MCLENNAN IH0035 (6351-58-001)

Items: 331

County: MCLENNAN
Length: N/A
Highway: IH0035
District: WACO
Control Number: 6351-58-001
DBE Goal: N/A
Project: RMC - 635158001
Guaranty: N/A
Time: 1095 CALENDAR DAYS
Engineer's Estimate: $28,080,845.14
Date: 05/08/2020 (6 years ago)
Contract Number: N/A
Type: ROUTINE MAINTENANCE OF IH - 35 CORRIDOR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$28,080,845.14
$26,575,153.00
Over/Under Est: -5.36% -$1,505,692.14
$29,203,607.00
Over/Under Est: 4% $1,122,761.86
Amt Left: 9.89% $2,628,454.00
Over/Under Est: 7.2% $2,022,617.86
Amt Left: 13.28% $3,528,310.00
Delta: -3.08% -$899,856.00

Bid Items & Bid Tabulations

331 Total 0 of 331
MCLENNAN  |  IH0035  |  WACO  |  6351-58-001  |  05/08/2020  |  $28,080,845.14  |  RMC - 635158001  |  ROUTINE MAINT OF IH - 35 CORRIDOR  |  1095 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CROSS PLUS CONSTRUCTION, LLC
DBI SERVICES, LLC
ROY JORGENSEN ASSOCIATES, INC.
REMOVING CONC (CURB OR CURB & GUTTER)
LF 300.000 $27.780 $20.000 $4.000 $5.000
EXCAVATION (CHANNEL)
CY 1,000.000 $83.590 $35.000 $6.000 $25.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 5,000.000 $25.000 $20.000 $22.000 $30.000
BLADING
HR 200.000 $300.000 $100.000 $175.000 $100.000
BULLDOZER WORK
HR 50.000 $250.000 $150.000 $135.000 $160.000
SPEC EXCAV WORK (BACKHOE)
HR 50.000 $194.340 $99.000 $65.000 $110.000
SPEC EXCAV WORK (FRONT-END LOADER)
HR 50.000 $200.000 $100.000 $85.000 $135.000
BROADCAST SEED (TEMP) (WARM)
SY 5,000.000 $0.890 $0.500 $0.250 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 5,000.000 $1.530 $0.500 $0.250 $0.500
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 5.000 $715.970 $200.000 $200.000 $775.000
DRILL SEEDING (PERM) (URBAN) (CLAY)
AC 5.000 $500.000 $500.000 $200.000 $775.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 500.000 $2.730 $6.000 $6.000 $7.000
SOIL RETENTION BLANKETS (CL 2) (TY G)
SY 500.000 $10.980 $6.000 $7.000 $7.000
FOG SEAL (CSS-1H)
GAL 4,000.000 $20.740 $6.500 $5.000 $9.000
D-GR HMA(SQ) TY-C SAC-A PG70-22
TON 3,000.000 $120.000 $130.000 $140.000 $150.000
D-GR HMA(SQ) TY-D SAC-A PG70-22
TON 3,000.000 $131.240 $130.000 $140.000 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 2,500.000 $70.000 $90.000 $100.000 $100.000
PLANE ASPH CONC PAV(0" TO 2")
SY 150,000.000 $2.440 $2.500 $4.500 $3.000
FULL - DEPTH REPAIR CPJR (9")
SY 1,500.000 $270.000 $280.000 $220.000 $225.000
FULL - DEPTH REPAIR CRCP (8"-14")
SY 1,500.000 $300.000 $280.000 $350.000 $450.000
FLOWABLE BACKFILL
CY 200.000 $180.000 $200.000 $130.000 $200.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 100.000 $205.790 $250.000 $475.000 $75.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 75.000 $299.510 $300.000 $515.000 $95.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 50.000 $316.820 $300.000 $585.000 $120.000
DRILL SHAFT (TRF SIG POLE) (42 IN)
LF 50.000 $400.000 $500.000 $590.000 $150.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 50.000 $435.000 $500.000 $600.000 $180.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 100.000 $130.000 $200.000 $170.000 $200.000
CONC STR REPAIR (STANDARD)
SF 100.000 $90.000 $200.000 $130.000 $150.000
RIPRAP (CONC)(CL B)
CY 500.000 $375.000 $375.000 $200.000 $350.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 500.000 $226.890 $200.000 $110.000 $150.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 500.000 $175.000 $200.000 $115.000 $175.000
CLEANING AND SEALING JOINTS
LF 1,000.000 $20.020 $20.000 $9.000 $15.000
