Bid Cobra

MCLENNAN SH 6 (0258-08-038)

Items: 53

County: MCLENNAN
Length: N/A
Highway: SH 6
District: WACO
Control Number: 0258-08-038
DBE Goal: N/A
Project: STP 2023(617)HES
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $649,412.15
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$649,412.15
$723,086.00
Over/Under Est: 11.34% $73,673.85
Over/Under Est: 28.82% $187,186.31
Amt Left: 15.7% $113,512.46
Over/Under Est: 36.1% $234,418.92
Amt Left: 22.23% $160,745.07
Delta: -5.65% -$47,232.61
Over/Under Est: 39.07% $253,729.10
Amt Left: 24.9% $180,055.25
Delta: -2.18% -$19,310.18

Bid Items & Bid Tabulations

53 Total 0 of 53
MCLENNAN  |  SH 6  |  WACO  |  0258-08-038  |  04/05/2023  |  $649,412.15  |  STP 2023(617)HES  |  HAZARD ELIM & SAFETY  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
PREPARING ROW
STA 1.000 $3,222.750 $2,000.000 $10,000.000 $17,000.000 $3,200.000
REMOVING CONCRETE(MOW STRIP)
LF 380.000 $6.500 $10.000 $15.000 $40.000 $16.000
REMOVING STAB BASE & ASPH PAV (8"-10")
SY 18.000 $10.000 $60.000 $50.000 $190.000 $85.000
EXCAVATION (ROADWAY)
CY 25.000 $11.500 $50.000 $50.000 $135.000 $24.000
SUBGRADE WIDENING (DENS CONT)
STA 9.000 $270.000 $950.000 $1,500.000 $2,300.000 $2,500.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 667.000 $15.250 $40.000 $25.000 $55.000 $50.000
BACKFILL (TY A OR B)
STA 9.000 $177.750 $500.000 $200.000 $1,050.000 $300.000
BLADING
STA 9.000 $123.000 $150.000 $185.000 $230.000 $300.000
FURNISHING AND PLACING TOPSOIL (4")
SY 11,374.000 $1.650 $0.010 $3.000 $1.450 $2.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 11,374.000 $0.500 $0.370 $0.410 $0.370 $1.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 11,374.000 $0.160 $0.330 $0.370 $0.330 $1.000
VEGETATIVE WATERING
MG 277.100 $22.500 $5.000 $1.500 $40.000 $20.000
PROOF ROLLING
HR 2.000 $125.750 $75.000 $180.000 $130.000 $150.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 212.000 $54.600 $125.000 $65.000 $120.000 $100.000
PRIME COAT(MC-30 OR AE-P)
GAL 152.000 $6.900 $15.000 $10.000 $9.400 $8.000
PLANE ASPH CONC PAV(0" TO 6")
SY 816.000 $6.000 $10.000 $5.000 $14.900 $8.500
PLANE ASPH CONC PAV (0" TO 2" MICRO)
SY 17,578.000 $3.600 $2.000 $5.000 $2.550 $3.500
TEMPORARY SPL SHORING
SF 808.000 $35.750 $33.000 $72.500 $31.600 $40.000
RIPRAP (MOW STRIP)(4 IN)
CY 14.000 $463.000 $775.000 $950.000 $842.000 $650.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 21.000 $1,187.500 $1,450.000 $1,672.000 $2,390.000 $1,500.000
WINGWALL (PW - 1) (HW=12 FT)
EA 1.000 $67,026.000 $77,000.000 $70,000.000 $78,950.000 $88,000.000
REMOV STR (WINGWALL)
EA 1.000 $993.500 $1,600.000 $2,250.000 $1,265.000 $7,500.000
REMOV STR (BOX CULVERT)
LF 6.000 $72.750 $350.000 $560.000 $105.250 $1,200.000
MOBILIZATION
LS 1.000 $9,339.640 $72,000.000 $70,000.000 $88,000.000 $75,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $7,412.250 $5,500.000 $2,000.000 $8,000.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 54.500 $33.900 $50.000 $78.000 $41.310 $50.000
ROCK FILTER DAMS (REMOVE)
LF 54.500 $9.100 $15.000 $34.000 $35.010 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 223.000 $3.500 $10.000 $10.000 $3.450 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 183.000 $1.200 $2.500 $2.250 $0.750 $5.000
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $34.000 $37.000 $34.300 $30.750 $35.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $2.750 $4.550 $2.800 $2.500 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,256.750 $4,000.000 $2,950.000 $2,650.000 $3,750.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $246.250 $415.000 $250.000 $225.000 $375.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 1.000 $426.250 $950.000 $550.000 $473.000 $500.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $465.000 $950.000 $550.000 $777.000 $800.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 2.000 $237.250 $375.000 $500.000 $700.000 $750.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 2.000 $82.250 $50.000 $67.000 $60.000 $45.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 4.000 $29.750 $45.000 $43.000 $38.500 $40.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 667.000 $1.050 $0.630 $1.400 $1.600 $1.650
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 20.000 $8.250 $15.000 $12.270 $25.000 $26.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 1,772.000 $0.610 $1.140 $1.090 $0.520 $0.550
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 698.000 $0.560 $1.480 $1.120 $0.520 $0.550
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 5,650.000 $0.790 $1.450 $1.090 $0.430 $0.450
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 5,242.000 $0.890 $2.390 $1.900 $1.230 $1.250
REFL PAV MRKR TY II-A-A
EA 162.000 $5.850 $8.000 $4.460 $7.000 $7.250
ELIM EXT PAV MRK & MRKS (4")
LF 847.000 $0.820 $2.250 $1.000 $1.060 $1.100
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 259.000 $89.600 $150.000 $160.000 $175.000 $200.000
TACK COAT
GAL 171.000 $4.000 $4.000 $15.000 $13.000 $10.000
SP MIXES SP-D SAC-B PG70-22 (EXEMPT)
TON 1,451.000 $163.000 $135.000 $160.000 $175.000 $175.000
UNDERSEAL COURSE
GAL 4,396.000 $3.750 $3.750 $5.230 $0.010 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $7,332.000 $7,500.000 $7,500.000 $6,500.000 $7,000.000
TMA (STATIONARY)
DAY 49.000 $191.750 $300.000 $1.000 $168.000 $350.000
TMA (MOBILE OPERATION)
HR 30.000 $74.000 $75.000 $50.000 $40.000 $100.000
Totals: $649,412.150 $723,086.000 $836,598.460 $883,831.080 $903,141.250