Show Job Controls
Bid Cobra

MCLENNAN SH 6 (0258-09-142)

Items: 345

County: MCLENNAN
Length: N/A
Highway: SH 6
District: WACO
Control Number: 0258-09-142
DBE Goal: N/A
Project: F 2021(943)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $61,351,328.50
Date: 08/05/2021 (4 years ago)
Contract Number: N/A
Type: CONSTRUCT RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$61,351,328.50
1
$62,594,543.19
Over/Under Est: 2.03% $1,243,214.69
Over/Under Est: 4.95% $3,035,880.45
Amt Left: 2.86% $1,792,665.76
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 10.68% $6,142,721.16
BEAR CREEK CONSTRUCTION, LLC 4.39% $2,524,957.48
ROAD SOLUTIONS L.L.C. 3.09% $1,777,247.98
ADCOCK 4 INVESTMENTS, LLC 3.02% $1,736,986.70
HERMANOS STEEL, LLC 1.75% $1,006,532.03
INDUS ROAD & BRIDGE, INC. 1.69% $972,022.36
WYLIE DRILLING & DRAINAGE, INC. 1.68% $966,270.74
ROADWAY SPECIALTIES, INC. 1.30% $747,709.50
190 CONSTRUCTION LLC 0.89% $511,893.43
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.85% $488,886.98
REDLAND CONSTRCUTION LLC 0.66% $379,606.36
FLASHER EQUIPMENT COMPANY 0.34% $195,554.79
T-BAR FENCE, INC. 0.29% $166,796.74
CENTRAL TEXAS CURB CUTTERS 0.28% $161,045.12
A BROTHERS MILLING, LLC 0.20% $115,032.23
S&S BRIDGE PAINTING 0.19% $109,280.62
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 0.16% $92,025.79
BUYERS BARRICADES, INC. 0.14% $80,522.56
TEXAS CUTTING & CORING GP, INC. 0.12% $69,019.34
ADRIAN CONTRACTING, INC 0.11% $63,267.73
ACT SAW CUTTING & REMOVAL 0.09% $51,764.50
PRIMATE CONSTRUCTION, LP 0.06% $34,509.67
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.05% $28,758.06
AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC 0.02% $11,503.22
H&M LANDSCAPE & SPRINKLER CO., INC. 0.02% $11,503.22
A-CORE CONCRETE CUTTING, INC. 0.01% $5,751.61
WEST TEXAS ROCK RESOURCES, LLC 0.01% $5,751.61
GIBSON & ASSOCIATES, INC. 0.01% $5,751.61
PANNELL INDUSTRIES, INC. 0.01% $5,751.61
H AND H SIGN COMPANY INC. 0.00% $0.00
HERMANOS STEEL, LLC 0.00% $0.00
Total: 32.11% $18,468,424.75

Bid Items & Bid Tabulations

345 Total 0 of 345
MCLENNAN  |  SH 6  |  WACO  |  0258-09-142  |  08/05/2021  |  $61,351,328.50  |  F 2021(943)  |  CONSTRUCT RAMPS  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
JAMES CONSTRUCTION GROUP, LLC
PREPARING ROW
STA 103.000 $10,000.000 $360.320 $50,500.000
REMOVING CONC (PAV)
SY 6,395.000 $6.000 $16.580 $7.170
REMOVING CONC (RIPRAP)
SY 2,099.000 $7.000 $26.140 $4.120
REMOVING CONC (DRIVEWAYS)
SY 1,942.000 $14.000 $22.990 $7.890
REMOVING CONC (CURB)
LF 320.000 $4.600 $20.550 $3.100
REMOVING CONC (CURB AND GUTTER)
LF 4,259.000 $8.500 $15.630 $3.290
REMOVING CONC (APPR SLAB)
SY 736.000 $50.000 $31.180 $13.890
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 106,244.000 $5.000 $11.530 $1.540
REMOVING STAB BASE & ASPH PAV (0-6")
SY 2,981.000 $8.000 $8.890 $1.480
EXCAVATION (ROADWAY)
CY 146,073.000 $7.000 $11.910 $7.110
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 173,817.000 $9.000 $9.930 $14.340
BLOCK SODDING
SY 99,139.000 $2.800 $2.720 $2.720
DRILL SEED (TEMP)(WARM OR COOL)
SY 99,139.000 $0.100 $0.080 $0.080
VEGETATIVE WATERING
MG 1,610.000 $17.000 $19.880 $13.500
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 99,139.000 $1.000 $0.630 $0.630
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 62,812.000 $40.000 $45.390 $41.970
LIME (HYD, COM, OR QK(SLURRY))
TON 6,567.000 $165.000 $162.750 $172.750
LIME TRT (SUBGRADE)(6")
