REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
300.000
|
$27.780
|
$20.000
|
$4.000
|
$5.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
1,000.000
|
$83.590
|
$35.000
|
$6.000
|
$25.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
5,000.000
|
$25.000
|
$20.000
|
$22.000
|
$30.000
|
|
|
BLADING
|
HR
|
200.000
|
$300.000
|
$100.000
|
$175.000
|
$100.000
|
|
|
BULLDOZER WORK
|
HR
|
50.000
|
$250.000
|
$150.000
|
$135.000
|
$160.000
|
|
|
SPEC EXCAV WORK (BACKHOE)
|
HR
|
50.000
|
$194.340
|
$99.000
|
$65.000
|
$110.000
|
|
|
SPEC EXCAV WORK (FRONT-END LOADER)
|
HR
|
50.000
|
$200.000
|
$100.000
|
$85.000
|
$135.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
5,000.000
|
$0.890
|
$0.500
|
$0.250
|
$0.500
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
5,000.000
|
$1.530
|
$0.500
|
$0.250
|
$0.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
5.000
|
$715.970
|
$200.000
|
$200.000
|
$775.000
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
AC
|
5.000
|
$500.000
|
$500.000
|
$200.000
|
$775.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
500.000
|
$2.730
|
$6.000
|
$6.000
|
$7.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY G)
|
SY
|
500.000
|
$10.980
|
$6.000
|
$7.000
|
$7.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
4,000.000
|
$20.740
|
$6.500
|
$5.000
|
$9.000
|
|
|
D-GR HMA(SQ) TY-C SAC-A PG70-22
|
TON
|
3,000.000
|
$120.000
|
$130.000
|
$140.000
|
$150.000
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG70-22
|
TON
|
3,000.000
|
$131.240
|
$130.000
|
$140.000
|
$150.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
2,500.000
|
$70.000
|
$90.000
|
$100.000
|
$100.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
150,000.000
|
$2.440
|
$2.500
|
$4.500
|
$3.000
|
|
|
FULL - DEPTH REPAIR CPJR (9")
|
SY
|
1,500.000
|
$270.000
|
$280.000
|
$220.000
|
$225.000
|
|
|
FULL - DEPTH REPAIR CRCP (8"-14")
|
SY
|
1,500.000
|
$300.000
|
$280.000
|
$350.000
|
$450.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
200.000
|
$180.000
|
$200.000
|
$130.000
|
$200.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
100.000
|
$205.790
|
$250.000
|
$475.000
|
$75.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
75.000
|
$299.510
|
$300.000
|
$515.000
|
$95.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
50.000
|
$316.820
|
$300.000
|
$585.000
|
$120.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (42 IN)
|
LF
|
50.000
|
$400.000
|
$500.000
|
$590.000
|
$150.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
50.000
|
$435.000
|
$500.000
|
$600.000
|
$180.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
100.000
|
$130.000
|
$200.000
|
$170.000
|
$200.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
100.000
|
$90.000
|
$200.000
|
$130.000
|
$150.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
500.000
|
$375.000
|
$375.000
|
$200.000
|
$350.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
500.000
|
$226.890
|
$200.000
|
$110.000
|
$150.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
500.000
|
$175.000
|
$200.000
|
$115.000
|
$175.000
|
|
|
CLEANING AND SEALING JOINTS
|
LF
|
1,000.000
|
$20.020
|
$20.000
|
$9.000
|
$15.000
|
|
|
STR STEEL (MISC NON-BRIDGE) (TRUSS)
|
LB
|
10,000.000
|
$3.000
|
$4.990
|
$5.000
|
$6.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
72.000
|
$2,500.000
|
$5,000.000
|
$1,750.000
|
$1,500.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
36.000
|
$4,500.000
|
$2,000.000
|
$2,500.000
|
$3,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
200.000
|
$30.370
|
$10.000
|
$20.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
200.000
|
$14.060
|
$10.000
|
$1.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
200.000
|
$3.320
|
$10.000
|
$3.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
200.000
|
$1.320
|
$1.000
|
$1.000
|
$1.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
3,000.000
|
$16.460
|
$5.000
|
$14.000
|
$10.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
2,500.000
|
$11.120
|
$5.000
|
$14.000
|
$10.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
300.000
|
$41.450
|
$5.000
|
$14.000
|
