PREPARING ROW
|
STA
|
103.000
|
$10,000.000
|
$360.320
|
$50,500.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
6,395.000
|
$6.000
|
$16.580
|
$7.170
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
2,099.000
|
$7.000
|
$26.140
|
$4.120
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,942.000
|
$14.000
|
$22.990
|
$7.890
|
|
|
REMOVING CONC (CURB)
|
LF
|
320.000
|
$4.600
|
$20.550
|
$3.100
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
4,259.000
|
$8.500
|
$15.630
|
$3.290
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
736.000
|
$50.000
|
$31.180
|
$13.890
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
106,244.000
|
$5.000
|
$11.530
|
$1.540
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
2,981.000
|
$8.000
|
$8.890
|
$1.480
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
146,073.000
|
$7.000
|
$11.910
|
$7.110
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
173,817.000
|
$9.000
|
$9.930
|
$14.340
|
|
|
BLOCK SODDING
|
SY
|
99,139.000
|
$2.800
|
$2.720
|
$2.720
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
99,139.000
|
$0.100
|
$0.080
|
$0.080
|
|
|
VEGETATIVE WATERING
|
MG
|
1,610.000
|
$17.000
|
$19.880
|
$13.500
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
99,139.000
|
$1.000
|
$0.630
|
$0.630
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
62,812.000
|
$40.000
|
$45.390
|
$41.970
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
6,567.000
|
$165.000
|
$162.750
|
$172.750
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
7,348.000
|
$2.500
|
$6.240
|
$8.940
|
|
|
LIME TRT (SUBGRADE)(12")
|
SY
|
198,998.000
|
$3.000
|
$4.910
|
$3.600
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
37,314.000
|
$4.000
|
$4.160
|
$4.100
|
|
|
ASPH (CRS-2)
|
GAL
|
84,796.000
|
$2.500
|
$2.940
|
$2.900
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
1,396.000
|
$90.000
|
$162.440
|
$160.000
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
20,785.000
|
$100.000
|
$106.650
|
$105.050
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
16,291.000
|
$1.500
|
$1.420
|
$0.730
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
6,670.000
|
$50.000
|
$70.770
|
$72.280
|
|
|
CEM STABIL BKFL
|
CY
|
2,994.000
|
$75.000
|
$105.160
|
$104.640
|
|
|
FLOWABLE BACKFILL
|
CY
|
1,659.000
|
$150.000
|
$104.070
|
$99.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
8,905.000
|
$3.550
|
$4.930
|
$0.140
|
|
|
TEMPORARY SPL SHORING
|
SF
|
555.000
|
$30.000
|
$36.400
|
$30.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
641.000
|
$100.000
|
$86.370
|
$125.420
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
624.000
|
$230.000
|
$151.350
|
$158.230
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
5,572.000
|
$170.000
|
$268.350
|
$230.650
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
22.000
|
$300.000
|
$225.000
|
$311.850
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
98.000
|
$170.000
|
$195.350
|
$133.730
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
540.000
|
$275.000
|
$315.890
|
$265.320
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
230.000
|
$210.000
|
$288.640
|
$209.110
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
42.000
|
$250.000
|
$202.080
|
$159.050
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
28.000
|
$310.000
|
$365.130
|
$27.290
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
584.600
|
$850.000
|
$1,500.000
|
$685.660
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
485.000
|
$950.000
|
$1,500.000
|
$817.060
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
525.100
|
$975.000
|
$1,500.000
|
$869.950
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
1,402.000
|
$275.000
|
$349.470
|
$391.870
|
|
|
CL C CONC (CURB OUTLET) (TY II)
|
EA
|
2.000
|
$1,000.000
|
$2,059.470
|
$2,885.990
|
|
|
CL C CONC (MISC)
|
CY
|
4.000
|
