Job Info for 6439-54-001

County: MEDINA Highway: FM0462 Date: 05/16/2024 (6 months ago) Engineer's Estimate: $255,633 Control Number: 6439-54-001
Project: BPM - 643954001 District: SAN ANTONIO Time: 25 W Type: EROSION REPAIR
Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $255,633.46
BECK-REIT & SONS, LTD.   $222,736.00 1
-12.87% | -$32,897.46
DIAMOND R CONTRACTING, LLC   $224,321.00 2
-12.25% | -$31,312.46
0.71% | $1,585.00
ICOS MANAGEMENT, LLC   $232,596.00 3
-9.01% | -$23,037.46
4.43% | $9,860.00
3.69% | $8,275.00
CRACKSEAL OF TEXAS, LLC   $253,590.00 4
-0.8% | -$2,043.46
13.85% | $30,854.00
9.03% | $20,994.00
GARRET SHIELDS INFRASTRUCTURE   $263,570.00 5
3.1% | $7,936.54
18.33% | $40,834.00
3.94% | $9,980.00
AAD CONTRACTING INC.   $289,096.00 6
13.09% | $33,462.54
29.79% | $66,360.00
9.68% | $25,526.00
RHINO EQUITY, LLC   $323,878.80 7
26.7% | $68,245.34
45.41% | $101,142.80
12.03% | $34,782.80
CRAIG & HEIDT, INC.   $387,936.00 8
51.75% | $132,302.54
74.17% | $165,200.00
19.78% | $64,057.20
FNH CONSTRUCTION, LLC   $442,120.00 9
72.95% | $186,486.54
98.5% | $219,384.00
13.97% | $54,184.00
Subcontractor Percentage Amount
BARRICADES UNLIMITED 1.67% $3,719.69
Total: 1.67% $3,719.69

Bid Items

Items: 24, 0 filtered
MEDINA FM0462  |  SAN ANTONIO  |  6439-54-001  |  05/16/2024  |  $255,633  |  BPM - 643954001  |  EROSION REPAIR  |  25 W
Item code Description Unit Quantity Engineer's Estimate BECK-REIT & SONS, LTD. DIAMOND R CONTRACTING, LLC ICOS MANAGEMENT, LLC CRACKSEAL OF TEXAS, LLC GARRET SHIELDS INFRASTRUCTURE AAD CONTRACTING INC. RHINO EQUITY, LLC CRAIG & HEIDT, INC. FNH CONSTRUCTION, LLC
104 6028 REMOVING CONC (MISC) SY 20.000 $250.000 $100.000 $250.000 $165.000 $40.000 $50.000 $45.000 $83.640 $2,000.000 $500.000
110 6002 EXCAVATION (CHANNEL) CY 40.000 $90.000 $75.000 $100.000 $44.000 $150.000 $100.000 $25.000 $58.740 $75.000 $250.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 10.000 $80.500 $100.000 $500.000 $88.000 $40.000 $50.000 $55.000 $70.550 $150.000 $500.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 250.000 $5.000 $5.000 $10.000 $11.000 $40.000 $5.000 $10.000 $4.680 $20.000 $20.000
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 250.000 $0.330 $2.000 $1.000 $1.000 $5.000 $1.000 $2.500 $1.050 $7.000 $10.000
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 250.000 $11.580 $10.000 $1.000 $1.000 $10.000 $6.000 $2.500 $4.480 $8.000 $20.000
401 6001 FLOWABLE BACKFILL CY 37.000 $500.000 $500.000 $100.000 $286.000 $500.000 $400.000 $275.000 $561.000 $300.000 $500.000
429 6001 CONC STR REPAIR(CLEAN & COAT WTH EPOXY) SF 75.000 $250.000 $75.000 $225.000 $220.000 $50.000 $250.000 $250.000 $182.670 $75.000 $500.000
432 6022 RIPRAP (STONE COMMON)(DRY)(6 IN) CY 237.000 $200.000 $155.000 $150.000 $154.000 $200.000 $200.000 $225.000 $255.000 $150.000 $150.000
459 6007 GABION MATTRESSES (GALV)(12 IN) SY 515.000 $135.000 $155.000 $100.000 $110.000 $70.000 $150.000 $100.000 $170.000 $135.000 $285.000
459 6013 GABION (1.5' X 3')(GALV) CY 115.000 $225.000 $222.000 $200.000 $275.000 $50.000 $300.000 $300.000 $403.750 $450.000 $325.000
480 6001 CLEAN EXIST CULVERTS EA 1.000 $500.000 $1,000.000 $15,000.000 $6,600.000 $6,660.000 $5,000.000 $2,500.000 $191.250 $3,500.000 $5,000.000
500 6001 MOBILIZATION LS 1.000 $8,000.000 $22,222.000 $20,000.000 $15,000.000 $40,000.000 $20,000.000 $35,000.000 $12,750.000 $90,000.000 $40,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.000 $3,500.000 $3,500.000 $1.000 $1.000 $1,000.000 $5,000.000 $10,000.000 $4,250.000 $6,500.000 $8,500.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 112.000 $40.000 $1.000 $1.000 $1.000 $50.000 $5.000 $25.000 $55.250 $31.000 $40.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 112.000 $20.000 $1.000 $1.000 $1.000 $50.000 $5.000 $8.000 $25.500 $22.000 $20.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 50.000 $20.000 $1.000 $10.000 $5.000 $10.000 $5.000 $8.000 $6.030 $10.000 $18.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 50.000 $15.000 $1.000 $10.000 $5.000 $10.000 $1.000 $3.000 $1.830 $10.000 $9.000
552 6004 WIRE FENCE (TY D) LF 155.000 $45.000 $20.000 $35.000 $22.000 $50.000 $10.000 $20.000 $19.130 $65.000 $20.000
752 6005 TREE REMOVAL (4" - 12" DIA) EA 5.000 $250.000 $500.000 $1,000.000 $2,200.000 $5,000.000 $200.000 $350.000 $850.000 $750.000 $2,000.000
752 6015 TREE AND BRUSH REMOVAL AC 0.120 $14,285.710 $30,000.000 $83,500.000 $22,000.000 $9,000.000 $20,000.000 $15,000.000 $22,950.000 $25,000.000 $100,000.000
780 6002 CNC CRACK REPAIR (DISCRETE)(INJECT) LF 150.000 $125.000 $10.000 $100.000 $110.000 $65.000 $80.000 $150.000 $102.850 $85.000 $100.000
6185 6002 TMA (STATIONARY) DAY 25.000 $225.000 $1.000 $1.000 $275.000 $310.000 $200.000 $350.000 $340.000 $425.000 $150.000
7000 6002 REML & DISPL DRIFTWOOD & DEBRIS LS 1.000 $3,666.670 $5,000.000 $5,000.000 $8,800.000 $9,000.000 $4,000.000 $15,000.000 $22,950.000 $7,500.000 $15,000.000
Totals: $255,633.46 $222,736.00 $224,321.00 $232,596.00 $253,590.00 $263,570.00 $289,096.00 $323,878.80 $387,936.00 $442,120.00