SY 7,348.000 $2.500 $6.240 $8.940
LIME TRT (SUBGRADE)(12")
SY 198,998.000 $3.000 $4.910 $3.600
PRIME COAT(MC-30 OR AE-P)
GAL 37,314.000 $4.000 $4.160 $4.100
ASPH (CRS-2)
GAL 84,796.000 $2.500 $2.940 $2.900
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 1,396.000 $90.000 $162.440 $160.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 20,785.000 $100.000 $106.650 $105.050
PLANE ASPH CONC PAV (2")
SY 16,291.000 $1.500 $1.420 $0.730
CONC PVMT (CONT REINF - CRCP) (8")
SY 6,670.000 $50.000 $70.770 $72.280
CEM STABIL BKFL
CY 2,994.000 $75.000 $105.160 $104.640
FLOWABLE BACKFILL
CY 1,659.000 $150.000 $104.070 $99.000
TRENCH EXCAVATION PROTECTION
LF 8,905.000 $3.550 $4.930 $0.140
TEMPORARY SPL SHORING
SF 555.000 $30.000 $36.400 $30.000
DRILL SHAFT (18 IN)
LF 641.000 $100.000 $86.370 $125.420
DRILL SHAFT (30 IN)
LF 624.000 $230.000 $151.350 $158.230
DRILL SHAFT (36 IN)
LF 5,572.000 $170.000 $268.350 $230.650
DRILL SHAFT (42 IN)
LF 22.000 $300.000 $225.000 $311.850
DRILL SHAFT (SIGN MTS) (24 IN)
LF 98.000 $170.000 $195.350 $133.730
DRILL SHAFT (SIGN MTS) (36 IN)
LF 540.000 $275.000 $315.890 $265.320
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 230.000 $210.000 $288.640 $209.110
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 42.000 $250.000 $202.080 $159.050
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 28.000 $310.000 $365.130 $27.290
CL C CONC (ABUT)(HPC)
CY 584.600 $850.000 $1,500.000 $685.660
CL C CONC (CAP)(HPC)
CY 485.000 $950.000 $1,500.000 $817.060
CL C CONC (COLUMN)(HPC)
CY 525.100 $975.000 $1,500.000 $869.950
CL C CONC (RAIL FOUNDATION)
CY 1,402.000 $275.000 $349.470 $391.870
CL C CONC (CURB OUTLET) (TY II)
EA 2.000 $1,000.000 $2,059.470 $2,885.990
CL C CONC (MISC)
CY 4.000 $875.000 $1,500.000 $4,259.900
REINF CONC SLAB
SF 66,010.000 $14.000 $18.550 $16.180
REINF CONC SLAB (BOX BEAM)
SF 106,197.000 $14.000 $11.660 $9.550
APPROACH SLAB
CY 1,058.100 $400.000 $438.970 $483.310
SHEAR KEY
CY 1,070.300 $300.000 $201.460 $230.840
RETAINING WALL (MSE)
SF 88,816.000 $45.000 $63.320 $33.190
RETAINING WALL (SPREAD FOOTING)
SF 2,135.000 $75.000 $103.860 $59.730
PRESTR CONC BOX BEAM (5B34)
LF 3,384.000 $200.000 $300.000 $228.690
PRESTR CONC BOX BEAM (4B40)
LF 5,018.270 $210.000 $300.000 $209.900
PRESTR CONC BOX BEAM (5B40)
LF 13,442.640 $220.000 $338.000 $209.820
PRESTR CONC GIRDER (TX54)
LF 8,574.780 $125.000 $208.250 $201.830
RIPRAP (CONC)(4 IN)
CY 759.800 $375.000 $340.000 $277.830
RIPRAP (CONC)(5 IN)
CY 424.000 $410.000 $350.000 $277.830
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 1,486.000 $410.000 $360.000 $294.890
RIPRAP (CONC) (CL B) (4")
CY 936.000 $375.000 $345.000 $277.830
RIPRAP (STONE PROTECTION)(18 IN)
CY 155.000 $100.000 $145.080 $108.490
RIPRAP (MOW STRIP)(4 IN)
CY 452.000 $435.000 $425.000 $443.680
CLEANING EXISTING JOINTS
LF 225.000 $15.000 $25.000 $13.820
STR STEEL (MISC NON - BRIDGE)
LB 2,650.000 $3.000 $18.110 $16.930
RAIL (TY SSTR)
LF 19,685.600 $40.000 $43.580 $60.680
RAIL (TY C221)
LF 1,387.000 $120.000 $85.110 $92.420
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 286.000 $40.000 $46.650 $83.890
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 1,006.000 $113.000 $111.710 $90.860
CONC BOX CULV (4 FT X 4 FT)
LF 16.000 $400.000 $661.680 $327.510
CONC BOX CULV (5 FT X 3 FT)
LF 15.000 $320.000 $871.150 $419.660
CONC BOX CULV (6 FT X 4 FT)
LF 373.000 $400.000 $400.530 $467.760
CONC BOX CULV (8 FT X 4 FT)