$875.000
|
$1,500.000
|
$4,259.900
|
|
|
REINF CONC SLAB
|
SF
|
66,010.000
|
$14.000
|
$18.550
|
$16.180
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
106,197.000
|
$14.000
|
$11.660
|
$9.550
|
|
|
APPROACH SLAB
|
CY
|
1,058.100
|
$400.000
|
$438.970
|
$483.310
|
|
|
SHEAR KEY
|
CY
|
1,070.300
|
$300.000
|
$201.460
|
$230.840
|
|
|
RETAINING WALL (MSE)
|
SF
|
88,816.000
|
$45.000
|
$63.320
|
$33.190
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
2,135.000
|
$75.000
|
$103.860
|
$59.730
|
|
|
PRESTR CONC BOX BEAM (5B34)
|
LF
|
3,384.000
|
$200.000
|
$300.000
|
$228.690
|
|
|
PRESTR CONC BOX BEAM (4B40)
|
LF
|
5,018.270
|
$210.000
|
$300.000
|
$209.900
|
|
|
PRESTR CONC BOX BEAM (5B40)
|
LF
|
13,442.640
|
$220.000
|
$338.000
|
$209.820
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
8,574.780
|
$125.000
|
$208.250
|
$201.830
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
759.800
|
$375.000
|
$340.000
|
$277.830
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
424.000
|
$410.000
|
$350.000
|
$277.830
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
1,486.000
|
$410.000
|
$360.000
|
$294.890
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
936.000
|
$375.000
|
$345.000
|
$277.830
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
155.000
|
$100.000
|
$145.080
|
$108.490
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
452.000
|
$435.000
|
$425.000
|
$443.680
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
225.000
|
$15.000
|
$25.000
|
$13.820
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
2,650.000
|
$3.000
|
$18.110
|
$16.930
|
|
|
RAIL (TY SSTR)
|
LF
|
19,685.600
|
$40.000
|
$43.580
|
$60.680
|
|
|
RAIL (TY C221)
|
LF
|
1,387.000
|
$120.000
|
$85.110
|
$92.420
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
286.000
|
$40.000
|
$46.650
|
$83.890
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
1,006.000
|
$113.000
|
$111.710
|
$90.860
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
16.000
|
$400.000
|
$661.680
|
$327.510
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
15.000
|
$320.000
|
$871.150
|
$419.660
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
373.000
|
$400.000
|
$400.530
|
$467.760
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
84.000
|
$450.000
|
$718.090
|
$634.800
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
13.000
|
$600.000
|
$758.280
|
$595.640
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
19.000
|
$600.000
|
$1,026.130
|
$833.670
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
36.000
|
$600.000
|
$873.380
|
$456.940
|
|
|
CONC BOX CULVERT (4 FT X 5 FT)(EXTEND)
|
LF
|
5.000
|
$500.000
|
$1,126.400
|
$1,185.580
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,054.000
|
$60.000
|
$58.680
|
$71.970
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8,127.000
|
$80.000
|
$61.040
|
$62.510
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
998.000
|
$110.000
|
$81.860
|
$75.050
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
718.000
|
$130.000
|
$105.300
|
$105.540
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
120.000
|
$250.000
|
$149.630
|
$162.990
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
127.000
|
$100.000
|
$85.210
|
$79.150
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
317.000
|
$236.000
|
$118.530
|
$125.830
|
|
|
RC PIPE (CL IV)(48 IN)
|
LF
|
341.000
|
$350.000
|
$210.030
|
$249.050
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
11.000
|
$4,500.000
|
$4,777.440
|
$5,126.090
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
16.000
|
$3,700.000
|
$6,031.130
|
$6,598.700
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
8.000
|
$5,500.000
|
$6,190.170
|
$6,691.400
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
3.000
|
$5,500.000
|
$6,464.270
|
$7,118.860
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