$10.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
3,000.000
|
$5.570
|
$5.000
|
$5.000
|
$5.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
3,000.000
|
$10.280
|
$5.000
|
$5.000
|
$10.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
2,500.000
|
$10.500
|
$5.000
|
$5.000
|
$10.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
300.000
|
$17.500
|
$5.000
|
$5.000
|
$10.000
|
|
|
CONC CURB (TY I)
|
LF
|
1,000.000
|
$30.000
|
$20.000
|
$6.000
|
$35.000
|
|
|
CONC CURB (TY II)
|
LF
|
1,000.000
|
$29.140
|
$20.000
|
$6.000
|
$19.000
|
|
|
CONC CURB (MONO) (TY I)
|
LF
|
500.000
|
$10.830
|
$20.000
|
$10.000
|
$40.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
500.000
|
$41.250
|
$20.000
|
$10.000
|
$20.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
100.000
|
$29.710
|
$20.000
|
$15.000
|
$40.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
100.000
|
$39.050
|
$20.000
|
$15.000
|
$45.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
100.000
|
$78.390
|
$49.000
|
$30.000
|
$115.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
5,000.000
|
$33.410
|
$35.000
|
$26.000
|
$45.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$2,775.000
|
$1,500.000
|
$1,300.000
|
$1,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
30.000
|
$1,570.270
|
$1,000.000
|
$1,040.000
|
$2,000.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
5.000
|
$700.000
|
$2,000.000
|
$175.000
|
$100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,000.000
|
$3.160
|
$14.000
|
$1.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
70.000
|
$200.000
|
$100.000
|
$85.000
|
$25.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
30.000
|
$150.000
|
$100.000
|
$85.000
|
$25.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$304.440
|
$500.000
|
$150.000
|
$25.000
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
5,000.000
|
$12.480
|
$13.000
|
$10.000
|
$11.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
6.000
|
$2,500.000
|
$2,500.000
|
$1,300.000
|
$3,000.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
4,000.000
|
$11.300
|
$1.000
|
$1.000
|
$2.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
6.000
|
$500.000
|
$200.000
|
$175.000
|
$350.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
45.000
|
$3,096.590
|
$3,500.000
|
$3,000.000
|
$4,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
5.000
|
$6,436.330
|
$500.000
|
$2,500.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
|
EA
|
5.000
|
$25,100.000
|
$15,000.000
|
$21,000.000
|
$24,000.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
50.000
|
$445.530
|
$200.000
|
$250.000
|
$30.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
50.000
|
$183.180
|
$200.000
|
$150.000
|
$30.000
|
|
|
RELOCATE RD IL ASM (U/P)
|
EA
|
10.000
|
$2,840.000
|
$300.000
|
$1,800.000
|
$2,200.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
10.000
|
$370.860
|
$300.000
|
$400.000
|
$525.000
|
|
|
IN RD IL AM (U/P) (TY 1) (150W) S
|
EA
|
5.000
|
$1,610.000
|
$800.000
|
$1,000.000
|
$1,250.000
|
|
|
IN RD IL AM (U/P) (TY 2) (150W) S
|
EA
|
5.000
|
$1,500.000
|
$800.000
|
$1,000.000
|
$1,250.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
10.000
|
$1,647.560
|
$800.000
|
$1,000.000
|
$1,250.000
|
|
|
IN RD IL (U/P) (TY 1) (250W EQ) LED
|
EA
|
5.000
|
$1,525.000
|
$800.000
|
$1,000.000
|
$1,250.000
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
5.000
|
$1,755.180
|
$800.000
|
$1,000.000
|
$1,250.000
|
|
|
IN RD IL (U/P) (TY 2) (250W EQ) LED
|
EA
|
5.000
|
$750.000
|
$800.000
|
$1,000.000
|
$1,250.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
5.000
|
$4,000.000
|
$3,000.000
|
$1,000.000
|
$2,200.000
|
|
|
IN RD IL (TY SP) 48S-8-8 (400W EQ) LED
|
EA
|
5.000
|
$5,527.130
|
$3,500.000
|
$1,000.000
|
$2,200.000
|
|
|
IN RD IL (TY SA) 50T-8 (400W EQ) LED
|
EA
|
5.000
|
$3,553.330
|
$3,500.000
|
$2,000.000
|
$2,650.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
500.000
|
$20.000
|
$4.000
|
$9.000
|
$10.500
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
500.000
|
$25.000
|
$4.000
|
$13.000
|
$10.500
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