LF 84.000 $450.000 $718.090 $634.800
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 13.000 $600.000 $758.280 $595.640
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 19.000 $600.000 $1,026.130 $833.670
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 36.000 $600.000 $873.380 $456.940
CONC BOX CULVERT (4 FT X 5 FT)(EXTEND)
LF 5.000 $500.000 $1,126.400 $1,185.580
RC PIPE (CL III)(18 IN)
LF 1,054.000 $60.000 $58.680 $71.970
RC PIPE (CL III)(24 IN)
LF 8,127.000 $80.000 $61.040 $62.510
RC PIPE (CL III)(30 IN)
LF 998.000 $110.000 $81.860 $75.050
RC PIPE (CL III)(36 IN)
LF 718.000 $130.000 $105.300 $105.540
RC PIPE (CL III)(48 IN)
LF 120.000 $250.000 $149.630 $162.990
RC PIPE (CL IV)(24 IN)
LF 127.000 $100.000 $85.210 $79.150
RC PIPE (CL IV)(36 IN)
LF 317.000 $236.000 $118.530 $125.830
RC PIPE (CL IV)(48 IN)
LF 341.000 $350.000 $210.030 $249.050
MANH (COMPL)(PRM)(48IN)
EA 11.000 $4,500.000 $4,777.440 $5,126.090
INLET (COMPL)(PCO)(3FT)(NONE)
EA 16.000 $3,700.000 $6,031.130 $6,598.700
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 8.000 $5,500.000 $6,190.170 $6,691.400
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 3.000 $5,500.000 $6,464.270 $7,118.860
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 6.000 $5,200.000 $6,891.300 $6,820.150
INLET (COMPL)(PCO)(4FT)(NONE)
EA 5.000 $5,000.000 $7,664.600 $6,748.050
INLET (COMPL)(PCO)(4FT)(LEFT)
EA 1.000 $5,000.000 $8,392.660 $8,880.180
INLET (COMPL)(PCO)(4FT)(RIGHT)
EA 1.000 $5,000.000 $7,601.620 $7,196.130
INLET (COMPL)(PCO)(4FT)(BOTH)
EA 2.000 $5,500.000 $8,661.650 $8,329.110
INLET (COMPL)(PCO)(6FT)(RIGHT)
EA 1.000 $7,500.000 $8,607.700 $9,420.930
INLET (COMPL)(PCO)(6FT)(BOTH)
EA 3.000 $7,500.000 $8,930.370 $9,281.860
INLET (COMPL)(PCU)(3FT)(NONE)
EA 14.000 $6,000.000 $7,254.020 $7,433.010
INLET (COMPL)(PCU)(3FT)(LEFT)
EA 1.000 $5,100.000 $7,129.380 $7,767.780
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 1.000 $6,350.000 $6,896.770 $6,912.880
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 8.000 $5,000.000 $7,913.800 $8,215.800
INLET (COMPL)(PCU)(4FT)(BOTH)
EA 1.000 $5,600.000 $8,121.730 $7,999.530
INLET (COMPL)(PCU)(5FT)(RIGHT)
EA 2.000 $3,900.000 $9,190.100 $8,576.310
INLET (COMPL)(PCU)(5FT)(BOTH)
EA 3.000 $5,300.000 $9,635.210 $9,024.360
INLET (COMPL)(PMBD)(4FT)
EA 3.000 $4,500.000 $8,095.850 $6,323.510
INLET (COMPL)(POD)(FG)(3FTX3FT)
EA 3.000 $5,000.000 $7,505.280 $4,026.610
INLET (COMPL)(POD)(FG)(4FTX4FT)
EA 3.000 $6,000.000 $8,159.270 $4,737.310
INLET (COMPL)(POD)(SFG)(3FTX3FT)
EA 9.000 $4,500.000 $7,390.230 $5,267.750
INLET (COMPL)(POD)(SFG)(4FTX4FT)
EA 1.000 $5,400.000 $7,777.680 $6,596.470
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 8.000 $4,500.000 $5,152.570 $5,320.150
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 2.000 $5,500.000 $5,085.810 $5,201.700
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 7.000 $5,500.000 $4,531.730 $4,737.200
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $5,500.000 $5,083.350 $4,737.230
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
EA 1.000 $5,500.000 $4,399.830 $3,398.230
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $40,000.000 $31,154.010 $24,531.690
WINGWALL (PW - 1) (HW=7 FT)
EA 5.000 $19,000.000 $8,247.770 $14,680.200
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $20,000.000 $20,927.200 $19,333.230
WINGWALL (PW - 1) (HW=9 FT)
EA 1.000 $25,000.000 $16,843.210 $23,617.860
