REMOVING CONC (PAV)
|
SY
|
2,200.000
|
$5.000
|
$19.980
|
$4.990
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,643.300
|
$8.000
|
$18.750
|
$20.090
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
2,466.600
|
$11.500
|
$14.550
|
$26.790
|
|
|
BACKFILL (TY B)
|
STA
|
21.500
|
$175.000
|
$369.630
|
$189.940
|
|
|
BLADING
|
HR
|
20.000
|
$100.000
|
$114.000
|
$334.870
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
4,402.000
|
$1.000
|
$2.190
|
$0.980
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
23,872.000
|
$0.150
|
$0.250
|
$0.170
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
5,968.000
|
$0.150
|
$0.250
|
$0.120
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
5,968.000
|
$0.150
|
$0.250
|
$0.110
|
|
|
VEGETATIVE WATERING
|
MG
|
268.310
|
$10.000
|
$16.650
|
$66.970
|
|
|
FL BS (CMP IN PLC)(TY E GR 5)(FNL POS)
|
CY
|
2,938.000
|
$65.000
|
$113.260
|
$93.760
|
|
|
FL BS (RDWY DEL)(TY E GR 5)(FNAL POS)
|
CY
|
1,206.000
|
$65.000
|
$113.250
|
$93.760
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
272.000
|
$154.000
|
$183.750
|
$254.500
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
11,708.000
|
$2.150
|
$3.420
|
$6.700
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
7,236.000
|
$2.000
|
$3.190
|
$6.700
|
|
|
CEMENT
|
TON
|
66.000
|
$150.000
|
$210.000
|
$241.110
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
7,236.000
|
$2.000
|
$4.560
|
$6.700
|
|
|
PRIME COAT (MC-30)
|
GAL
|
3,558.000
|
$4.150
|
$6.480
|
$5.880
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
209.000
|
$100.000
|
$148.900
|
$151.350
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
217.000
|
$100.000
|
$148.720
|
$147.110
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
16,703.000
|
$3.500
|
$4.060
|
$22.600
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
5,876.000
|
$71.000
|
$141.200
|
$85.030
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
551.000
|
$81.000
|
$178.810
|
$81.270
|
|
|
CONC PVMT(CRCP)(TRANSITION SLAB)
|
SY
|
315.000
|
$145.000
|
$192.580
|
$199.580
|
|
|
CEM STABIL BKFL
|
CY
|
66.000
|
$120.000
|
$190.770
|
$69.560
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
37.000
|
$110.000
|
$270.350
|
$66.210
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
120.000
|
$210.000
|
$205.970
|
$224.650
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
4.200
|
$445.000
|
$852.160
|
$497.290
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
12.000
|
$90.000
|
$160.120
|
$74.200
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
152.000
|
$375.000
|
$877.940
|
$386.850
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
16.000
|
$67.000
|
$223.510
|
$66.680
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8.000
|
$85.000
|
$275.630
|
$82.740
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
4.000
|
$9,000.000
|
$11,329.410
|
$11,963.950
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,100.000
|
$1,598.410
|
$1,095.220
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,150.000
|
$2,583.060
|
$1,098.070
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,450.000
|
$2,554.270
|
$1,689.710
|
|
|
REMOV STR (SMALL)
|
EA
|
3.000
|
$1,500.000
|
$9,958.010
|
$3,137.170
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$228,000.000
|
$450,695.990
|
$488,907.930
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$3,600.000
|
$6,400.000
|
$13,394.740
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
100.000
|
$30.000
|
$46.300
|
$33.210
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$10.000
|
$17.300
|
$10.050
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
420.000
|
$3.000
|
$5.250
|
$2.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
420.000
|
$1.000
|
$1.000
|
$0.860
|
|
|
CONSTRUCTING DETOURS
|
SY
|
7,000.000
|
$43.000
|
$42.570
|
$60.050
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,440.000
|
$35.000
|
$41.360
|
$26.710
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,290.000
|
$10.000
|
$12.410
|
$6.390
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,440.000
|
$5.000
|
$23.740
|
$6.530
|
|
|
COLORED TEXTURED CONC (5")
|
SY
|
1,086.600
|
$64.000
|
$117.530
|
$133.950
|
|
|
CONC CURB (TY II)
|
LF
|
1,463.000
|
$20.000
|
$22.580
|
$10.760
|
|
|
CONC CURB (MONO) (TY I)
|
LF
|