250.000
|
$45.000
|
$20.000
|
$25.000
|
$27.500
|
|
|
CONDT (RM) (2")
|
LF
|
100.000
|
$25.000
|
$11.000
|
$9.000
|
$10.500
|
|
|
CONDT (RM) (3")
|
LF
|
75.000
|
$35.000
|
$15.000
|
$13.000
|
$16.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
500.000
|
$2.000
|
$2.000
|
$3.500
|
$4.250
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,000.000
|
$3.000
|
$2.000
|
$3.500
|
$4.250
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
250.000
|
$3.000
|
$2.000
|
$5.750
|
$7.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
500.000
|
$4.000
|
$2.000
|
$5.750
|
$7.000
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
50.000
|
$5.000
|
$2.000
|
$5.250
|
$6.500
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
5.000
|
$901.640
|
$500.000
|
$1,300.000
|
$1,600.000
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
2.000
|
$1,102.210
|
$500.000
|
$1,450.000
|
$1,750.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
2.000
|
$1,150.000
|
$500.000
|
$1,450.000
|
$1,750.000
|
|
|
ZINC-COAT STL WIRE STRAND (3/8")
|
LF
|
500.000
|
$3.580
|
$3.000
|
$3.750
|
$4.500
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
2.000
|
$690.000
|
$23.000
|
$300.000
|
$375.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
|
EA
|
2.000
|
$7,000.000
|
$1,000.000
|
$8,500.000
|
$10,100.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
|
EA
|
2.000
|
$6,300.000
|
$1,000.000
|
$7,500.000
|
$9,050.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
5,000.000
|
$25.000
|
$25.000
|
$24.000
|
$35.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
5,000.000
|
$31.820
|
$25.000
|
$24.000
|
$35.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
10,000.000
|
$25.000
|
$25.000
|
$24.000
|
$25.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
5,000.000
|
$25.000
|
$25.000
|
$24.000
|
$40.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
200.000
|
$624.930
|
$1,200.000
|
$415.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
200.000
|
$868.190
|
$1,200.000
|
$390.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
200.000
|
$1,300.000
|
$1,200.000
|
$295.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(P)
|
EA
|
200.000
|
$685.000
|
$1,200.000
|
$500.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
200.000
|
$1,465.000
|
$2,500.000
|
$570.000
|
$1,100.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
50.000
|
$1,500.000
|
$800.000
|
$950.000
|
$1,400.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
50.000
|
$1,500.000
|
$800.000
|
$950.000
|
$1,400.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
10.000
|
$2,210.000
|
$800.000
|
$1,800.000
|
$500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
200.000
|
$600.000
|
$300.000
|
$235.000
|
$50.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
50.000
|
$765.000
|
$200.000
|
$170.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
|
EA
|
1,000.000
|
$59.470
|
$50.000
|
$85.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
2,500.000
|
$13.000
|
$8.000
|
$7.000
|
$4.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
|
EA
|
1,000.000
|
$78.000
|
$35.000
|
$35.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
|
EA
|
1,000.000
|
$55.630
|
$40.000
|
$50.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
1,000.000
|
$230.170
|
$40.000
|
$100.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
1,000.000
|
$272.500
|
$40.000
|
$100.000
|
$35.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
1,000.000
|
$26.200
|
$4.000
|
$10.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
5,000.000
|
$30.000
|
$5.000
|
$20.000
|
$15.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
2,500.000
|
$86.070
|
$5.000
|
$50.000
|
$35.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
10,000.000
|
$1.920
|
$0.600
|
$0.520
|
$2.150
|
|
REFL PAV MRK TY I (W)4"(LNDP)(100MIL)
|
LF
|
10,000.000
|
$1.000
|
$0.600
|
$0.520
|
$2.150
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
10,000.000
|
$1.670
|
$0.800
|
$0.690
|
$2.150
|
|
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
|
LF
|
10,000.000
|
$2.500
|
$0.800
|
$0.690
|
$2.150
|
|
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