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 1.000 $1,000.000 $1,610.390 $1,032.560
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 4.000 $1,200.000 $1,678.400 $1,119.530
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 14.000 $1,400.000 $1,678.400 $1,119.280
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $800.000 $1,714.390 $1,166.460
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $1,000.000 $1,770.390 $1,238.560
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 3.000 $1,900.000 $2,182.400 $1,768.240
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 4.000 $1,400.000 $1,858.400 $1,351.280
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 1.000 $2,400.000 $3,421.620 $2,865.960
ADJUSTING INLETS
EA 1.000 $2,300.000 $2,477.680 $1,209.360
CLEAN EXIST CULVERTS
EA 3.000 $2,000.000 $27,737.200 $2,514.300
REMOV STR (INLET)
EA 20.000 $700.000 $778.920 $199.780
REMOV STR (SET)
EA 26.000 $350.000 $630.300 $210.320
REMOV STR (WINGWALL)
EA 16.000 $1,100.000 $1,008.000 $823.510
REMOV STR (HEADWALL)
EA 18.000 $1,100.000 $1,530.550 $823.510
REMOV STR (PIPE)
LF 3,025.000 $12.000 $18.750 $6.670
REMOV STR (BOX CULVERT)
LF 60.000 $45.000 $108.660 $33.070
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 4.000 $80,000.000 $59,565.620 $152,261.000
MOBILIZATION
LS 1.000 $4,103,300.000 $5,500,000.000 $5,209,770.970
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 45.000 $12,000.000 $802.250 $22,987.300
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 354.000 $25.000 $20.200 $20.200
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 315.000 $25.000 $25.000 $25.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 234.000 $65.000 $78.080 $78.080
ROCK FILTER DAMS (REMOVE)
LF 903.000 $8.000 $10.730 $10.730
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,326.000 $20.000 $25.770 $25.770
CONSTRUCTION EXITS (REMOVE)
SY 1,326.000 $7.000 $7.770 $7.770
TEMP SEDMT CONT FENCE (INSTALL)
LF 9,405.000 $2.500 $2.140 $2.140
TEMP SEDMT CONT FENCE (REMOVE)
LF 9,405.000 $0.650 $0.440 $0.440
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,011.000 $4.000 $3.930 $3.930
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,011.000 $1.000 $0.440 $0.440
CONSTRUCTING DETOURS
SY 4,845.000 $56.000 $71.310 $62.670
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 1,830.000 $8.500 $6.440 $7.670
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 5,800.000 $10.000 $6.020 $6.280
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 140.000 $20.000 $6.700 $6.630
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 630.000 $6.000 $5.000 $7.440
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 13,910.000 $5.000 $4.540 $3.930
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 480.000 $8.500 $4.760 $4.450
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,470.000 $10.000 $6.030 $6.270
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 5,800.000 $10.000 $5.480 $6.160
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 140.000 $15.000 $6.160 $6.530
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 5,305.000 $60.000 $69.360 $68.960
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 240.000 $170.000 $136.380 $151.450
CONC CURB (MONO) (TY II)
LF 741.000 $7.000 $2.900 $18.580
CONC CURB & GUTTER (TY II)
LF 20,505.000 $20.000 $25.000 $18.120
DRIVEWAYS (ACP)
SY 1,827.000 $30.000 $41.930 $58.540
DRIVEWAYS (CONC) (HES)