6.000
|
$5,200.000
|
$6,891.300
|
$6,820.150
|
|
|
INLET (COMPL)(PCO)(4FT)(NONE)
|
EA
|
5.000
|
$5,000.000
|
$7,664.600
|
$6,748.050
|
|
|
INLET (COMPL)(PCO)(4FT)(LEFT)
|
EA
|
1.000
|
$5,000.000
|
$8,392.660
|
$8,880.180
|
|
|
INLET (COMPL)(PCO)(4FT)(RIGHT)
|
EA
|
1.000
|
$5,000.000
|
$7,601.620
|
$7,196.130
|
|
|
INLET (COMPL)(PCO)(4FT)(BOTH)
|
EA
|
2.000
|
$5,500.000
|
$8,661.650
|
$8,329.110
|
|
|
INLET (COMPL)(PCO)(6FT)(RIGHT)
|
EA
|
1.000
|
$7,500.000
|
$8,607.700
|
$9,420.930
|
|
|
INLET (COMPL)(PCO)(6FT)(BOTH)
|
EA
|
3.000
|
$7,500.000
|
$8,930.370
|
$9,281.860
|
|
|
INLET (COMPL)(PCU)(3FT)(NONE)
|
EA
|
14.000
|
$6,000.000
|
$7,254.020
|
$7,433.010
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
1.000
|
$5,100.000
|
$7,129.380
|
$7,767.780
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
1.000
|
$6,350.000
|
$6,896.770
|
$6,912.880
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
8.000
|
$5,000.000
|
$7,913.800
|
$8,215.800
|
|
|
INLET (COMPL)(PCU)(4FT)(BOTH)
|
EA
|
1.000
|
$5,600.000
|
$8,121.730
|
$7,999.530
|
|
|
INLET (COMPL)(PCU)(5FT)(RIGHT)
|
EA
|
2.000
|
$3,900.000
|
$9,190.100
|
$8,576.310
|
|
|
INLET (COMPL)(PCU)(5FT)(BOTH)
|
EA
|
3.000
|
$5,300.000
|
$9,635.210
|
$9,024.360
|
|
|
INLET (COMPL)(PMBD)(4FT)
|
EA
|
3.000
|
$4,500.000
|
$8,095.850
|
$6,323.510
|
|
|
INLET (COMPL)(POD)(FG)(3FTX3FT)
|
EA
|
3.000
|
$5,000.000
|
$7,505.280
|
$4,026.610
|
|
|
INLET (COMPL)(POD)(FG)(4FTX4FT)
|
EA
|
3.000
|
$6,000.000
|
$8,159.270
|
$4,737.310
|
|
|
INLET (COMPL)(POD)(SFG)(3FTX3FT)
|
EA
|
9.000
|
$4,500.000
|
$7,390.230
|
$5,267.750
|
|
|
INLET (COMPL)(POD)(SFG)(4FTX4FT)
|
EA
|
1.000
|
$5,400.000
|
$7,777.680
|
$6,596.470
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
8.000
|
$4,500.000
|
$5,152.570
|
$5,320.150
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
2.000
|
$5,500.000
|
$5,085.810
|
$5,201.700
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
7.000
|
$5,500.000
|
$4,531.730
|
$4,737.200
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$5,500.000
|
$5,083.350
|
$4,737.230
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
1.000
|
$5,500.000
|
$4,399.830
|
$3,398.230
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$40,000.000
|
$31,154.010
|
$24,531.690
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
5.000
|
$19,000.000
|
$8,247.770
|
$14,680.200
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$20,000.000
|
$20,927.200
|
$19,333.230
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$25,000.000
|
$16,843.210
|
$23,617.860
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,000.000
|
$1,610.390
|
$1,032.560
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,200.000
|
$1,678.400
|
$1,119.530
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
14.000
|
$1,400.000
|
$1,678.400
|
$1,119.280
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$800.000
|
$1,714.390
|
$1,166.460
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,000.000
|
$1,770.390
|
$1,238.560
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,900.000
|
$2,182.400
|
$1,768.240
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$1,400.000
|
$1,858.400
|
$1,351.280
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,400.000
|
$3,421.620
|
$2,865.960
|
|
|
ADJUSTING INLETS
|
EA
|
1.000
|
$2,300.000
|
$2,477.680
|
$1,209.360
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$2,000.000
|
$27,737.200
|
$2,514.300
|
|
|
REMOV STR (INLET)
|
EA
|
20.000
|
$700.000
|
$778.920
|
$199.780
|
|
|
REMOV STR (SET)
|
EA
|
26.000
|
$350.000
|
$630.300
|
$210.320
|
|
|
REMOV STR (WINGWALL)
|
EA
|
16.000
|
$1,100.000
|
$1,008.000
|
$823.510
|
|
|
REMOV STR (HEADWALL)
|
EA
|
18.000
|
$1,100.000
|
$1,530.550
|
$823.510
|
|
|
REMOV STR (PIPE)
|
LF
|
3,025.000
|
$12.000
|
$18.750
|
$6.670
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