|
LF
|
10,000.000
|
$1.500
|
$0.900
|
$0.780
|
$2.650
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
10,000.000
|
$1.390
|
$0.900
|
$0.780
|
$2.650
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
10,000.000
|
$1.980
|
$1.000
|
$0.870
|
$2.650
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
10,000.000
|
$0.820
|
$1.000
|
$0.870
|
$1.350
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
10,000.000
|
$3.020
|
$1.750
|
$1.520
|
$3.200
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
10,000.000
|
$3.200
|
$3.000
|
$2.600
|
$3.700
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
200.000
|
$6.850
|
$6.000
|
$9.100
|
$7.400
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
100.000
|
$534.670
|
$125.000
|
$190.000
|
$135.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
100.000
|
$340.290
|
$150.000
|
$130.000
|
$300.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
100.000
|
$577.150
|
$400.000
|
$350.000
|
$700.000
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
100.000
|
$604.590
|
$135.000
|
$120.000
|
$350.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
100.000
|
$70.000
|
$25.000
|
$22.000
|
$60.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
100.000
|
$55.000
|
$25.000
|
$22.000
|
$70.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
10,000.000
|
$1.380
|
$0.900
|
$0.780
|
$1.070
|
|
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
|
LF
|
10,000.000
|
$0.650
|
$0.700
|
$0.820
|
$0.720
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
10,000.000
|
$1.100
|
$0.800
|
$1.170
|
$0.830
|
|
REFL PAV MRK TY II (W) (UTURN ARROW)
|
EA
|
100.000
|
$151.540
|
$40.000
|
$35.000
|
$215.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
10,000.000
|
$0.300
|
$0.140
|
$0.210
|
$0.120
|
|
|
PAVEMENT SEALER 6"
|
LF
|
10,000.000
|
$0.300
|
$0.180
|
$0.270
|
$0.140
|
|
|
PAVEMENT SEALER 8"
|
LF
|
10,000.000
|
$0.430
|
$0.270
|
$0.430
|
$0.350
|
|
|
PAVEMENT SEALER 12"
|
LF
|
10,000.000
|
$1.320
|
$0.750
|
$0.650
|
$1.070
|
|
|
PAVEMENT SEALER 24"
|
LF
|
10,000.000
|
$3.320
|
$1.500
|
$2.300
|
$2.120
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
100.000
|
$55.000
|
$30.000
|
$45.000
|
$27.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
100.000
|
$65.000
|
$30.000
|
$26.000
|
$27.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
100.000
|
$32.830
|
$45.000
|
$55.000
|
$37.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
100.000
|
$98.840
|
$100.000
|
$44.000
|
$37.000
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
100.000
|
$200.000
|
$20.000
|
$87.000
|
$95.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
500.000
|
$15.160
|
$15.000
|
$18.000
|
$16.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
300,000.000
|
$1.310
|
$0.320
|
$0.370
|
$0.450
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,200,000.000
|
$0.590
|
$0.320
|
$0.350
|
$0.430
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
300,000.000
|
$0.660
|
$0.450
|
$0.680
|
$0.580
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
600,000.000
|
$0.500
|
$0.450
|
$0.680
|
$0.540
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
300,000.000
|
$0.800
|
$0.320
|
$0.370
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,200,000.000
|
$0.640
|
$0.320
|
$0.350
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
300,000.000
|
$2.000
|
$0.450
|
$0.390
|
$0.580
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
600,000.000
|
$0.500
|
$0.450
|
$0.680
|
$0.540
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
100,000.000
|
$0.600
|
$0.700
|
$0.850
|
$0.580
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
100,000.000
|
$1.400
|
$0.800
|
$1.210
|
$0.840
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
100,000.000
|
$1.370
|
$0.800
|
$1.210
|
$0.840
|
|
REFL PAV MRKR TY I-A
|
EA
|
50,000.000
|
$3.000
|
$3.400
|
$4.750
|
$4.050
|
|
REFL PAV MRKR TY I-C
|
EA
|
5,000.000
|
$12.000
|
$3.400
|
$3.500
|
$4.050
|
|
REFL PAV MRKR TY I-R
|
EA
|
5,000.000
|
$5.000
|
$15.000
|
$3.500
|
$4.050
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
50,000.000
|
$2.750
|
$3.400
|
$4.900