SY 2,594.000 $90.000 $62.000 $59.190
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 16,430.000 $0.200 $0.300 $0.130
MTL W-BEAM GD FEN (STEEL POST)
LF 5,450.000 $27.000 $26.000 $29.150
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 31.000 $1,910.000 $1,900.000 $2,160.440
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 18.000 $1,140.000 $1,200.000 $1,232.060
REMOVE METAL BEAM GUARD FENCE
LF 9,525.000 $2.500 $2.250 $1.230
REMOVE TERMINAL ANCHOR SECTION
EA 20.000 $200.000 $125.000 $189.070
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $200.000 $100.000 $189.290
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 11.000 $180.000 $225.000 $204.910
CABLE BARRIER SYSTEM (TL-4)
LF 971.000 $9.500 $17.950 $17.500
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 4.000 $2,400.000 $3,005.000 $3,350.000
REMOVE CABLE BARRIER
LF 5,802.000 $4.000 $2.800 $5.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 4.000 $400.000 $200.000 $1,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 23.000 $2,700.000 $2,550.000 $2,975.000
GUARDRAIL END TREATMENT (REMOVE)
EA 24.000 $265.000 $225.000 $204.860
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $3,000.000 $1,200.000 $1,250.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,100.000 $800.000 $750.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 9.000 $11,000.000 $22,375.000 $21,181.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,000.000 $7,550.000 $7,050.000
CHAIN LINK FENCE (INSTALL) (8')
LF 1,410.000 $50.000 $60.000 $45.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 2.000 $1,500.000 $3,539.960 $1,595.260
REMOVE RD IL ASM (TRANS-BASE)
EA 2.000 $500.000 $1,597.000 $921.100
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 12.000 $1,000.000 $2,206.670 $895.550
IN RD IL (TY SA) 40B-8 (250W EQ) LED
EA 2.000 $4,500.000 $3,850.950 $4,063.290
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 21.000 $3,500.000 $3,981.220 $4,334.800
CONDT (PVC) (SCH 40) (2")
LF 7,159.000 $9.000 $9.790 $11.120
CONDT (PVC) (SCH 40) (2") (BORE)
LF 508.000 $25.000 $25.550 $16.480
CONDT (PVC) (SCH 40) (3")
LF 377.000 $17.000 $17.990 $15.950
CONDT (PVC) (SCH 40) (3") (BORE)
LF 981.000 $33.000 $31.450 $23.600
CONDT (PVC) (SCH 40) (4")
LF 872.000 $13.000 $19.890 $18.030
CONDT (PVC) (SCH 80) (2")
LF 325.000 $8.500 $11.550 $15.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 4,588.000 $20.000 $24.090 $18.080
CONDT (PVC) (SCH 80) (3")
LF 40.000 $14.500 $19.460 $19.840
CONDT (RM) (1")
LF 359.000 $26.000 $22.010 $17.240
CONDT (RM) (3")
LF 644.000 $55.000 $47.220 $46.030
ELEC CONDR (NO.14) INSULATED
LF 3,970.000 $1.200 $1.120 $0.810
ELEC CONDR (NO.12) INSULATED
LF 45.000 $1.300 $1.210 $0.870
ELEC CONDR (NO.8) BARE
LF 8,853.000 $1.000 $2.670 $0.850
ELEC CONDR (NO.8) INSULATED
LF 19,476.000 $1.200 $2.590 $1.220
ELEC CONDR (NO.6) BARE
LF 1,858.000 $1.600 $1.810 $1.720
ELEC CONDR (NO.6) INSULATED
LF 680.000 $2.250 $2.180 $1.750
GROUND BOX TY A (122311)W/APRON
EA 31.000 $1,000.000 $998.900 $733.840
GROUND BOX TY C (162911)W/APRON
EA 6.000 $1,230.000 $1,215.690 $882.130
GROUND BOX TY D (162922)
EA 5.000 $950.000 $988.650 $520.500
GROUND BOX TY D (162922)W/APRON
EA 4.000 $1,100.000 $1,220.000 $855.860
REMOVE GROUND BOX
EA 13.000 $240.000 $241.250 $127.750
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
EA 1.000 $7,000.000 $7,448.460 $5,783.670
ELC SRV TY D 120/240 060(NS)AL(E)PS(U)
EA 1.000 $6,300.000 $6,250.000 $4,879.960