STR STEEL (MISC NON-BRIDGE) (TRUSS)
LB 10,000.000 $3.000 $4.990 $5.000 $6.000
MOBILIZATION (CALLOUT)
EA 72.000 $2,500.000 $5,000.000 $1,750.000 $1,500.000
MOBILIZATION (EMERGENCY)
EA 36.000 $4,500.000 $2,000.000 $2,500.000 $3,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 200.000 $30.370 $10.000 $20.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 200.000 $14.060 $10.000 $1.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 200.000 $3.320 $10.000 $3.000 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 200.000 $1.320 $1.000 $1.000 $1.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 3,000.000 $16.460 $5.000 $14.000 $10.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 2,500.000 $11.120 $5.000 $14.000 $10.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 300.000 $41.450 $5.000 $14.000 $10.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,000.000 $5.570 $5.000 $5.000 $5.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 3,000.000 $10.280 $5.000 $5.000 $10.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 2,500.000 $10.500 $5.000 $5.000 $10.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 300.000 $17.500 $5.000 $5.000 $10.000
CONC CURB (TY I)
LF 1,000.000 $30.000 $20.000 $6.000 $35.000
CONC CURB (TY II)
LF 1,000.000 $29.140 $20.000 $6.000 $19.000
CONC CURB (MONO) (TY I)
LF 500.000 $10.830 $20.000 $10.000 $40.000
CONC CURB (MONO) (TY II)
LF 500.000 $41.250 $20.000 $10.000 $20.000
CONC CURB & GUTTER (TY I)
LF 100.000 $29.710 $20.000 $15.000 $40.000
CONC CURB & GUTTER (TY II)
LF 100.000 $39.050 $20.000 $15.000 $45.000
CONC SIDEWALKS (4")
SY 100.000 $78.390 $49.000 $30.000 $115.000
MTL W-BEAM GD FEN (STEEL POST)
LF 5,000.000 $33.410 $35.000 $26.000 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $2,775.000 $1,500.000 $1,300.000 $1,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 30.000 $1,570.270 $1,000.000 $1,040.000 $2,000.000
MTL BM GD FEN TRANS (31"-28")
EA 5.000 $700.000 $2,000.000 $175.000 $100.000
REMOVE METAL BEAM GUARD FENCE
LF 5,000.000 $3.160 $14.000 $1.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 70.000 $200.000 $100.000 $85.000 $25.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 30.000 $150.000 $100.000 $85.000 $25.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 10.000 $304.440 $500.000 $150.000 $25.000
CABLE BARRIER SYSTEM (TL-4)
LF 5,000.000 $12.480 $13.000 $10.000 $11.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 6.000 $2,500.000 $2,500.000 $1,300.000 $3,000.000
REMOVE CABLE BARRIER
LF 4,000.000 $11.300 $1.000 $1.000 $2.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 6.000 $500.000 $200.000 $175.000 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 45.000 $3,096.590 $3,500.000 $3,000.000 $4,500.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $6,436.330 $500.000 $2,500.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
EA 5.000 $25,100.000 $15,000.000 $21,000.000 $24,000.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 50.000 $445.530 $200.000 $250.000 $30.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 50.000 $183.180 $200.000 $150.000 $30.000
RELOCATE RD IL ASM (U/P)
EA 10.000 $2,840.000 $300.000 $1,800.000 $2,200.000
REMOVE RD IL ASM (U/P)
EA 10.000 $370.860 $300.000 $400.000 $525.000
IN RD IL AM (U/P) (TY 1) (150W) S
EA 5.000 $1,610.000 $800.000 $1,000.000 $1,250.000
IN RD IL AM (U/P) (TY 2) (150W) S
EA 5.000 $1,500.000 $800.000 $1,000.000 $1,250.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 10.000 $1,647.560 $800.000 $1,000.000 $1,250.000