|
$4.050
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
50,000.000
|
$2.500
|
$3.400
|
$6.000
|
$4.050
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
65,000.000
|
$1.000
|
$1.200
|
$1.000
|
$0.430
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
2,000.000
|
$0.500
|
$1.500
|
$1.500
|
$0.430
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
10,000.000
|
$1.000
|
$1.800
|
$1.800
|
$0.700
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
500.000
|
$2.110
|
$4.000
|
$4.000
|
$1.750
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,200.000
|
$3.000
|
$4.000
|
$5.000
|
$3.700
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
500.000
|
$55.410
|
$100.000
|
$100.000
|
$40.000
|
|
|
ELIM EXT PAV MRK & MRKS (NUMBER)
|
EA
|
500.000
|
$90.000
|
$100.000
|
$85.000
|
$40.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
500.000
|
$67.420
|
$100.000
|
$100.000
|
$51.000
|
|
|
PED SIG SEC (LED)(2 INDICATIONS)
|
EA
|
3.000
|
$600.000
|
$500.000
|
$3,125.000
|
$530.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
3.000
|
$600.000
|
$400.000
|
$3,125.000
|
$635.000
|
|
|
PED SIG SEC (LED)(CNTDWN)(MODUL ONLY)
|
EA
|
2.000
|
$250.000
|
$200.000
|
$1,050.000
|
$370.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
|
LF
|
100.000
|
$4.000
|
$3.000
|
$5.000
|
$3.200
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
200.000
|
$5.000
|
$3.000
|
$6.000
|
$4.250
|
|
|
TRF SIG CBL (TY A)(12 AWG)(16 CONDR)
|
LF
|
400.000
|
$6.000
|
$3.000
|
$7.000
|
$7.400
|
|
|
INS TRF SIG PL AM (MAST)(INSTALL ONLY)
|
EA
|
2.000
|
$1,000.000
|
$3,000.000
|
$5,000.000
|
$5,300.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
2.000
|
$2,800.000
|
$550.000
|
$6,000.000
|
$4,250.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
2.000
|
$938.610
|
$400.000
|
$3,600.000
|
$740.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
2.000
|
$3,472.710
|
$2,200.000
|
$6,250.000
|
$3,175.000
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
10.000
|
$201.820
|
$100.000
|
$520.000
|
$530.000
|
|
|
INSTALL OF SIGNAL HEAD ASSM
|
EA
|
3.000
|
$608.340
|
$100.000
|
$3,125.000
|
$1,000.000
|
|
|
REMOVAL OF SIGNAL RELATED SIGNS
|
EA
|
10.000
|
$113.450
|
$25.000
|
$150.000
|
$530.000
|
|
|
REPLACE OF SIGNAL RELATED SIGNS
|
EA
|
10.000
|
$515.000
|
$25.000
|
$520.000
|
$795.000
|
|
|
INSTALL OF SIGNAL RELATED SIGNS
|
EA
|
10.000
|
$425.000
|
$25.000
|
$420.000
|
$635.000
|
|
|
INSTALL OF CONTROL CABINET(GRND MNT)
|
EA
|
2.000
|
$4,444.440
|
$400.000
|
$11,700.000
|
$22,000.000
|
|
|
REMOVAL OF SIGNAL POLE ASSM
|
EA
|
3.000
|
$1,289.260
|
$200.000
|
$3,150.000
|
$3,150.000
|
|
|
REMOVE VID IMAGE VEH DET SYS (VIVDS)
|
EA
|
3.000
|
$808.880
|
$200.000
|
$3,650.000
|
$800.000
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
1,500.000
|
$240.000
|
$75.000
|
$70.000
|
$100.000
|
|
|
POTHOLE REPAIR (SAW - CUT)
|
SY
|
300.000
|
$140.000
|
$100.000
|
$125.000
|
$125.000
|
|
|
JT / CRCK SEAL (RUBBER - ASPHALT)
|
LMI
|
500.000
|
$575.060
|
$600.000
|
$400.000
|
$1,100.000
|
|
|
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
|
GAL
|
10,000.000
|
$40.000
|
$37.000
|
$60.000
|
$75.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
41,178.000
|
$33.000
|
$32.000
|
$45.500
|
$41.000
|
|
|
SPOT MOWING
|
AC
|
180.000
|
$85.000
|
$100.000
|
$100.000
|
$52.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
3,321.000
|
$180.000
|
$150.000
|
$125.000
|
$200.000
|
|
|
BROADCAST APPLICATION
|
AC
|
15,000.000
|
$65.000
|
$60.000
|
$80.000
|
$40.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
AC
|
800.000
|
$250.000
|
$65.000
|
$46.000
|
$40.000
|
|
|
LITTER REMOVAL
|
AC
|
41,178.000
|
$10.000
|
$10.000
|
$18.000
|
$17.500
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
180.000
|
$40.000
|
$100.000
|
$200.000
|
$20.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
MI
|
36,317.000
|
$20.000
|
$55.000
|
$54.000
|
$48.000
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
MI
|
22,849.000
|
$20.000
|
$35.000
|
$54.000
|
$48.000
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
MI
|
2,926.000
|
$20.000
|
$35.000
|
$54.000
|
$48.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