ALUMINUM SIGNS (TY A)
SF 208.250 $24.000 $38.500 $38.000
ALUMINUM SIGNS (TY G)
SF 709.000 $26.000 $33.590 $33.910
ALUMINUM SIGNS (TY O)
SF 1,843.500 $24.500 $33.990 $22.660
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 65.000 $500.000 $701.490 $597.180
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 2.000 $575.000 $772.010 $675.410
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 29.000 $525.000 $791.770 $724.880
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 5.000 $650.000 $923.580 $760.830
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $525.000 $822.260 $851.390
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $650.000 $912.020 $935.440
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $750.000 $1,031.980 $866.200
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $800.000 $1,089.730 $1,064.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 3.000 $2,200.000 $2,287.410 $2,415.300
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 3.000 $2,000.000 $2,485.330 $2,513.930
REMOVE SM RD SN SUP&AM
EA 89.000 $75.000 $118.980 $85.930
INSTALL LRSS (STRUCT STEEL)
LB 1,823.200 $5.500 $7.500 $20.130
REMOVE LRSA
EA 9.000 $950.000 $1,139.480 $1,509.330
INS OH SN SUP(30 FT BAL TEE)
EA 1.000 $22,000.000 $29,246.200 $23,693.260
INS OH SN SUP(40 FT CANT)(SPAN ONLY)
EA 1.000 $20,000.000 $19,801.460 $58,603.370
INS OH SN SUP(60 FT BRDG)
EA 1.000 $30,000.000 $40,075.330 $34,398.220
INS OH SN SUP(80 FT BRDG)
EA 1.000 $35,000.000 $35,090.090 $38,474.360
INS OH SN SUP(100 FT BRDG)
EA 1.000 $35,000.000 $51,883.830 $72,005.460
INS OH SN SUP(165 FT BRDG)
EA 1.000 $75,000.000 $114,634.000 $156,881.000
REMOVE OVERHD SIGN SUP
EA 2.000 $21,000.000 $5,622.450 $3,851.910
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 3.000 $700.000 $864.420 $924.460
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 55.000 $18.000 $18.000 $16.570
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 54.000 $20.000 $18.000 $16.570
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 57.000 $25.000 $18.500 $17.170
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 57.000 $35.000 $37.000 $24.730
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 51.000 $25.000 $37.000 $24.730
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 37.000 $70.000 $69.000 $57.390
INSTL DEL ASSM (D-DY)SZ 1(YFLX)SRF
EA 16.000 $90.000 $30.000 $65.280
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 92.000 $3.750 $5.000 $5.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 1,950.000 $0.500 $0.670 $0.670
WK ZN PAV MRK REMOV (W)4"(LNDP)
LF 483.000 $2.000 $2.000 $2.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 36,280.000 $0.500 $0.570 $0.570
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 1,469.000 $1.300 $1.500 $1.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 34,299.000 $0.500 $0.570 $0.570
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 1,056.000 $1.000 $0.800 $0.800
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,505.000 $0.750 $0.700 $0.700
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 897.000 $3.000 $3.000 $3.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,950.000 $2.500 $2.770 $2.770