60.000
|
$45.000
|
$108.660
|
$33.070
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
4.000
|
$80,000.000
|
$59,565.620
|
$152,261.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,103,300.000
|
$5,500,000.000
|
$5,209,770.970
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
45.000
|
$12,000.000
|
$802.250
|
$22,987.300
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
354.000
|
$25.000
|
$20.200
|
$20.200
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
315.000
|
$25.000
|
$25.000
|
$25.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
234.000
|
$65.000
|
$78.080
|
$78.080
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
903.000
|
$8.000
|
$10.730
|
$10.730
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,326.000
|
$20.000
|
$25.770
|
$25.770
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,326.000
|
$7.000
|
$7.770
|
$7.770
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,405.000
|
$2.500
|
$2.140
|
$2.140
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,405.000
|
$0.650
|
$0.440
|
$0.440
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,011.000
|
$4.000
|
$3.930
|
$3.930
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,011.000
|
$1.000
|
$0.440
|
$0.440
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,845.000
|
$56.000
|
$71.310
|
$62.670
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,830.000
|
$8.500
|
$6.440
|
$7.670
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
5,800.000
|
$10.000
|
$6.020
|
$6.280
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
140.000
|
$20.000
|
$6.700
|
$6.630
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
630.000
|
$6.000
|
$5.000
|
$7.440
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
13,910.000
|
$5.000
|
$4.540
|
$3.930
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
480.000
|
$8.500
|
$4.760
|
$4.450
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,470.000
|
$10.000
|
$6.030
|
$6.270
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
5,800.000
|
$10.000
|
$5.480
|
$6.160
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
140.000
|
$15.000
|
$6.160
|
$6.530
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
5,305.000
|
$60.000
|
$69.360
|
$68.960
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
240.000
|
$170.000
|
$136.380
|
$151.450
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
741.000
|
$7.000
|
$2.900
|
$18.580
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
20,505.000
|
$20.000
|
$25.000
|
$18.120
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,827.000
|
$30.000
|
$41.930
|
$58.540
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
2,594.000
|
$90.000
|
$62.000
|
$59.190
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
16,430.000
|
$0.200
|
$0.300
|
$0.130
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
5,450.000
|
$27.000
|
$26.000
|
$29.150
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
31.000
|
$1,910.000
|
$1,900.000
|
$2,160.440
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
18.000
|
$1,140.000
|
$1,200.000
|
$1,232.060
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
9,525.000
|
$2.500
|
$2.250
|
$1.230
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
20.000
|
$200.000
|
$125.000
|
$189.070
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
1.000
|
$200.000
|
$100.000
|
$189.290
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
11.000
|
$180.000
|
$225.000
|
$204.910
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
971.000
|
$9.500
|
$17.950
|
$17.500
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
4.000
|
$2,400.000
|
$3,005.000
|
$3,350.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
5,802.000
|
$4.000
|
$2.800
|
$5.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
4.000
|
$400.000
|
$200.000
|
