MCLENNAN FM 2114 (2061-02-030)

Items: 121

County: MCLENNAN
Length: N/A
Highway: FM 2114
District: WACO
Control Number: 2061-02-030
DBE Goal: N/A
Project: STP 1802(320)
Guaranty: N/A
Time: 510 WORKING DAYS
Engineer's Estimate: $9,350,224.38
Date: 10/02/2018 (7 years ago)
Contract Number: N/A
Type: REHAB & WDN RDWY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$9,350,224.38
$9,997,468.08
Over/Under Est: 6.92% $647,243.70
Over/Under Est: 6.93% $647,715.52
Amt Left: 0% $471.82
Over/Under Est: 11.19% $1,046,024.99
Amt Left: 3.99% $398,781.29
Delta: -3.98% -$398,309.47
Over/Under Est: 42.34% $3,959,347.28
Amt Left: 33.13% $3,312,103.58
Delta: -28.02% -$2,913,322.29

Bid Items & Bid Tabulations

121 Total 0 of 121
MCLENNAN  |  FM 2114  |  WACO  |  2061-02-030  |  10/02/2018  |  $9,350,224.38  |  STP 1802(320)  |  REHAB & WDN RDWY  |  510 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
OLDCASTLE MATERIALS TEXAS, INC.
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 597.000 $1,500.000 $250.000 $38.850 $100.000 $1,365.000
REMOVING CONC (RIPRAP)
SY 3,990.000 $20.000 $5.000 $10.750 $10.000 $13.650
REMOVING CONC (DRIVEWAYS)
SY 73.000 $6.220 $20.000 $19.250 $15.000 $15.750
EXCAVATION (ROADWAY)
CY 11,380.000 $5.610 $10.000 $3.200 $3.000 $13.650
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 25,734.000 $6.300 $10.000 $21.250 $5.000 $13.650
FURNISHING AND PLACING TOPSOIL (4")
SY 395,348.000 $0.520 $0.500 $0.150 $0.010 $0.750
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 395,348.000 $0.180 $0.120 $0.120 $0.010 $0.180
DRILL SEEDING (TEMP) (WARM)
SY 197,674.000 $0.100 $0.060 $0.060 $0.010 $0.050
DRILL SEEDING (TEMP) (COOL)
SY 197,674.000 $0.100 $0.060 $0.060 $0.010 $0.050
VEGETATIVE WATERING
MG 6,422.000 $10.310 $1.000 $0.100 $0.010 $10.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 600.000 $2.100 $5.000 $1.610 $5.690 $9.450
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 33,705.000 $35.060 $38.000 $45.640 $40.550 $50.000
REWRKING BS MATL (TY C)(10")(ORD COMP)
SY 195,719.000 $6.000 $1.000 $1.550 $2.000 $1.150
CEMENT
TON 2,260.790 $75.870 $135.000 $128.000 $131.000 $140.000
CEMENT TREAT (EXIST MATL) (7")
SY 215,332.000 $1.450 $2.000 $1.150 $2.000 $1.440
EMULS ASPH (BS OR SUBGR TRT)(MS-2)
GAL 101,116.000 $1.140 $3.000 $1.350 $2.750 $2.600
ASPH (CRS-2)
GAL 90,083.000 $2.280 $2.800 $3.050 $2.500 $2.700
ASPH (RC-250)
GAL 30,335.000 $1.860 $4.000 $3.750 $3.750 $3.750
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 1,601.000 $74.790 $80.000 $121.400 $98.300 $85.000
AGGR (TY-D GR-5 OR TY-L GR-5)
CY 703.000 $170.000 $80.000 $63.950 $108.000 $96.000
D-GR HMA TY-C SAC-B PG64-22
TON 21,858.000 $26.840 $65.000 $65.750 $67.000 $85.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 400.000 $40.000 $60.000 $48.150 $48.000 $31.500
PLANE ASPH CONC PAV(0" TO 6")
SY 6,340.000 $1.250 $3.000 $2.450 $1.800 $2.500
CEM STABIL BKFL
CY 322.460 $89.700 $150.000 $140.850 $131.000 $150.000
CUT & RESTORING PAV
SY 543.000 $99.000 $80.000 $27.950 $26.000 $100.000
FLOWABLE BACKFILL
CY 9.000 $150.000 $225.000 $169.900 $157.000 $750.000
TRENCH EXCAVATION PROTECTION
LF 271.000 $3.100 $15.000 $9.650 $9.000 $10.000
TEMPORARY SPL SHORING
SF 10,670.000 $15.000 $25.000 $19.350 $18.000 $25.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 8.800 $250.000 $1,000.000 $875.500 $915.000 $2,400.000
RIPRAP (CONC)(4 IN)
CY 186.000 $327.000 $375.000 $360.000 $333.000 $450.000
RIPRAP (CONC)(5 IN)
CY 47.500 $400.000 $375.000 $430.000 $400.000 $450.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 877.000 $80.000 $100.000 $138.000 $145.000 $215.000
RIPRAP (MOW STRIP)(4 IN)
CY 542.000 $400.000 $450.000 $387.000 $360.000 $525.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 311.500 $40.000 $35.000 $28.750 $26.750 $40.000
CLEANING AND SEALING EXIST JOINTS(CL5)
LF 127.000 $15.000 $50.000 $48.500 $45.100 $60.000
CLEANING AND SEALING JOINTS (CL 3)
LF 160.000 $30.000 $36.000 $28.750 $26.750 $50.000
RETROFIT RAIL (TY T221)
