Job Info for 0848-04-052

County: MEDINA Highway: FM 462 Date: 06/06/2024 (5 months ago) Engineer's Estimate: $9,823,332 Control Number: 0848-04-052
Project: F 2B24(170) District: SAN ANTONIO Time: 312 WORKING DAYS Type: REHABILITATE EXISTING ROADWAY
Bidder's List
Informational:
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2
Plans: Plans | Revision | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $9,823,331.71
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.   $6,964,196.97 1
-29.11% | -$2,859,134.74
J. CARROLL WEAVER, INC.   $7,223,627.02 2
-26.46% | -$2,599,704.69
3.73% | $259,430.05
HUNTER INDUSTRIES, LTD.   $8,102,246.52 3
-17.52% | -$1,721,085.19
16.34% | $1,138,049.55
12.16% | $878,619.50
LCR TOTAL TRANSPORT LLC   $8,180,645.30 4
-16.72% | -$1,642,686.41
17.47% | $1,216,448.33
0.97% | $78,398.78
ALLEN KELLER COMPANY   $8,908,270.43 5
-9.32% | -$915,061.28
27.92% | $1,944,073.46
8.89% | $727,625.13
DEAN WORD COMPANY, LTD.   $9,549,479.76 6
-2.79% | -$273,851.95
37.12% | $2,585,282.79
7.20% | $641,209.33
CK NEWBERRY, LLC   $9,849,333.21 7
0.26% | $26,001.50
41.43% | $2,885,136.24
3.14% | $299,853.45
CLARK CONSTRUCTION OF TEXAS, INC.   $12,498,200.32 8
27.23% | $2,674,868.61
79.46% | $5,534,003.35
26.89% | $2,648,867.11
Subcontractor Percentage Amount
LONE STAR EROSION CONTROL 4.09% $284,835.66
AVILA AND SON"S L.L.C. 2.38% $165,747.89
BUYERS BARRICADES SAN ANTONIO, LLC 0.41% $28,553.21
Total: 6.88% $479,136.76

Bid Items

Items: 98, 0 filtered
MEDINA FM 462  |  SAN ANTONIO  |  0848-04-052  |  06/06/2024  |  $9,823,332  |  F 2B24(170)  |  REHAB EXIST ROADWAY  |  312 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate SALINAS CONSTRUCTION TECHNOLOGIES, LTD. J. CARROLL WEAVER, INC. HUNTER INDUSTRIES, LTD. LCR TOTAL TRANSPORT LLC ALLEN KELLER COMPANY DEAN WORD COMPANY, LTD. CK NEWBERRY, LLC CLARK CONSTRUCTION OF TEXAS, INC.
100 6002 PREPARING ROW STA 302.000 $1,000.000 $181.950 $218.000 $654.900 $1,205.000 $456.360 $610.720 $500.000 $166.550
104 6009 REMOVING CONC (RIPRAP) SY 118.000 $35.000 $19.300 $42.330 $24.500 $11.500 $44.960 $20.200 $60.000 $50.000
105 6008 REMOVING STAB BASE AND ASPH PAV (6") SY 1,962.000 $10.000 $8.630 $7.370 $12.900 $4.250 $4.030 $6.370 $15.000 $10.770
110 6001 EXCAVATION (ROADWAY) CY 26,033.000 $25.000 $13.460 $11.580 $22.300 $34.000 $16.560 $23.340 $28.000 $20.880
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 2,474.000 $30.000 $14.870 $22.570 $17.500 $12.750 $60.200 $36.120 $30.000 $45.950
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 72,851.000 $2.000 $2.040 $0.880 $1.740 $0.650 $1.650 $0.900 $2.500 $7.000
162 6008 ROLL SODDING SY 8,167.000 $9.000 $7.410 $6.540 $7.250 $7.800 $7.480 $7.280 $7.000 $5.930
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 64,684.000 $0.300 $0.200 $0.200 $0.280 $0.300 $0.290 $0.280 $0.180 $0.190
164 6051 DRILL SEED (TEMP)(WARM OR COOL) SY 64,684.000 $0.300 $0.180 $0.100 $0.220 $0.250 $0.240 $0.230 $0.160 $0.180