IN RD IL (U/P) (TY 1) (250W EQ) LED
EA 5.000 $1,525.000 $800.000 $1,000.000 $1,250.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 5.000 $1,755.180 $800.000 $1,000.000 $1,250.000
IN RD IL (U/P) (TY 2) (250W EQ) LED
EA 5.000 $750.000 $800.000 $1,000.000 $1,250.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 5.000 $4,000.000 $3,000.000 $1,000.000 $2,200.000
IN RD IL (TY SP) 48S-8-8 (400W EQ) LED
EA 5.000 $5,527.130 $3,500.000 $1,000.000 $2,200.000
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 5.000 $3,553.330 $3,500.000 $2,000.000 $2,650.000
CONDT (PVC) (SCH 40) (2")
LF 500.000 $20.000 $4.000 $9.000 $10.500
CONDT (PVC) (SCH 40) (3")
LF 500.000 $25.000 $4.000 $13.000 $10.500
CONDT (PVC) (SCH 80) (3") (BORE)
LF 250.000 $45.000 $20.000 $25.000 $27.500
CONDT (RM) (2")
LF 100.000 $25.000 $11.000 $9.000 $10.500
CONDT (RM) (3")
LF 75.000 $35.000 $15.000 $13.000 $16.000
ELEC CONDR (NO.8) BARE
LF 500.000 $2.000 $2.000 $3.500 $4.250
ELEC CONDR (NO.8) INSULATED
LF 1,000.000 $3.000 $2.000 $3.500 $4.250
ELEC CONDR (NO.6) BARE
LF 250.000 $3.000 $2.000 $5.750 $7.000
ELEC CONDR (NO.6) INSULATED
LF 500.000 $4.000 $2.000 $5.750 $7.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 50.000 $5.000 $2.000 $5.250 $6.500
GROUND BOX TY A (122311)W/APRON
EA 5.000 $901.640 $500.000 $1,300.000 $1,600.000
GROUND BOX TY C (162911)W/APRON
EA 2.000 $1,102.210 $500.000 $1,450.000 $1,750.000
GROUND BOX TY D (162922)W/APRON
EA 2.000 $1,150.000 $500.000 $1,450.000 $1,750.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 500.000 $3.580 $3.000 $3.750 $4.500
REMOVE ELECTRICAL SERVICES
EA 2.000 $690.000 $23.000 $300.000 $375.000
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
EA 2.000 $7,000.000 $1,000.000 $8,500.000 $10,100.000
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
EA 2.000 $6,300.000 $1,000.000 $7,500.000 $9,050.000
ALUMINUM SIGNS (TY G)
SF 5,000.000 $25.000 $25.000 $24.000 $35.000
ALUMINUM SIGNS (TY O)
SF 5,000.000 $31.820 $25.000 $24.000 $35.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 10,000.000 $25.000 $25.000 $24.000 $25.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 5,000.000 $25.000 $25.000 $24.000 $40.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 200.000 $624.930 $1,200.000 $415.000 $600.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 200.000 $868.190 $1,200.000 $390.000 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 200.000 $1,300.000 $1,200.000 $295.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 200.000 $685.000 $1,200.000 $500.000 $700.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 200.000 $1,465.000 $2,500.000 $570.000 $1,100.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 50.000 $1,500.000 $800.000 $950.000 $1,400.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 50.000 $1,500.000 $800.000 $950.000 $1,400.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 10.000 $2,210.000 $800.000 $1,800.000 $500.000
RELOCATE SM RD SN SUP&AM TY S80
EA 200.000 $600.000 $300.000 $235.000 $50.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 50.000 $765.000 $200.000 $170.000 $50.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 1,000.000 $59.470 $50.000 $85.000 $35.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 2,500.000 $13.000 $8.000 $7.000 $4.000
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
EA 1,000.000 $78.000 $35.000 $35.000 $35.000
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
EA 1,000.000 $55.630 $40.000 $50.000 $35.000