2,160.000
|
$20.000
|
$35.000
|
$54.000
|
$48.000
|
|
|
DEBRIS REMOVAL (DIRECT CONNECTOR)
|
MI
|
618.000
|
$20.000
|
$35.000
|
$54.000
|
$48.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
MI
|
12,708.000
|
$110.000
|
$149.000
|
$160.000
|
$160.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
MI
|
12,708.000
|
$110.000
|
$129.000
|
$160.000
|
$160.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
MI
|
7,477.000
|
$110.000
|
$100.000
|
$185.000
|
$160.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
MI
|
958.000
|
$110.000
|
$156.000
|
$160.000
|
$160.000
|
|
|
CLEANING / SWEEPING (AGGREGATE REMOVAL)
|
MI
|
100.000
|
$100.000
|
$500.000
|
$470.000
|
$265.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
180.000
|
$125.000
|
$500.000
|
$470.000
|
$265.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
15,000.000
|
$0.350
|
$1.060
|
$4.000
|
$2.500
|
|
|
CLEANING / SWEEPING (DIRECT CONNECTOR)
|
MI
|
169.000
|
$160.000
|
$186.000
|
$250.000
|
$200.000
|
|
|
GRAFFITI REMOVAL (BLAST CLEANING)
|
SF
|
5,000.000
|
$4.500
|
$3.000
|
$4.000
|
$3.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
5,000.000
|
$1.180
|
$3.000
|
$4.000
|
$3.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
5,000.000
|
$2.380
|
$3.000
|
$4.000
|
$5.000
|
|
|
IRRIG SYS OPERATION AND REPAIR
|
MO
|
42.000
|
$500.000
|
$5,100.000
|
$2,000.000
|
$5,000.000
|
|
|
MULCH & RESHAPING OF PLANT BEDS
|
CYC
|
30.000
|
$681.430
|
$2,900.000
|
$2,800.000
|
$10,000.000
|
|
|
PLANT BED MAINTENANCE
|
CYC
|
90.000
|
$2,000.000
|
$5,000.000
|
$1,060.000
|
$10,000.000
|
|
|
PRUNING
|
CYC
|
12.000
|
$1,500.000
|
$5,200.000
|
$7,890.000
|
$2,500.000
|
|
|
VEGETATIVE WATERING
|
MG
|
500.000
|
$100.000
|
$1.000
|
$50.000
|
$10.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
15.000
|
$3,000.000
|
$2,500.000
|
$6,000.000
|
$1,500.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
100.000
|
$2,000.000
|
$1,500.000
|
$2,400.000
|
$1,000.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
5.000
|
$500.000
|
$200.000
|
$400.000
|
$200.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
5.000
|
$600.000
|
$200.000
|
$600.000
|
$200.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
5.000
|
$1,500.000
|
$200.000
|
$610.000
|
$200.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
2.000
|
$1,350.000
|
$200.000
|
$900.000
|
$200.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
2.000
|
$328.570
|
$200.000
|
$1,000.000
|
$200.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
2.000
|
$450.000
|
$200.000
|
$1,100.000
|
$200.000
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
2.000
|
$666.670
|
$200.000
|
$1,200.000
|
$400.000
|
|
|
STUMP REMOVAL
|
EA
|
10.000
|
$105.840
|
$50.000
|
$100.000
|
$500.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
20,000.000
|
$12.500
|
$6.000
|
$1.000
|
$1.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
200.000
|
$440.760
|
$75.000
|
$30.000
|
$100.000
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
200.000
|
$12.890
|
$100.000
|
$25.000
|
$15.000
|
|
|
STORM SEWER CLEANING (ALL SIZES)
|
LF
|
200.000
|
$30.650
|
$15.000
|
$25.000
|
$15.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(ALL SIZES)
|
LF
|
200.000
|
$61.300
|
$200.000
|
$35.000
|
$25.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
300.000
|
$11.910
|
$25.000
|
$3.000
|
$10.000
|
|
|
POST AND CABLE FENCE (NEW CONC ANCHOR)
|
EA
|
6.000
|
$235.290
|
$25.000
|
$100.000
|
$50.000
|
|
|
POST AND CABLE FENCE(REMV / REPL POSTS)
|
EA
|
300.000
|
$200.000
|
$2.000
|
$20.000
|
$100.000
|
|
|
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
|
EA
|
6.000
|
$250.000
|
$2.000
|
$100.000
|
$100.000
|
|
|
REMOVE AND REPLACE (TRACC)
|
EA
|
15.000
|
$20,000.000
|
$16,000.000
|
$17,500.000
|
$15,000.000
|
|
|
REMOVE AND REPLACE (WIDE TRACC)
|
EA
|
15.000
|
$27,530.910
|
$27,000.000
|
$22,000.000
|
$17,000.000
|
|
|
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
|
EA
|
20.000
|
$800.000
|
$20.000
|
$700.000
|
$450.000
|
|
|
REPAIR (TRACC)
|
EA
|
15.000
|
$5,000.000
|
$10,000.000
|
$2,500.000
|
$2,500.000
|
|
|
REPAIR (WIDE TRACC)
