Job Info for 2060-01-037

County: MCLENNAN Highway: FM 2113 Date: 01/07/2022 (2 years ago) Engineer's Estimate: $15,388,383 Control Number: 2060-01-037
Project: F 2021(489) District: WACO Time: 510 WORKING DAYS Type: WIDEN PAVEMENT AND ADD CURB & GUTTER
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $15,388,382.99
BIG CREEK CONSTRUCTION, LTD.   $15,387,558.27 1
-0.01% | -$824.72
TEXAS MATERIALS GROUP, INC.   $15,603,362.51 2
1.4% | $214,979.52
1.4% | $215,804.24
KNIFE RIVER CORPORATION - SOUTH   $15,983,915.94 3
3.87% | $595,532.95
3.88% | $596,357.67
2.44% | $380,553.43
Subcontractor Percentage Amount
KLP COMMERCIAL, L.L.C. 9.48% $1,458,740.52
POTTER TRUCKING 1.93% $296,979.87
CEN TEX HYDROSEED, INC. 1.39% $213,887.06
FLASHER EQUIPMENT COMPANY 0.92% $141,565.54
QMF STEEL, INC. 0.66% $101,557.88
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.41% $63,088.99
WYLIE DRILLING & DRAINAGE, INC. 0.37% $56,933.97
DUSTIN ALLEN, INC. 0.35% $53,856.45
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.30% $46,162.67
MOBILE ENTERPRISES, INC. 0.09% $13,848.80
HERMANOS STEEL, LLC 0.00% $0.00
Total: 15.90% $2,446,621.75

Bid Items

Items: 162, 0 filtered
MCLENNAN FM 2113  |  WACO  |  2060-01-037  |  01/07/2022  |  $15,388,383  |  F 2021(489)  |  WIDEN PAVMT AND ADD CURB & GUTTER  |  510 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate BIG CREEK CONSTRUCTION, LTD. TEXAS MATERIALS GROUP, INC. KNIFE RIVER CORPORATION - SOUTH
100 6002 PREPARING ROW STA 118.030 $3,244.310 $2,500.000 $2,717.000 $1,600.000
104 6009 REMOVING CONC (RIPRAP) SY 1,622.000 $20.950 $8.000 $11.000 $14.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 2,762.000 $10.780 $15.000 $16.760 $18.000
104 6029 REMOVING CONC (CURB OR CURB & GUTTER) LF 5,262.000 $10.280 $5.500 $6.600 $6.000
104 6054 REMOVING CONCRETE(MOW STRIP) LF 548.000 $13.860 $7.000 $6.200 $15.000
105 6037 REMOVING STAB BASE AND ASPH PAV(0"-16") SY 51,347.000 $8.000 $5.000 $5.000 $6.000
110 6001 EXCAVATION (ROADWAY) CY 53,096.000 $11.980 $15.000 $4.500 $12.500
110 6002 EXCAVATION (CHANNEL) CY 316.000 $11.120 $20.000 $6.000 $19.000
132 6004 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 13,352.000 $14.450 $15.000 $6.000 $12.500
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 56,438.000 $0.540 $1.500 $2.600 $2.000
162 6002 BLOCK SODDING SY 15,467.000 $4.640 $5.000 $3.850 $4.200
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 40,971.000 $1.000 $0.160 $0.140 $0.150
164 6009 BROADCAST SEED (TEMP) (WARM) SY 42,512.000 $1.000 $0.140 $0.120 $0.130
164 6011 BROADCAST SEED (TEMP) (COOL) SY 42,512.000 $1.000 $0.140 $0.120 $0.130
168 6001 VEGETATIVE WATERING MG 1,023.000 $32.280 $20.000 $28.000 $35.000
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 40,971.000 $2.000 $1.250 $0.850 $1.000
192 6017 VEGETATION BARRIER SY 18.000 $2.040 $25.000 $5.000 $50.000
247 6231 FL BS (CMP IN PLACE)(TY A GR 1-2)(10") SY 74,031.000 $21.000 $17.000 $16.000 $13.500
260 6011 LIME TRT (EXST MATL) (12") SY 78,404.000 $3.060 $5.000 $10.100 $3.700
260 6016 LIME (HYD, COM, OR QK(SLURRY)) TON 2,116.000 $169.590 $200.000 $180.000 $190.000
