Bid Cobra

MCLENNAN FM0434 (6467-47-001)

Items: 49

County: MCLENNAN
Length: 0.0100 MILES
Highway: FM0434
District: WACO
Control Number: 6467-47-001
DBE Goal: N/A
Project: BPM - 646747001
Guaranty: $33,000.00
Time: 110 W
Engineer's Estimate: $1,674,713.84
Date: 09/05/2024 (1 year ago)
Contract Number: 9244006
Type: BRIDGE PREVENTATIVE MAINTENANCE
Project ID: A00209709
Project Description: BRIDGE PREVENTATIVE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,674,713.84
$1,743,360.00
Over/Under Est: 4.1% $68,646.16
Over/Under Est: 6.28% $105,134.31
Amt Left: 2.09% $36,488.15
Over/Under Est: 16.01% $268,100.16
Amt Left: 11.44% $199,454.00
Delta: -9.16% -$162,965.85
Over/Under Est: 23.97% $401,416.16
Amt Left: 19.09% $332,770.00
Delta: -6.86% -$133,316.00
Over/Under Est: 38.24% $640,477.86
Amt Left: 32.8% $571,831.70
Delta: -11.51% -$239,061.70
Subcontractor Percentage Amount
TAYLOR CONTRACTING LLC 18.83% $324,435.02
S & S BRIDGE PAINTING, INC. 9.45% $162,820.55
LONE STAR PAVING COMPANY 2.42% $41,695.84
STRIPE IT UP, LLC 0.34% $5,858.09
Total: 31.04% $534,809.50