168 6001 VEGETATIVE WATERING MG 2,146.200 $40.000 $21.410 $20.710 $24.500 $42.000 $15.390 $17.790 $20.000 $50.000
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 64,684.000 $1.100 $1.140 $1.360 $1.550 $1.700 $1.600 $1.600 $1.250 $1.390
216 6001 PROOF ROLLING HR 26.000 $140.000 $76.200 $70.850 $84.000 $120.000 $138.850 $83.590 $100.000 $85.000
247 6475 FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS CY 25,281.000 $70.000 $42.600 $48.680 $64.570 $52.600 $60.490 $80.300 $65.000 $95.900
251 6025 REWORK BS MTL (TY B) (6") (ORD COMP) SY 115,634.000 $5.000 $1.230 $1.190 $3.540 $3.550 $4.030 $5.490 $6.500 $3.850
275 6001 CEMENT TON 997.000 $300.000 $248.910 $198.470 $236.500 $250.000 $287.410 $258.480 $230.000 $235.000
275 6002 CEMENT TREAT (EXIST MATL) (6") SY 82,400.000 $4.500 $1.420 $1.760 $2.400 $1.450 $2.480 $3.060 $1.800 $3.350
275 6004 CEMENT TREAT (MX EXST MTL & NW BS) (6") SY 33,234.000 $8.000 $1.420 $1.740 $2.400 $1.450 $2.480 $4.140 $1.800 $3.330
316 6029 ASPH (RC-250) GAL 21,379.000 $6.000 $5.020 $5.480 $5.360 $5.350 $5.780 $5.860 $5.250 $6.240
316 6240 AGGR(TY-PD GR-4 SAC-B) CY 896.000 $210.000 $144.760 $199.330 $135.630 $140.000 $143.950 $240.790 $125.000 $176.360
316 6414 AGGR (TY-B GR-5) CY 764.000 $190.000 $170.930 $190.390 $82.630 $127.500 $244.200 $235.840 $250.000 $170.450
316 6419 ASPH (AC-15P, AC-20-5TR OR AC-20XP) GAL 68,747.000 $5.000 $4.430 $3.890 $4.470 $4.850 $5.920 $4.650 $4.500 $5.410
316 6431 AGGR (TY-PB GR-4) CY 896.000 $200.000 $171.180 $192.170 $129.630 $117.500 $347.120 $153.640 $250.000 $176.360
400 6006 CUT & RESTORING PAV SY 52.000 $175.000 $163.910 $136.250 $250.000 $156.000 $309.250 $78.400 $125.000 $74.030
401 6001 FLOWABLE BACKFILL CY 27.000 $250.000 $244.840 $207.100 $305.230 $202.000 $283.520 $195.780 $200.000 $250.000
402 6001 TRENCH EXCAVATION PROTECTION LF 66.000 $25.000 $25.510 $5.450 $44.250 $14.000 $51.560 $7.700 $30.000 $100.000
403 6001 TEMPORARY SPL SHORING SF 384.000 $25.000 $75.490 $27.250 $25.000 $34.000 $97.830 $16.260 $40.000 $50.000
432 6002 RIPRAP (CONC)(5 IN) CY 59.000 $700.000 $584.860 $545.000 $510.000 $593.000 $489.370 $514.760 $525.000 $910.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 150.100 $650.000 $603.860 $654.000 $580.000 $592.000 $674.820 $494.960 $550.000 $900.000
459 6001 GABIONS (GALV) CY 145.000 $300.000 $319.120 $398.500 $475.000 $511.000 $489.370 $329.000 $325.000 $475.000
459 6007 GABION MATTRESSES (GALV)(12 IN) SY 655.000 $135.000 $101.990 $175.050 $109.350 $118.000 $112.630 $69.920 $110.000 $200.000
459 6008 GABION MATTRESSES (GALV)(18 IN) SY 276.000 $200.000 $162.560 $238.270 $157.570 $169.000 $162.390 $135.750 $170.000 $330.000
462 6003 CONC BOX CULV (4 FT X 2 FT) LF 46.000 $550.000 $508.430 $828.520 $1,009.880 $629.000 $654.430 $719.070 $725.000 $1,810.000
462 6006 CONC BOX CULV (5 FT X 2 FT) LF 92.000 $650.000 $548.930 $920.040 $1,009.880 $699.000 $479.170 $854.050 $900.000 $1,880.000