INSTL OM ASSM (OM-3L)(TWT)GND
EA 1,000.000 $230.170 $40.000 $100.000 $35.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 1,000.000 $272.500 $40.000 $100.000 $35.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 1,000.000 $26.200 $4.000 $10.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 5,000.000 $30.000 $5.000 $20.000 $15.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 2,500.000 $86.070 $5.000 $50.000 $35.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 10,000.000 $1.920 $0.600 $0.520 $2.150
REFL PAV MRK TY I (W)4"(LNDP)(100MIL)
LF 10,000.000 $1.000 $0.600 $0.520 $2.150
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 10,000.000 $1.670 $0.800 $0.690 $2.150
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
LF 10,000.000 $2.500 $0.800 $0.690 $2.150
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
LF 10,000.000 $1.500 $0.900 $0.780 $2.650
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 10,000.000 $1.390 $0.900 $0.780 $2.650
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 10,000.000 $1.980 $1.000 $0.870 $2.650
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 10,000.000 $0.820 $1.000 $0.870 $1.350
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 10,000.000 $3.020 $1.750 $1.520 $3.200
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 10,000.000 $3.200 $3.000 $2.600 $3.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 200.000 $6.850 $6.000 $9.100 $7.400
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 100.000 $534.670 $125.000 $190.000 $135.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 100.000 $340.290 $150.000 $130.000 $300.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 100.000 $577.150 $400.000 $350.000 $700.000
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
EA 100.000 $604.590 $135.000 $120.000 $350.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 100.000 $70.000 $25.000 $22.000 $60.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 100.000 $55.000 $25.000 $22.000 $70.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 10,000.000 $1.380 $0.900 $0.780 $1.070
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
LF 10,000.000 $0.650 $0.700 $0.820 $0.720
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 10,000.000 $1.100 $0.800 $1.170 $0.830
REFL PAV MRK TY II (W) (UTURN ARROW)
EA 100.000 $151.540 $40.000 $35.000 $215.000
PAVEMENT SEALER 4"
LF 10,000.000 $0.300 $0.140 $0.210 $0.120
PAVEMENT SEALER 6"
LF 10,000.000 $0.300 $0.180 $0.270 $0.140
PAVEMENT SEALER 8"
LF 10,000.000 $0.430 $0.270 $0.430 $0.350
PAVEMENT SEALER 12"
LF 10,000.000 $1.320 $0.750 $0.650 $1.070
PAVEMENT SEALER 24"
LF 10,000.000 $3.320 $1.500 $2.300 $2.120
PAVEMENT SEALER (ARROW)
EA 100.000 $55.000 $30.000 $45.000 $27.000
PAVEMENT SEALER (WORD)
EA 100.000 $65.000 $30.000 $26.000 $27.000
PAVEMENT SEALER (UTURN ARROW)
EA 100.000 $32.830 $45.000 $55.000 $37.000
PAVEMENT SEALER (LNDP ARROW)
EA 100.000 $98.840 $100.000 $44.000 $37.000
PAVEMENT SEALER (RR XING)
EA 100.000 $200.000 $20.000 $87.000 $95.000
PAVEMENT SEALER (YLD TRI)
EA 500.000 $15.160 $15.000 $18.000 $16.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 300,000.000 $1.310 $0.320 $0.370 $0.450
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,200,000.000 $0.590 $0.320 $0.350 $0.430
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 300,000.000 $0.660 $0.450 $0.680 $0.580
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 600,000.000 $0.500 $0.450 $0.680 $0.540