LF 550.670 $85.000 $150.000 $255.000 $723.000 $210.000
CONC BOX CULV (3 FT X 2 FT)
LF 222.000 $90.600 $225.000 $207.500 $192.000 $200.000
CONC BOX CULV (5 FT X 2 FT)
LF 140.000 $135.700 $250.000 $308.600 $287.000 $290.000
CONC BOX CULV (5 FT X 3 FT)
LF 116.000 $118.700 $300.000 $321.500 $299.000 $300.000
CONC BOX CULV (7 FT X 3 FT)
LF 174.000 $190.000 $450.000 $487.000 $452.000 $450.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 41.000 $450.000 $600.000 $540.000 $502.000 $650.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 80.000 $475.000 $700.000 $511.800 $476.000 $950.000
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
LF 21.600 $775.000 $800.000 $693.500 $644.000 $1,150.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 38.000 $975.000 $850.000 $465.000 $433.000 $1,350.000
CONC BOX CULV (9 FT X 7 FT)(EXTEND)
LF 46.700 $641.000 $850.000 $677.000 $629.000 $1,400.000
CONC BOX CULV (9 FT X 8 FT)(EXTEND)
LF 62.000 $700.000 $900.000 $467.000 $433.000 $1,450.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 65.000 $900.000 $1,000.000 $608.000 $565.000 $1,550.000
RC PIPE (CL III)(18 IN)
LF 4,372.000 $51.850 $50.000 $50.500 $47.000 $37.500
RC PIPE (CL III)(24 IN)
LF 1,336.000 $58.970 $65.000 $75.250 $70.000 $73.500
RC PIPE (CL III)(30 IN)
LF 200.000 $76.000 $90.000 $146.250 $136.000 $94.500
RC PIPE (CL III)(42 IN)
LF 180.000 $130.000 $125.000 $157.000 $145.000 $150.000
RC PIPE (CL III)(48 IN)
LF 156.000 $132.000 $200.000 $221.500 $206.000 $245.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $4,532.440 $5,500.000 $5,800.000 $5,383.000 $6,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 3.000 $4,030.900 $6,000.000 $6,120.000 $5,679.000 $7,000.000
HEADWALL (CH - PW - 0) (DIA= 54 IN)
EA 2.000 $2.000 $12,500.000 $8,050.000 $7,471.000 $10,000.000
HEADWALL (CH - PW - S) (DIA= 60 IN)
EA 1.000 $5,480.000 $14,000.000 $8,525.000 $7,913.000 $14,000.000
HEADWALL (CH - PW - S) (DIA= 66 IN)
EA 1.000 $19,210.000 $16,000.000 $8,855.000 $8,221.000 $15,000.000
WINGWALL (PW - 1) (HW=10 FT)
EA 4.000 $19,837.000 $20,000.000 $20,430.000 $19,000.000 $30,000.000
WINGWALL (PW - 1) (HW=11 FT)
EA 2.000 $22,550.000 $35,000.000 $26,880.000 $25,000.000 $35,000.000
WINGWALL (PW - 1) (HW=12 FT)
EA 2.000 $11,000.000 $40,000.000 $36,560.000 $34,000.000 $40,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $10,841.850 $7,500.000 $5,850.000 $5,430.000 $9,500.000
WINGWALL (PW - 1) (HW=5 FT)
EA 8.000 $10,669.190 $8,500.000 $7,175.000 $6,662.000 $10,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $10,754.840 $12,500.000 $7,555.000 $7,015.000 $15,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 4.000 $11,343.750 $15,500.000 $8,930.000 $8,288.000 $20,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 4.000 $23,100.000 $19,500.000 $15,050.000 $14,000.000 $25,000.000
WINGWALL (SW - 0) (HW=5 FT)
EA 3.000 $3,721.200 $8,500.000 $7,080.000 $6,572.000 $10,000.000
SET (TY I)(S=3 FT)(HW=2FT)(3:1)(C)
EA 1.000 $4,500.000 $4,000.000 $7,340.000 $6,816.000 $7,350.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 240.000 $650.000 $775.000 $990.000 $920.000 $525.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 9.000 $960.000 $850.000 $1,020.000 $950.000 $840.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 66.000 $1,200.000 $1,000.000 $1,180.000 $1,096.000 $840.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $815.110 $1,500.000 $1,405.000 $1,302.000 $1,890.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 14.000 $1,500.000 $2,500.000 $2,014.000 $1,870.000 $1,365.000
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 4.000 $3,200.000 $7,500.000 $4,235.000 $3,930.000 $6,000.000
SET (TY II) (48 IN) (RCP) (6: 1) (P)
EA 4.000 $6,300.000 $12,500.000 $6,066.000 $5,632.000 $7,000.000
CLEAN EXIST CULVERTS
EA 13.000 $1,300.000 $2,500.000 $1,505.000 $1,400.000 $3,150.000
REMOV STR (PIPE)
EA 120.000 $172.850 $300.000 $220.000 $203.000 $210.000
MOBILIZATION
