PREPARING ROW
|
STA
|
686.000
|
$800.000
|
$163.156
|
$180.000
|
$404.490
|
$400.000
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
483.000
|
$13.960
|
$21.800
|
$13.350
|
$13.320
|
$12.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
117,954.000
|
$11.500
|
$9.004
|
$12.650
|
$10.130
|
$15.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
7,555.000
|
$10.000
|
$6.419
|
$5.200
|
$8.940
|
$10.000
|
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
73,442.000
|
$1.250
|
$0.670
|
$1.290
|
$0.620
|
$1.700
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
73,442.000
|
$0.150
|
$0.155
|
$0.160
|
$0.160
|
$0.160
|
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
73,442.000
|
$0.140
|
$0.124
|
$0.130
|
$0.100
|
$0.100
|
|
|
|
VEGETATIVE WATERING
|
MG
|
1,146.000
|
$16.500
|
$23.846
|
$15.000
|
$19.980
|
$40.000
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
73,442.000
|
$1.000
|
$0.803
|
$1.300
|
$0.750
|
$0.750
|
|
|
|
PROOF ROLLING
|
HR
|
208.000
|
$58.300
|
$59.240
|
$65.000
|
$62.700
|
$80.000
|
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
2,709.000
|
$60.000
|
$65.797
|
$67.850
|
$66.600
|
$67.000
|
|
|
|
REWORK BS MTL (TY C) (6") (ORD COMP)
|
SY
|
213,051.000
|
$1.000
|
$0.752
|
$0.500
|
$2.110
|
$2.000
|
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
4,877.000
|
$3.120
|
$3.843
|
$3.400
|
$3.830
|
$5.000
|
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
2,898.000
|
$48.000
|
$88.239
|
$0.000
|
$0.000
|
$150.000
|
|
|
|
ASPH (AC-15P OR AC-20-5TR)
|
GAL
|
69,547.000
|
$2.000
|
$3.834
|
$0.000
|
$0.000
|
$3.600
|
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
220,221.000
|
$52.000
|
$57.892
|
$67.600
|
$66.050
|
$75.000
|
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG76-22
|
TON
|
39,990.000
|
$80.000
|
$80.920
|
$75.400
|
$80.010
|
$90.000
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
8,653.000
|
$1.600
|
$3.326
|
$1.850
|
$2.820
|
$2.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
75.000
|
$76.000
|
$115.200
|
$150.000
|
$175.000
|
$225.000
|
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
110.000
|
$80.000
|
$50.371
|
$173.000
|
$110.000
|
$68.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
93.000
|
$2.000
|
$19.680
|
$21.000
|
$75.000
|
$5.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
450.000
|
$20.000
|
$25.440
|
$42.000
|
$75.000
|
$14.000
|
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
205.000
|
$400.000
|
$499.920
|
$420.000
|
$400.000
|
$470.000
|
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
214.200
|
$375.000
|
$494.125
|
$420.000
|
$430.000
|
$490.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
218.000
|
$405.000
|
$517.020
|
$447.000
|
$525.000
|
$475.000
|
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
1,640.000
|
$26.000
|
$11.330
|
$13.500
|
$11.300
|
$11.000
|
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
205.000
|
$400.000
|
$403.369
|
$410.000
|
$402.230
|
$400.000
|
|
|
|
JOINT SEALANT
|
LF
|
1,460.000
|
$8.000
|
$8.755
|
$8.900
|
$8.730
|
$8.500
|
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
52.000
|
$75.000
|
$82.660
|
$89.500
|
$70.000
|
$40.000
|
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
61.200
|
$300.000
|
$634.320
|
$510.000
|
$410.000
|
$625.000
|
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
32.000
|
$320.000
|
$762.380
|
$520.000
|
$470.000
|
$650.000
|
|
|
|
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
|
LF
|
42.600
|
$790.000
|
$815.555
|
$835.000
|
$990.000
|
$800.000
|
|
|
|
CONC BOX CULV (9 FT X 6 FT)(EXTEND)
|
LF
|
44.100
|
$1,020.000
|
$729.950
|