360.000
|
$16.000
|
$21.400
|
$15.700
|
|
|
DRIVEWAYS (BASE)
|
SY
|
69.000
|
$110.000
|
$21.900
|
$23.050
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
1,850.000
|
$1.200
|
$1.900
|
$0.200
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,300.000
|
$1,450.000
|
$1,652.440
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$850.000
|
$850.000
|
$894.660
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$7,000.000
|
$6,000.000
|
$3,228.130
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
2.000
|
$180.000
|
$212.440
|
$234.300
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
12.000
|
$3,900.000
|
$4,107.000
|
$4,998.850
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
6,635.000
|
$9.000
|
$8.750
|
$12.120
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
336.000
|
$20.000
|
$14.350
|
$21.760
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
6,971.000
|
$1.300
|
$1.350
|
$1.380
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
4,356.000
|
$1.500
|
$1.440
|
$1.810
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
9.000
|
$1,000.000
|
$904.610
|
$1,439.430
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$3,900.000
|
$6,325.000
|
$5,038.740
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
64.000
|
$30.050
|
$32.000
|
$33.690
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$500.000
|
$533.710
|
$605.080
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$600.000
|
$718.740
|
$741.130
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$700.000
|
$834.280
|
$867.740
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
18.000
|
$350.000
|
$286.100
|
$411.040
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
4.000
|
$450.000
|
$325.080
|
$552.140
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
25.000
|
$75.000
|
$75.000
|
$106.570
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
4.000
|
$50.000
|
$126.880
|
$70.270
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
1,180.000
|
$0.450
|
$0.650
|
$1.010
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
43,145.000
|
$0.450
|
$0.650
|
$0.810
|
|
|
WK ZN PAV MRK REMOV (W)8"(DOT)
|
LF
|
64.000
|
$1.250
|
$3.000
|
$1.930
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
162.000
|
$8.000
|
$14.000
|
$8.420
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
48,507.000
|
$0.500
|
$0.650
|
$0.810
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
354.000
|
$1.500
|
$1.410
|
$1.190
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
946.000
|
$1.500
|
$1.410
|
$1.470
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
38.000
|
$1.350
|
$4.000
|
$1.210
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
590.000
|
$0.350
|
$0.550
|
$0.440
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
13,276.000
|
$0.250
|
$0.520
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
14,628.000
|
$0.250
|
$0.520
|
$0.360
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
215.000
|
$13.000
|
$14.000
|
$24.070
|
|
REFL PAV MRKR TY I-C
|
EA
|
30.000
|
$4.250
|
$5.000
|
$3.790
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
209.000
|
$3.750
|
$5.000
|
$3.340
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
8,213.000
|
$0.600
|
$0.500
|
$0.480
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
24.000
|
$4.250
|
$5.000
|
$4.900
|
|
|
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
|
LF
|
5,505.000
|
$1.500
|
$1.550
|
$2.120
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
4.000
|
$3,100.000
|
$4,797.000
|
$4,393.470
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
4.000
|
$650.000
|
$100.000
|
$1,423.060
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
3,369.000
|
$70.000
|
$93.330
|
$127.300
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
3,452.000
|
$80.000
|
$105.410
|
$152.760
|
|
|
TACK COAT
|
GAL
|
1,021.000
|
$3.250
|
$3.610
|
$7.090
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
9.000
|
$6,000.000
|
$7,500.000
|
$11,055.110
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
352.000
|
$3.500
|
$10.000
|
$3.810
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$250.000
|
$300.000
|
$188.140
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$250.000
|
$300.000
|
$370.340
|
|
Totals: |
$2,898,349.750
|
$4,538,993.462
|
$4,938,742.970
|