Job Info for 6399-55-001

County: MCLENNAN Highway: SH0006 Date: 05/04/2022 (2 years ago) Engineer's Estimate: $1,284,554 Control Number: 6399-55-001
Project: RMC - 639955001 District: WACO Time: 365 CALENDAR DAYS Type: BASE FAILURE PAVEMENT REPAIR

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,284,553.88
KNIFE RIVER CORPORATION - SOUTH   $991,978.75 1
-22.78% | -$292,575.13
BIG CREEK CONSTRUCTION, LTD.   $1,269,033.75 2
-1.21% | -$15,520.13
27.93% | $277,055.00
TEXAS MATERIALS GROUP, INC.   $1,410,976.43 3
9.84% | $126,422.55
42.24% | $418,997.68
11.19% | $141,942.68

Bid Items

Items: 25, 0 filtered
MCLENNAN SH0006  |  WACO  |  6399-55-001  |  05/04/2022  |  $1,284,554  |  RMC - 639955001  |  BASE FAILURE PAVMT REPAIR  |  365 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate KNIFE RIVER CORPORATION - SOUTH BIG CREEK CONSTRUCTION, LTD. TEXAS MATERIALS GROUP, INC.
134 6008 BACKFILL (TY A OR B) CY 100.000 $25.000 $55.000 $80.000 $21.000
351 6004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 1,600.000 $50.000 $59.000 $60.000 $82.000
351 6013 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") SY 800.000 $30.000 $42.000 $35.000 $48.000
354 6045 PLANE ASPH CONC PAV (2") SY 59,090.000 $2.000 $1.600 $2.500 $2.750
500 6033 MOBILIZATION (CALLOUT) EA 3.000 $31,631.960 $310.000 $2,500.000 $0.010
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 2,390.000 $1.000 $1.000 $1.250 $1.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 2,390.000 $1.000 $1.000 $1.250 $1.000
666 6033 REFL PAV MRK TY I (W)8"(LNDP)(100MIL) LF 1,600.000 $2.000 $1.200 $1.250 $1.150
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 3,000.000 $1.000 $1.050 $1.100 $1.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 200.000 $7.000 $9.500 $10.000 $9.000
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 16.000 $100.000 $131.750 $130.000 $125.000
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 8.000 $120.000 $137.000 $140.000 $130.000
666 6199 REFL PAV MRK TY II (W) 36" (YLD TRI) EA 5.000 $25.000 $15.800 $20.000 $15.000
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 5,975.000 $1.000 $0.670 $0.750 $0.640
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 23,900.000 $1.000 $0.510 $0.550 $0.480
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 50.000 $1.000 $2.000 $2.250 $1.950
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 23,700.000 $1.000 $0.520 $0.600 $0.490
672 6007 REFL PAV MRKR TY I-C EA 50.000 $5.000 $5.800 $6.500 $5.500
672 6009 REFL PAV MRKR TY II-A-A EA 17.000 $4.000 $12.650 $15.000 $12.000
672 6010 REFL PAV MRKR TY II-C-R EA 510.000 $4.000 $5.400 $6.000 $5.100
3076 6023 D-GR HMA TY-C PG70-22 TON 6,501.000 $130.000 $107.250 $135.000 $155.000
3076 6038 D-GR HMA TY-D PG64-22 (LEVEL-UP) TON 100.000 $120.000 $92.000 $200.000 $220.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 120.000 $80.000 $2.260 $50.000 $0.010
6185 6002 TMA (STATIONARY) DAY 120.000 $160.000 $4.400 $175.000 $0.010
6185 6003 TMA (MOBILE OPERATION) HR 100.000 $80.000 $88.650 $50.000 $25.000
Totals: $1,284,553.88 $991,978.75 $1,269,033.75 $1,410,976.43