$1,010.000
|
$830.000
|
$825.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,460.000
|
$53.700
|
$62.680
|
$68.400
|
$56.000
|
$75.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
306.000
|
$54.900
|
$134.201
|
$82.000
|
$100.000
|
$90.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
74.000
|
$110.000
|
$118.130
|
$115.000
|
$100.000
|
$150.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$5,000.000
|
$6,588.000
|
$6,800.000
|
$3,800.000
|
$3,250.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
6.000
|
$4,000.000
|
$4,387.400
|
$4,700.000
|
$3,500.000
|
$5,500.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
16.000
|
$6,000.000
|
$4,337.820
|
$3,370.000
|
$2,500.000
|
$4,000.000
|
|
|
|
SET (TY I)(S= 7 FT)(HW= 8 FT)(4:1) (C)
|
EA
|
6.000
|
$7,000.000
|
$11,963.600
|
$14,385.000
|
$11,000.000
|
$8,000.000
|
|
|
|
SET (TY I)(S= 9 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
3.000
|
$9,000.000
|
$11,839.580
|
$12,760.000
|
$15,000.000
|
$11,000.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$903.090
|
$1,275.500
|
$1,150.000
|
$1,500.000
|
$1,100.000
|
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$925.000
|
$1,595.260
|
$1,260.000
|
$1,500.000
|
$1,500.000
|
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (C)
|
EA
|
1.000
|
$1,325.000
|
$1,732.880
|
$1,260.000
|
$1,900.000
|
$1,500.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (5: 1) (C)
|
EA
|
2.000
|
$1,200.000
|
$1,669.100
|
$1,260.000
|
$1,800.000
|
$1,500.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$2,300.000
|
$1,722.100
|
$1,475.000
|
$1,900.000
|
$1,500.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,540.830
|
$1,722.100
|
$1,640.000
|
$1,900.000
|
$1,500.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,800.000
|
$2,050.600
|
$3,250.000
|
$2,600.000
|
$2,500.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
20.000
|
$1,500.000
|
$707.000
|
$1,580.000
|
$1,250.000
|
$1,925.000
|
|
|
|
REMOV STR (SET)
|
EA
|
41.000
|
$462.210
|
$624.500
|
$470.000
|
$400.000
|
$250.000
|
|
|
|
REMOV STR (PIPE)
|
EA
|
20.000
|
$800.000
|
$601.000
|
$730.000
|
$1,000.000
|
$250.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,580,000.000
|
$2,278,808.638
|
$1,077,550.000
|
$2,000,423.830
|
$1,850,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$4,900.000
|
$4,441.663
|
$2,700.000
|
$1,880.940
|
$14,500.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
10,375.000
|
$23.850
|
$24.205
|
$21.000
|
$20.000
|
$20.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
795.000
|
$23.130
|
$24.978
|
$23.000
|
$22.000
|
$22.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
1,285.000
|
$54.820
|
$47.380
|
$48.400
|
$46.000
|
$46.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
12,455.000
|
$7.220
|
$7.210
|
$7.000
|
$7.000
|
$7.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,092.000
|
$13.550
|
$12.875
|
$13.000
|
$12.500
|
$12.500
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,092.000
|
$4.780
|
$2.060
|
$2.000
|
$2.000
|
$2.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
12,595.000
|
$1.660
|
$1.854
|
$1.900
|
$1.800
|
$1.800
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
12,595.000
|
$0.360
|
$0.567
|
$0.550
|
$0.550
|
$0.550
|
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,140.000
|
$12.770
|
$14.490
|
$27.000
|
$19.000
|
$44.000
|
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
2,280.000
|
$8.670
|
$6.224
|
$6.800
|
$13.000
|
$9.000
|
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,140.000
|
$10.150
|
$10.948
|
$10.500
|
$16.000
|
$18.000
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,663.000