310 6027 PRIME COAT(MC-30 OR AE-P) GAL 14,800.000 $4.620 $4.000 $4.000 $4.500
316 6022 ASPH (CRS-2) GAL 42,671.000 $2.690 $3.000 $2.650 $3.000
316 6397 AGGR(TY-D GR-4 OR TY-L GR-4) CY 527.000 $172.350 $125.000 $120.000 $185.000
354 6023 PLANE ASPH CONC PAV(0" TO 4") SY 9,157.000 $1.410 $2.500 $1.480 $2.400
400 6005 CEM STABIL BKFL CY 2,135.500 $100.000 $125.000 $145.000 $157.000
400 6008 CUT & RESTORE ASPH PAVING SY 141.000 $91.090 $70.000 $60.000 $127.000
402 6001 TRENCH EXCAVATION PROTECTION LF 11,909.000 $5.280 $5.000 $6.000 $6.500
403 6001 TEMPORARY SPL SHORING SF 1,410.000 $28.620 $25.000 $22.000 $30.000
416 6002 DRILL SHAFT (24 IN) LF 192.000 $227.350 $250.000 $306.000 $380.000
420 6019 CL C CONC (ABUT)(EXTEND) CY 18.100 $2,200.000 $3,000.000 $3,130.000 $2,250.000
420 6033 CL C CONC (CAP)(EXTEND) CY 4.500 $5,100.000 $3,000.000 $4,925.000 $5,750.000
420 6037 CL C CONC (COLUMN) CY 3.700 $1,573.360 $3,000.000 $4,325.000 $3,350.000
420 6054 CL C CONC (HEADWALL) CY 7.500 $831.770 $1,500.000 $800.000 $1,050.000
420 6062 CL C CONC (RETAINING WALL) CY 6.000 $897.440 $2,000.000 $2,630.000 $3,000.000
422 6013 BRIDGE SIDEWALK SF 1,510.000 $11.400 $15.000 $24.000 $16.700
422 6015 APPROACH SLAB CY 114.000 $469.760 $650.000 $1,025.000 $547.000
422 6030 CONCRETE PAN GIRDER (EXTEND) CY 67.900 $2,400.000 $1,500.000 $3,550.000 $2,600.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 10.200 $176.930 $550.000 $570.000 $500.000
432 6002 RIPRAP (CONC)(5 IN) CY 50.900 $423.690 $475.000 $650.000 $535.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 410.000 $135.810 $120.000 $189.000 $205.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 30.500 $316.160 $475.000 $500.000 $573.000
438 6002 CLEANING AND SEALING EXIST JOINTS(CL3) LF 306.000 $16.540 $60.000 $26.000 $36.000
450 6101 RAIL (TY C2P) LF 201.300 $325.000 $350.000 $518.000 $400.000
450 6103 RAIL (TY PR11) LF 279.000 $84.060 $175.000 $155.000 $135.000
450 6104 RAIL (TY PR22) LF 149.300 $98.410 $250.000 $306.000 $187.000
462 6003 CONC BOX CULV (4 FT X 2 FT) LF 1,122.000 $226.840 $240.000 $245.000 $266.000
462 6006 CONC BOX CULV (5 FT X 2 FT) LF 602.000 $250.120 $310.000 $326.000 $354.000
462 6010 CONC BOX CULV (6 FT X 3 FT) LF 150.000 $349.590 $420.000 $426.000 $463.000
462 6019 CONC BOX CULV (8 FT X 4 FT) LF 70.000 $585.930 $650.000 $610.000 $663.000
464 6003 RC PIPE (CL III)(18 IN) LF 573.000 $55.230 $65.000 $51.000 $55.000
464 6005 RC PIPE (CL III)(24 IN) LF 7,540.000 $96.950 $75.000 $62.000 $67.000
464 6008 RC PIPE (CL III)(36 IN) LF 5,428.000 $219.130 $125.000 $116.000 $126.000
464 6010 RC PIPE (CL III)(48 IN) LF 171.000 $176.520 $190.000 $188.000 $204.000
465 6007 JCTBOX(COMPL)(PJB)(3FTX5FT) EA 1.000 $4,209.940 $5,100.000 $4,134.000 $4,500.000
465 6012 JCTBOX(COMPL)(PJB)(8FTX8FT) EA 3.000 $13,981.420 $10,000.000 $8,832.000 $9,600.000
465 6013 INLET (COMPL)(PCO)(3FT)(NONE) EA 8.000 $5,049.980 $4,400.000 $3,207.000 $3,500.000
465 6014 INLET (COMPL)(PCO)(3FT)(LEFT) EA 27.000 $5,029.370 $5,000.000 $3,958.000 $4,300.000
465 6015 INLET (COMPL)(PCO)(3FT)(RIGHT) EA 9.000 $5,093.460 $4,700.000 $3,660.000 $4,000.000