466 6179 WINGWALL (PW - 1) (HW=4 FT) EA 1.000 $20,000.000 $20,410.470 $21,412.830 $14,183.690 $12,315.000 $18,244.550 $18,121.530 $11,500.000 $33,000.000
466 6180 WINGWALL (PW - 1) (HW=5 FT) EA 2.000 $30,000.000 $24,121.770 $27,538.990 $2,258.040 $14,700.000 $19,584.480 $18,616.480 $11,500.000 $34,800.000
467 6171 SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C) EA 2.000 $15,000.000 $14,518.340 $10,205.640 $16,112.670 $8,020.000 $7,495.890 $10,449.150 $9,000.000 $19,250.000
496 6004 REMOV STR (SET) EA 2.000 $1,000.000 $2,304.220 $832.390 $1,123.350 $726.000 $154.620 $1,099.910 $2,000.000 $2,000.000
496 6006 REMOV STR (HEADWALL) EA 2.000 $1,500.000 $2,449.630 $1,664.990 $1,702.040 $1,200.000 $309.250 $1,814.850 $2,000.000 $3,500.000
496 6007 REMOV STR (PIPE) LF 32.000 $25.000 $26.580 $62.430 $88.510 $16.000 $14.420 $49.500 $30.000 $35.000
496 6008 REMOV STR (BOX CULVERT) LF 35.000 $100.000 $138.580 $107.030 $123.680 $74.000 $51.560 $151.790 $50.000 $140.000
500 6001 MOBILIZATION LS 1.000 $893,030.160 $657,635.000 $895,489.640 $804,723.960 $740,000.000 $660,000.000 $906,951.130 $950,000.000 $2,280,950.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 20.000 $8,000.000 $1,615.150 $3,052.000 $6,252.900 $2,750.000 $9,200.000 $4,046.610 $23,500.000 $7,425.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 100.000 $40.000 $42.020 $56.680 $29.700 $32.000 $30.590 $31.200 $50.000 $52.100
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 120.000 $40.000 $44.910 $60.500 $39.850 $43.000 $41.070 $36.400 $55.000 $55.470
506 6011 ROCK FILTER DAMS (REMOVE) LF 220.000 $15.000 $10.940 $16.810 $6.540 $7.000 $6.750 $9.360 $20.000 $15.420
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 224.000 $25.000 $26.550 $34.880 $17.840 $19.000 $18.400 $26.000 $30.000 $40.940
506 6024 CONSTRUCTION EXITS (REMOVE) SY 224.000 $10.000 $5.680 $8.720 $6.740 $7.250 $6.940 $7.280 $20.000 $14.560
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 13,670.000 $3.000 $3.800 $4.910 $3.500 $3.750 $3.590 $3.550 $5.000 $4.320
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 13,670.000 $0.800 $1.120 $2.180 $0.350 $0.400 $0.340 $0.570 $1.500 $1.680
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 3,025.000 $5.000 $9.250 $9.270 $6.750 $7.300 $6.940 $7.000 $10.000 $8.470
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 3,025.000 $1.000 $2.790 $2.180 $1.000 $1.100 $1.020 $0.940 $2.000 $2.020
508 6001 CONSTRUCTING DETOURS SY 24,889.000 $43.000 $49.410 $35.870 $37.370 $35.500 $54.670 $37.730 $45.000 $59.590
510 6001 ONE-WAY TRAF CONT (FLAGGER CONT) HR 96.000 $150.000 $73.210 $28.130 $108.000 $120.000 $224.050 $34.450 $75.000 $300.000
510 6002 ONE-WAY TRAF CONT (PILOT CAR) HR 48.000 $120.000 $130.880 $125.290 $108.000 $175.000 $316.540 $120.030 $150.000 $300.000