|
$50.000
|
$78.000
|
$75.800
|
$70.000
|
$72.000
|
|
|
|
DRIVEWAYS AND TURNOUTS (ACP)
|
SY
|
5,386.000
|
$11.000
|
$35.169
|
$49.000
|
$35.040
|
$45.000
|
|
|
|
DRIVEWAYS AND TURNOUTS (SURF TREAT)
|
SY
|
4,616.000
|
$22.610
|
$9.474
|
$8.500
|
$17.520
|
$11.000
|
|
|
|
DRIVEWAYS (BASE)
|
SY
|
350.000
|
$11.000
|
$19.271
|
$23.450
|
$17.520
|
$42.000
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,833.000
|
$45.000
|
$23.021
|
$20.950
|
$19.900
|
$20.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
14.000
|
$1,800.000
|
$2,208.990
|
$2,500.000
|
$2,473.000
|
$2,300.000
|
|
|
|
SHORT RADIUS
|
LF
|
72.000
|
$26.980
|
$33.321
|
$26.900
|
$25.580
|
$46.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$900.000
|
$1,153.600
|
$1,100.000
|
$1,075.000
|
$1,070.000
|
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
25.000
|
$75.500
|
$87.344
|
$56.700
|
$53.880
|
$62.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,660.000
|
$2.000
|
$1.185
|
$1.000
|
$1.000
|
$1.000
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
12.000
|
$252.000
|
$103.000
|
$125.000
|
$125.000
|
$255.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
14.000
|
$318.000
|
$2,868.550
|
$2,870.000
|
$2,730.000
|
$2,350.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$250.000
|
$149.350
|
$125.000
|
$125.000
|
$150.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
4.000
|
$9,949.390
|
$11,690.500
|
$12,200.000
|
$11,600.000
|
$11,350.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$964.780
|
$1,493.500
|
$1,420.000
|
$1,350.000
|
$1,500.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$567.940
|
$309.000
|
$785.000
|
$750.000
|
$300.000
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$325.000
|
$329.600
|
$335.000
|
$320.000
|
$410.000
|
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
2.000
|
$165.000
|
$190.550
|
$190.000
|
$185.000
|
$560.000
|
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
40.000
|
$12.000
|
$47.380
|
$42.100
|
$46.000
|
$47.000
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
50.000
|
$1.200
|
$4.120
|
$2.680
|
$4.000
|
$4.000
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
100.000
|
$1.130
|
$4.120
|
$3.150
|
$4.000
|
$4.000
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$730.810
|
$2,008.500
|
$1,580.000
|
$1,950.000
|
$2,000.000
|
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$245.460
|
$515.000
|
$1,050.000
|
$500.000
|
$510.000
|
|
|
|
ELC SRV TY D 120/240 070(NS)AL(E)TP(O)
|
EA
|
1.000
|
$3,647.640
|
$9,630.500
|
$5,790.000
|
$9,350.000
|
$9,540.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
43.000
|
$393.700
|
$391.400
|
$400.000
|
$380.000
|
$360.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
21.000
|
$475.000
|
$484.100
|
$494.000
|
$470.000
|
$410.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
9.000
|
$583.580
|
$628.300
|
$640.000
|
$610.000
|
$510.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
$577.600
|
$643.750
|
$650.000
|
$625.000
|
$530.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
8.000
|
$713.000
|
$715.850
|
$730.000
|
$695.000
|
$590.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
77.000
|
$61.760
|
$46.350
|
$45.000
|
$45.000
|
$51.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
47.000
|
$10.000
|
$20.600
|
$21.000
|
$20.000
|
$11.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
65.000
|
$39.260
|
$53.560
|
$54.500
|
$52.000
|
$41.000
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
32.000
|
$11.800
|
$10.300
|
$10.000
|
$10.000
|
$20.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
179,208.000