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 300,000.000 $0.800 $0.320 $0.370 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,200,000.000 $0.640 $0.320 $0.350 $0.420
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 300,000.000 $2.000 $0.450 $0.390 $0.580
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 600,000.000 $0.500 $0.450 $0.680 $0.540
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 100,000.000 $0.600 $0.700 $0.850 $0.580
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 100,000.000 $1.400 $0.800 $1.210 $0.840
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 100,000.000 $1.370 $0.800 $1.210 $0.840
REFL PAV MRKR TY I-A
EA 50,000.000 $3.000 $3.400 $4.750 $4.050
REFL PAV MRKR TY I-C
EA 5,000.000 $12.000 $3.400 $3.500 $4.050
REFL PAV MRKR TY I-R
EA 5,000.000 $5.000 $15.000 $3.500 $4.050
REFL PAV MRKR TY II-A-A
EA 50,000.000 $2.750 $3.400 $4.900 $4.050
REFL PAV MRKR TY II-C-R
EA 50,000.000 $2.500 $3.400 $6.000 $4.050
ELIM EXT PAV MRK & MRKS (4")
LF 65,000.000 $1.000 $1.200 $1.000 $0.430
ELIM EXT PAV MRK & MRKS (6")
LF 2,000.000 $0.500 $1.500 $1.500 $0.430
ELIM EXT PAV MRK & MRKS (8")
LF 10,000.000 $1.000 $1.800 $1.800 $0.700
ELIM EXT PAV MRK & MRKS (12")
LF 500.000 $2.110 $4.000 $4.000 $1.750
ELIM EXT PAV MRK & MRKS (24")
LF 1,200.000 $3.000 $4.000 $5.000 $3.700
ELIM EXT PAV MRK & MRKS (ARROW)
EA 500.000 $55.410 $100.000 $100.000 $40.000
ELIM EXT PAV MRK & MRKS (NUMBER)
EA 500.000 $90.000 $100.000 $85.000 $40.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 500.000 $67.420 $100.000 $100.000 $51.000
PED SIG SEC (LED)(2 INDICATIONS)
EA 3.000 $600.000 $500.000 $3,125.000 $530.000
PED SIG SEC (LED)(COUNTDOWN)
EA 3.000 $600.000 $400.000 $3,125.000 $635.000
PED SIG SEC (LED)(CNTDWN)(MODUL ONLY)
EA 2.000 $250.000 $200.000 $1,050.000 $370.000
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
LF 100.000 $4.000 $3.000 $5.000 $3.200
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 200.000 $5.000 $3.000 $6.000 $4.250
TRF SIG CBL (TY A)(12 AWG)(16 CONDR)
LF 400.000 $6.000 $3.000 $7.000 $7.400
INS TRF SIG PL AM (MAST)(INSTALL ONLY)
EA 2.000 $1,000.000 $3,000.000 $5,000.000 $5,300.000
PED POLE ASSEMBLY
EA 2.000 $2,800.000 $550.000 $6,000.000 $4,250.000
PED DETECT PUSH BUTTON (APS)
EA 2.000 $938.610 $400.000 $3,600.000 $740.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $3,472.710 $2,200.000 $6,250.000 $3,175.000
REMOVAL OF SIGNAL HEAD ASSM
EA 10.000 $201.820 $100.000 $520.000 $530.000
INSTALL OF SIGNAL HEAD ASSM
EA 3.000 $608.340 $100.000 $3,125.000 $1,000.000
REMOVAL OF SIGNAL RELATED SIGNS
EA 10.000 $113.450 $25.000 $150.000 $530.000
REPLACE OF SIGNAL RELATED SIGNS
EA 10.000 $515.000 $25.000 $520.000 $795.000
INSTALL OF SIGNAL RELATED SIGNS
EA 10.000 $425.000 $25.000 $420.000 $635.000
INSTALL OF CONTROL CABINET(GRND MNT)
EA 2.000 $4,444.440 $400.000 $11,700.000 $22,000.000
REMOVAL OF SIGNAL POLE ASSM
EA 3.000 $1,289.260 $200.000 $3,150.000 $3,150.000
REMOVE VID IMAGE VEH DET SYS (VIVDS)
EA 3.000 $808.880 $200.000 $3,650.000 $800.000
POTHOLE REPAIR (STANDARD)
SY 1,500.000 $240.000 $75.000 $70.000 $100.000
POTHOLE REPAIR (SAW - CUT)
SY 300.000 $140.000 $100.000 $125.000 $125.000
JT / CRCK SEAL (RUBBER - ASPHALT)
LMI 500.000 $575.060 $600.000 $400.000 $1,100.000
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 10,000.000 $40.000 $37.000 $60.000 $75.000
FULL - WIDTH MOWING
AC 41,178.000 $33.000 $32.000 $45.500 $41.000
SPOT MOWING
AC 180.000 $85.000 $100.000 $100.000 $52.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 3,321.000 $180.000 $150.000 $125.000 $200.000