|
EA
|
15.000
|
$4,349.080
|
$10,000.000
|
$4,000.000
|
$2,500.000
|
|
|
REPAIR (ALUMINUM RAIL)
|
LF
|
1,000.000
|
$100.000
|
$85.000
|
$150.000
|
$50.000
|
|
|
REPAIR (STEEL RAIL)
|
LF
|
1,000.000
|
$100.000
|
$85.000
|
$250.000
|
$75.000
|
|
|
CONC RAIL REPAIR(REMOVE AND REPL RAIL)
|
LF
|
1,000.000
|
$450.000
|
$125.000
|
$100.000
|
$100.000
|
|
|
BRIDGE JOINT REPAIR (CONCRETE)
|
LF
|
300.000
|
$240.330
|
$100.000
|
$100.000
|
$158.000
|
|
|
BRIDGE JOINT REPAIR (STEEL)
|
LF
|
300.000
|
$15.000
|
$10.000
|
$210.000
|
$188.500
|
|
|
RAISING AND UNDERSEALING CONCRETE SLAB
|
LB
|
20,000.000
|
$7.000
|
$5.000
|
$5.000
|
$6.000
|
|
|
REMOVE CONDUCTOR
|
LF
|
500.000
|
$1.000
|
$50.000
|
$2.000
|
$2.000
|
|
|
INSTALL ELECTRICAL SPLICE
|
EA
|
2.000
|
$328.000
|
$150.000
|
$500.000
|
$550.000
|
|
|
REMOVE ROADWAY ILLUM ASSEMBLY (HPS)
|
EA
|
5.000
|
$551.790
|
$500.000
|
$1,000.000
|
$1,100.000
|
|
|
INSTALL ROADWAY ILLUM ASSEMBLY (LED)
|
EA
|
15.000
|
$2,497.030
|
$6,000.000
|
$2,000.000
|
$2,225.000
|
|
|
REMOVE ROADWAY ILLUM ASSEMBLY (LED)
|
EA
|
5.000
|
$532.500
|
$500.000
|
$1,000.000
|
$1,000.000
|
|
|
REPLACE ROADWAY ILLUM ASSEMBLY (LED)
|
EA
|
30.000
|
$2,487.520
|
$3,000.000
|
$2,500.000
|
$2,225.000
|
|
|
REMOVE GROUND BOX
|
EA
|
3.000
|
$426.000
|
$100.000
|
$500.000
|
$550.000
|
|
|
REMOVE FOUNDATION
|
EA
|
5.000
|
$1,730.260
|
$100.000
|
$1,200.000
|
$1,275.000
|
|
|
REPLACE BREAKAWAY FUSE HOLDER
|
EA
|
3.000
|
$272.720
|
$150.000
|
$250.000
|
$275.000
|
|
|
REPLACE PHOTOCELL AND BRACKET
|
EA
|
5.000
|
$221.500
|
$500.000
|
$200.000
|
$125.000
|
|
|
REPLACE AVIATION WARNING FIXTURE
|
EA
|
2.000
|
$893.800
|
$100.000
|
$200.000
|
$125.000
|
|
|
REPLACE AVIATION WARNING LAMP
|
EA
|
2.000
|
$106.500
|
$100.000
|
$200.000
|
$125.000
|
|
|
RAISE AND LOWER RING (HIGH MAST LIGHT)
|
EA
|
10.000
|
$426.000
|
$2,500.000
|
$700.000
|
$850.000
|
|
|
TROUBLESHOOT FOR REPAIRS
|
HR
|
300.000
|
$197.250
|
$175.000
|
$130.000
|
$175.000
|
|
|
REPLACE PHOTOCELL
|
EA
|
5.000
|
$135.250
|
$100.000
|
$200.000
|
$125.000
|
|
|
INSTALL LUMINAIRE 250 W EQ (LED)
|
EA
|
2.000
|
$637.560
|
$1,500.000
|
$800.000
|
$850.000
|
|
|
INSTALL LUMINAIRE 400 W EQ (LED)
|
EA
|
15.000
|
$426.000
|
$1,500.000
|
$900.000
|
$1,000.000
|
|
|
REMOVE LUMINAIRE
|
EA
|
2.000
|
$319.500
|
$500.000
|
$500.000
|
$650.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
200.000
|
$271.000
|
$50.000
|
$60.000
|
$150.000
|
|
|
VIVDS PROCESSOR SYSTEM
|
EA
|
1.000
|
$7,844.440
|
$5,000.000
|
$7,400.000
|
$11,750.000
|
|
|
VIVDS CAMERA ASSEMBLY
|
EA
|
3.000
|
$1,920.000
|
$1,500.000
|
$2,200.000
|
$2,650.000
|
|
|
VIVDS SET-UP SYSTEM
|
EA
|
2.000
|
$732.860
|
$1,500.000
|
$2,500.000
|
$1,050.000
|
|
|
VIVDS COMMUNICATION CABLE (COAXIAL)
|
LF
|
100.000
|
$8.000
|
$5.000
|
$5.000
|
$4.250
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
100,000.000
|
$0.850
|
$0.750
|
$0.730
|
$0.800
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
50,000.000
|
$0.690
|
$0.850
|
$0.730
|
$0.900
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
10,000.000
|
$1.810
|
$1.000
|
$0.870
|
$1.060
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
100,000.000
|
$0.850
|
$0.750
|
$0.730
|
$0.800
|
|
|
MOBILE RETROREFLECTIVITY DATA COLLECT
|
MI
|
2,107.000
|
$10.000
|
$14.000
|
$12.000
|
$10.000
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
200.000
|
$250.000
|
$200.000
|
$220.000
|
$100.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
3.000
|
$9,000.000
|
$300.000
|
$10,000.000
|
$10,100.000
|
|
|
ITS POLE (50 FT)(90 MPH)
|
EA
|
1.000
|
$11,147.140
|
$7,000.000
|
$10,500.000
|
$26,500.000
|
|
|
ITS POLE (55 FT)(90 MPH)
|
EA
|
1.000
|
$15,000.000
|
$12,000.000
|
$14,000.000
|
$27,500.000
|
|
|
ITS POLE (60 FT)(90 MPH)
|
EA
|
1.000
|
$25,000.000
|
$12,000.000
|
$15,500.000
|
$28,600.000
|
|
|
ITS POLE MNT CAB (TY 1)(CONF 1)
|
EA
|
1.000
|
$7,000.000
|
$3,000.000
|
$11,430.000
|
$11,600.000
|
|
|
ITS POLE MNT CAB (TY 1)(CONF 2)
|
EA
|
1.000
|
$8,000.000
|
$3,000.000
|
$12,150.000
|
$13,800.000
|
|
|
DEAD END ROADWAY BARRICADE
|
LF
|
300.000
|
$100.000
|
$1.000
|
$30.000
|
$10.000
|
|
|
REPLC LED HI MST IL(6 FIXT)(SYM)(TY S)