$1,500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
23.000
|
$2,700.000
|
$2,550.000
|
$2,975.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
24.000
|
$265.000
|
$225.000
|
$204.860
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$3,000.000
|
$1,200.000
|
$1,250.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,100.000
|
$800.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
9.000
|
$11,000.000
|
$22,375.000
|
$21,181.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,000.000
|
$7,550.000
|
$7,050.000
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
1,410.000
|
$50.000
|
$60.000
|
$45.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$1,500.000
|
$3,539.960
|
$1,595.260
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$500.000
|
$1,597.000
|
$921.100
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
12.000
|
$1,000.000
|
$2,206.670
|
$895.550
|
|
|
IN RD IL (TY SA) 40B-8 (250W EQ) LED
|
EA
|
2.000
|
$4,500.000
|
$3,850.950
|
$4,063.290
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
21.000
|
$3,500.000
|
$3,981.220
|
$4,334.800
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
7,159.000
|
$9.000
|
$9.790
|
$11.120
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
508.000
|
$25.000
|
$25.550
|
$16.480
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
377.000
|
$17.000
|
$17.990
|
$15.950
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
981.000
|
$33.000
|
$31.450
|
$23.600
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
872.000
|
$13.000
|
$19.890
|
$18.030
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
325.000
|
$8.500
|
$11.550
|
$15.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
4,588.000
|
$20.000
|
$24.090
|
$18.080
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
40.000
|
$14.500
|
$19.460
|
$19.840
|
|
|
CONDT (RM) (1")
|
LF
|
359.000
|
$26.000
|
$22.010
|
$17.240
|
|
|
CONDT (RM) (3")
|
LF
|
644.000
|
$55.000
|
$47.220
|
$46.030
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
3,970.000
|
$1.200
|
$1.120
|
$0.810
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
45.000
|
$1.300
|
$1.210
|
$0.870
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
8,853.000
|
$1.000
|
$2.670
|
$0.850
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
19,476.000
|
$1.200
|
$2.590
|
$1.220
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,858.000
|
$1.600
|
$1.810
|
$1.720
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
680.000
|
$2.250
|
$2.180
|
$1.750
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
31.000
|
$1,000.000
|
$998.900
|
$733.840
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
6.000
|
$1,230.000
|
$1,215.690
|
$882.130
|
|
|
GROUND BOX TY D (162922)
|
EA
|
5.000
|
$950.000
|
$988.650
|
$520.500
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
4.000
|
$1,100.000
|
$1,220.000
|
$855.860
|
|
|
REMOVE GROUND BOX
|
EA
|
13.000
|
$240.000
|
$241.250
|
$127.750
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
|
EA
|
1.000
|
$7,000.000
|
$7,448.460
|
$5,783.670
|
|
|
ELC SRV TY D 120/240 060(NS)AL(E)PS(U)
|
EA
|
1.000
|
$6,300.000
|
$6,250.000
|
$4,879.960
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
208.250
|
$24.000
|
$38.500
|
$38.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
709.000
|
$26.000
|
$33.590
|
$33.910
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
1,843.500
|
$24.500
|
$33.990
|
$22.660
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
65.000
|
$500.000
|
$701.490
|
$597.180
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
2.000
|
$575.000
|
$772.010
|
$675.410
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
29.000
|
$525.000
|
$791.770
|
$724.880
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
5.000
|
$650.000
|
$923.580
|
$760.830
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$525.000
|
$822.260
|
$851.390