465 6016 INLET (COMPL)(PCO)(3FT)(BOTH) EA 49.000 $6,500.000 $5,400.000 $4,462.000 $4,850.000
465 6017 INLET (COMPL)(PCO)(4FT)(NONE) EA 2.000 $5,346.200 $6,700.000 $5,566.000 $6,050.000
465 6018 INLET (COMPL)(PCO)(4FT)(LEFT) EA 2.000 $5,727.520 $5,900.000 $4,775.000 $5,200.000
465 6019 INLET (COMPL)(PCO)(4FT)(RIGHT) EA 7.000 $5,509.490 $6,500.000 $5,218.000 $5,700.000
465 6020 INLET (COMPL)(PCO)(4FT)(BOTH) EA 14.000 $6,405.170 $6,700.000 $5,433.000 $5,900.000
465 6025 INLET (COMPL)(PCO)(6FT)(NONE) EA 1.000 $5,831.900 $7,500.000 $6,096.000 $6,600.000
465 6026 INLET (COMPL)(PCO)(6FT)(LEFT) EA 1.000 $6,125.500 $7,600.000 $5,773.000 $6,300.000
465 6028 INLET (COMPL)(PCO)(6FT)(BOTH) EA 1.000 $9,356.260 $7,700.000 $6,287.000 $6,800.000
465 6032 INLET (COMPL)(PCU)(3FT)(BOTH) EA 1.000 $5,952.670 $6,000.000 $5,227.000 $5,600.000
465 6071 INLET (COMPL)(PSL)(RC)(4FTX4FT) EA 7.000 $4,725.360 $6,900.000 $5,854.000 $6,300.000
465 6074 INLET (COMPL)(PSL)(RC)(5FTX5FT) EA 1.000 $5,471.110 $8,700.000 $7,720.000 $8,300.000
465 6126 INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT) EA 11.000 $4,220.350 $5,800.000 $3,904.000 $4,200.000
465 6128 INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT) EA 6.000 $5,264.130 $7,200.000 $5,076.000 $5,500.000
465 6320 INLET (COMPL)(JUNCTION BOX)(7' TO 10') EA 1.000 $10,000.000 $10,000.000 $8,832.000 $9,600.000
466 6103 HEADWALL (CH - PW - 0) (DIA= 48 IN) EA 2.000 $10,801.320 $7,600.000 $8,476.000 $9,200.000
466 6181 WINGWALL (PW - 1) (HW=6 FT) EA 1.000 $18,854.530 $15,000.000 $10,225.000 $11,000.000
466 6182 WINGWALL (PW - 1) (HW=7 FT) EA 1.000 $12,439.330 $23,500.000 $14,000.000 $15,000.000
466 6183 WINGWALL (PW - 1) (HW=8 FT) EA 3.000 $28,640.530 $28,000.000 $18,500.000 $20,000.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 10.000 $1,039.420 $1,050.000 $1,131.000 $1,200.000
479 6001 ADJUSTING MANHOLES EA 19.000 $1,166.180 $1,800.000 $594.000 $650.000
496 6001 REMOV STR (BOX CULVERT) EA 4.000 $7,784.380 $3,600.000 $1,137.000 $1,250.000
496 6003 REMOV STR (MANHOLE) EA 1.000 $642.440 $500.000 $1,365.000 $1,500.000
496 6004 REMOV STR (SET) EA 14.000 $2,500.000 $500.000 $853.000 $900.000
496 6005 REMOV STR (WINGWALL) EA 155.000 $1,600.000 $500.000 $300.000 $325.000
496 6016 REMOV STR (PIPE) EA 82.000 $345.380 $300.000 $430.000 $465.000
500 6001 MOBILIZATION LS 1.000 $1,136,444.000 $1,500,000.000 $1,560,000.000 $1,590,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 34.000 $7,129.780 $10,725.000 $9,000.000 $7,500.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 1,225.000 $25.120 $35.000 $28.000 $30.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 1,225.000 $9.200 $3.000 $9.000 $9.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 448.000 $10.000 $25.000 $24.000 $16.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 448.000 $5.870 $3.000 $11.000 $4.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 11,828.000 $3.620 $3.000 $2.850 $6.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 11,828.000 $1.150 $0.500 $0.750 $0.750
