0.420
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 2,433.000 $1.900 $2.100 $2.200 $2.100 $1.500 $1.500 $1.000 $1.500 $1.600
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 16.000 $14.000 $10.500 $11.000 $11.000 $20.000 $20.000 $23.000 $20.000 $21.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 31,288.000 $0.200 $0.170 $0.180 $0.200 $0.200 $0.200 $0.300 $0.200 $0.220
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 6,522.000 $0.900 $0.790 $0.830 $0.800 $1.420 $1.420 $1.750 $1.420 $1.450
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 44,857.000 $0.750 $0.680 $0.720 $0.700 $0.850 $0.850 $1.750 $0.850 $0.900
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 6,064.000 $1.750 $0.790 $0.830 $0.800 $1.700 $1.700 $4.000 $1.700 $1.800
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 3,569.000 $4.000 $5.250 $5.500 $5.500 $8.000 $8.000 $5.000 $8.000 $8.400
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 15.000 $25.000 $52.500 $55.000 $51.000 $20.000 $20.000 $45.000 $20.000 $21.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 56,939.000 $0.750 $0.680 $0.720 $0.700 $0.850 $0.850 $1.750 $0.850 $0.900
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 214.000 $1.000 $1.890 $1.980 $2.000 $0.420 $0.420 $1.000 $0.420 $0.450
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 12,025.000 $0.950 $0.790 $0.830 $0.800 $0.840 $0.840 $1.400 $0.840 $0.870
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,980.000 $4.000 $3.150 $3.300 $3.100 $3.000 $3.000 $3.250 $3.000 $3.200
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 8,432.000 $0.480 $0.580 $0.610 $0.600 $0.420 $0.420 $0.750 $0.420 $0.450
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 28,885.000 $0.450 $0.470 $0.500 $0.500 $0.420 $0.420 $0.750 $0.420 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 38,636.000 $0.450 $0.470 $0.500 $0.500 $0.420 $0.420 $0.750 $0.420 $0.450
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 640.000 $2.800 $5.250 $5.500 $5.000 $3.000 $3.000 $2.000 $3.000 $3.200
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 795.000 $13.500 $14.700 $15.400 $15.000 $15.000 $15.000 $20.000 $15.000 $16.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 28.000 $230.000 $231.000 $242.000 $230.000 $250.000 $250.000 $250.000 $250.000 $265.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 10.000 $325.000 $441.000 $462.000 $440.000 $450.000 $450.000 $500.000 $450.000 $465.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 8.000 $330.000 $441.000 $462.000 $430.000 $500.000 $500.000 $550.000 $500.000 $520.000
PREFAB PAV MRK TY C (W) (WORD)
EA 29.000 $250.000 $262.500 $275.000 $260.000 $350.000 $350.000 $375.000 $350.000 $370.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 60.000 $35.000 $26.250 $27.500 $26.000 $40.000 $40.000 $45.000 $40.000 $42.000
REFL PAV MRKR TY I-C
EA 207.000 $3.500 $3.680 $3.850 $4.000 $5.000 $5.000 $5.000 $5.000 $5.400
REFL PAV MRKR TY II-C-R
EA 1,157.000 $3.000 $3.130 $3.280 $3.500 $3.250 $3.250 $5.000 $3.250 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 36,113.000 $0.450 $0.630 $0.660 $0.700 $0.750 $0.750 $0.750 $0.750 $0.800
ELIM EXT PAV MRK & MRKS (8")
LF 3,826.000 $0.900 $1.040 $1.090 $1.100 $1.250 $1.250 $1.250 $1.250 $1.300
ELIM EXT PAV MRK & MRKS (12")
LF 301.000 $2.250 $2.100 $2.200 $2.100 $3.000 $3.000 $2.250 $3.000 $3.200
SHRUB PLANTING AND REMOVAL
EA 41.000 $10.000 $80.750 $275.000 $250.000 $1,000.000 $750.000 $55.000 $250.000 $52.000
SP MIXES SP-B SAC-B PG70-22
TON 49,477.000 $90.000 $69.000 $81.000 $85.000 $85.000 $84.000 $90.000 $92.250 $96.000
TACK COAT
GAL 11,293.000 $3.400 $2.800 $2.700 $6.000 $3.500 $3.300 $4.250 $3.000 $3.250
BONDING COURSE
GAL 12,820.000 $3.750 $3.520 $2.700 $3.500 $3.500 $3.300 $4.250 $3.500 $3.750
TIP TESTING(DRILL SHAFT)
EA 4.000 $4,850.000 $3,386.250 $3,289.260 $13,000.000 $1,878.000 $2,800.000 $26,000.000 $2,800.000 $6,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $9,500.000 $7,875.000 $19,270.000 $25,000.000 $10,250.000 $10,792.950 $15,000.000 $17,250.000 $15,500.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 1.000 $1,750.000 $8,400.000 $8,800.000 $7,500.000 $7,000.000 $2,446.080 $7,500.000 $8,000.000 $2,900.000
ITS RADIO (INSTALL ONLY)
EA 1.000 $4,000.000 $7,938.000 $8,316.000 $600.000 $500.000 $1,557.920 $525.000 $7,560.000 $1,900.000
ITS POLE (60 FT)(90 MPH)
EA 1.000 $13,780.000 $21,000.000 $22,000.000 $18,000.000 $17,500.000 $24,239.040 $18,500.000 $20,000.000 $29,000.000
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 1.000 $8,500.000 $7,350.000 $7,700.000 $6,000.000 $5,600.000 $5,735.520 $6,000.000 $7,000.000 $7,000.000
ETHERNET SWITCH (INSTALL ONLY)
EA 1.000 $400.000 $3,150.000 $3,300.000 $500.000 $450.000 $537.600 $475.000 $3,000.000 $650.000
TMA (STATIONARY)
DAY 1,770.000 $165.000 $25.000 $117.900 $150.000 $150.000 $334.580 $190.000 $128.140 $200.000
TMA (MOBILE OPERATION)
DAY 20.000 $425.000 $892.500 $609.000 $630.000 $380.000 $734.040 $250.000 $290.970 $500.000
Totals: $22,306,271.290 $18,245,177.990 $20,065,709.155 $20,632,503.690 $20,978,854.870 $21,510,385.682 $21,913,748.500 $21,937,568.002 $24,191,930.940