Bid Items & Bid Tabulations

49 Total 0 of 49
MCLENNAN  |  FM0434  |  WACO  |  6467-47-001  |  09/05/2024  |  $1,674,713.84  |  BPM - 646747001  |  BRIDGE PREVENT MAINT  |  110 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
GARRET SHIELDS INFRASTRUCTURE
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
CROSS PLUS CONSTRUCTION, LLC
ROY JORGENSEN ASSOCIATES, INC.
SCR CIVIL CONSTRUCTION, LLC
REMOV CONC (WINGWALL)
CY 13.200 $700.000 $100.000 $125.000 $200.000 $250.000 $1,640.000
EXCAV (CHANNEL)
CY 200.000 $45.000 $100.000 $150.000 $36.000 $25.000 $96.000
EMBANK (VEH)(OC)(TY B)
CY 230.000 $78.000 $60.000 $20.000 $45.000 $80.000 $150.000
D-GR HMA TY-C SAC-B PG70-22 (EXEMPT)
TON 85.000 $390.000 $250.000 $400.000 $265.000 $345.000 $485.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 26.000 $218.000 $50.000 $250.000 $356.000 $750.000 $1,130.000
PLANE ASPH CONC PAV(0" TO 6")
SY 773.000 $4.250 $10.000 $16.000 $21.000 $25.000 $34.000
PAV JT UNDERSEAL (24")
LF 48.000 $100.000 $50.000 $50.000 $26.000 $125.000 $230.000
CEM STABIL BKFL
CY 120.000 $260.000 $300.000 $350.000 $225.000 $750.000 $540.000
FLOWABLE BACKFILL
CY 61.000 $443.000 $500.000 $400.000 $352.000 $750.000 $440.000
TEMPORARY SPL SHORING
SF 576.000 $30.000 $60.000 $50.000 $24.000 $60.000 $133.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 2,890.000 $40.000 $10.000 $35.000 $55.000 $38.000 $2.000
CL C CONC (WINGWALLS)
CY 17.200 $3,610.000 $3,000.000 $1,000.000 $2,600.000 $4,200.000 $6,910.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 631.000 $250.000 $200.000 $275.000 $200.000 $265.000 $260.000
CONC STR REPAIR (STANDARD)
SF 30.000 $250.000 $250.000 $250.000 $200.000 $225.000 $300.000
RIPRAP (CONC)(5 IN)
CY 30.000 $780.000 $1,000.000 $750.000 $699.000 $950.000 $1,415.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 150.000 $300.000 $200.000 $250.000 $300.000 $250.000 $430.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 211.000 $200.000 $300.000 $250.000 $300.000 $275.000 $305.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 414.000 $190.000 $300.000 $250.000 $300.000 $285.000 $305.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 1,200.000 $50.000 $50.000 $60.000 $35.000 $50.000 $56.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 1,674.000 $50.000 $50.000 $60.000 $35.000 $50.000 $35.000
CLEANING EXISTING JOINTS
LF 2,596.000 $50.000 $25.000 $25.000 $20.000 $15.000 $30.000
RESIZING AND SEALING JOINTS
LF 136.000 $50.000 $50.000 $75.000 $55.000 $150.000 $75.000
STR STEEL (MISC NON-BRIDGE)
LB 112.000 $24.000 $20.000 $50.000 $65.000 $35.000 $30.000
STR STEEL (PEDESTAL)
LB 378.000 $45.000 $50.000 $65.000 $65.000 $80.000 $78.500
GABIONS (GALV)
CY 116.000 $330.000 $300.000 $350.000 $255.000 $350.000 $355.000
CLEAN EXIST CULVERTS
EA 1.000 $3,500.000 $5,000.000 $5,000.000 $500.000 $15,000.000 $12,000.000
RAISING EXIST STRUCT
LS 2.000 $60,000.000 $120,000.000 $75,000.000 $175,000.000 $120,000.000 $85,000.000
MOBILIZATION
LS 1.000 $153,973.990 $150,000.000 $165,000.000 $175,000.000 $200,000.000 $231,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $5,000.000 $5,000.000 $3,500.000 $5,000.000 $7,500.000 $12,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 182.000 $120.000 $100.000 $35.000 $50.000 $150.000 $116.000
TMA (STATIONARY)
DAY 200.000 $250.000 $300.000 $300.000 $100.000 $200.000 $385.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 200.000 $5.000 $6.000 $5.000 $1.000 $5.000 $12.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 200.000 $1.500 $2.000 $2.000 $1.000 $2.000 $2.300
WIRE FENCE (TY C)
LF 122.000 $35.000 $30.000 $20.000 $21.000 $30.000 $30.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 15.000 $2.000 $10.000 $0.010 $5.000 $20.000 $5.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 580.000 $1.310 $11.000 $8.000 $5.000 $15.000 $7.450
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 580.000 $1.310 $11.000 $8.000 $5.000 $15.000 $7.450
REFL PAV MRKR TY II-A-A
EA 7.000 $7.000 $10.000 $50.000 $5.000 $50.000 $40.100
DRIFTWOOD REMOVAL
CY 23.000 $75.000 $150.000 $100.000 $300.000 $125.000 $190.000
REPAIR (STEEL RAIL)
LF 11.000 $75.000 $100.000 $500.000 $325.000 $325.000 $500.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 116.000 $100.000 $120.000 $120.000 $99.000 $175.000 $85.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 30.000 $100.000 $100.000 $100.000 $99.000 $125.000 $76.000
STL STRUCTURE REPAIR (ENTIRE BRIDGE)
LS 1.000 $90,000.000 $50,000.000 $75,000.000 $57,000.000 $45,000.000 $72,000.000
BRIDGE JOINT REPAIR (HEADER)
LF 174.000 $110.000 $200.000 $100.000 $125.000 $300.000 $290.000
UNDERSEAL COURSE
GAL 155.000 $5.000 $10.000 $11.000 $21.000 $14.000 $13.000
STEEL BRIDGE ZONE PAINTING REF STR #1
EA 1.000 $48,000.000 $50,000.000 $60,000.000 $75,000.000 $57,000.000 $85,000.000
STEEL BRIDGE ZONE PAINTING REF STR #2
EA 1.000 $48,000.000 $120,000.000 $140,000.000 $188,000.000 $121,000.000 $181,000.000
BENT CAP/ABUTMENT CAP CLEANING
EA 19.000 $200.000 $1,000.000 $700.000 $1,200.000 $750.000 $2,800.000
MAINTENANCE SPEED LIMIT SIGNING
DAY 182.000 $150.000 $100.000 $15.000 $50.000 $50.000 $22.000
Totals: $1,674,713.840 $1,743,360.000 $1,779,848.150 $1,942,814.000 $2,076,130.000 $2,315,191.700