MATAGORDA SH 60 (0241-03-029)

Items: 97

County: MATAGORDA
Length: N/A
Highway: SH 60
District: YOAKUM
Control Number: 0241-03-029
DBE Goal: N/A
Project: F 2021(721)
Guaranty: N/A
Time: 195 WORKING DAYS
Engineer's Estimate: $2,898,349.75
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$2,898,349.75
$4,538,993.44
Over/Under Est: 56.61% $1,640,643.69
$4,938,742.95
Over/Under Est: 70.4% $2,040,393.20
Amt Left: 8.81% $399,749.51
Subcontractor Percentage Amount
ALLSTATE SIGNAL & CONSTRUCTION, LLC 4.32% $197,357.46
HIGHWAY BARRICADES AND SERVICES, LLC 3.62% $165,378.24
TERRA CONSTRUCTION LLC 3.11% $142,079.10
A K FUQUAY CONSTRUCTION 0.39% $17,816.99
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.35% $15,989.61
Total: 11.79% $538,621.40

Bid Items & Bid Tabulations

97 Total 0 of 97
MATAGORDA  |  SH 60  |  YOAKUM  |  0241-03-029  |  08/04/2021  |  $2,898,349.75  |  F 2021(721)  |  HAZARD ELIM & SAFETY  |  195 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ALTUS CONSTRUCTION LLC
REMOVING CONC (PAV)
SY 2,200.000 $5.000 $19.980 $4.990
EXCAVATION (ROADWAY)
CY 9,643.300 $8.000 $18.750 $20.090
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 2,466.600 $11.500 $14.550 $26.790
BACKFILL (TY B)
STA 21.500 $175.000 $369.630 $189.940
BLADING
HR 20.000 $100.000 $114.000 $334.870
FURNISHING AND PLACING TOPSOIL (4")
SY 4,402.000 $1.000 $2.190 $0.980
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 23,872.000 $0.150 $0.250 $0.170
BROADCAST SEED (TEMP) (WARM)
SY 5,968.000 $0.150 $0.250 $0.120
BROADCAST SEED (TEMP) (COOL)
SY 5,968.000 $0.150 $0.250 $0.110
VEGETATIVE WATERING
MG 268.310 $10.000 $16.650 $66.970
FL BS (CMP IN PLC)(TY E GR 5)(FNL POS)
CY 2,938.000 $65.000 $113.260 $93.760
FL BS (RDWY DEL)(TY E GR 5)(FNAL POS)
CY 1,206.000 $65.000 $113.250 $93.760
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 272.000 $154.000 $183.750 $254.500
LIME TRT (SUBGRADE)(8")
SY 11,708.000 $2.150 $3.420 $6.700
LIME TRT (SUBGRADE)(6")
SY 7,236.000 $2.000 $3.190 $6.700
CEMENT
TON 66.000 $150.000 $210.000 $241.110
CEMENT TREAT (NEW BASE) (6")
SY 7,236.000 $2.000 $4.560 $6.700
PRIME COAT (MC-30)
GAL 3,558.000 $4.150 $6.480 $5.880
AGGR(TY-PE GR-3 SAC-B)
CY 209.000 $100.000 $148.900 $151.350
AGGR(TY-PE GR-4 SAC-B)
CY 217.000 $100.000 $148.720 $147.110
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 16,703.000 $3.500 $4.060 $22.600
CONC PVMT (CONT REINF - CRCP) (11")
SY 5,876.000 $71.000 $141.200 $85.030
CONC PVMT (CONT REINF - CRCP) (13")
SY 551.000 $81.000 $178.810 $81.270
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 315.000 $145.000 $192.580 $199.580
CEM STABIL BKFL
CY 66.000 $120.000 $190.770 $69.560
CUT AND RESTORE PAV (FLEX BASE)
SY 37.000 $110.000 $270.350 $66.210
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 120.000 $210.000 $205.970 $224.650
RIPRAP (CONC)(CL B)
CY 4.200 $445.000 $852.160 $497.290
CMP (GAL STL 18 IN)
LF 12.000 $90.000 $160.120 $74.200
CONC BOX CULV (6 FT X 3 FT)
LF 152.000 $375.000 $877.940 $386.850
RC PIPE (CL III)(18 IN)
LF 16.000 $67.000 $223.510 $66.680
RC PIPE (CL III)(24 IN)
LF 8.000 $85.000 $275.630 $82.740
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (C)
EA 4.000 $9,000.000 $11,329.410 $11,963.950
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 2.000 $1,100.000 $1,598.410 $1,095.220
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $1,150.000 $2,583.060 $1,098.070
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,450.000 $2,554.270 $1,689.710
REMOV STR (SMALL)
EA 3.000 $1,500.000 $9,958.010 $3,137.170
MOBILIZATION
LS 1.000 $228,000.000 $450,695.990 $488,907.930
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $3,600.000 $6,400.000 $13,394.740
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $30.000 $46.300 $33.210
ROCK FILTER DAMS (REMOVE)
LF 100.000 $10.000 $17.300 $10.050
TEMP SEDMT CONT FENCE (INSTALL)
LF 420.000 $3.000 $5.250 $2.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 420.000 $1.000 $1.000 $0.860
CONSTRUCTING DETOURS
