County: MCLENNAN Highway: US 84 Date: 08/01/2024 (3 months ago) Engineer's Estimate: $983,606 Control Number: 0055-15-082
Project: F 2B24(408) District: WACO Time: 120 WORKING DAYS Type: LANDSCAPE DEVELOPMENT
Bidder's List
Informational:

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $983,606.25
ENCINO LANDSCAPE, INC.   $1,013,078.00 1
3% | $29,471.75
APEX LANDSCAPE & IRRIGATION, LLC   $1,076,250.25 2
9.42% | $92,644.00
6.24% | $63,172.25
GREEN SAGE SERVICES LLC   $1,078,344.90 3
9.63% | $94,738.65
6.44% | $65,266.90
0.19% | $2,094.65
CROSS PLUS CONSTRUCTION, LLC   $1,130,438.00 4
14.93% | $146,831.75
11.58% | $117,360.00
4.83% | $52,093.10
CENTRAL NORTH CONSTRUCTION, LLC   $1,241,704.30 5
26.24% | $258,098.05
22.57% | $228,626.30
9.84% | $111,266.30
TIGHT LINE CONSTRUCTION, LLC   $1,306,233.00 6
32.8% | $322,626.75
28.94% | $293,155.00
5.20% | $64,528.70

Bid Items

Items: 33, 0 filtered
MCLENNAN US 84  |  WACO  |  0055-15-082  |  08/01/2024  |  $983,606  |  F 2B24(408)  |  LANDSCAPE DEVELOPMENT  |  120 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ENCINO LANDSCAPE, INC. APEX LANDSCAPE & IRRIGATION, LLC GREEN SAGE SERVICES LLC CROSS PLUS CONSTRUCTION, LLC CENTRAL NORTH CONSTRUCTION, LLC TIGHT LINE CONSTRUCTION, LLC
100 6001 PREPARING ROW AC 0.990 $5,400.000 $5,000.000 $5,000.000 $2,500.000 $5,000.000 $96,473.790 $15,000.000
100 6013 PREP ROW (TREE) (2" TO 12" DIA) EA 16.000 $230.000 $500.000 $325.000 $400.000 $600.000 $200.000 $1,000.000
104 6011 REMOVING CONC (MEDIANS) SY 27.000 $11.250 $30.000 $50.000 $43.000 $90.000 $250.000 $200.000
104 6040 REMOVING CONC (PAVERS) SY 4,043.000 $5.500 $30.000 $15.000 $19.000 $10.000 $8.000 $20.000
161 6012 GENERAL USE COMPOST CY 802.000 $35.000 $50.000 $28.000 $37.000 $65.000 $40.000 $60.000
168 6001 VEGETATIVE WATERING MG 168.000 $25.000 $30.000 $5.750 $38.000 $10.000 $10.000 $25.000
170 6001 IRRIGATION SYSTEM LS 1.000 $303,110.000 $100,000.000 $70,000.000 $73,500.000 $162,000.000 $180,000.000 $175,000.000
192 6012 MULCH CY 245.000 $40.000 $50.000 $26.000 $55.000 $85.000 $45.000 $55.000
192 6016 PLANT BED PREPARATION SY 4,815.000 $3.100 $3.000 $5.000 $1.300 $12.000 $5.250 $5.000
192 6017 VEGETATION BARRIER SY 1,892.000 $1.500 $5.000 $2.500 $2.000 $5.000 $4.000 $10.000
192 6025 PLANT MATERIAL (45 GAL) (TREE) EA 38.000 $550.000 $500.000 $450.000 $480.000 $600.000 $500.000 $450.000
192 6026 PLANT MATERIAL (65 GAL) (TREE) EA 9.000 $725.000 $800.000 $720.000 $620.000 $1,200.000 $700.000 $650.000
192 6028 PLANT MATERIAL (1 GAL) (SHRUB) EA 8,382.000 $10.000 $15.000 $12.500 $8.700 $20.000 $10.000 $10.000
192 6030 PLANT MATERIAL (3 GAL) (SHRUB) EA 1,053.000 $25.000 $30.000 $30.000 $24.500 $35.000 $18.000 $30.000
192 6067 LANDSCAPE EDGE (TYPE I) LF 560.000 $20.000 $10.000 $10.000 $11.500 $22.000 $20.000 $18.000
192 6097 CONC LNDSCP EDG (12 IN WIDTH) LF 2,375.000 $30.000 $25.000 $23.000 $23.000 $22.000 $35.000 $30.000
192 6100 VEGETATION BARRIER (TREE ROOT) SY 144.000 $60.000 $100.000 $30.000 $60.000 $5.000 $10.000 $25.000
193 6001 PLANT MAINTENANCE MO 3.000 $750.000 $2,000.000 $5,000.000 $2,000.000 $5,000.000 $5,000.000 $2,500.000
193 6007 IRRIGATION SYSTEM OPER AND MAINT MO 3.000 $500.000 $1,000.000 $1,750.000 $100.000 $5,000.000 $1,250.000 $2,000.000
500 6001 MOBILIZATION LS 1.000 $85,000.000 $100,000.000 $107,250.000 $33,000.000 $90,000.000 $70,000.000 $130,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 $1,750.000 $3,000.000 $3,500.000 $5,500.000 $4,500.000 $2,000.000 $2,500.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 317.000 $1.500 $10.000 $1.750 $5.000 $1.000 $1.000 $10.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 317.000 $5.000 $1.000 $0.500 $1.500 $1.000 $0.500 $1.000
506 6044 SANDBAGS FOR EROSION CONTROL (8") LF 41.000 $15.000 $1.000 $20.000 $8.000 $1.000 $5.000 $1.000
528 6003 COLORED TEXTURED CONC (8") SY 1,260.000 $90.000 $75.000 $160.000 $180.000 $123.000 $210.000 $225.000
528 6008 COLORED TEXTURED CONC (5") SY 481.000 $70.000 $60.000 $135.000 $170.000 $95.000 $200.000 $175.000
618 6034 CONDT (PVC) (SCH 40) (4") (BORE) LF 900.000 $28.000 $60.000 $40.000 $44.000 $40.000 $50.000 $55.000
1004 6001 TREE PROTECTION EA 26.000 $240.000 $300.000 $250.000 $100.000 $150.000 $50.000 $350.000
1005 6002 LOOSE AGGR FOR GROUNDCOVER (TYPE II) CY 84.000 $105.000 $100.000 $450.000 $350.000 $66.000 $350.000 $250.000
1005 6003 LOOSE AGGR FOR GROUNDCOVER (TYPE III) CY 126.000 $80.000 $125.000 $450.000 $185.000 $99.000 $350.000 $250.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 30.000 $120.000 $200.000 $55.000 $300.000 $50.000 $200.000 $200.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $6,000.000 $5,000.000 $15,000.000 $1,200.000 $500.000 $5,000.000 $15,000.000
6185 6002 TMA (STATIONARY) DAY 240.000 $175.000 $300.000 $245.000 $690.000 $200.000 $85.000 $1.000
Totals: $983,606.25 $1,013,078.00 $1,076,250.25 $1,078,344.90 $1,130,438.00 $1,241,704.30 $1,306,233.00