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 4.000 $8,000.000 $3,130.450 $4,360.000 $16,831.010 $4,550.000 $10,942.840 $4,839.610 $6,000.000 $10,300.000
512 6009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 1,520.000 $60.000 $5.000 $78.390 $38.000 $47.500 $50.000 $29.580 $25.000 $82.120
512 6010 PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 160.000 $80.000 $1.640 $75.400 $35.000 $47.000 $50.000 $34.100 $25.000 $72.250
512 6033 PORT CTB (MOVE)(LOW PROF)(TY 1) LF 1,520.000 $25.000 $1.000 $12.560 $15.000 $18.000 $9.220 $13.060 $10.000 $24.980
512 6034 PORT CTB (MOVE)(LOW PROF)(TY 2) LF 160.000 $25.000 $1.000 $29.840 $36.000 $18.000 $21.900 $11.840 $10.000 $31.240
512 6057 PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 1,520.000 $15.000 $2.900 $12.560 $18.000 $21.000 $18.740 $25.950 $20.000 $61.160
512 6058 PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 160.000 $15.000 $1.800 $29.840 $50.000 $21.000 $28.350 $24.750 $20.000 $46.870
530 6003 INTERSECTIONS (SURF TREAT) SY 253.000 $50.000 $50.170 $44.760 $41.400 $45.000 $90.690 $31.640 $50.000 $33.350
530 6006 DRIVEWAYS (SURF TREAT) SY 2,659.000 $40.000 $30.140 $13.080 $46.000 $42.000 $58.940 $29.360 $45.000 $31.010
530 6009 TURNOUTS (SURF TREAT) SY 320.000 $40.000 $95.280 $8.720 $50.600 $42.000 $24.910 $35.230 $40.000 $45.070
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 2,000.000 $25.000 $23.720 $27.410 $25.150 $24.250 $25.780 $26.160 $30.000 $26.400
540 6033 MTL BM GD FEN (LONG SPAN SYSTEM) EA 3.000 $1,300.000 $1,383.740 $2,207.250 $2,025.000 $1,390.000 $1,233.130 $2,105.830 $2,500.000 $1,465.560
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 10.000 $3,500.000 $2,947.370 $3,624.250 $3,325.000 $2,980.000 $2,883.780 $3,457.720 $4,000.000 $3,587.050
552 6001 WIRE FENCE (TY A) LF 775.000 $20.000 $15.860 $44.690 $41.000 $50.000 $42.240 $42.640 $50.000 $50.000
560 6006 MAILBOX INSTALL-M (TWG-POST) TY 2 EA 1.000 $750.000 $529.470 $801.150 $425.000 $535.000 $437.910 $441.960 $425.000 $425.000
560 6007 MAILBOX INSTALL-S (WC-POST) TY 3 EA 4.000 $300.000 $214.470 $288.850 $150.000 $210.000 $154.630 $155.990 $150.000 $150.000
560 6011 MAILBOX INSTALL-S (TWW-POST) TY 4 EA 6.000 $350.000 $319.470 $288.850 $280.000 $317.000 $288.380 $291.180 $280.000 $280.000
560 6013 MAILBOX INSTALL-M (TWW-POST) TY 4 EA 4.000 $800.000 $749.970 $801.150 $600.000 $758.000 $618.510 $623.950 $600.000 $600.000
560 6015 MAILBOX INSTALL-S (TIM-POST) TY 5 EA 1.000 $500.000 $329.970 $288.850 $300.000 $328.000 $309.250 $311.970 $300.000 $300.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 71.000 $800.000 $702.580 $779.350 $600.000 $710.000 $618.510 $623.950 $600.000 $600.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 4.000 $1,100.000 $812.970 $1,062.750 $850.000 $823.000 $875.810 $883.930 $850.000 $850.000
644 6076 REMOVE SM RD SN SUP&AM EA 28.000 $120.000 $119.970 $115.540 $75.000 $113.000 $77.290 $77.990 $75.000 $75.000