BROADCAST APPLICATION
AC 15,000.000 $65.000 $60.000 $80.000 $40.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
AC 800.000 $250.000 $65.000 $46.000 $40.000
LITTER REMOVAL
AC 41,178.000 $10.000 $10.000 $18.000 $17.500
LITTER REMOVAL (SPOT)
AC 180.000 $40.000 $100.000 $200.000 $20.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
MI 36,317.000 $20.000 $55.000 $54.000 $48.000
DEBRIS REMOVAL (FRONTAGE ROADS)
MI 22,849.000 $20.000 $35.000 $54.000 $48.000
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
MI 2,926.000 $20.000 $35.000 $54.000 $48.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 2,160.000 $20.000 $35.000 $54.000 $48.000
DEBRIS REMOVAL (DIRECT CONNECTOR)
MI 618.000 $20.000 $35.000 $54.000 $48.000
CLEANING / SWEEPING (CENTER MEDIAN)
MI 12,708.000 $110.000 $149.000 $160.000 $160.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
MI 12,708.000 $110.000 $129.000 $160.000 $160.000
CLEANING / SWEEPING (FRONTAGE ROAD)
MI 7,477.000 $110.000 $100.000 $185.000 $160.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
MI 958.000 $110.000 $156.000 $160.000 $160.000
CLEANING / SWEEPING (AGGREGATE REMOVAL)
MI 100.000 $100.000 $500.000 $470.000 $265.000
CLEANING / SWEEPING (SPOT)
MI 180.000 $125.000 $500.000 $470.000 $265.000
CLEANING / SWEEPING (HANDWORK)
SY 15,000.000 $0.350 $1.060 $4.000 $2.500
CLEANING / SWEEPING (DIRECT CONNECTOR)
MI 169.000 $160.000 $186.000 $250.000 $200.000
GRAFFITI REMOVAL (BLAST CLEANING)
SF 5,000.000 $4.500 $3.000 $4.000 $3.000
GRAFFITI REMOVAL (PAINTING)
SF 5,000.000 $1.180 $3.000 $4.000 $3.000
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 5,000.000 $2.380 $3.000 $4.000 $5.000
IRRIG SYS OPERATION AND REPAIR
MO 42.000 $500.000 $5,100.000 $2,000.000 $5,000.000
MULCH & RESHAPING OF PLANT BEDS
CYC 30.000 $681.430 $2,900.000 $2,800.000 $10,000.000
PLANT BED MAINTENANCE
CYC 90.000 $2,000.000 $5,000.000 $1,060.000 $10,000.000
PRUNING
CYC 12.000 $1,500.000 $5,200.000 $7,890.000 $2,500.000
VEGETATIVE WATERING
MG 500.000 $100.000 $1.000 $50.000 $10.000
TREE TRIMMING / BRUSH REMOVAL
MI 15.000 $3,000.000 $2,500.000 $6,000.000 $1,500.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 100.000 $2,000.000 $1,500.000 $2,400.000 $1,000.000
TREE REMOVAL (4" - 12" DIA)
EA 5.000 $500.000 $200.000 $400.000 $200.000
TREE REMOVAL (12" - 18" DIA)
EA 5.000 $600.000 $200.000 $600.000 $200.000
TREE REMOVAL (18" - 24" DIA)
EA 5.000 $1,500.000 $200.000 $610.000 $200.000
TREE REMOVAL (24" - 30" DIA)
EA 2.000 $1,350.000 $200.000 $900.000 $200.000
TREE REMOVAL (30" - 36" DIA)
EA 2.000 $328.570 $200.000 $1,000.000 $200.000
TREE REMOVAL (36" - 42" DIA)
EA 2.000 $450.000 $200.000 $1,100.000 $200.000
TREE REMOVAL (42" - 48" DIA)
EA 2.000 $666.670 $200.000 $1,200.000 $400.000
STUMP REMOVAL
EA 10.000 $105.840 $50.000 $100.000 $500.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 20,000.000 $12.500 $6.000 $1.000 $1.000
DRAIN INLET CLEANING
EA 200.000 $440.760 $75.000 $30.000 $100.000
SLOTTED DRAIN CLEANING
LF 200.000 $12.890 $100.000 $25.000 $15.000
STORM SEWER CLEANING (ALL SIZES)
LF 200.000 $30.650 $15.000 $25.000 $15.000
STORM SEWER CLEAN (BOX CULV)(ALL SIZES)
LF 200.000 $61.300 $200.000 $35.000 $25.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 300.000 $11.910 $25.000 $3.000 $10.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 6.000 $235.290 $25.000 $100.000 $50.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 300.000 $200.000 $2.000 $20.000 $100.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 6.000 $250.000 $2.000 $100.000 $100.000