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
7.000
|
$650.000
|
$912.020
|
$935.440
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$750.000
|
$1,031.980
|
$866.200
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$800.000
|
$1,089.730
|
$1,064.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
3.000
|
$2,200.000
|
$2,287.410
|
$2,415.300
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
3.000
|
$2,000.000
|
$2,485.330
|
$2,513.930
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
89.000
|
$75.000
|
$118.980
|
$85.930
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,823.200
|
$5.500
|
$7.500
|
$20.130
|
|
|
REMOVE LRSA
|
EA
|
9.000
|
$950.000
|
$1,139.480
|
$1,509.330
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
1.000
|
$22,000.000
|
$29,246.200
|
$23,693.260
|
|
|
INS OH SN SUP(40 FT CANT)(SPAN ONLY)
|
EA
|
1.000
|
$20,000.000
|
$19,801.460
|
$58,603.370
|
|
|
INS OH SN SUP(60 FT BRDG)
|
EA
|
1.000
|
$30,000.000
|
$40,075.330
|
$34,398.220
|
|
|
INS OH SN SUP(80 FT BRDG)
|
EA
|
1.000
|
$35,000.000
|
$35,090.090
|
$38,474.360
|
|
|
INS OH SN SUP(100 FT BRDG)
|
EA
|
1.000
|
$35,000.000
|
$51,883.830
|
$72,005.460
|
|
|
INS OH SN SUP(165 FT BRDG)
|
EA
|
1.000
|
$75,000.000
|
$114,634.000
|
$156,881.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
2.000
|
$21,000.000
|
$5,622.450
|
$3,851.910
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
3.000
|
$700.000
|
$864.420
|
$924.460
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
55.000
|
$18.000
|
$18.000
|
$16.570
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
54.000
|
$20.000
|
$18.000
|
$16.570
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
57.000
|
$25.000
|
$18.500
|
$17.170
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
57.000
|
$35.000
|
$37.000
|
$24.730
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
51.000
|
$25.000
|
$37.000
|
$24.730
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
37.000
|
$70.000
|
$69.000
|
$57.390
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)SRF
|
EA
|
16.000
|
$90.000
|
$30.000
|
$65.280
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
92.000
|
$3.750
|
$5.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
1,950.000
|
$0.500
|
$0.670
|
$0.670
|
|
|
WK ZN PAV MRK REMOV (W)4"(LNDP)
|
LF
|
483.000
|
$2.000
|
$2.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
36,280.000
|
$0.500
|
$0.570
|
$0.570
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,469.000
|
$1.300
|
$1.500
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
34,299.000
|
$0.500
|
$0.570
|
$0.570
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
1,056.000
|
$1.000
|
$0.800
|
$0.800
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,505.000
|
$0.750
|
$0.700
|
$0.700
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
897.000
|
$3.000
|
$3.000
|
$3.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,950.000
|
$2.500
|
$2.770
|
$2.770
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
45.000
|
$6.000
|
$8.000
|
$8.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
27.000
|
$120.000
|
$150.000
|
$150.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
4.000
|
$175.000
|
$350.000
|
$350.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
4.000
|
$330.000
|
$400.000
|
$400.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
23.000
|
$140.000
|
$150.000
|
$150.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
6.000
|
$800.000
|
$1,000.000
|
$1,000.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
10.000
|
$800.000
|
$1,000.000
|
$1,000.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
28.000
|
$30.000
|
$40.000
|
$40.000
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
5,290.000
|
$0.150
|
$0.180
|
$0.180
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
26,221.000
|
$0.150
|
$0.150
|
$0.150