|
$0.220
|
$0.288
|
$0.290
|
$0.210
|
$0.200
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
177,388.000
|
$0.220
|
$0.288
|
$0.290
|
$0.210
|
$0.200
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
506.000
|
$2.590
|
$4.120
|
$4.200
|
$3.030
|
$3.000
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,080.000
|
$0.540
|
$0.690
|
$0.710
|
$0.830
|
$0.800
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,080.000
|
$0.550
|
$0.690
|
$0.710
|
$0.830
|
$0.800
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
6,575.000
|
$1.060
|
$1.333
|
$0.780
|
$1.760
|
$1.500
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
7,972.000
|
$1.330
|
$1.333
|
$0.780
|
$1.760
|
$1.500
|
|
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,234.000
|
$2.590
|
$0.515
|
$0.530
|
$1.880
|
$1.800
|
|
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
140.000
|
$3.500
|
$1.545
|
$1.580
|
$3.960
|
$4.000
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,472.000
|
$0.700
|
$0.721
|
$0.740
|
$1.250
|
$1.200
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
218.000
|
$5.500
|
$6.180
|
$6.300
|
$9.180
|
$9.000
|
|
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
16.000
|
$95.000
|
$124.630
|
$127.000
|
$99.100
|
$98.000
|
|
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(090MIL)
|
EA
|
6.000
|
$315.000
|
$228.660
|
$233.000
|
$250.350
|
$250.000
|
|
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
12.000
|
$109.000
|
$141.110
|
$144.000
|
$125.180
|
$120.000
|
|
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
24.000
|
$27.800
|
$41.200
|
$42.000
|
$39.640
|
$40.000
|
|
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
2,272.000
|
$5.040
|
$6.180
|
$6.300
|
$3.960
|
$4.000
|
|
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
6.000
|
$190.290
|
$342.990
|
$350.000
|
$208.630
|
$205.000
|
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
137,251.000
|
$0.250
|
$0.958
|
$0.980
|
$0.750
|
$0.750
|
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
102,278.000
|
$0.250
|
$0.659
|
$0.670
|
$0.570
|
$0.600
|
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
|
LF
|
8,470.000
|
$0.250
|
$0.659
|
$0.670
|
$0.780
|
$0.800
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
8,454.000
|
$0.320
|
$0.371
|
$0.380
|
$0.380
|
$0.400
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
554.000
|
$3.860
|
$4.120
|
$4.200
|
$3.340
|
$3.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,118.000
|
$3.690
|
$3.090
|
$3.150
|
$2.920
|
$3.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
82,064.000
|
$0.470
|
$0.649
|
$0.660
|
$0.780
|
$0.500
|
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
500.000
|
$0.800
|
$2.060
|
$2.100
|
$2.610
|
$0.700
|
|
|
|
REMOVAL OF CONDUIT
|
LF
|
60.000
|
$6.050
|
$21.115
|
$31.600
|
$20.500
|
$21.000
|
|
|
|
REMOVAL OF GROUND BOXES
|
EA
|
1.000
|
$366.000
|
$216.300
|
$315.000
|
$210.000
|
$210.000
|
|
|
|
REMOVAL OF CABLES
|
LF
|
350.000
|
$2.040
|
$1.442
|
$3.150
|
$1.400
|
$1.500
|
|
|
|
INSTALL OF CABLES
|
LF
|
100.000
|
$2.630
|
$3.296
|
$6.300
|
$3.200
|
$3.300
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,740.000
|
$9,010.000
|
$9,500.000
|
$8,354.450
|
$35,300.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
275.000
|
$240.000
|
$212.000
|
$200.000
|
$222.790
|
$160.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
57.000
|
$224.000
|
$455.800
|
$200.000
|
$278.480
|
$230.000
|
|
1
|
|
MEMBRANE UNDERSEAL
|
GAL
|
69,547.000
|
$4.000
|
$0.000
|
$2.800
|
$3.830
|
$0.000
|
|
Totals: |
$21,821,963.570
|
$23,420,629.629
|
$24,221,494.810
|
$25,062,846.550
|
$28,692,661.720
|