REMOVE AND REPLACE (TRACC)
EA 15.000 $20,000.000 $16,000.000 $17,500.000 $15,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 15.000 $27,530.910 $27,000.000 $22,000.000 $17,000.000
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 20.000 $800.000 $20.000 $700.000 $450.000
REPAIR (TRACC)
EA 15.000 $5,000.000 $10,000.000 $2,500.000 $2,500.000
REPAIR (WIDE TRACC)
EA 15.000 $4,349.080 $10,000.000 $4,000.000 $2,500.000
REPAIR (ALUMINUM RAIL)
LF 1,000.000 $100.000 $85.000 $150.000 $50.000
REPAIR (STEEL RAIL)
LF 1,000.000 $100.000 $85.000 $250.000 $75.000
CONC RAIL REPAIR(REMOVE AND REPL RAIL)
LF 1,000.000 $450.000 $125.000 $100.000 $100.000
BRIDGE JOINT REPAIR (CONCRETE)
LF 300.000 $240.330 $100.000 $100.000 $158.000
BRIDGE JOINT REPAIR (STEEL)
LF 300.000 $15.000 $10.000 $210.000 $188.500
RAISING AND UNDERSEALING CONCRETE SLAB
LB 20,000.000 $7.000 $5.000 $5.000 $6.000
REMOVE CONDUCTOR
LF 500.000 $1.000 $50.000 $2.000 $2.000
INSTALL ELECTRICAL SPLICE
EA 2.000 $328.000 $150.000 $500.000 $550.000
REMOVE ROADWAY ILLUM ASSEMBLY (HPS)
EA 5.000 $551.790 $500.000 $1,000.000 $1,100.000
INSTALL ROADWAY ILLUM ASSEMBLY (LED)
EA 15.000 $2,497.030 $6,000.000 $2,000.000 $2,225.000
REMOVE ROADWAY ILLUM ASSEMBLY (LED)
EA 5.000 $532.500 $500.000 $1,000.000 $1,000.000
REPLACE ROADWAY ILLUM ASSEMBLY (LED)
EA 30.000 $2,487.520 $3,000.000 $2,500.000 $2,225.000
REMOVE GROUND BOX
EA 3.000 $426.000 $100.000 $500.000 $550.000
REMOVE FOUNDATION
EA 5.000 $1,730.260 $100.000 $1,200.000 $1,275.000
REPLACE BREAKAWAY FUSE HOLDER
EA 3.000 $272.720 $150.000 $250.000 $275.000
REPLACE PHOTOCELL AND BRACKET
EA 5.000 $221.500 $500.000 $200.000 $125.000
REPLACE AVIATION WARNING FIXTURE
EA 2.000 $893.800 $100.000 $200.000 $125.000
REPLACE AVIATION WARNING LAMP
EA 2.000 $106.500 $100.000 $200.000 $125.000
RAISE AND LOWER RING (HIGH MAST LIGHT)
EA 10.000 $426.000 $2,500.000 $700.000 $850.000
TROUBLESHOOT FOR REPAIRS
HR 300.000 $197.250 $175.000 $130.000 $175.000
REPLACE PHOTOCELL
EA 5.000 $135.250 $100.000 $200.000 $125.000
INSTALL LUMINAIRE 250 W EQ (LED)
EA 2.000 $637.560 $1,500.000 $800.000 $850.000
INSTALL LUMINAIRE 400 W EQ (LED)
EA 15.000 $426.000 $1,500.000 $900.000 $1,000.000
REMOVE LUMINAIRE
EA 2.000 $319.500 $500.000 $500.000 $650.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 200.000 $271.000 $50.000 $60.000 $150.000
VIVDS PROCESSOR SYSTEM
EA 1.000 $7,844.440 $5,000.000 $7,400.000 $11,750.000
VIVDS CAMERA ASSEMBLY
EA 3.000 $1,920.000 $1,500.000 $2,200.000 $2,650.000
VIVDS SET-UP SYSTEM
EA 2.000 $732.860 $1,500.000 $2,500.000 $1,050.000
VIVDS COMMUNICATION CABLE (COAXIAL)
LF 100.000 $8.000 $5.000 $5.000 $4.250
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 100,000.000 $0.850 $0.750 $0.730 $0.800
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 50,000.000 $0.690 $0.850 $0.730 $0.900
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 10,000.000 $1.810 $1.000 $0.870 $1.060
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 100,000.000 $0.850 $0.750 $0.730 $0.800
MOBILE RETROREFLECTIVITY DATA COLLECT
MI 2,107.000 $10.000 $14.000 $12.000 $10.000
RELOC SMALL RDSD SIGN SUPT & ASSEM
EA 200.000 $250.000 $200.000 $220.000 $100.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 3.000 $9,000.000 $300.000 $10,000.000 $10,100.000
ITS POLE (50 FT)(90 MPH)
EA 1.000 $11,147.140 $7,000.000 $10,500.000 $26,500.000
ITS POLE (55 FT)(90 MPH)
EA 1.000 $15,000.000 $12,000.000 $14,000.000 $27,500.000
ITS POLE (60 FT)(90 MPH)