|
EA
|
10.000
|
$7,869.000
|
$1,500.000
|
$9,500.000
|
$34,000.000
|
|
|
REPLC LED HI MST IL(6 FIXT)(ASYM)(TY A)
|
EA
|
2.000
|
$9,263.680
|
$1,500.000
|
$9,500.000
|
$37,000.000
|
|
|
REPLC LED HI MST IL(6 FIXT)(ASYM)(TY B)
|
EA
|
2.000
|
$8,905.100
|
$1,500.000
|
$9,500.000
|
$42,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
150.000
|
$311.750
|
$1,000.000
|
$400.000
|
$1,000.000
|
|
|
TMA (MOBILE OPERATIONS) (SNOW & ICE)
|
HR
|
1,000.000
|
$84.000
|
$75.000
|
$70.000
|
$50.000
|
|
|
OVERHEAD SIGN SUPPORT REPAIR
|
EA
|
10.000
|
$21,000.000
|
$800.000
|
$300.000
|
$500.000
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
50.000
|
$700.000
|
$800.000
|
$1,300.000
|
$700.000
|
|
|
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
50.000
|
$300.000
|
$800.000
|
$500.000
|
$400.000
|
|
|
REPL LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
50.000
|
$850.000
|
$2,000.000
|
$750.000
|
$1,000.000
|
|
|
REMV LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
50.000
|
$300.000
|
$300.000
|
$300.000
|
$300.000
|
|
|
INCIDENT MANAGEMENT (TYPE A)
|
HR
|
100.000
|
$266.000
|
$300.000
|
$215.000
|
$600.000
|
|
|
INCIDENT MANAGEMENT (TYPE B)
|
HR
|
100.000
|
$380.000
|
$300.000
|
$265.000
|
$700.000
|
|
|
INCIDENT MANAGEMENT (TYPE E)
|
HR
|
100.000
|
$380.000
|
$500.000
|
$455.000
|
$800.000
|
|
|
INCIDENT MANAGEMENT (TYPE F)
|
HR
|
100.000
|
$380.000
|
$200.000
|
$220.000
|
$500.000
|
|
|
RVDS(PRESENCE AND ADVANCE DET)
|
EA
|
5.000
|
$7,000.000
|
$500.000
|
$12,000.000
|
$9,500.000
|
|
|
REML & DISPL DRIFTWOOD & DEBRIS
|
CY
|
4,000.000
|
$115.000
|
$49.000
|
$50.000
|
$50.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 5)
|
EA
|
50.000
|
$903.250
|
$899.000
|
$530.000
|
$850.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 6)
|
EA
|
50.000
|
$565.300
|
$999.000
|
$880.000
|
$950.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 9)
|
EA
|
50.000
|
$500.980
|
$389.000
|
$725.000
|
$800.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 11)
|
EA
|
50.000
|
$1,256.710
|
$899.000
|
$1,850.000
|
$1,500.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 12)
|
EA
|
50.000
|
$589.230
|
$599.000
|
$500.000
|
$350.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 13)
|
EA
|
50.000
|
$442.520
|
$1,000.000
|
$500.000
|
$400.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 14)
|
EA
|
50.000
|
$1,142.470
|
$499.000
|
$700.000
|
$500.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 16)
|
EA
|
50.000
|
$372.650
|
$400.000
|
$530.000
|
$300.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 17)
|
EA
|
50.000
|
$377.730
|
$300.000
|
$500.000
|
$200.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 5)
|
HR
|
50.000
|
$93.740
|
$85.000
|
$150.000
|
$215.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 6)
|
HR
|
50.000
|
$122.830
|
$85.000
|
$200.000
|
$200.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 9)
|
HR
|
50.000
|
$68.500
|
$85.000
|
$175.000
|
$200.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 11)
|
HR
|
50.000
|
$299.700
|
$85.000
|
$460.000
|
$500.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 12)
|
HR
|
50.000
|
$93.740
|
$85.000
|
$125.000
|
$150.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 13)
|
HR
|
50.000
|
$93.740
|
$95.000
|
$125.000
|
$175.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 14)
|
HR
|
50.000
|
$93.740
|
$95.000
|
$175.000
|
$125.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 16)
|
HR
|
50.000
|
$29.750
|
$95.000
|
$130.000
|
$125.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 17)
|
HR
|
50.000
|
$93.740
|
$95.000
|
$175.000
|
$125.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 18)
|
HR
|
500.000
|
$70.000
|
$95.000
|
$240.000
|
$225.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
500.000
|
$120.000
|
$150.000
|
$100.000
|
$50.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
2,000.000
|
$80.000
|
$50.000
|
$50.000
|
$50.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
1,000.000
|
$80.000
|
$200.000
|
$100.000
|
$40.000
|
|
Totals: |
$28,080,885.140
|
$26,575,153.000
|
$29,203,607.000
|
$30,103,463.000
|