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
4,790.000
|
$0.250
|
$0.270
|
$0.270
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
20,569.000
|
$0.250
|
$0.230
|
$0.230
|
|
REFL PAV MRK TY II (W) 8" (LNDP)
|
LF
|
1,056.000
|
$0.300
|
$0.500
|
$0.500
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
4,505.000
|
$0.300
|
$0.500
|
$0.500
|
|
REFL PAV MRK TY II (W) 12" (LNDP)
|
LF
|
897.000
|
$1.000
|
$1.300
|
$1.300
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
1,950.000
|
$1.000
|
$1.300
|
$1.300
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
45.000
|
$3.000
|
$5.000
|
$5.000
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
27.000
|
$60.000
|
$52.000
|
$52.000
|
|
REFL PAV MRK TY II (W) (UTURN ARROW)
|
EA
|
4.000
|
$100.000
|
$100.000
|
$100.000
|
|
REFL PAV MRK TY II (W) (LNDP ARW)
|
EA
|
4.000
|
$100.000
|
$120.000
|
$120.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
23.000
|
$65.000
|
$55.000
|
$55.000
|
|
REFL PAV MRK TY II (W) (ENTR GORE)
|
EA
|
6.000
|
$200.000
|
$450.000
|
$450.000
|
|
REFL PAV MRK TY II (W) (EXIT GORE)
|
EA
|
10.000
|
$200.000
|
$450.000
|
$450.000
|
|
REFL PAV MRK TY II (W) 18" (YLD TRI)
|
EA
|
28.000
|
$60.000
|
$22.000
|
$22.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
29,185.000
|
$0.150
|
$0.150
|
$0.150
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
17,844.000
|
$0.250
|
$0.230
|
$0.230
|
|
|
PAVEMENT SEALER 4"
|
LF
|
6,640.000
|
$0.150
|
$0.150
|
$0.150
|
|
|
PAVEMENT SEALER 6"
|
LF
|
5,345.000
|
$0.200
|
$0.230
|
$0.230
|
|
|
PAVEMENT SEALER 8"
|
LF
|
114.000
|
$0.500
|
$0.500
|
$0.500
|
|
|
PAVEMENT SEALER 12"
|
LF
|
664.000
|
$1.000
|
$1.400
|
$1.400
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
5,290.000
|
$0.500
|
$0.450
|
$0.450
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
26,221.000
|
$0.500
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
4,790.000
|
$0.500
|
$0.550
|
$0.550
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
20,569.000
|
$0.500
|
$0.520
|
$0.520
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
29,185.000
|
$0.500
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
17,844.000
|
$0.500
|
$0.520
|
$0.520
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
260.000
|
$0.500
|
$20.000
|
$20.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
26.000
|
$2.800
|
$4.000
|
$4.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,144.000
|
$3.500
|
$3.440
|
$3.440
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
11,975.000
|
$0.500
|
$0.570
|
$0.570
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
284.000
|
$0.750
|
$2.000
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
7.000
|
$54.000
|
$55.000
|
$55.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
3.000
|
$58.000
|
$55.000
|
$55.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
6,640.000
|
$0.100
|
$0.150
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
5,345.000
|
$0.150
|
$0.200
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
114.000
|
$0.150
|
$0.500
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
664.000
|
$0.250
|
$1.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
10.000
|
$15.000
|
$50.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
5.000
|
$20.000
|
$50.000
|
$50.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$25,000.000
|
$27,500.000
|
$22,086.310
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$4,000.000
|
$5,500.000
|
$2,800.680
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
4.000
|
$235.000
|
$268.750
|
$215.440
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
6.000
|
$230.000
|
$245.150
|
$217.780
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$235.000
|
$270.820
|
$215.440
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
6.000
|
$230.000
|
$239.240
|
$217.780
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$230.000