508 6001 CONSTRUCTING DETOURS SY 12,765.000 $46.890 $75.000 $80.000 $95.000
512 6021 PORT CTB (DES SOURCE)(LOW PROF)(TY 1) LF 10,040.000 $42.700 $12.000 $10.000 $13.600
512 6022 PORT CTB (DES SOURCE)(LOW PROF)(TY 2) LF 2,000.000 $9.720 $12.000 $21.000 $13.600
512 6033 PORT CTB (MOVE)(LOW PROF)(TY 1) LF 12,300.000 $3.840 $6.000 $5.000 $11.750
512 6034 PORT CTB (MOVE)(LOW PROF)(TY 2) LF 3,260.000 $3.780 $6.000 $14.000 $11.750
512 6045 PORT CTB (STKPL)(LOW PROF)(TY 1) LF 10,040.000 $4.760 $8.000 $9.000 $13.000
512 6046 PORT CTB (STKPL)(LOW PROF)(TY 2) LF 2,000.000 $4.840 $8.000 $19.000 $13.000
529 6008 CONC CURB & GUTTER (TY II) LF 23,695.000 $19.300 $20.000 $20.000 $22.500
529 6015 CONC CURB (TY C1) LF 364.000 $111.080 $100.000 $35.000 $200.000
530 6002 INTERSECTIONS (ACP) SY 8,284.000 $34.000 $75.000 $80.000 $100.000
530 6004 DRIVEWAYS (CONC) SY 3,527.000 $54.220 $95.000 $80.000 $100.000
531 6003 CONC SIDEWALKS (6") SY 2,705.000 $58.130 $68.500 $60.000 $65.000
531 6005 CURB RAMPS (TY 2) EA 2.000 $1,700.000 $2,000.000 $1,300.000 $2,450.000
531 6010 CURB RAMPS (TY 7) EA 2.000 $1,791.630 $2,000.000 $1,300.000 $2,450.000
531 6013 CURB RAMPS (TY 10) EA 8.000 $1,495.390 $1,500.000 $1,700.000 $2,450.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 350.000 $25.560 $45.000 $28.000 $39.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 8.000 $1,914.080 $2,500.000 $2,050.000 $3,100.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 525.000 $2.100 $3.000 $2.000 $2.150
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 8.000 $178.000 $250.000 $200.000 $217.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 8.000 $2,740.230 $3,500.000 $2,700.000 $3,300.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 8.000 $211.000 $250.000 $200.000 $217.000
560 6007 MAILBOX INSTALL-S (WC-POST) TY 3 EA 27.000 $220.000 $300.000 $200.000 $215.000
560 6008 MAILBOX INSTALL-D (WC-POST) TY 3 EA 1.000 $199.110 $400.000 $250.000 $270.000
636 6001 ALUMINUM SIGNS (TY A) SF 20.000 $58.000 $30.000 $50.000 $54.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 28.000 $585.710 $600.000 $600.000 $650.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 42.000 $620.990 $700.000 $700.000 $760.000
644 6034 IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT) EA 1.000 $973.360 $1,200.000 $800.000 $870.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 10.000 $150.000 $650.000 $400.000 $430.000
644 6076 REMOVE SM RD SN SUP&AM EA 62.000 $81.400 $100.000 $150.000 $150.000
644 6080 RELOCATE SM RD SN SUP & AM TY TEMP EA 3.000 $228.000 $500.000 $200.000 $215.000
658 6047 INSTL OM ASSM (OM-2Y)(WC)GND EA 18.000 $106.380 $75.000 $100.000 $108.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 20,310.000 $0.180 $0.350 $0.300 $0.330
662 6016 WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF 418.000 $2.670 $4.000 $3.000 $3.260
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 39,451.000 $0.180 $0.350 $0.300 $0.330
662 6048 WK ZN PAV MRK REMOV (REFL) TY I-C EA 1,088.000 $3.370 $4.000 $3.200 $3.480
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 3,217.000 $4.120 $4.000 $3.200 $3.480
