Show Job Controls
Bid Cobra

MEDINA US 90 (0024-05-102)

Items: 25

County: MEDINA
Length: 61.0840 MILES
Highway: US 90
District: SAN ANTONIO
Control Number: 0024-05-102
DBE Goal: 0.0%
Project: STP 2025(004)HES
Guaranty: $46,000.00
Time: 180 WORKING DAYS
Engineer's Estimate: $2,300,334.48
Date: 09/05/2024 (1 year ago)
Contract Number: 9243026
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00184331
Project Description: INSTALL SIGNAL BACKPLATE AND SIGNAL HEAD
Mail/Deliver Bids To: N/A
ORLANDO GALLEGOS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,300,334.48
$2,230,735.00
Over/Under Est: -3.03% -$69,599.48
$2,372,268.08
Over/Under Est: 3.13% $71,933.60
Amt Left: 6.34% $141,533.08
Over/Under Est: 3.55% $81,702.02
Amt Left: 6.78% $151,301.50
Delta: -0.41% -$9,768.42

Bid Items & Bid Tabulations

25 Total 0 of 25
MEDINA  |  US 90  |  SAN ANTONIO  |  0024-05-102  |  09/05/2024  |  $2,300,334.48  |  STP 2025(004)HES  |  HAZARD ELIM & SAFETY  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E-Z BEL CONSTRUCTION, LLC
THE LEVY COMPANY, INC.
FLORIDA TRAFFIC CONTROL DEVICES, INC.
MOBILIZATION
LS 1.000 $209,121.320 $140,000.000 $237,226.800 $191,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $10,910.430 $1,000.000 $6,413.440 $3,465.500
TMA (STATIONARY)
DAY 200.000 $305.140 $290.000 $63.510 $160.000
REPLACE LUMINAIRE W/(250W EQ) LED
EA 66.000 $717.610 $450.000 $595.820 $553.000
INSTALL HWY TRF SIG (UPGRADE)
EA 18.000 $1,000.000 $900.000 $8,010.650 $870.000
VEH SIG SEC (12")LED(GRN)
EA 724.000 $271.000 $280.000 $285.540 $258.000
VEH SIG SEC (12")LED(GRN ARW)
EA 268.000 $271.000 $275.000 $285.540 $258.000
VEH SIG SEC (12")LED(YEL)
EA 796.000 $280.000 $280.000 $285.540 $258.000
VEH SIG SEC (12")LED(YEL ARW)
EA 375.000 $271.000 $280.000 $285.540 $258.000
VEH SIG SEC (12")LED(RED)
EA 768.000 $271.000 $280.000 $285.540 $258.000
VEH SIG SEC (12")LED(RED ARW)
EA 208.000 $271.000 $280.000 $285.540 $258.000
VEH SIG SEC (12")LED(GRN U-TURN ARW)
EA 2.000 $289.270 $315.000 $313.400 $281.000
VEH SIG SEC (12")LED(YEL U-TURN ARW)
EA 2.000 $289.270 $315.000 $313.400 $281.000
VEH SIG SEC (12")LED(RED U-TURN ARW)
EA 2.000 $289.270 $315.000 $313.400 $281.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 754.000 $215.900 $145.000 $164.120 $197.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 197.000 $278.050 $215.000 $215.450 $240.000
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 12.000 $276.550 $250.000 $259.450 $275.000
BACKPLATE W/REFL BRDR (1SEC)(WENT)ALUM
EA 116.000 $112.000 $120.000 $107.730 $219.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 14,695.000 $2.980 $2.500 $3.380 $2.100
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 76,515.000 $3.560 $3.500 $4.630 $3.000
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
LF 13,400.000 $3.730 $3.200 $4.320 $2.900
REMOVAL OF CABLES
LF 104,610.000 $1.000 $1.000 $0.340 $1.000
REMOVAL OF SIGNAL HEAD ASSM
EA 1,079.000 $73.830 $100.000 $39.460 $282.000
REMOVAL OF SIGNAL RELATED SIGNS
EA 441.000 $215.000 $30.000 $39.460 $94.000
INSTALL OF SIGNAL RELATED SIGNS
EA 544.000 $175.000 $650.000 $412.690 $514.000
Totals: $2,300,334.480 $2,230,735.000 $2,372,268.080 $2,382,036.500