EA 1.000 $25,000.000 $12,000.000 $15,500.000 $28,600.000
ITS POLE MNT CAB (TY 1)(CONF 1)
EA 1.000 $7,000.000 $3,000.000 $11,430.000 $11,600.000
ITS POLE MNT CAB (TY 1)(CONF 2)
EA 1.000 $8,000.000 $3,000.000 $12,150.000 $13,800.000
DEAD END ROADWAY BARRICADE
LF 300.000 $100.000 $1.000 $30.000 $10.000
REPLC LED HI MST IL(6 FIXT)(SYM)(TY S)
EA 10.000 $7,869.000 $1,500.000 $9,500.000 $34,000.000
REPLC LED HI MST IL(6 FIXT)(ASYM)(TY A)
EA 2.000 $9,263.680 $1,500.000 $9,500.000 $37,000.000
REPLC LED HI MST IL(6 FIXT)(ASYM)(TY B)
EA 2.000 $8,905.100 $1,500.000 $9,500.000 $42,500.000
TMA (STATIONARY)
DAY 150.000 $311.750 $1,000.000 $400.000 $1,000.000
TMA (MOBILE OPERATIONS) (SNOW & ICE)
HR 1,000.000 $84.000 $75.000 $70.000 $50.000
OVERHEAD SIGN SUPPORT REPAIR
EA 10.000 $21,000.000 $800.000 $300.000 $500.000
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
EA 50.000 $700.000 $800.000 $1,300.000 $700.000
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
EA 50.000 $300.000 $800.000 $500.000 $400.000
REPL LARGE RDSD SIGN SUPP & ASSEM
EA 50.000 $850.000 $2,000.000 $750.000 $1,000.000
REMV LARGE RDSD SIGN SUPP & ASSEM
EA 50.000 $300.000 $300.000 $300.000 $300.000
INCIDENT MANAGEMENT (TYPE A)
HR 100.000 $266.000 $300.000 $215.000 $600.000
INCIDENT MANAGEMENT (TYPE B)
HR 100.000 $380.000 $300.000 $265.000 $700.000
INCIDENT MANAGEMENT (TYPE E)
HR 100.000 $380.000 $500.000 $455.000 $800.000
INCIDENT MANAGEMENT (TYPE F)
HR 100.000 $380.000 $200.000 $220.000 $500.000
RVDS(PRESENCE AND ADVANCE DET)
EA 5.000 $7,000.000 $500.000 $12,000.000 $9,500.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 4,000.000 $115.000 $49.000 $50.000 $50.000
LANE CLOSURE (SETUP AND REMOV)(TY 5)
EA 50.000 $903.250 $899.000 $530.000 $850.000
LANE CLOSURE (SETUP AND REMOV)(TY 6)
EA 50.000 $565.300 $999.000 $880.000 $950.000
LANE CLOSURE (SETUP AND REMOV)(TY 9)
EA 50.000 $500.980 $389.000 $725.000 $800.000
LANE CLOSURE (SETUP AND REMOV)(TY 11)
EA 50.000 $1,256.710 $899.000 $1,850.000 $1,500.000
LANE CLOSURE (SETUP AND REMOV)(TY 12)
EA 50.000 $589.230 $599.000 $500.000 $350.000
LANE CLOSURE (SETUP AND REMOV)(TY 13)
EA 50.000 $442.520 $1,000.000 $500.000 $400.000
LANE CLOSURE (SETUP AND REMOV)(TY 14)
EA 50.000 $1,142.470 $499.000 $700.000 $500.000
LANE CLOSURE (SETUP AND REMOV)(TY 16)
EA 50.000 $372.650 $400.000 $530.000 $300.000
LANE CLOSURE (SETUP AND REMOV)(TY 17)
EA 50.000 $377.730 $300.000 $500.000 $200.000
LANE CLOSURE (MAINTENANCE) (TY 5)
HR 50.000 $93.740 $85.000 $150.000 $215.000
LANE CLOSURE (MAINTENANCE) (TY 6)
HR 50.000 $122.830 $85.000 $200.000 $200.000
LANE CLOSURE (MAINTENANCE) (TY 9)
HR 50.000 $68.500 $85.000 $175.000 $200.000
LANE CLOSURE (MAINTENANCE) (TY 11)
HR 50.000 $299.700 $85.000 $460.000 $500.000
LANE CLOSURE (MAINTENANCE) (TY 12)
HR 50.000 $93.740 $85.000 $125.000 $150.000
LANE CLOSURE (MAINTENANCE) (TY 13)
HR 50.000 $93.740 $95.000 $125.000 $175.000
LANE CLOSURE (MAINTENANCE) (TY 14)
HR 50.000 $93.740 $95.000 $175.000 $125.000
LANE CLOSURE (MAINTENANCE) (TY 16)
HR 50.000 $29.750 $95.000 $130.000 $125.000
LANE CLOSURE (MAINTENANCE) (TY 17)
HR 50.000 $93.740 $95.000 $175.000 $125.000
LANE CLOSURE (SETUP AND REMOV)(TY 18)
HR 500.000 $70.000 $95.000 $240.000 $225.000
SNOW AND ICE CONTROL (TRUCK)
HR 500.000 $120.000 $150.000 $100.000 $50.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 2,000.000 $80.000 $50.000 $50.000 $50.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 1,000.000 $80.000 $200.000 $100.000 $40.000
Totals: $28,080,885.140 $26,575,153.000 $29,203,607.000 $30,103,463.000