662 6060 WK ZN PAV MRK REMOV (W)4"(BRK) LF 1,176.000 $0.830 $1.500 $1.000 $1.090
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 22,500.000 $0.620 $0.650 $0.600 $0.650
662 6071 WK ZN PAV MRK REMOV (W)8"(SLD) LF 247.000 $0.860 $1.500 $1.000 $1.090
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 64,339.000 $0.590 $0.650 $0.600 $0.650
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 1,191.000 $1.010 $1.500 $1.140 $1.400
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 1,469.000 $1.060 $1.500 $1.140 $1.400
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 1,772.000 $0.860 $1.500 $1.000 $1.090
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 463.000 $4.200 $4.000 $3.500 $3.800
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 554.000 $5.450 $6.500 $6.000 $6.520
666 6176 REFL PAV MRK TY II (W) 8" (DOT) LF 75.000 $1.000 $2.000 $1.000 $1.090
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 20,774.000 $0.660 $0.600 $0.500 $0.540
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 3,630.000 $0.810 $0.600 $0.500 $0.540
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 26,497.000 $0.640 $0.600 $0.500 $0.540
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 16.000 $220.680 $250.000 $190.000 $206.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 8.000 $311.120 $300.000 $230.000 $250.000
668 6089 PREFAB PAV MRK TY C (W) (RR XING) EA 1.000 $700.000 $1,000.000 $750.000 $815.000
668 6092 PREFAB PAV MRK TY C (W) (36")(YLD TRI) EA 24.000 $39.780 $70.000 $55.000 $60.000
672 6007 REFL PAV MRKR TY I-C EA 63.000 $2.730 $5.000 $4.000 $4.350
672 6009 REFL PAV MRKR TY II-A-A EA 1,010.000 $2.630 $4.000 $3.500 $3.800
672 6010 REFL PAV MRKR TY II-C-R EA 14.000 $3.890 $5.000 $4.000 $4.350
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 34,325.000 $0.550 $0.500 $0.450 $0.490
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 599.000 $3.290 $4.000 $3.000 $3.260
677 6008 ELIM EXT PAV MRK & MRKS (ARROW) EA 4.000 $76.310 $150.000 $100.000 $108.000
677 6012 ELIM EXT PAV MRK & MRKS (WORD) EA 4.000 $114.320 $150.000 $100.000 $108.000
685 6004 INSTL RDSD FLSH BCN ASSM (SOLAR PWRD) EA 2.000 $5,924.280 $10,000.000 $14,000.000 $12,000.000
685 6006 REMOV RDSD FLSH BCN AM (SOLAR PWRD) EA 2.000 $588.860 $1,000.000 $1,600.000 $2,000.000
3002 6001 MEMBRANE UNDERSEAL GAL 2,001.000 $3.250 $3.000 $3.150 $3.250
3076 6002 D-GR HMA TY-B SAC-B PG64-22 TON 14,351.000 $85.180 $75.000 $96.000 $84.000
3077 6023 SP MIXES SP-C SAC-B PG70-22 TON 7,869.000 $86.840 $80.000 $120.000 $99.000
3084 6001 BONDING COURSE GAL 17,885.000 $3.150 $3.000 $0.010 $3.250
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 30.000 $67.510 $150.000 $135.000 $175.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $7,855.120 $12,000.000 $18,400.000 $10,000.000
6185 6002 TMA (STATIONARY) DAY 26.000 $90.560 $250.000 $240.000 $500.000
6185 6003 TMA (MOBILE OPERATION) HR 72.000 $167.180 $75.000 $24.000 $85.000
7012 6001 CURB INLET SEDIMENT PROTECTION LF 2,130.000 $3.000 $8.000 $32.180 $25.000
Totals: $15,388,382.99 $15,387,558.27 $15,603,362.51 $15,983,915.94