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 45.000 $6.000 $8.000 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 27.000 $120.000 $150.000 $150.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 4.000 $175.000 $350.000 $350.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 4.000 $330.000 $400.000 $400.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 23.000 $140.000 $150.000 $150.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 6.000 $800.000 $1,000.000 $1,000.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 10.000 $800.000 $1,000.000 $1,000.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 28.000 $30.000 $40.000 $40.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 5,290.000 $0.150 $0.180 $0.180
REFL PAV MRK TY II (W) 4" (SLD)
LF 26,221.000 $0.150 $0.150 $0.150
REFL PAV MRK TY II (W) 6" (BRK)
LF 4,790.000 $0.250 $0.270 $0.270
REFL PAV MRK TY II (W) 6" (SLD)
LF 20,569.000 $0.250 $0.230 $0.230
REFL PAV MRK TY II (W) 8" (LNDP)
LF 1,056.000 $0.300 $0.500 $0.500
REFL PAV MRK TY II (W) 8" (SLD)
LF 4,505.000 $0.300 $0.500 $0.500
REFL PAV MRK TY II (W) 12" (LNDP)
LF 897.000 $1.000 $1.300 $1.300
REFL PAV MRK TY II (W) 12" (SLD)
LF 1,950.000 $1.000 $1.300 $1.300
REFL PAV MRK TY II (W) 24" (SLD)
LF 45.000 $3.000 $5.000 $5.000
REFL PAV MRK TY II (W) (ARROW)
EA 27.000 $60.000 $52.000 $52.000
REFL PAV MRK TY II (W) (UTURN ARROW)
EA 4.000 $100.000 $100.000 $100.000
REFL PAV MRK TY II (W) (LNDP ARW)
EA 4.000 $100.000 $120.000 $120.000
REFL PAV MRK TY II (W) (WORD)
EA 23.000 $65.000 $55.000 $55.000
REFL PAV MRK TY II (W) (ENTR GORE)
EA 6.000 $200.000 $450.000 $450.000
REFL PAV MRK TY II (W) (EXIT GORE)
EA 10.000 $200.000 $450.000 $450.000
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 28.000 $60.000 $22.000 $22.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 29,185.000 $0.150 $0.150 $0.150
REFL PAV MRK TY II (Y) 6" (SLD)
LF 17,844.000 $0.250 $0.230 $0.230
PAVEMENT SEALER 4"
LF 6,640.000 $0.150 $0.150 $0.150
PAVEMENT SEALER 6"
LF 5,345.000 $0.200 $0.230 $0.230
PAVEMENT SEALER 8"
LF 114.000 $0.500 $0.500 $0.500
PAVEMENT SEALER 12"
LF 664.000 $1.000 $1.400 $1.400
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 5,290.000 $0.500 $0.450 $0.450
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 26,221.000 $0.500 $0.400 $0.400
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 4,790.000 $0.500 $0.550 $0.550
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 20,569.000 $0.500 $0.520 $0.520
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 29,185.000 $0.500 $0.400 $0.400
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 17,844.000 $0.500 $0.520 $0.520
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 260.000 $0.500 $20.000 $20.000
REFL PAV MRKR TY II-A-A
EA 26.000 $2.800 $4.000 $4.000
REFL PAV MRKR TY II-C-R
EA 1,144.000 $3.500 $3.440 $3.440
ELIM EXT PAV MRK & MRKS (4")
LF 11,975.000 $0.500 $0.570 $0.570
ELIM EXT PAV MRK & MRKS (8")
LF 284.000 $0.750 $2.000 $2.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 7.000 $54.000 $55.000 $55.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 3.000 $58.000 $55.000 $55.000
PAV SURF PREP FOR MRK (4")
LF 6,640.000 $0.100 $0.150 $0.150
PAV SURF PREP FOR MRK (6")
LF 5,345.000 $0.150 $0.200 $0.200
PAV SURF PREP FOR MRK (8")
LF 114.000 $0.150 $0.500 $0.500
PAV SURF PREP FOR MRK (12")
LF 664.000 $0.250 $1.000 $1.000
PAV SURF PREP FOR MRK (ARROW)
EA 10.000 $15.000 $50.000 $50.000
PAV SURF PREP FOR MRK (WORD)
EA 5.000 $20.000 $50.000 $50.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $25,000.000 $27,500.000 $22,086.310
REMOVING TRAFFIC SIGNALS
EA 1.000 $4,000.000 $5,500.000 $2,800.680