SY 7,000.000 $43.000 $42.570 $60.050
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,440.000 $35.000 $41.360 $26.710
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,290.000 $10.000 $12.410 $6.390
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,440.000 $5.000 $23.740 $6.530
COLORED TEXTURED CONC (5")
SY 1,086.600 $64.000 $117.530 $133.950
CONC CURB (TY II)
LF 1,463.000 $20.000 $22.580 $10.760
CONC CURB (MONO) (TY I)
LF 360.000 $16.000 $21.400 $15.700
DRIVEWAYS (BASE)
SY 69.000 $110.000 $21.900 $23.050
RUMBLE STRIPS (CENTERLINE)
LF 1,850.000 $1.200 $1.900 $0.200
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $1,300.000 $1,450.000 $1,652.440
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $850.000 $850.000 $894.660
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $7,000.000 $6,000.000 $3,228.130
MAILBOX INSTALL-S (WC-POST) TY 3
EA 2.000 $180.000 $212.440 $234.300
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 12.000 $3,900.000 $4,107.000 $4,998.850
CONDT (PVC) (SCH 80) (2")
LF 6,635.000 $9.000 $8.750 $12.120
CONDT (PVC) (SCH 80) (2") (BORE)
LF 336.000 $20.000 $14.350 $21.760
ELEC CONDR (NO.8) BARE
LF 6,971.000 $1.300 $1.350 $1.380
ELEC CONDR (NO.8) INSULATED
LF 4,356.000 $1.500 $1.440 $1.810
GROUND BOX TY D (162922)W/APRON
EA 9.000 $1,000.000 $904.610 $1,439.430
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $3,900.000 $6,325.000 $5,038.740
ALUMINUM SIGNS (TY A)
SF 64.000 $30.050 $32.000 $33.690
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $500.000 $533.710 $605.080
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $600.000 $718.740 $741.130
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $700.000 $834.280 $867.740
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 18.000 $350.000 $286.100 $411.040
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 4.000 $450.000 $325.080 $552.140
REMOVE SM RD SN SUP&AM
EA 25.000 $75.000 $75.000 $106.570
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $50.000 $126.880 $70.270
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 1,180.000 $0.450 $0.650 $1.010
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 43,145.000 $0.450 $0.650 $0.810
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 64.000 $1.250 $3.000 $1.930
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 162.000 $8.000 $14.000 $8.420
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 48,507.000 $0.500 $0.650 $0.810
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 354.000 $1.500 $1.410 $1.190
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 946.000 $1.500 $1.410 $1.470
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 38.000 $1.350 $4.000 $1.210
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 590.000 $0.350 $0.550 $0.440
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 13,276.000 $0.250 $0.520 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 14,628.000 $0.250 $0.520 $0.360
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 215.000 $13.000 $14.000 $24.070
REFL PAV MRKR TY I-C
EA 30.000 $4.250 $5.000 $3.790
REFL PAV MRKR TY II-A-A
EA 209.000 $3.750 $5.000 $3.340
ELIM EXT PAV MRK & MRKS (4")
LF 8,213.000 $0.600 $0.500 $0.480
ELIM EXT PAV MRK & MRKS (24")
LF 24.000 $4.250 $5.000 $4.900
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
LF 5,505.000 $1.500 $1.550 $2.120
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 4.000 $3,100.000 $4,797.000 $4,393.470
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 4.000 $650.000 $100.000 $1,423.060
D-GR HMA TY-B PG64-22
TON 3,369.000 $70.000 $93.330 $127.300
D-GR HMA TY-D SAC-B PG70-22
TON 3,452.000 $80.000 $105.410 $152.760
TACK COAT
GAL 1,021.000 $3.250 $3.610 $7.090
PORTABLE CHANGEABLE MESSAGE SIGN
EA 9.000 $6,000.000 $7,500.000 $11,055.110
PREFORMED CENTERLINE RUMBLE STRIP
LF 352.000 $3.500 $10.000 $3.810
TMA (STATIONARY)
DAY 20.000 $250.000 $300.000 $188.140
TMA (MOBILE OPERATION)
DAY 20.000 $250.000 $300.000 $370.340
Totals: $2,898,349.750 $4,538,993.462 $4,938,742.970