LS 1.000 $460,000.000 $777,000.000 $967,480.000 $1,122,600.000 $1,302,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $4,000.000 $2,500.000 $2,650.000 $19,000.000 $21,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 2,200.000 $55.640 $50.000 $46.900 $43.650 $68.780
ROCK FILTER DAMS (REMOVE)
LF 2,200.000 $8.210 $5.000 $6.450 $6.000 $9.870
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,700.000 $3.160 $3.000 $3.050 $2.650 $3.120
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,700.000 $0.610 $0.500 $0.380 $0.350 $0.720
INTERSECTIONS (ACP)
SY 4,010.000 $14.760 $20.000 $21.400 $24.250 $30.270
DRIVEWAYS (CONC)
SY 73.000 $64.950 $100.000 $82.800 $76.000 $94.500
DRIVEWAYS (ACP)
SY 6,729.000 $24.850 $20.000 $21.150 $25.200 $30.270
TURNOUTS (ACP)
SY 710.000 $21.020 $35.000 $21.300 $33.200 $31.320
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 57,797.000 $0.170 $0.200 $0.300 $0.210 $0.160
MTL W-BEAM GD FEN (STEEL POST)
LF 4,875.000 $22.000 $27.000 $24.000 $22.400 $24.300
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 11.000 $1,600.000 $1,800.000 $2,471.000 $1,775.000 $1,875.660
REMOVE METAL BEAM GUARD FENCE
LF 2,650.000 $2.500 $3.000 $1.600 $1.500 $2.890
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $185.000 $150.000 $134.400 $125.000 $147.000
GUARDRAIL END TREATMENT (INSTALL)
EA 41.000 $2,400.000 $2,600.000 $2,875.000 $2,674.000 $2,656.500
GUARDRAIL END TREATMENT (REMOVE)
EA 30.000 $250.000 $400.000 $134.400 $125.000 $367.500
CRASH CUSH ATTEN (INSTL)
EA 1.000 $9,000.000 $7,000.000 $8,064.000 $7,500.000 $10,500.000
WIRE FENCE (TY C)
LF 41.250 $11.680 $100.000 $35.000 $32.000 $31.500
GATE (SPECIAL)
EA 1.000 $5,250.000 $7,000.000 $1,100.000 $2,100.000 $5,250.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 47.000 $200.000 $125.000 $123.650 $185.000 $120.750
MAILBOX INSTALL-D (WC-POST) TY 3
EA 3.000 $225.000 $150.000 $161.300 $200.000 $157.500
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 3.000 $310.180 $520.000 $559.000 $400.000 $546.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 4.000 $348.200 $550.000 $591.000 $450.000 $577.500
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
EA 7.000 $376.000 $550.000 $575.000 $500.000 $561.750
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000 $700.000 $1,000.000 $1,032.000 $500.000 $1,008.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 1.000 $401.560 $800.000 $855.000 $700.000 $834.750
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 167.000 $349.650 $300.000 $285.000 $295.000 $278.250
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 17.000 $366.770 $350.000 $333.000 $325.000 $325.500
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 73.000 $12.830 $20.000 $19.350 $58.000 $24.150
INSTL OM ASSM (OM-2X)(WC)GND
EA 80.000 $24.330 $60.000 $58.000 $113.000 $56.700
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 10,830.000 $0.330 $0.200 $0.550 $0.200 $0.530
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 56,527.000 $0.230 $0.200 $0.490 $0.180 $0.530
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,474.000 $1.000 $1.000 $1.370 $1.000 $1.890
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 508.000 $5.910 $6.000 $7.900 $5.680 $5.780
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 116,246.000 $0.270 $0.340 $0.330 $0.330 $0.440
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 10,830.000 $0.270 $0.350 $0.340 $0.340 $0.530
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 56,527.000 $0.290 $0.350 $0.330 $0.340 $0.470
REFL PAV MRKR TY II-A-A
EA 1,281.000 $2.850 $3.500 $4.680 $3.200 $3.520
FULL - WIDTH MOWING
CYC 5.000 $3,000.000 $6,500.000 $2,700.000 $5,600.000 $15,750.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $120.000 $100.000 $73.000 $50.000 $105.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $3,000.000 $10,000.000 $5,000.000 $18,715.000 $15,000.000
TMA (STATIONARY)
DAY 318.000 $300.000 $250.000 $225.000 $255.000 $420.000
TMA (MOBILE OPERATION)
HR 120.000 $50.000 $100.000 $50.000 $35.350 $73.500
Totals: $9,350,509.809 $9,997,468.080 $9,997,939.906 $10,396,249.375 $13,309,571.665