VEH SIG SEC (12")LED(GRN)
EA 4.000 $235.000 $268.750 $215.440
VEH SIG SEC (12")LED(GRN ARW)
EA 6.000 $230.000 $245.150 $217.780
VEH SIG SEC (12")LED(YEL)
EA 4.000 $235.000 $270.820 $215.440
VEH SIG SEC (12")LED(YEL ARW)
EA 6.000 $230.000 $239.240 $217.780
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $230.000 $236.350 $215.440
PED SIG SEC (LED)(2 INDICATIONS)
EA 8.000 $175.000 $375.750 $462.470
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 4.000 $130.000 $156.740 $107.670
BACKPLATE W/REFL BRDR(4 SEC)ALUM
EA 4.000 $154.000 $158.810 $132.240
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 5,007.000 $1.250 $1.460 $1.110
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 5,179.000 $2.000 $2.160 $1.420
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
LF 3,309.000 $4.750 $4.400 $3.440
INS TRF SIG PL AM(S)1 ARM(36')
EA 1.000 $7,750.000 $10,913.620 $8,812.900
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $9,000.000 $10,535.930 $9,707.070
PED POLE ASSEMBLY
EA 7.000 $1,815.000 $1,982.070 $1,852.290
PED DETECT PUSH BUTTON (APS)
EA 7.000 $735.000 $808.500 $674.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,150.000 $3,382.920 $3,194.020
REMOVAL OF CONTROL CABINET(GRND MNT)
EA 1.000 $1,100.000 $1,000.000 $499.370
REPLACE OF CONTROL CABINET(GRND MNT)
EA 1.000 $20,000.000 $2,659.720 $1,264.390
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 73,371.000 $1.000 $3.000 $2.070
POST AND CABLE FENCE (REMOVAL)
LF 656.000 $3.500 $2.000 $5.000
NO. OF WORKING DAYS
$/D 12,500.000 $1,132.000 $520.000 $867.000
NO. OF DAYS MILESTONE 1
$/D 3,000.000 $667.000 $400.000 $484.000
D-GR HMA TY-B PG64-22
TON 41,631.000 $60.000 $65.990 $65.000
TACK COAT
GAL 44,377.000 $3.000 $0.010 $0.010
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 180.000 $120.000 $270.630 $13.890
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,500.000 $17,861.250 $1,250.000
FIBER OPTIC CBL (SNGLE-MODE)(24 FIBER)
LF 3,930.000 $9.000 $3.150 $3.590
FIBER OPTIC PIGTAIL (6 FIBER)
LF 70.000 $60.000 $13.150 $13.790
FIBER OPTIC SPLICE ENCLOSURE
EA 6.000 $3,400.000 $2,734.500 $719.050
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 2.000 $1,400.000 $1,881.180 $536.100
FIBER OPTIC CABLE ROAD MARKER
EA 5.000 $200.000 $262.960 $63.200
CCTV FIELD EQUIPMENT (DIGITAL)
EA 1.000 $9,800.000 $7,533.180 $7,340.280
CCTV FIELD CONTROLLER
EA 1.000 $3,200.000 $4,876.740 $1,663.300
CCTV MOUNT (POLE)
EA 1.000 $1,000.000 $773.030 $357.930
ITS MULTI-DUCT CND (PVC-80)
LF 3,485.000 $14.500 $22.990 $21.920
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 445.000 $26.000 $51.050 $33.470
INSTALL DMS (FOUNDATION MTD CABINET)
EA 1.000 $12,000.000 $11,279.360 $8,936.950
ITS POLE (40 FT)(90 MPH)
EA 1.000 $7,600.000 $8,681.280 $11,034.950
ITS POLE MNT CAB (TY 1)(CONF 1)
EA 1.000 $5,000.000 $5,300.000 $3,980.440
TMA (STATIONARY)
DAY 30.000 $300.000 $265.040 $397.500
TMA (MOBILE OPERATION)
HR 40.000 $50.000 $72.940 $69.010
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
EA 4.000 $3,560.000 $4,800.000 $3,289.090
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
EA 2.000 $4,400.000 $7,450.000 $7,451.960
VIVDS PROSR SYS
EA 1.000 $10,500.000 $8,846.920 $16,617.320
VIVDS CAM ASSY FXD LNS
EA 6.000 $1,700.000 $1,990.860 $1,494.630
VIVDS CNTRL SOFTWARE
EA 1.000 $2,000.000 $950.160 $234.970
VIVDS CABLING
LF 3,655.000 $3.000 $3.340 $1.010
Totals: $61,351,328.500 $62,594,543.228 $64,387,208.997