658 6046 INSTL OM ASSM (OM-2X)(WC)GND EA 6.000 $80.000 $96.340 $98.100 $75.000 $89.000 $77.290 $77.990 $55.000 $75.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 100.000 $50.000 $29.140 $31.070 $30.000 $20.000 $30.930 $31.200 $35.000 $30.000
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 132,215.000 $0.500 $0.490 $0.490 $0.450 $0.800 $0.490 $0.470 $1.000 $0.450
662 6067 WK ZN PAV MRK REMOV (W)6"(SLD) LF 173,975.000 $0.750 $0.900 $0.930 $0.850 $1.350 $0.870 $0.880 $1.500 $0.950
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 528.000 $12.000 $14.880 $15.260 $14.000 $10.750 $14.420 $14.560 $15.000 $12.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 4,520.000 $2.000 $1.220 $1.090 $1.630 $2.000 $1.890 $1.540 $2.000 $2.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 24.000 $12.000 $12.970 $2.730 $8.500 $13.000 $8.740 $8.840 $15.000 $12.000
666 6225 PAVEMENT SEALER 6" LF 103,434.000 $0.500 $0.430 $0.440 $0.400 $0.250 $0.390 $0.420 $0.200 $0.450
666 6230 PAVEMENT SEALER 24" LF 24.000 $3.000 $6.670 $2.730 $2.500 $2.700 $2.570 $2.600 $2.500 $5.000
666 6343 REF PROF PAV MRK TY I(W)6"(SLD)(100MIL) LF 60,865.000 $1.200 $1.220 $1.250 $1.150 $1.150 $1.170 $1.200 $1.050 $1.150
666 6346 REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL) LF 4,440.000 $1.500 $1.280 $1.310 $1.200 $1.150 $1.210 $1.250 $1.050 $1.150
666 6347 REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL) LF 38,129.000 $1.200 $1.220 $1.250 $1.150 $1.150 $1.170 $1.200 $1.050 $1.150
672 6009 REFL PAV MRKR TY II-A-A EA 764.000 $6.500 $6.550 $6.540 $6.000 $6.000 $6.170 $6.240 $5.500 $5.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 71,400.000 $0.750 $1.010 $1.040 $0.950 $0.800 $0.970 $0.990 $0.750 $0.750
678 6002 PAV SURF PREP FOR MRK (6") LF 103,434.000 $0.300 $0.270 $0.270 $0.250 $0.050 $0.240 $0.260 $0.050 $0.010
678 6008 PAV SURF PREP FOR MRK (24") LF 24.000 $1.500 $4.840 $0.820 $0.750 $1.100 $0.780 $0.780 $1.000 $0.060
730 6107 FULL - WIDTH MOWING CYC 7.000 $3,000.000 $3,544.330 $1,635.000 $3,000.000 $5,213.000 $6,971.570 $3,299.730 $2,500.000 $3,500.000
734 6002 LITTER REMOVAL CYC 20.000 $1,500.000 $1,076.980 $545.000 $1,100.000 $3,920.000 $3,369.270 $1,649.870 $2,500.000 $2,500.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 32.000 $135.000 $55.900 $59.950 $165.460 $349.000 $53.110 $219.980 $200.000 $115.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $12,000.000 $28,871.090 $8,175.000 $11,437.720 $21,550.000 $20,400.100 $13,198.920 $30,000.000 $50,000.000
6185 6005 TMA (MOBILE OPERATION) DAY 8.000 $400.000 $745.720 $218.000 $341.330 $527.000 $380.620 $604.950 $100.000 $500.000
6509 6001 DRIVEWAY ASSISTANCE DEVICE(DAD) SYSTEM MO 18.000 $12,000.000 $10,308.530 $11,445.000 $1,115.170 $4,200.000 $1,728.330 $31,237.460 $16,250.000 $13,900.000
Totals: $9,823,331.71 $6,964,196.98 $7,223,627.02 $8,102,246.52 $8,180,645.30 $8,908,270.44 $9,549,479.77 $9,849,333.21 $12,498,200.32