|
$236.350
|
$215.440
|
|
|
PED SIG SEC (LED)(2 INDICATIONS)
|
EA
|
8.000
|
$175.000
|
$375.750
|
$462.470
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)ALUM
|
EA
|
4.000
|
$130.000
|
$156.740
|
$107.670
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)ALUM
|
EA
|
4.000
|
$154.000
|
$158.810
|
$132.240
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
5,007.000
|
$1.250
|
$1.460
|
$1.110
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
5,179.000
|
$2.000
|
$2.160
|
$1.420
|
|
|
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
|
LF
|
3,309.000
|
$4.750
|
$4.400
|
$3.440
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
1.000
|
$7,750.000
|
$10,913.620
|
$8,812.900
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
1.000
|
$9,000.000
|
$10,535.930
|
$9,707.070
|
|
|
PED POLE ASSEMBLY
|
EA
|
7.000
|
$1,815.000
|
$1,982.070
|
$1,852.290
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
7.000
|
$735.000
|
$808.500
|
$674.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
$3,150.000
|
$3,382.920
|
$3,194.020
|
|
|
REMOVAL OF CONTROL CABINET(GRND MNT)
|
EA
|
1.000
|
$1,100.000
|
$1,000.000
|
$499.370
|
|
|
REPLACE OF CONTROL CABINET(GRND MNT)
|
EA
|
1.000
|
$20,000.000
|
$2,659.720
|
$1,264.390
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
73,371.000
|
$1.000
|
$3.000
|
$2.070
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
656.000
|
$3.500
|
$2.000
|
$5.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
12,500.000
|
$1,132.000
|
$520.000
|
$867.000
|
|
|
NO. OF DAYS MILESTONE 1
|
$/D
|
3,000.000
|
$667.000
|
$400.000
|
$484.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
41,631.000
|
$60.000
|
$65.990
|
$65.000
|
|
|
TACK COAT
|
GAL
|
44,377.000
|
$3.000
|
$0.010
|
$0.010
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
180.000
|
$120.000
|
$270.630
|
$13.890
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,500.000
|
$17,861.250
|
$1,250.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(24 FIBER)
|
LF
|
3,930.000
|
$9.000
|
$3.150
|
$3.590
|
|
|
FIBER OPTIC PIGTAIL (6 FIBER)
|
LF
|
70.000
|
$60.000
|
$13.150
|
$13.790
|
|
|
FIBER OPTIC SPLICE ENCLOSURE
|
EA
|
6.000
|
$3,400.000
|
$2,734.500
|
$719.050
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
2.000
|
$1,400.000
|
$1,881.180
|
$536.100
|
|
|
FIBER OPTIC CABLE ROAD MARKER
|
EA
|
5.000
|
$200.000
|
$262.960
|
$63.200
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
1.000
|
$9,800.000
|
$7,533.180
|
$7,340.280
|
|
|
CCTV FIELD CONTROLLER
|
EA
|
1.000
|
$3,200.000
|
$4,876.740
|
$1,663.300
|
|
|
CCTV MOUNT (POLE)
|
EA
|
1.000
|
$1,000.000
|
$773.030
|
$357.930
|
|
|
ITS MULTI-DUCT CND (PVC-80)
|
LF
|
3,485.000
|
$14.500
|
$22.990
|
$21.920
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
445.000
|
$26.000
|
$51.050
|
$33.470
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
1.000
|
$12,000.000
|
$11,279.360
|
$8,936.950
|
|
|
ITS POLE (40 FT)(90 MPH)
|
EA
|
1.000
|
$7,600.000
|
$8,681.280
|
$11,034.950
|
|
|
ITS POLE MNT CAB (TY 1)(CONF 1)
|
EA
|
1.000
|
$5,000.000
|
$5,300.000
|
$3,980.440
|
|
|
TMA (STATIONARY)
|
DAY
|
30.000
|
$300.000
|
$265.040
|
$397.500
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$50.000
|
$72.940
|
$69.010
|
|
|
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
|
EA
|
4.000
|
$3,560.000
|
$4,800.000
|
$3,289.090
|
|
|
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
|
EA
|
2.000
|
$4,400.000
|
$7,450.000
|
$7,451.960
|
|
|
VIVDS PROSR SYS
|
EA
|
1.000
|
$10,500.000
|
$8,846.920
|
$16,617.320
|
|
|
VIVDS CAM ASSY FXD LNS
|
EA
|
6.000
|
$1,700.000
|
$1,990.860
|
$1,494.630
|
|
|
VIVDS CNTRL SOFTWARE
|
EA
|
1.000
|
$2,000.000
|
$950.160
|
$234.970
|
|
|
VIVDS CABLING
|
LF
|
3,655.000
|
$3.000
|
$3.340
|
$1.010
|
|
Totals: |
$61,351,328.500
|
$62,594,543.228
|
$64,387,208.997
|